Results for “Project Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Establishment of a National Wind Energy Center at University of Houston

The DOE-supported project objectives are to: establish a national wind energy center (NWEC) at University of Houston and conduct research to address critical science and engineering issues for the development of future large MW-scale wind energy production systems, especially offshore wind turbines. The goals of the project are to: (1) establish a sound scientific/technical knowledge base of solutions to critical science and engineering issues for developing future MW-scale large wind energy production systems, (2) develop a state-of-the-art wind rotor blade research facility at the University of Houston, and (3) through multi-disciplinary research, introducing technology innovations on advanced wind-turbine materials, processing/manufacturing technology, design and simulation, testing and reliability assessment methods related to future wind turbine systems for cost-effective production of offshore wind energy. To achieve the goals of the project, the following technical tasks were planned and executed during the period from April 15, 2010 to October 31, 2014 at the University of Houston: (1) Basic research on large offshore wind turbine systems (2) Applied research on innovative wind turbine rotors for large offshore wind energy systems (3) Integration of offshore wind-turbine design, advanced materials and manufacturing technologies (4) Integrity and reliability of large offshore wind turbine blades and scaled model testing (5) Education and training of graduate and undergraduate students and post- doctoral researchers (6) Development of a national offshore wind turbine blade research facility The research program addresses both basic science and engineering of current and future large wind turbine systems, especially offshore wind turbines, for MW-scale power generation. The results of the research advance current understanding of many important scientific issues and provide technical information for solving future large wind turbines with advanced design, composite materials, integrated manufacturing, and structural reliability and integrity. The educational program have trained many graduate and undergraduate students and post-doctoral level researchers to learn critical science and engineering of wind energy production systems through graduate-level courses and research, and participating in various projects in center’s large multi-disciplinary research. These students and researchers are now employed by the wind industry, national labs and universities to support the US and international wind energy industry. The national offshore wind turbine blade research facility developed in the project has been used to support the technical and training tasks planned in the program to accomplish their goals, and it is a national asset which is available for used by domestic and international researchers in the wind energy arena.

17 WIND ENERGY↗

Warhead Monitoring Planning and Execution

The Warhead Measurement Campaign is a multi-laboratory project lead by the Los Alamos National Laboratory. The project will measure several items of the US nuclear weapons stockpile with a wide range of radiation detection systems. This report provides a brief summary of those LLNL executed activities for the Warhead Measurement Campaign from FY11 through FY16. A more detailed description of all of LLNL’s activiites for the WMC will be presented in the final report of a follow-on project, , LA17-V-Wx.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

The Continuously Evolving Land Use Control Climate in FUSRAP - 12285

In recent years the topic of Land Use Controls (LUCs) has become much more prevalent in the Formerly Utilized Sites Remedial Action Program (FUSRAP) for a number of reasons. Some regulatory agencies have been placing much more emphasis on this topic than they historically did. Also as the FUSRAP has matured, more sites are approaching a point in the project lifecycle that LUCs are needed to be implemented. There are many issues, some site specific, some agency specific, and some programmatic, that may arise when addressing LUCs on a FUSRAP site. These issues can span the life of a project from planning to implementation. As the emphasis on LUCs increases at a fast pace, USACE is faced with the task of developing consistency in how we respond, and at the same time leaving enough latitude for projects to accomplish their individual missions while taking into consideration the site specific concerns. The Land Use Controls arena encompasses a large number of tools to address the matter at hand. There are numerous mechanisms that can accomplish Land Use Control goals, some of which include administrative controls and engineering controls. This paper will discuss some of the mechanisms being utilized by USACE at our FUSRAP projects. Having a better understanding of how LUCs are currently being handled in the FUSRAP will be beneficial to project delivery teams in order to make the best decisions moving through the project lifecycle. Being aware of LUC requirements and options at an early stage in a project will help a team effectively plan for and execute the chosen alternative for remedial action. There are a number of guidance tools from various other agencies that exist for consideration during Land Use Control planning and implementation. The USACE is currently evaluating these guidance tools to determine applicability and impact to FUSRAP projects. Some of these tools are under review at Army and the Department of Defense. Critical to this evaluation is internal team coordination as well as coordination and input from stakeholders. With guidance on LUCs available from a number of entities, the USACE now has the opportunity to develop consistency in determining how LUCs are handled on FUSRAP projects. The FUSRAP ER, ER 200-1-4, is currently being revised and will broadly touch on LUCs. This broad approach was a result of recognizing the magnitude of variances and site specific components that come into play when applying LUCs to our FUSRAP sites. As land use controls scenarios continue to arise on our FUSRAP sites, the methods for how our project teams address those will continue to evolve. The Program is continuing to develop guidance on how to address LUCs. In the interim, our FUSRAP projects can share lessons learned on the LUCs they are implementing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Facilities and Infrastructure Plan.

Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continued to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.

99 GENERAL AND MISCELLANEOUS↗

Latest experience from Jose Cabrera reactor vessel dismantling project - 15214

Westinghouse is performing a decommissioning project at the Jose Cabrera NPP in Spain. The project was awarded in June 2013 and the main scope is to cut and package the reactor vessel and the reactor vessel head. The project is performed in the necessary sequential steps needed to prepare, segment, separate, and package the individual component segments using under water mechanical techniques. The first activities to be performed on site included e.g. cutting of all pipe penetrations on the reactor, sealing of some of the pipe penetrations, lifting and transportation of the reactor and sealing of the reactor pit. The results of these activities were very good and gave a perfect foundation for the cutting and packaging of the reactor vessel. Cutting of the reactor vessel head and the reactor vessel is made with different types of Westinghouse designed cutting equipment. The flexible nature of the cutting equipment has proved to be very valuable for the execution of the cutting work. The project is planned to be finalized in April 2014. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Test Plan Proposal for an International Joint Project for Transient Testing of Fast Reactor Fuels

EXECUTIVE SUMMARY An international joint project for transient testing of fast reactor fuels is proposed. Input from several countries is provided regarding their advanced/fast reactor programs, and the objectives and methods are given based on both historical projects and modern tools and methods. The full package would include irradiation testing using TREAT, use of existing facilities for non destructive exams/evaluations (NDE) and post irradiation exams (PIE), and integration of current state-of-the-art modeling and simulation (M&S) tools to aid in both experiment design, and prediction of experimental results.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Sharing Report for the Quantification of Removable Activity in Various Surveillance and Maintenance Facilities at the Oak Ridge National Laboratory Oak Ridge TN

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OR-EM) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using American Recovery and Reinvestment Act (ARRA) funds. Specifically, DOE OR-EM requested that ORAU plan and implement a sampling and analysis campaign targeting potential removable radiological contamination that may be transferrable to future personal protective equipment (PPE) and contamination control materials—collectively referred to as PPE throughout the remainder of this report—used in certain URS|CH2M Oak Ridge, LLC (UCOR) Surveillance and Maintenance (S&M) Project facilities at the Oak Ridge National Laboratory (ORNL). Routine surveys in Bldgs. 3001, 3005, 3010, 3028, 3029, 3038, 3042, 3517, 4507, and 7500 continuously generate PPE. The waste is comprised of Tyvek coveralls, gloves, booties, Herculite, and other materials used to prevent worker exposure or the spread of contamination during routine maintenance and monitoring activities. This report describes the effort to collect and quantify removable activity that may be used by the ORNL S&M Project team to develop radiation instrumentation “screening criteria.” Material potentially containing removable activity was collected on smears, including both masselin large-area wipes (LAWs) and standard paper smears, and analyzed for site-related constituents (SRCs) in an analytical laboratory. The screening criteria, if approved, may be used to expedite waste disposition of relatively clean PPE. The ultimate objectives of this effort were to: 1) determine whether screening criteria can be developed for these facilities, and 2) provide process knowledge information for future site planners. The screening criteria, if calculated, must be formally approved by Federal Facility Agreement parties prior to use for ORNL S&M Project PPE disposal at the Environmental Management Waste Management Facility (EMWMF). ORAU executed the approved sampling and analysis plan (SAP) (DOE 2013) while closely coordinating with ORNL S&M Project personnel and using guidelines outlined in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012). WHP guidelines were followed because the PPE waste targeted by this SAP is consistent with that addressed under the approved Waste Lot (WL) 108.1 profile for disposal at EMWMF—this PPE is a “future waste stream” as defined in the WHP. The SAP presents sampling strategy and methodology, sample selection guidelines, and analytical guidelines and requirements necessary for characterizing future ORNL S&M Project PPE waste. This report presents a review of the sample and analysis methods including data quality objectives (DQOs), required deviations from the original design, summary of field activities, radiation measurement data, analytical laboratory results, a brief presentation of results, and process knowledge summaries.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Characterization Report for Strontium Titanate in SWSA 7 And Adjacent Parcels in Support of the National Priorities List Site Boundary Definition Program, Oak Ridge, Tennessee

The U.S. Department of Energy (DOE) Oak Ridge Office requested support from the Oak Ridge Institute for Science and Education (ORISE) contract to delineate the extent of strontium titanate (SrTiO3) contamination in and around Solid Waste Storage Area (SWSA) 7 as part of the Oak Ridge National Priorities List Site boundary definition program. The study area is presented in Fig. 1.1 relative to the Oak Ridge Reservation (ORR). The investigation was executed according to Sampling and Analysis Plan/Quality Assurance Project Plan (SAP/QAPP) (DOE 2011) to supplement previous investigations noted below and to determine what areas, if any, have been adversely impacted by site operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Maturation in Support of DOE 413.3B Project Execution - 16436

The DOE Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' provides program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements. Execution of complex DOE 413.3B projects depends, in part, upon the successful integration of a technology maturation program. The Low Activity Waste Pre-Treatment System (LAWPS) is executing a detailed technology maturation program under the Technology Readiness Level/Technology Maturation Plan (TRL/TMP) guidance of DOE Order 413.3B. The interaction of the technology maturation process and the project execution including technical, programmatic, and contractual execution, has been a critical component for project success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A 'Method Based Survey' Succeeds in a Spanish Scrap Clearance Project - 15664

During the last years, a Waste Minimization Project has been implemented in Cofrentes NPP in a collaborative effort performed by IBERDROLA and ENRESA. The final result has been more than 760 t of metallic scrap including containerised materials but also massive surface contaminated objects have been managed and finally cleared. The initial project scope included 10 spent fuel pool racks weighting 130 tones but limited testing demonstrated they presented high contamination levels and were managed as radwaste including down-sizing and conditioning in ENRESA standard radwaste containers for metallic scrap (CMT's). This project started in 2008 and finished just in the summer of 2014. During these years planning and licensing, procurement, execution, including, a huge effort in decontamination and clearance measurement, was developed. The project closure is developing actually. The residual materials were stored and initially characterized previously its down-sizing and decontamination using chemical baths (warm diluted sulfuric acid and ultrasounds) , blasting (water jetting with iron grit) and in special cases mopping using industrial cleaners). Some big items were decontaminated previously its down-sizing. The materials were cleared using an approach similar to MARSAME approach based in MARSSIM guidelines. The 160 containers needed six in situ gamma spectrometry measurements each and 115 massive (from 0.45 t to 13.7 t) items need at least so many measurements as total surface in square meters. In total 763 t were cleared with only 0.6 t rejected and treated as radwaste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of the Manuela 3D/Radiation Scanning Tool at Nuclear Facilities - 20437

Licensees, facility operators and decommissioning contractors have a need for comprehensive, accurate and precise radiological and topographical data to plan and execute safe and efficient Decontamination and Decommissioning (D and D) projects. Traditional approaches rely greatly upon labor and administratively intensive data collection methods that require considerable time and effort to glean the relevant data to plan and perform work in a radiological work area. Orano Decommissioning Services has developed and utilized at French nuclear facilities a lightweight portable scanning instrument called MANUELA (Mobile Apparatus for Nuclear Expertise Localization Assistance). Recently Orano conducted demonstrations at two United States nuclear facilities using MANUELA that may prove useful in areas of the fuel cycle including: - ALARA (As Low As Reasonably Achievable) planning during facility operations; - Scoping and site characterization during the D and D planning phase; - Remedial action support during active decommissioning work; - Radiation and modeling planning for plant modifications; - Support Final Status Survey and demonstration of 'end state' compliance for license termination. MANUELA is currently being evaluated for use during decommissioning of nuclear facilities and could aide in demonstrating compliance with end state criteria after decommissioning. Of particular interest are decommissioning projects planned for various sites across the United States. Most of these sites present unique challenges and opportunities to safely and efficiently decommission in a regulatory compliant manner. The two demonstration site's current conditions of relatively low radiation levels inside containment proved to be ideal platforms to deploy the MANUELA instrument for evaluation of the complex geometries typically found in a nuclear facility. The MANUELA instrument was able to precisely identify local hot spots of the reactor system's primary equipment and was able to simultaneously overlay the dose information onto the scanned 3D images. Using data like this, a licensee would be able to make informed technical and personnel decisions on methods to remediate, shield or properly dispose of the radioactive source term. MANUELA can be used throughout the decommissioning process to validate progress and continue to refine the work activities to optimize the efforts of the crew which reduces downtime waiting for survey results, whereas traditional survey methodology relies on a physical survey to be performed and the data transcribed onto survey maps that are only two dimensional. The traditional format tends to be inaccurate and difficult to interpret the precise location(s) of hot spots or generalized dose rates. The resultant scan also allows the user to know the exact extent of the survey versus transposing information onto a map with only a portion of the map area scanned. MANUELA also compiles all of the relevant survey data into a downloadable table format which includes the measurement identification number, time stamp, point space location on the XYZ plane, and the dose rate value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SECARB Design Specifications for Seismic Survey (SECARB Phase III Work Product 4.2.2.a)

A test site and anthropogenic CO 2 source have been selected for a large-scale demonstration of carbon dioxide separation, capture and sequestration in southwestern Alabama as part of the Southeastern Regional Carbon Sequestration Partnership’s (SECARB) Phase III initiative. The James M. Barry Generating Plant, a major coal-fired power plant in southwestern Alabama, is the selected anthropogenic CO 2 source for the project. The proposed storage test site is located in the Southeast Unit of the Citronelle oil field, which lies at the crest of the Citronelle Dome about 10 miles to the west of the power plant. The proposed storage site appears to be suitable for deep underground injection of CO 2 . An evaluation of the storage capacity and geological integrity of the proposed injection and confining intervals is a critical step in the assessment of the test site. This evaluation is important for several reasons, including project planning, permitting of injection wells, and the design and execution of injection and monitoring operations. Accordingly, the Geological Survey of Alabama (GSA) will conduct a detailed geological evaluation of the Southeast Citronelle Unit that emphasizes the acquisition, interpretation, and analysis of seismic reflection data. The goals of this work are to characterize the geologic structure of the area, verify that no faults are present, determine and analyze the seismic expression of sandstone and shale bodies in the Paluxy target interval, and to assist in the Underground Injection Control (UIC) permitting process.

01 COAL, LIGNITE, AND PEAT↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends with Washed and Unwashed Legacy Coals and Other Waste Fuels to Generate White Hydrogen

The objective of this effort, primarily funded by the United States Department of Energy (DOE), and led by the Electric Power Research Institute, Inc. (EPRI), with support by Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), has been to qualify coal, biomass, and plastic waste blends based on performance testing of selected fuel pellet compositions in a pilot-scale updraft moving-bed (UDMB) gasifier. The testing provided relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are the focus. The gasifier used for testing is HMI’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips (biomass). However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The three feedstocks were densified and pelletized by California Pellet Mill (CPM) to meet the feedstock size required by Sotacarbo’s 30mm ID UDMB gasifier, under contract to HMI. The technical tasks and results from this two-year research project included: (1) Feed Procurement and Preparation: Nine different tri-fuel pellets were prepared from varying compositions of fresh mined PRB coal, corn stover biomass, and car fluff waste plastics. Tri-fuel pellets were produced by CPM and shipped to Sotacarbo’s test facility in Carbonia, Sardinia, Italy. (2) Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different UDMB gasification tests to be performed in Sotacarbo’s 12-inch ID pilot scale gasifier, the process monitoring instrumentation used, and the extractive samples recovered for analysis of the total gasification process mass and energy balance. (3) Gasifier Testing: Nine different gasification runs were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstock compositions generated from varying mixtures of PRB coal, biomass, and plastic wastes. The testing generated performance data on gasification reaction efficiency and performance, yielding relevant data for models used to scale up the gasifier design. This task also included work to refurbish and reassemble the pilot gasifier at Sotacarbo and perform a baseline 100% PRB coal run. (4) Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results are reported in the project’s final report, published in March 2024. The results show that all tri-fuel pellets gasified well and maintained structural integrity throughout the gasification process. The syngas generated can be shifted to hydrogen by using commercial syngas shifting technologies. (5) High Fidelity computational fluid dynamics (CFD) Simulation: The National Energy Technology Laboratory (NETL) team performed CFD simulations of the UDMB gasifier for two of the tri-fuel pellets gasified in Sotacarbo’s pilot scale gasifier. The kinetic mechanisms for the pyrolysis of each constituent, PRB coal, corn stover biomass, and waste plastics are based on thermogravimetric analysis performed by Sotacarbo. The gasification model was validated by comparing the predicted syngas composition at the exit of the gasifier with the measured syngas composition. In addition, the reactor’s measured internal temperature profile agreed well with the predicted internal reactor temperature profile. These results validate that the model can be used to predict the performance of the updraft moving bed gasifier for different feedstocks and operating conditions. This paper summarizes the results of the completed work in which the pelletizing procedure was validated to ensure the viability of the tri-fuel pellets for the gasification runs performed at Sotacarbo’s 30 mm UDMB gasifier. The gasification performance data from this series of nine runs will enable modeling of a full-scale HMI industrial scale gasifier supporting both combined heat and power, and Hydrogen production from coal (both fresh mined and legacy) combined with various biomass and waste plastics. Additionally, plans and progress on a follow-up project, being executed by the same project team, will be presented. In this project, a total of twenty (20) different feedstocks are being prepared from varying compositions of biomass (both woody biomass and corn stover) with a mixture of legacy coal waste, plastic waste, and refuse-derived fuel (RDF). The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design to 50 megawatt electric (MWe) (equivalent hydrogen production). Tests will also be performed on a bench-scale fluidized-bed gasifier for comparison purposes. The results of this testing will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends.

08 HYDROGEN↗

Design, Construction, and Commissioning of the RH LLW Disposal Facility at INL - 19445

The newly-commissioned Remote-Handled Low-Level Waste (RH LLW) Disposal Facility at Idaho National Laboratory (INL) provides permanent disposal capability critical for continuing INL nuclear research and Naval Reactors missions at the Idaho site. The facility mission need [critical decision (CD)- 0] was approved in 2009. Alternative selection (CD-1) was finalized in 2011. The project performance baseline (CD-2/3) was approved and design was initiated in 2014 and construction began in 2015. Construction was completed and transitioned to Materials and Fuels Complex (MFC) Operations in 2017. The facility successfully achieved readiness with authorization to begin operations (CD-4) in 2018. The $77 M line-item capital-acquisition project was completed six months ahead of the congressional commitment date and significantly under budget. This paper presents highlights of the RH LLW Disposal Facility project delivery and a summary of facility features and critical characteristics. Highlights include: - As a hazard category II nuclear facility, the project complied with United States Department of Energy (DOE) requirements for incorporation of nuclear safety into facility design and construction as identified in DOE-STD-1189 as well as 10 CFR 835 Subpart K requirements for incorporation of ALARA principles in facility design. - From an environmental compliance perspective, the facility was subject to National Environmental Policy Act requirements resulting in a Finding of No Significant Impact as determined by an Environmental Assessment. An operating disposal authorization statement from the Low-Level Waste Disposal Facility Federal Review Group (LFRG) authorizing waste disposal operations in accordance with DOE Order 435.1 was obtained. - The project was delivered using a design-build delivery method with a firm-fixed price with incentive fee contracting mechanism. The project was executed as a line-item capital-acquisition project, in full compliance with DOE Order 413.3B under INL's certified Earned Value Management System (EVMS) program. - The facility supports twenty years of waste disposal operations with five disposal vault configurations in four vault arrays supporting six different cask/canister system configurations. Three of the six cask/canister systems currently exist and three will be developed to support future operations. There are a total of 446 waste disposal vaults that will accommodate disposal of a total of 939 stainless steel radioactive waste canisters. The facility is designed to accommodate canisters with contact radiation dose rates as high as 600 Sievert/hour (60,000 Rem/hour). - The facility underwent a rigorous readiness review process in accordance with DOE Order 425.1D. Readiness activities included rigorous facility testing and shakedown activities, a management-self assessment, a contractor operational readiness review, and a DOE operational readiness review. Readiness was demonstrated for an existing cask/canister system (the MFC HFEF-5 cask). Separate readiness activities will be conducted for each cask/canister system as they are brought online for facility operations. INL's successful delivery of the project has provided waste disposal capability to ensure long-term viability of planned and current facilities and missions associated with both INL and the Naval Reactors Facility. Successful execution of the project has proven to be strategically important to future capital investments in capabilities necessary to advance INL's mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗