Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Energy Storage Impacts in Resilience Hubs and Other Critical Infrastructure: An Assessment Guide for Developers and Practitioners

Battery energy storage systems (BESS) deployed behind the meter at resilience hubs and other critical infrastructure can provide economic and operational value during normal operations—such as lower and more predictable energy costs—as well as resilience and security benefits during power disruptions by maintaining essential services. However, existing evaluation approaches tend to focus narrowly on engineering performance or rely on broad socio-economic frameworks that are not well suited to behind-the-meter storage. As a result, developers, utilities, and funders often lack consistent methods for defining success, quantifying benefits, and comparing outcomes across projects. This report presents a practitioner-oriented impact assessment framework for evaluating behind-the-meter BESS at resilience hubs and critical infrastructure facilities. The framework is organized into five iterative components—developing an action plan, defining project goals, identifying metrics, collecting data and measuring outcomes, and reporting and using results—and includes a structured metric architecture spanning six impact categories. Designed for real-world constraints such as limited staffing and uneven data availability, the framework was developed, applied, and refined through real projects, and is illustrated with case studies across diverse deployment contexts.

Impact Assessment↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Delivery of a Solar-Powered Forward Osmosis Seawater Desalination Plant: Trevi’s 500 m3/day Zero-Carbon FO Seawater Desalination Plant at NELHA

This paper presents an account of Trevi’s delivery of a 500 m3/day solar powered forward osmosis (FO) seawater desalination plant at the Ocean Science and Technology Park of the Natural Energy Laboratory of Hawaii Authority (NELHA). The project aimed to demonstrate the viability of solar thermal-powered desalination for agricultural applications through the integration of a 2MW micro-dish solar thermal array with a state-of-the-art FO system. Highlighted in the paper are the three distinct project phases; Planning and Design, System Construction, Installation & Testing followed finally by System Operation and Optimization. Results and decisions which led to the final plant design will be shared, highlighting how Trevi Systems succeeded in producing a zero-carbon FO seawater desalination plant with a projected Levelized Cost of Water (LCOW) estimate competitive with existing carbon-intensive RO technologies (based on some assumptions and the cost of heat which is required for FO.

14 SOLAR ENERGY↗

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY↗

Modernizing Fermilab's Accelerator Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available.The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab s control system. We will review the existing CAMAC hardware and provide updates on the status of the ACORN project, which includes the conceptual design of the MicroTCA replacement hardware and software tools for supporting the installation of hundreds of MicroTCA crates.

43 PARTICLE ACCELERATORS↗

Selection of Global Climate Model Data for Downscaling With Generative Machine Learning and Use in the Power Planning for Alignment of Climate and Energy Systems Project

The range of results from climate models and scenarios is important to the understanding of uncertainty in power planning analysis. A U.S. Department of Energy-funded analytic project called Power Planning for Alignment of Climate and Energy Systems is developing data and analytic methods to reflect the effects of climate change on key variables for power system planning, as part of the Grid Modernization Lab Consortium. This project will select and prepare global climate model results for use in power system planning models. A related report (Evaluation of Global Climate Models for Use in Energy Analysis) assesses the performance of various global climate models from the Coupled Model Intercomparison Project Phase 6 data archive for their historical skill with respect to energy system performance and for their future projections under multiple climate change scenarios. Building from that report, we describe the selection of a climate scenario (Shared Socioeconomic Pathway [SSP] 2-4.5) and five climate models: TaiESM1, EC-Earth3-CC, GFDL-CM4, EC-Earth3-Veg, and MPI-ESM1-2-HR. We describe the model selection criteria, which were based on the quality of the match between model results under historical conditions and on the representation of the range of future values for several variables. These results will be downscaled via an open-source generative machine learning method called Super-Resolution for Renewable Energy Resource Data with Climate Change Impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Conceptual Design of a Water Tank Critical Facility for SPARC

Critical experiments, sometimes referred to zero-power reactors, are crucial tools in developing and validating nuclear physics predictions and thus an indispensable capability to ensure criticality safety during all parts of the nuclear fuel cycle and in reducing uncertainties in reactor physics predictions toward optimizing nuclear energy production. The System Physics Advanced Reactor Facility (SPARC) project was recently initiated to enable large-scale criticality experiments using a horizontal split table machine well suited toward solid core materials systems (fuel, moderator, reflector). The facility selected for this mission was a former pool-type research reactor building and thus also well suited toward a second critical experiment capability able to house full-size light-water reactor (LWR) fuel bundles. A conceptual design study was undertaken to review past water tank critical experiments used for LWR physics experiments and to develop an early engineering design for a new critical assembly tank (CAT). The work described here shows that a relatively simple CAT concept can be constructed and deployed in the SPARC facility to meet the urgent demands for new critical experiments on advanced LWR fuel bundles designs. The SPARC facility layout is conducive to the receipt and upending of LWR fuel bundles using existing containers and equipment from the LWR industry. The facility’s overhead crane can then be used to handle fuel bundles and place them in a vertical storage rack or in the CAT for critical experiments, both of which fit within the building’s “open basement” alongside other equipment planned for SPARC and the horizontal split table. A slightly lower area in the basement can serve as a large drain tank so that fail-safe valves drain the CAT reactor tank for safe shutdown. Neutronic configurations were determined where a 3 × 3 array of fuel bundles can be surrounded by full-length “loose rods” to adjust reactivity so that critical is achieved when the bundles are fully submerged. Viable configurations were determined for both pressurized- and boiling-water-reactor-type fuel bundles. This design concept was used to develop an early planning basis for establishing the CAT capability alongside the otherwise planned SPARC project in order to help streamline the process. Recent presidential executive orders have highlighted the need to achieve power uprates in LWR plants and the CAT capability will be a crucial element of these initiatives. Based on the work described herein, it is recommended that an earnest and timely project begin in order to establish this urgently needed capability.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Pipeline for Integrated Projects in Energy Systems (PIPES): A Tool for Integrated System Planning [Slides]

The Pipeline for Integrated Projects in Energy Systems (PIPES) is a comprehensive project, data, and workflow management tool designed for integrated modeling teams. PIPES facilitates the management of data requirements, tasks, and progress tracking, serving as a higher-level integration layer that works across various data and modeling software. This tool integrates models, data, and tools to perform large-scale, integrated analysis work at scale. PIPES is designed to streamline integrated modeling projects, enhance collaboration, and ensure the quality and efficiency of data management and workflow processes. This presentation introduces PIPES a multi-model tool for integrated system planning; it describes the underlying architecture, deep dives into common user workflows, and outlines the upcoming development roadmap beyond its current alpha state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Detection and Association of Operational Events using DAS and Seismometers (FY 2025 Mid-Year Report)

This mid-year report summarizes ongoing work to identify anomalous vibration signals indicative of potential containment breaches. This work includes compiling continuous seismic datasets and testing and refining underground detection and geolocation techniques. In the first two quarters of FY25, we have completed two project work plan tasks: (1) creating a database of continuous waveforms and ground truth event data from multiple modalities and (2) refining and implementing a detection and association algorithm to create a catalog of anomalous underground activities. This report contains a summary of the seismic database including the continuous seismic data collected by a dense array of surface seismic stations above Pleasant Gap Mine, and continuous seismic data collected using subsurface distributed acoustic sensing (DAS) in the subsurface at Sanford Underground Research Facility (SURF) and the ground truth information gathered from both sites. This report also includes results from refining and applying a dynamic power spectral density detector to both continuous seismic datasets. Finally, the report provides an initial catalog of subsurface operational events from both sensing modalities.

58 GEOSCIENCES↗

Transmission for Tribal Nations

A presentation about the Tribal Nation Transmission Program and an overview of transmission generally for attendees of the Seminole Annual Conference.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 8 Deliverable 8.0 - Commercialization Plan

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis from industrial facilities that are not collocated with prospective storage geology (i.e., the Coastal Plain of the Southeastern U.S. in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns are required to identify CO 2 storage opportunities in under-developed areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province of the Appalachian Fold and Thrust Belt occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale.

20 FOSSIL-FUELED POWER PLANTS↗

1995 OMPO Model Development Project

The 1995 Oahu Metropolitan Planning Organization (OMPO) Model Development Project for Oahu Island was intended to document how Oahu residents use the streets, highways, and transit services in the region. These data were used to develop the Travel Demand Forecasting Model, which is used to forecast the traffic impacts of various land use changes. The survey collected complete travel information of 4,060 Oahu households for a 24-hour period, including demographic and socioeconomic data.

1Hz data↗

Illinois Storage Corridor CarbonSAFE Phase III: Stakeholder Engagement and Outreach Plan

The Stakeholder Engagement and Outreach Plan provides a comprehensive framework for engaging stakeholders of the Illinois Storage Corridor (ISC) project. The ISC project is a CarbonSAFE Phase III project designed to facilitate commercial deployment of carbon capture, utilization, and storage (CCUS) in Illinois. The project aims to establish a multi-industry carbon storage corridor through development of storage sites near the One Earth Energy (OEE) ethanol production facility in north-central Illinois and the Prairie State Generating Company (PSGC) coal-fired power plant in south-central Illinois, with combined annual CO 2 capture ultimately exceeding 8.6 million tons per year. Stakeholder engagement is recognized as a critical component for successful CCUS deployment, alongside technical and economic considerations. As an emerging technology, CCUS may not be well understood by the general population, and lack of public awareness can lead to opposition that poses significant barriers to project development. This plan addresses this challenge through systematic stakeholder identification, analysis, planning, and implementation of engagement actions. The plan is structured around four main sections: Communication, Stakeholder Analysis, Stakeholder Engagement, and Environmental Justice. Activities will be conducted under Tasks 1 and 4 of the project's Statement of Project Objectives, with two key subtasks: (1) developing a stakeholder analysis and engagement plan through face-to-face meetings, facilitated discussions, and surveys; and (2) implementing stakeholder engagement and public outreach activities including meetings, open houses, and permit hearings. The Illinois State Geological Survey (ISGS) will manage engagement activities following DOE-NETL best practices, focusing on providing objective, fact-based information about CCUS and the ISC project. A comprehensive Communication Plan establishes protocols for media contacts, site visits, and crisis communications. The stakeholder analysis follows a structured workflow process divided into Pre-feasibility and Feasibility phases, incorporating contextual understanding, assessment, data collection, and analysis. Key stakeholder groups include government bodies, educational organizations, conservation and environmental groups, agricultural communities, and religious organizations. The plan addresses common stakeholder questions regarding project risks, benefits, safety, property values, liability, and environmental impacts. Recommendations emphasize developing clear messaging, creating informational materials, and preparing to address both project-specific and broader environmental concerns to ensure transparent communication and build stakeholder support throughout project implementation.

25 ENERGY STORAGE↗

Energy Baseline Assessment and Project Considerations for the Wai'anae Moku Community Energy Plan

This report was prepared as a supplement to the Waianae moku community's energy plan and includes results of two activities conducted by the National Laboratory of the Rockies in support of the planning process: (1) an energy baseline assessment and (2) considerations and resources for possible energy projects prioritized by the community in its energy plan. Results of the energy assessment describe the energy landscape in the state of Hawaii, on the island of Oahu, and in the Waianae moku at the time the plan was developed, with the intention of supporting informed community participation in the planning process. Considerations and resources align with each of the energy project ideas identified in the community's energy plan, and are intended to describe the current context and activities related to each, along with possible next steps toward implementation, and additional resources. The report concludes with takeaways for the community to consider as they pursue their energy goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Land of Opportunity: Potential for Renewable Energy on Federal Lands

Renewable energy (RE) in the United States has historically been deployed primarily on private lands, but the growing interest in RE development, generally across the country and specifically on federal lands, raises questions about the potential for RE on public lands. This study seeks to estimate RE technical potential on federal lands and project the amount of RE to be developed on federal lands under decarbonization scenarios for the contiguous United States. The study applied a combination of high-resolution geospatial analysis and power sector modeling and relied on multiple partner federal agencies and land administrators from the Bureau of Land Management, the U.S. Fish and Wildlife Service, the U.S. Forest Service, the U.S. Department of Defense, and the U.S. Department of Energy. In our reference siting access case, we estimate 44 million acres of federal land across the contiguous United States is potentially suitable for UPV development, which corresponds to a capacity technical potential of 5,750 gigawatts (GW) (Figure ES-1). Federal land area available for wind development is similar to UPV but wind’s generating capacity technical potential is lower (875 GW). The technical potential is estimated for two geothermal technologies, hydrothermal and enhanced geothermal systems (EGS), both of which have a smaller amount of federal land available for development (12 and 27 million acres, respectively). However, in terms of capacity, the technical potential for EGS (975 GW) is approximately equal to wind’s technical potential and there is an estimated 130 GW of hydrothermal potential. We also developed cases with more-limited land available for UPV and wind (for federal and non-federal lands) resulting in 96% reduction of wind capacity potential and 70% reduction for UPV. In a case with additional constraints applied to non-federal lands only (Limited Private), the overall (federal and non-federal) technical potential declines but the share of that technical potential on federal lands is higher than in the other siting cases. The technical potential is the maximum amount that could be developed, but only a small fraction would be developed or needed in the future. Across seven scenarios that achieve 100% carbon-free electricity by 2035, we estimate 26 GW to 270 GW of RE capacity could be deployed on federal lands by 2035. The three central scenarios have 51–84 GW of RE deployed by 2035 and requiring about 500,000 to 1,000,000 acres of total land area. Direct land consumption is less than total land use required, thus enabling co-use opportunities. The large technical potential estimates and the increasing deployment projections from the collection of scenarios show the opportunities for RE development on federal lands. Capturing these opportunities-while minimizing conflicts with other land uses, federal department or agency missions, and public interest, and simultaneously maximizing the economic, grid, and social value of the projects-would require collaborative planning among federal land administrators, grid planners, project developers, the public, and other stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ESM data downscaling: a comparison of super-resolution deep learning models

Abstract Climate projections at fine spatial resolutions are required to conduct accurate risk assessment for critical infrastructure and design adaptation planning. Generating these projections using advanced Earth system models (ESM) requires significant computational resources. To address this issue, various statistical downscaling techniques have been introduced to generate fine-resolution data from coarse-resolution simulations. In this study, we evaluate and compare five deep learning-based downscaling techniques, namely, super-resolution convolutional neural networks, fast super-resolution convolutional neural network ESM, efficient sub-pixel convolutional neural network, enhanced deep residual network (EDRN), and super-resolution generative adversarial network (SRGAN). These techniques are applied to a dataset generated by the Energy Exascale Earth System Model (E3SM), focusing on key surface variables such as surface temperature, shortwave heat flux, and longwave heat flux. Models are trained and validated using paired fine-resolution (0.25 $$^{\circ }$$ ∘ ) and coarse-resolution (1 $$^{\circ }$$ ∘ ) monthly data obtained from a 9-year simulation. Next, blind testing is performed using monthly data obtained from two different years outside of the training and validation set. To evaluate the efficiency of each technique, different statistical metrics are used, including mean squared error (MSE), peak signal-to-noise ratio (PSNR), structural similarity index measure (SSIM), and learned perceptual image patch similarity (LPIPS). The results show that EDRN outperforms other algorithms in terms of PSNR, SSIM, and MSE, but struggles to capture fine-scale features in the data. In contrast, SRGAN, a generative model that uses perceptual loss, excels in capturing fine details at boundaries and internal structures, resulting in lower LPIPS than other methods.

Pawar, Nikhil M. (ORCID:0000000211613289)↗

Z Facility Sustainment Status (September FY2023) [Slides]

FY23 Sustainment, performed from 1 March through 30 September, completed with Cumulative Costs at 69% and combined Costs plus Commitments at 87%. Nineteen projects were completed in FY23. Eleven projects continue to close out purchasing activities or will roll over into FY24 projects. Two projects have been placed on hold and will be reevaluated for potential future consideration. Diagnostics projects issued all planned FY23 purchases and finished FY23 with 78% cumulative costs and combined costs and commitments at 102%. FY24 Sustainment Project identification, definition and prioritization was completed. Once the budget is finalized, project selection will quickly be set and projects kicked off.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗