Search NASASearch

SEARCH · Search NASA

Results for “Project Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

Thomas, Leann

PC-based Multiple Information System Interface (PC/MISI) detailed design and implementation plan

The design plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intended to be used as a blueprint for the implementation of the system. Each component is described in the detail necessary to allow programmers to implement the system. A description of the system data flow and system file structures is given.

Dominick, Wayne D.

Design concepts for low-cost composite turbofan engine frame

Design concepts for low cost, lightweight composite engine frames were applied to the design requirements for the frame of a commercial, high bypass engine. Four alternative composite frame design concepts identified which consisted of generic type components and subcomponents that could be adapted to use in different locations in the engine and the different engine sizes. A variety of materials and manufacturing methods were projected with a goal for the lowest number of parts at the lowest possible cost. After a preliminary evaluation of all four frame concepts, two designs were selected for an extended design and evaluation which narrowed the final selection down to one frame that was significantly lower in cost and slighty lighter than the other frame. An implementation plan for this lowest cost frame is projected for future development and includes prospects for reducing its weight with proposed unproven, innovative fabrication techniques.

Mitchell, S. C.

Changing the Project Execution Culture at NASA Dryden

Dryden has embarked on implementing Critical Chain Project Management (CCPM) philosophies and tools to reduce workforce stress and increase the centers work throughput. This effort has been under way for over one year and represents a fundamental state change in how various projects are planned and executed at the center. The implementation of CCPM philosophies and the required cultural changes represent the most difficult aspects of the implementation.

Horn, Thomas J.

CCSDS - An approach to the definition of common standards for understanding space-related data

International cooperation for space data projects requires common data processing goals and unique data exchange mechanisms. The absence of standards has led to project unique interface definitions and special software on diverse systems. To address this problem, CCSDS Panel 2 is creating a set of standards to support self description of data using standard structures. The proposed standard data interchange mechanism - the Standard Formatted Data Unit (SFDU) - reduces information loss in data transfers, increases automated information exchange, and extends the lifetime of data. Data interchange structures, languages, and services are being developed with necessary control functions to provide these benefits. A set of recommendations for agency review has been issued this year to be the basis for future data exchange and to enhance access to older mission data sets. Space agencies and other space data handling facilities are being encouraged to implement the SFDU concept for ongoing and planned projects.

Drexler, Manfred

Remote sensing procurement package: A management report for state and local governments

An overview of the remote sensing procurement process is presented for chief executives, senior administrators, and other local and state officials responsible for purchasing remote sensing products, services, or equipment. Guidelines are provided for planning, organizing, staffing, and implementing such a procurement project. Other sections of the four-volume package are described and their benefits examined.

Source record

Automated Procurement System (APS) revised project management plan (DS-03)

The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.

1393 Ring Bus at JPL: Description and Status

Completed Ring Bus IC V&V Phase - Ring Bus Test Plan Completed for SIM Project - Applicable to Other Projects Implemented a Avionics Bus Based upon the IEEE 1393 Standard - Excellent Starting Point for a General Purpose High-Speed Spacecraft Bus - Designed to Meet SIM Requirements for - Real-time deterministic, distributed systems. - Control system requirements - Fault detection and recovery Other JPL Projects Considering Implementation F'light Software Ring Bus Driver Module Began in 2006, Continues Participating in Standard Revision. Search for Earth-like planets orbiting nearby stars and measure the masses and orbits of the planets it finds. Survey 2000 nearby stars for planetary systems to learn whether our Solar System is unusual, or typical. Make a new catalog of star position 100 times more accurate than current measurements. Learn how our galaxy formed and will evolve by studying the dynamics of its stars. Critically test models of exactly how stars shine, including exotic objects like black holes, neutron stars and white dwarfs.

time synchronization

Europa Clipper Payload Verification and Validation: Early Architecture and Implementation

NASA’s Europa Clipper mission will investigate the Jovian icy moon Europa with a sophisticated payload consisting of a suite of nine instruments. Clipper’s observations will help provide answers to a broad range of scientific objectives related to Europa’s habitability. As the project proceeds through Phase C, we are building confidence in the system’s ability to achieve these science goals by implementing a rigorous payload verification and validation (V&V) program. This paper details the planned structure and implementation of the Europa Clipper payload V&V program as it exists leading up to the project critical design review (CDR), before the bulk of instrument- or payload- level V&V activities have begun. We first explain the context for payload V&V on Europa Clipper, including its interfaces with other parts of the project system. We then describe the taxonomy of V&V concepts and their interrelationships, followed by a discussion on how this framework allows us to codify interfaces, processes, and ideas that are key to a successful V&V program. We focus on key aspects of the planning phases of V&V, especially establishing a complete set of verification items and accurately mapping them into appropriate verification activities. The second half of the paper describes the logistics of implementing this framework onto our actual payload system, including the processes and tools we use to manage and communicate agreements, changes, and risks across the project. We conclude with a reflection on the unique drivers and challenges of the V&V program concept development so far and the work that is planned for phase D implementation.

Srivastava, Priyanka

The OSIRIS-Rex Asteroid Sample Return: Mission Operations Design

The OSIRIS-REx mission employs a methodical, phased approach to ensure success in meeting the missions science requirements. OSIRIS-REx launches in September 2016, with a backup launch period occurring one year later. Sampling occurs in 2019. The departure burn from Bennu occurs in March 2021. On September 24, 2023, the SRC lands at the Utah Test and Training Range (UTTR). Stardust heritage procedures are followed to transport the SRC to Johnson Space Center, where the samples are removed and delivered to the OSIRIS-REx curation facility. After a six-month preliminary examination period the mission will produce a catalog of the returned sample, allowing the worldwide community to request samples for detailed analysis.Traveling and returning a sample from an Asteroid that has not been explored before requires unique operations consideration. The Design Reference Mission (DRM) ties together space craft, instrument and operations scenarios. The project implemented lessons learned from other small body missions: APLNEAR, JPLDAWN and ESARosetta. The key lesson learned was expected the unexpected and implement planning tools early in the lifecycle. In preparation to PDR, the project changed the asteroid arrival date, to arrive one year earlier and provided additional time margin. STK is used for Mission Design and STKScheduler for instrument coverage analysis.

GCS plan for software aspects of certification

As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.

Shagnea, Anita M.

JPL space robotics: Present accomplishments and future thrusts

Complex missions require routine and unscheduled inspection for safe operation. The purpose of research in this task is to facilitate structural inspection of the planned Space Station while mitigating the need for extravehicular activity (EVA), and giving the operator supervisory control over detailed and somewhat mundane, but important tasks. The telerobotic system enables inspection relative to a given reference (e.g., the status of the facility at the time of the last inspection) and alerts the operator to potential anomalies for verification and action. There are two primary objectives of this project: (1) To develop technologies that enable well-integrated NASA ground-to-orbit telerobotics operations, and (2) to develop a prototype common architecture workstation which implements these capabilities for other NASA technology projects and planned NASA flight applications. This task develops and supports three telerobot control modes which are applicable to time delay operation: Preview teleoperation, teleprogramming, and supervised autonomy.

Weisbin, C. R.

Artificial Gravity as a Multi-System Countermeasure to Bed Rest Deconditioning: Pilot Study Overview

Efficient, effective, multi-system countermeasures will likely be required to protect the health, safety, and performance of crews aboard planned exploration-class space flight missions to Mars and beyond. To that end, NASA, DLR, and IMBP initiated a multi-center international project to begin systematically exploring the utility of artificial gravity (AG) as a multi-system countermeasure in ground based venues using test subjects deconditioned by bed rest. The goal of this project is to explore the efficacy of short-radius, intermittent AG as a countermeasure to bone, muscle, cardiovascular, and sensory-motor adaptations to hypogravity. This session reports the results from a pilot study commissioned to validate a standardized protocol to be used by all centers involved in the project. Subject selection criteria, medical monitoring requirements, medical care procedures, experiment control procedures, and standardized dependent measures were established jointly. Testing was performed on 15 rigorously screened male volunteers subjected to 21 days of 6deg HDT bed rest. (All provided written consent to volunteer after the nature of the study and its hazards were clearly explained to them.) Eight were treated with daily 1hr AG exposures (2.5g at the feet decreasing to 1.0g at the heart) aboard a short radius (3m) centrifuge, while the other seven served as controls. Multiple tests of multiple dependent measures were made in each of the primary physiological systems of interest during a 10 day acclimatization period prior to HDT bed rest and again during an 8 day recovery period after the bed rest period was complete. Analyses of these data (presented in other papers in this session) suggest the AG prescription had salutary effects on aspects of the bone, muscle, and cardiovascular systems, with no untoward effects on the vestibular system, the immune system, or cognitive function. Furthermore, treatment subjects were able to tolerate 153/160 centrifuge sessions over the 21 day deconditioning protocol, suggesting that tolerance was unaffected by deconditioning. These positive results set the stage for full implementation of the planned multi-center international AG project. Future work will be devoted to developing optimization techniques for AG prescriptions (likely supplemented by exercise) to provide maximum physiological protection across all systems subject to space flight deconditioning in both men and women with minimum time and/or side effects. While a continuous AG solution (rotating vehicle) would likely be more efficient, this study suggests that intermittent AG could be an effective multi-system countermeasure.

Paloski, William H.

International Space Station (ISS) Low Pressure Intramodule Quick Disconnect Failures

A failure of an ISS intermodule Quick Disconnect (QD) during protoflight vibration testing of ISS regenerative Environmental Control and Life Support (ECLS) hardware led to the discovery of QD design, manufacturing, and test flaws which can yield the male QD susceptible to failure of the secondary housing seal and inadequate housing assembly locking mechanisms. Discovery of this failure had large implications when considering that currently there are 399 similar units on orbit and approximately 1100 units on the ground integrated into flight hardware. Discovery of the nature of the failure required testing and analysis and implementation of a recovery plan requiring part screening and review of element level and project hazard analysis to determine if secondary seals are required. Implementation also involves coordination with the Nodes and MPLM project offices, Regenerative ECLS Project, ISS Payloads, JAXA, ESA, and ISS Logistics and Maintenance.

Lewis, John F.

Human factors aspects of air traffic control

An overview of human factors problems associated with the operation of present and future air traffic control systems is presented. A description is included of those activities and tasks performed by air traffic controllers at each operational position within the present system. Judgemental data obtained from controllers concerning psychological dimensions related to these tasks and activities are also presented. The analysis includes consideration of psychophysiological dimensions of human performance. The role of the human controller in present air traffic control systems and his predicted role in future systems is described, particularly as that role changes as the result of the system's evolution towards a more automated configuration. Special attention is directed towards problems of staffing, training, and system operation. A series of ten specific research and development projects are recommended and suggested work plans for their implementation are included.

Older, H. J.

Information Management System for the California State Water Resources Control Board (SWRCB)

A study was made to establish the requirements for an integrated state-wide information management system for water quality control and water quality rights for the State of California. The data sources and end requirements were analyzed for the data collected and used by the numerous agencies, both State and Federal, as well as the nine Regional Boards under the jurisdiction of the State Board. The report details the data interfaces and outlines the system design. A program plan and statement of work for implementation of the project is included.

Heald, T. C.

Materials Processing in Space (MPS) program description

Insight is provided into the scientific rotationale for materials processing in space (MPS), and a comprehensive and cohesive approach for implementation and integration of the many, diverse aspects of MPS is described. The programmatic and management functions apply to all projects and activities implemented under MPS. It is intended that specific project plans, providing project unique details, will be appended to this document for endeavors such as the Space Processing Applications Rocket (SPAR) Project, the Materials Experiment Assembly (MEA) Project, the MPS/Spacelab (MPS/SL) Project, and the Materials Experiment Carrier (MEC) Payloads.

Source record

Coarsening in Solid-Liquid Mixtures-2: A Materials Science Experiment for the ISS

A materials science experiment has been developed and readied for operation aboard the International Space Station (ISS). Components of this experiment are onboard ISS and area awaiting the flight of science samples. The goal of the experiment is to understand the dynamics of Ostwald ripening, also known as coarsening, a process that occurs in nearly any two-phase mixture found in nature. Attempts to obtain experimental data in ground-based laboratories are hindered due to the presence of gravity, which introduces material transport modes other than that of the coarsening phenomenon. This introduces adjustable parameters in the formulation of theory. The original Coarsening in Solid-Liquid Mixtures (CSLM) mission, which flew on the Space Shuttle in 1997, produced data from a coarsened eutectic alloy. Unfortunately, both the science matrix and the hardware, while nominally functional, did not account adequately for operations in microgravity. A significantly redesigned follow-on experiment, CSLM-2 has been developed to redress the inadequacies of the original experiment. This paper reviews the CSLM-2 project: its history, science goals, flight hardware implementation, and planned operations and analysis

Hickman, J. Mark