Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A Risk-Driven Probabilistic Approach to Quantify Resilience in Power Distribution Systems

It is of growing concern to ensure resilience in power distribution systems to extreme weather events. However, there are no clear methodologies or metrics available for resilience assessment that allows system planners to assess the impact of appropriate planning measures and new operational procedures for resilience enhancement. In this paper, we propose a resilience metric using parameters that define system attributes and performance. To represent extreme events (tail probability), the conditional value-at-risk of each of the parameters are combined using Choquet Integral to evaluate the overall resilience. The effectiveness of the proposed resilience metric is studied within the simulation-based framework under extreme weather scenarios with the help of a modified IEEE 123-bus system. With the proposed framework, system operators will have additional flexibility to prioritize one investment over the others to enhance the resilience of the grid.

Poudyal, Abodh↗

Safety Analysis for the Versatile Test Reactor Conceptual Design

Safety analysis simulations have been carried out using the SAS4A/SASSYS-1 safety analysis code system to update the baseline set of results for the Versatile Test Reactor conceptual design. Results from a previous revision of this work provided input for the Conceptual Safety Design Report summarizing the overall safety basis for the VTR. This work will also support future analyses that will be required for Chapter 13, “Accident Analysis,” of a preliminary safety analysis report. A number of transients have been evaluated based on categories of postulated accident sequences suggested for consideration in NUREG-1537. Ultimately, the full spectrum of event initiators and subsequent accident sequences will be defined through a probabilistic risk assessment of the plant design following the implementation of the Licensing Modernization Project guidelines as described in the VTR Safety Design Strategy. Since that process is ongoing, the present analysis addresses several transients that are expected to be bounding accident scenarios that represent the three key ways to perturb a reactor: through changes to the core inlet temperature, mass flow rate, or reactivity. These correspond to a loss of heat sink (LOHS), loss of flow (LOF) or station blackout (SBO), and transient overpower (TOP), respectively. Both Protected and Unprotected versions of these transients have been evaluated, along with additional transients that include transient overpower with one stuck rod, pump coast-down failures, seismic events, and overcooling events. At the current stage of design, transient simulation results for the Versatile Test Reactor indicate that large safety margins exist for many event initiators. However, several “enabling” assumptions have been made, in terms of both design features and design limits, in order to perform the analyses; and these assumptions will need to be revised as the design matures. In addition, a larger spectrum of events needs to be evaluated as part of the on-going probabilistic risk assessment process.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Structures, Systems, and Components Classification Criteria for the Versatile Test Reactor

The Versatile Test Reactor (VTR) is a fast spectrum test reactor currently being developed in the United States under the direction of the US Department of Energy (DOE), Office of Nuclear Energy. The VTR mission is to enable accelerated testing of advanced reactor fuels and materials required for advanced reactor technologies. The conceptual design of the 300 MWth sodium-cooled metallic-fueled pool-type fast reactor has been led by the U.S. National Laboratories in collaboration with General Electric-Hitachi and Bechtel National Inc. As part of the VTR authorization process by the DOE, it is necessary to identify the safety classification of structures, systems, and components (SSCs) to determine the proper design, surveillance, operation, and incident-reporting requirements. Since VTR is utilizing a risk-informed, performance-based authorization process based on the Licensing Modernization Project (LMP) described in NEI 18-04 [1], the criteria for SSC classification, which are reviewed here, includes both risk information from the probabilistic risk assessment (PRA) and prescriptive requirements.

Grabaskas, David↗

Markov Decision Processes for Intelligent, Risk-Informed Asset-Management Decision-Making

Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.

Grabaskas, David↗

Dynamic PRA Methods to Evaluate the Impact on Accident Progression of Accident Tolerant Fuels

Accident tolerant fuels (ATFs) are new nuclear fuels developed in response to the accident at the Fukushima power station in March 2011. The goal of ATFs is to withstand accident scenarios through better performance compared to currently employed fuels (e.g., small-scale hydrogen generation). This paper targets a method for evaluating and comparing ATF performance from a probabilistic risk assessment (PRA) perspective by employing a newly developed combination of event trees and dynamic PRA methods. Compared to classical PRA methods based on event trees and fault trees, dynamic PRA can evaluate with higher resolution the safety impacts of physics dynamics and the timing/sequencing of events on the accident progression without the need to introduce overly conservative modeling assumptions and success criteria. In this paper, we analyze the impact on the accident progression of three different cladding configurations for two initiating events [a large break loss-of-coolant accident (LB-LOCA) and a station blackout (SBO)] by employing dynamic PRA methods. The goal is to compare the safety performance of ATFs (FeCrAl and Cr-coated cladding) and the currently employed Zr-based clad fuel. We employ two different strategies. The first focuses on the identification of success criteria discrepancies between the accident sequences generated by the classical PRA model and the set of simulation runs generated by dynamic PRA using ATF. The second one, on the other hand, directly uses dynamic PRA to evaluate the impact of timing of events (e.g., recovery actions) on accident progression. In conclusion, by applying these methods to the LB-LOCA and SBO initiating events, we show how dynamic PRA methods can provide analysts with detailed and quantitative information on the safety impact of ATFs.

97 - MATHEMATICS AND COMPUTING↗

Refining Processing Engines from SAPHIRE: Initialization of Fault Tree/Event Tree Solver

SAPHIRE has been extensively employed for over 35 years to model risk-important systems and quantify risk models. As a well-established and thoroughly documented Probabilistic Risk Assessment (PRA) tool, SAPHIRE has continuously tracked computational trends and received regular updates. Despite its ongoing evolution, there remains a need for further enhancements, particularly in dealing with the quantification of exceptionally large models. These improvements could take the form of algorithmic advancements, harnessing the power of parallel computing, and exploring the potential benefits of cloud computing solutions. Considering these aspirations, the notion of a remote solve option was introduced and subsequently evolved into a dedicated project within the SAPHIRE development team. A significant outcome of this initiative is SAPHSOLVE, an engine extracted from the SageRisk API designed specifically for remote solving capabilities. The ongoing project is nearing its culmination, marked by a series of discoveries that have brought undocumented aspects to light. Among these revelations is the intricacy of the input and output format for the SAPHSOLVE engine. This document serves the crucial purpose of meticulously delineating the precise formats for both input and output, as they form an indispensable foundation. The importance of documenting these formats cannot be overstated, as it is a pivotal step in facilitating rigorous testing and comparison. Whether it involves scrutinizing SAPHSOLVE results against those of the internal integrated solver or other external solvers, the ability to construct models or transform existing ones into a compatible SAPHSOLVE format is imperative. Chapter 1 offers a succinct introduction to both SAPHIRE and SAPHSOLVE, followed by Chapter 2 which outlines the roadmap for enhancing SAPHSOLVE. The core of this report is Chapter 3, which intricately elucidates the intricacies of the input and output file formats. To provide a tangible illustration of these formats, a rudimentary example has been compiled and is available in Appendix. SAPHSOLVE represents a novel external solving mechanism developed by the SAPHIRE team, although it has not yet reached the full spectrum of capabilities possessed by SAPHIRE's internal solver. However, the SAPHIRE team has set a comprehensive course for incorporating the functionalities of SAPHSOLVE. A comprehensive outlook on the future of SAPHSOLVE is expounded upon in Chapter 4.

97 MATHEMATICS AND COMPUTING↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities (Revision 1)

This project will demonstrate a multi-hazard time-dependent probabilistic risk assessment (PRA) approach for nuclear facilities considering aging-related deterioration of structures. A generic pressurized water reactor (PWR) reactor subjected to seismic mainshock-aftershock sequences considering the aging of the containment structure will be used as a case study to demonstrate the multi-hazard PRA approach. Using advanced modeling and simulation, seismic mainshock-aftershock fragility functions will be simulated for the containment structure considering aging effects. A multi-hazard PRA model for a generic PWR reactor will be built to quantify the multi-hazard core damage frequency (CDF) and large early release frequency (LERF) with explicit time-dependent modeling of event sequences. To date, the cascading impacts of multi-hazards are not adequately accounted for in the PRA models for nuclear facilities. In addition, for both initial and periodic evaluation of facilities to withstand natural phenomena hazards (NPH), deterioration of the SSCs due to aging and other effects is not adequately considered. By advancing multi-hazard considerations accounting for aging effects, this project will contribute to improved understanding of the safety of aging nuclear facilities. Project outcomes such as the multi-hazard CDF and LERF will also allow facility owners to optimize upgrade and retrofit protocols. This project is divided into two components: (1) advanced modeling and simulations; and (2) multi-hazard PRA. For the first component, Idaho National Laboratory’s (INL) Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) and BlackBear codes will be used to simulate the seismic response and damage of a containment structure under cascading mainshock-aftershock sequences with aging effects. Uncertainties related to the seismic inputs, material parameters, and environmental factors such as temperature and humidity will be identified and propagated to the fragility functions. These fragility functions, which consider aging effects, will be time dependent. The second component will take the fragility information from the first component to build a multi-hazard time-dependent PRA model starting from a generic PWR model to evaluate the multi-hazard CDF and LERF and characterize the associated consequences. For this component, OpenPRA Web Application and SAPHIRE code will be used. Events such as the Fukushima Daiichi accident have highlighted the importance of considering the cascading impacts of multi-hazards for PRA. Moreover, many of the reactors in the current nuclear fleet in the United States (US) are already operating well beyond their initially planned design life, and applications for further extensions to operating licenses are being considered. Therefore, considering multi-hazard effects and aging deterioration in the NPH risk assessment process will contribute to the safety of both existing and future nuclear facilities. Outcomes of this project will thus directly benefit the standards DOE-STD-1020-16 and DOE-HDBK-1224-18.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multicriterion Benefit Evaluation of Deploying New Battery Technology with Increased Capacity at a Generic Nuclear Power

Nuclear power plant (NPP) safety improvements are routinely made by plant licensees and regulators. Examples of plant improvements include accident-tolerant fuel, diverse and flexible coping strategies, passive cooling systems, and increased battery capacity. A combined use of these plant improvements could lead to plant designs with enhanced resilience, allowing NPPs to better cope with both internal and external hazards and keep the plant operating safely, efficiently, and economically. This paper focuses on increased battery capacity and evaluates the potential costs and benefits of deploying batteries with increased capacities at a generic boiling water reactor (BWR) NPP. A multicriterion benefit evaluation methodology is used for the cost-benefit analysis. Ten alternatives for extending battery capacity are developed, including nine alternatives to provide additional direct-current power and one alternative to provide additional alternating-current power. Potential benefits of reducing plant risk are quantified through incorporating the alternatives into loss-of-offsite-power scenarios of the generic BWR probabilistic risk assessment model. Potential costs of implementing the alternatives are qualitatively discussed and ranked. The alternatives are then compared based on their impacts on plant risk and economics.

99 GENERAL AND MISCELLANEOUS↗

Multicriterion Benefit Evaluation of Deploying New Battery Technology with Increased Capacity at a Generic Nuclear Power Plant

This presentation is prepared for the DOE LWRS RISA Pathway Stakeholder Engagement Meeting on October 13-14, 2021. Nuclear power plant (NPP) safety improvements are routinely made by plant licensees and regulators. Examples of plant improvements include accident-tolerant fuel, diverse and flexible coping strategies, passive cooling systems, and increased battery capacity. A combined use of these plant improvements could lead to plant designs with enhanced resilience, allowing NPPs to better cope with both internal and external hazards and keep the plant operating safely, efficiently, and economically. This presentation focuses on increased battery capacity and evaluates the potential costs and benefits of deploying batteries with increased capacities at a generic boiling water reactor (BWR) NPP. A multicriterion benefit evaluation methodology is used for the cost-benefit analysis. Ten alternatives for extending battery capacity are developed, including eight alternatives to provide additional direct-current power and one alternative to provide additional alternating-current power. Potential benefits of reducing plant risk are quantified through incorporating the alternatives into loss-of-offsite-power scenarios of the generic BWR probabilistic risk assessment model. Potential costs of implementing the alternatives are qualitatively discussed and ranked. The alternatives are then compared based on their impacts on plant risk and economics.

99 GENERAL AND MISCELLANEOUS↗

System risk quantification and decision making support using functional modeling and dynamic Bayesian network

Risk-informed decision-making requires a probabilistic assessment of the likelihood of success of control action, given the system status. This paper presents a systematic state transition modeling approach integrating dynamic probabilistic risk assessment with a decision-making process using a dynamic Bayesian network (DBN) coupled with functional modeling. A functional model designed with multilevel flow modeling (MFM) technique was used to build a system state structure inferred by energy, mass, and information flow so that one can verify the developed model with respect to system functionality. The MFM model represents the causal relationship among the nodes, which captures the structure of process parameters and control units. Each node may have multiple possible states, and the DBN structured by the MFM model represents the time-domain transitions among the defined states. Furthermore, the MFM-DBN integrated state transition modeling is a white-box approach that allows one to draw the system's risk profile by updating the system states and supports the decisions probabilistically with physical inference. An example of a simple heating system has been used to illustrate this process, including decision-making support based on quantitative risk profile. For demonstrating its applicability to a complex system operational decision making, a case study of station blackout accident scenario leading to the seal loss of coolant accident in a nuclear power plant is presented. The proposed approach effectively provided the risk profile along time for each option so that the operators can make the best decision, which minimizes the plant risk.

42 ENGINEERING↗

Integrating static PRA information with risk informed safety margin characterization (RISMC) simulation methods

The overall objective of the project was to develop a computationally feasible and user-friendly mechanized process to integrate traditional probabilistic risk assessment (PRA) and dynamic PRA (DPRA) results. Starting with the systematic identification of items in an existing PRA that need dynamic augmentation, the project used a generic 4-loop pressurized reactor (PWR) and 3-loop PWR as example plants. Station blackout (SBO) and large break loss of coolant accident SBLOCA) were selected as the example initiating events. Using the traditional event-tree (ET)/fault-tree (FT) methodology augmented by dynamic evet tree approach, the potential consequences of the initiating events were simulated with RELAP-3D and MELCOR/RASCAL codes to cover Level 1 through Level 3 of PRA. RAVEN and ADAPT software were used to generate Level 1 simulations with RELAP-3D and Level 2/3 simulations with MELCOR (Level 2)/RASCAL (Level 3), respectively. Example branching conditions (BCs) for SBO included AC power recovery time, valve repair failure time, reactor coolant pump leak time/break size and emergency power supply duration to a total of 9. Example BCs for LOCA included off-site power recovery time, diesel generator power recovery time, auxiliary feed water system operation time, safety relief valve failure to open upon demand, reactor coolant pump seal break time and size to a total of 21. Each RELAP-3D simulation (9,587 scenarios) was labelled OK or Core Damage based on the maximum allowed peak clad temperature (2,100oF). Each MELCOR simulation (4610 scenarios) was labeled as Bin over 10rem or Bin 0-10rem based on the dose at the site boundary. The scenarios were clustered based on the criteria above using the mean shift methodology. Classical PRA (CPRA) and DPRA results were compared to identify the ET sequences that need DPRA augmentation. Several approaches were proposed for the incorporation of these sequences into CPRA using clustering with the mean shift methodology, restructuring the CPRA ETs by adding new BCs/sequences, and using the concept of a limit surface. Procedures for decision making regarding the possible consequences of an initiating event (e.g. core damage or not, site evacuation or not) were developed using a convolutional neural network (CNN), a recurrent neural network (RNN) and a transformer neural network (TNN). The project has led to two PhD degrees, three archival journal papers and five refereed conference proceedings.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Substation Configuration Effect on Substation Reliability

The nation’s electrical grid must be reliable because of its critical role in the economy, defense, and security of the nation. Many common tasks and industrial operations rely on proper electrical power distribution. In the design of new bus systems or evaluation of existing bus systems, the type of bus configuration affects the risk, reliability, maintenance, and cost of the system. This work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA) based sensitivity study on the reliability of substations with differing bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses of varying number of lines. The case variances, methods, and rankings presented can provide a guide for bus configuration for future electrical grid design and analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Regulatory Treatment of Non-Core Sources of Radioactivity for Advanced Reactor Designs

The recent resurgence in advance (non-light water) reactor development has been paralleled by the development of risk-informed performance-based (RIPB) licensing pathways. Specifically, the creation of the RIPB Licensing Modernization Project (LMP) approach and subsequent endorsement by the U.S. Nuclear Regulatory Commission (NRC) now provides advanced reactor vendors with a defined RIPB method to develop an affirmative safety case for licensing. In addition, the Technology Inclusive Content of Applications Project (TICAP) has published guidance on developing a license application based on the LMP approach. To support the utilization of risk information as part of advanced reactor design and licensing efforts, the American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) Joint Committee on Nuclear Risk Management (JCNRM) has developed a probabilistic risk assessment (PRA) standard for advanced reactors. The standard, which was formerly approved by the American National Standards Institute (ANSI) in 2021 and recently endorsed by the NRC in trial use Regulatory Guide (RG) 1.247, is an integral standard, covering from initiating events to offsite consequence. A major feature of the standard is that it permits the inclusion of any source of radioactivity material at the site within the plant PRA. Therefore, non-core sources of radioactivity, such as fuel storage, fuel processing, and purification systems, can be included within a single comprehensive plant PRA. For those advanced reactor vendors utilizing a RIPB licensing approach, there is an opportunity to include the non-core sources of radioactivity within the RIPB framework for licensing decision-making, such as the categorization of events, classification of structures, systems, and components (SSCs), and evaluation of the adequacy of defense-in-depth (DID). For advanced reactor designs that contain multiple non-core sources of radioactivity, or for monolithic plant sites that include associated fuel facilities, this approach could potentially simplify licensing applications through the use of a single, uniform, and consistent decision-making framework across all radioactive sources at the site. In addition, a RIPB approach could provide additional insights regarding plant behavior, flexibility regarding licensing decision-making, and potentially allow the use of risk information as part of the plant oversight process. Risk-informing these aspects of advanced reactor licensing would also be consistent with the NRC’s risk policy statement. However, there is diverse regulation and guidance regarding the licensing of non-core sources of radioactivity and generally limited experience using RIPB approaches for the evaluation as part of licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities

While probabilistic risk assessment (PRA) of nuclear facilities is expected to include internal and external hazards for a risk-informed and performance-based design, the current state of practice treats each hazard independently. However, such an independent treatment of hazards may not account for the correlations between different hazards and their response of and damage to the structures, systems, and components (SSCs) in a plant resulting in underestimating the overall risk. This project proposes to advance the multi-hazard PRA of nuclear facilities to more adequately evaluate concurrent hazards and contribute to an increased safety of nuclear plants. A framework for multi-hazard PRA will be developed by identifying concurrent hazard events (both internal and external) and event sequences that include interdependencies through the response of SSCs. An example application of the multi-hazard PRA framework will be demonstrated by considering a generic pressurized water reactor (PWR) subjected to seismic and internal flooding hazards. Computational models for the response of components will be developed to generated multi-hazard fragility surfaces under seismic and flooding loads. A PRA model consisting of event and fault trees will also be developed to quantify the multi-hazard risk profile and compare it with the independent hazard risk profile. Overall, by advancing the multi-hazard PRA of nuclear facilities, this project enhances nuclear safety and reduces costs by mitigating unforeseen consequences caused by correlations between concurrent hazards.

97 - MATHEMATICS AND COMPUTING↗

First-of-a-Kind Risk-Informed Digital Twin for Operational Decision Making

A digital twin (DT) is a digital model or a collection of models of a physical entity. DTs in the nuclear arena can be used from plant design through decommissioning. Decisions are typically a priori or made offline. Risk-informed decision making is identifying what can go wrong, its frequency, and the consequences of its failure. Ideally risk-informed decision making reflects the current state of the plant and provides a decision in real time. Traditionally, probabilistic risk assessments (PRAs) evaluate the failures of safety systems, the risk of core damage, and the offsite dose as the consequence. However, this DT evaluates the decisions on the control side rather than the protection side. It uses the same risk methods to probabilistically inform the decision-making process but in a different way. Rather than evaluating the risk of core damage, this DT evaluates the likelihood of avoiding a trip set point while maintaining plant safety. Performance-based assessments are identified via its probabilistic evaluation of operational alternatives based on system status. Because the purpose of the control system is to maintain system variables within prescribed operating ranges, upsets or challenges that can exceed a trip set point resulting in a plant transient and a challenge to plant mitigating systems based on actual plant conditions, are evaluated to safely maintain the plant within the operating ranges. The probabilistic portion of the model is autonomously and automatically adjusted, and the metric of interest (i.e. likelihood of avoiding a trip set point) is recalculated. The digital representation of the physical system (i.e. the DT) performs a deterministic performance–based assessment of the probabilistically identified alternatives identified to validate the probabilistic assessment. A decision-making algorithm selects the appropriate option based on the probabilistic and deterministic assessments and transmits a control signal to a component(s) to initiate a corrective action or informs an operator of its decision.

digital twin↗

Cost- and Risk-Based Seismic Design Optimization of Nuclear Power Plant Safety Systems

Seismic analysis, design, and qualification of systems, structures, and components (SSCs) is a significant contributor to the capital cost of a nuclear power plant. To reduce capital costs of advanced nuclear power plants and make commercial nuclear energy more competitive, innovations are needed in their structural design and construction, and not just in the reactor core and associated systems. Seismic isolation has been identified as an important cost-cutting technology that enables standardization of equipment across various sites. This paper develops and demonstrates a cost- and risk-based seismic design optimization of a representative safety system in a nuclear power plant with the dual goals of minimizing overnight capital cost and meeting safety goals. The design optimization can also include component seismic isolation, in which case, the optimized design includes a set of equipment that needs to be seismically isolated to minimize capital cost. The open-source codes MASTODON and Dakota are used for seismic probabilistic risk assessment and design optimization, respectively. A generic nuclear facility with a safety system comprising SSCs that are common to nuclear power plants is considered for the demonstration of the design optimization and is assumed to be located at the Idaho National Laboratory site. Generic costs and seismic design cost functions are assumed for the SSCs of the safety system. The sum of the costs of the SSCs is minimized in the optimization process, while the risk of failure of the safety system is provided as a constraint. Furthermore, results show that the optimization process reduces capital costs significantly while automatically prioritizing the safety of SSCs that contribute most to the risk of the safety system.

42 ENGINEERING↗