Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Progress in the development of the community Particle Accelerator Lattice Standard (PALS)

The Particle Accelerator Lattice Standard (PALS) is a community effort to create an open standard to promote lattice information exchange for particle accelerators. PALS development is a community-wide international effort involving accelerator physicists from multiple institutions. While it started as a lattice standard for beam dynamics simulations, it is now being extended to support other particle accelerator activities, in particular accelerator operation. With new accelerators that are becoming more complex, larger collaborations and the increasing imprint of artificial intelligence in all accelerator activities (from design to operation to workforce development), the imperative for a common, standardized accelerator ontology has been transitioning from “nice-to-have” to “must-have”. We will present the status of the project, its relations to other projects, including to two of the particle accelerator projects of the newly announced US DOE Genesis Mission: the Multi-Office Accelerator Team (MOAT) project and the Nuclear physics AI-Ready Accelerator Data (NARAD) project.

Brynes, A. [Science and Technology Facilities Coun↗

Configuration Management History Report for the RH LLW Disposal Facility Project

This document outlines and summarized the configuration management process that was used for the RHLLW Disposal Facility design and turnover to operations in support of process readiness reviews. The project was originally solicited as a design-build-operate contract, but awarded as a design-build project only to Areva Federal Services in 2014. The RHLLW requirements were captured in two documents: 1) SPC-1437, Design-Build-Operate Performance Specification for the Remote-Handled Low-Level Waste Disposal Project; and 2) TFR-483, Technical and Functional Requirements for the Remote-Handled Low-Level Waste Disposal Project. TFR-483 and SPC-1437 outlined the requirements for the facility and SPC-1437 documented additional requirements regarding quality, design, and construction. A Code of Record (COR) was generated during conceptual design and updated during final design to document the design-basis codes and standards (INL/EXT-10-20044).

42 ENGINEERING↗

Design of the ARES Mars Airplane and Mission Architecture

Significant technology advances have enabled planetary aircraft to be considered as viable science platforms. Such systems fill a unique planetary science measurement gap, that of regional-scale, near-surface observation, while providing a fresh perspective for potential discovery. Recent efforts have produced mature mission and flight system concepts, ready for flight project implementation. This paper summarizes the development of a Mars airplane mission architecture that balances science, implementation risk and cost. Airplane mission performance, flight system design and technology maturation are described. The design, analysis and testing completed demonstrates the readiness of this science platform for use in a Mars flight project.

Braun, Robert D.↗

Electric Sail Tether Deployment System for CubeSats

An Electric Sail (E-Sail) propulsion system consists of long, thin tethers - positively-charged wires extending radially and symmetrically outward from a spacecraft. Tethers must be biased using a high-voltage power supply to ensure that the solar wind produces thrust. While the E-Sail concept shows great promise for flying heliopause missions with higher characteristic acceleration than solar sails, there are significant technical challenges related to deploying and controlling multiple tethers. A typical full-scale design involves a hub and spoke arrangement of 10 to 100 tethers, each 20 km long. In the last 20 years, there have been multiple space mission failures due to tether deployment and control issues, and most configurations involved a single tether. This paper describes an effort to develop and test a simple yet robust single-tether deployment system for a two-6U CubeSat configuration. The project included the following: a) Tether dynamic modeling/simulation b) E-Sail single-tether prototype development and testing c) Space environmental effects testing to identify best materials for further development. These three areas of investigation were needed to provide technical rationale for an E-Sail flight demonstration mission that is expected to be proposed for the 2022 time frame. The project team used an “agile” engineering approach in which E-Sail single-tether prototype designs were iteratively developed and tested to solve problems and identify design improvements. The agile approach was ideal for this low Technology Readiness Level (TRL) project because tether deployer development involved many unknowns in prototype development that could only be discovered through iterative cycles of construction and testing. Extensive modeling and simulation were accomplished for three types of tether deployment: a) Stage 1: propulsive separation with one 6U fixed b) Stage 2: propulsive spin-up with one 6U fixed c) Stage 3: propulsive spin-up with both 6Us free Simulation results were valuable for understanding the propulsive and braking forces needed for controlled tether deployment. This paper describes the evolution, insights, and test/ performance data related to the resultant single-tether two-6U E-Sail test article which has been demonstrated in a test laboratory. The development effort suggests near-term work needed to achieve a useful flight demonstration, and provides ideas for how multiple-tether deployment systems might evolve going forward. A planned next-generation E-Sail prototype will include autonomous propulsive tether deployment while monitoring tether tension, location on the floor, distance between tether ends, acceleration, velocity, and propellant used.

Tinker, Michael↗

KBase partners with community developers from several Department of Energy Science Focus Areas to increase functionality of tools and analysis

Several SFAs were selected for training on the KBase Software Development Kit (SDK) to integrate tools and data into the KBase platform. Overall, the collaborative effort was viewed as highly successful. Every SFA project was able to achieve their proposed targets for training and functionality, while also gaining an appreciation for the role KBase plays/could play in their future science plans. Both the SFA and KBase teams felt that continued collaboration would be beneficial, especially if the programs were able to jointly prioritize scope and readiness of future projects. This poster will outline the scope of functionality added by SFA community developers, and highlight points of intersection across these efforts.

59 BASIC BIOLOGICAL SCIENCES↗

National Community Solar Partnership Credit Ready Solar Initiative

This fact sheet discusses the Credit Ready Solar Initiative, which will leverage working groups, technical assistance, training, and strategic partnerships to build a pipeline of credit-ready community solar projects and broad access to a community solar marketplace that connects owners, developers, lenders, and philanthropy to support more equitable deployment of community solar.

solar, solar energy, community solar, national com↗

An Overview of the Smart Sensor Inter-Agency Reference Testbench (SSIART)

In this paper, we present an overview of a proposed collaboration between the National Aeronautics and Space Administration (NASA) and the European Space Agency (ESA), which is designed to facilitate the introduction of commercial-off-the-shelf (COTS) radios for smart-sensing applications into international spaceflight programs and projects. The proposed work will produce test hardware reference designs, test software reference architectures and example implementations, test plans in reference test environments, and test results, all of which will be shared between the agencies and documented for future use by mission planners. The proposed collaborative structure together with all of the anticipated tools and results produced under the effort is collectively referred to as the Smart Sensor Inter-agency Reference Testbench or SSIART. It is intended to provide guidance in technology selection and in increasing the related readiness levels of projects and missions as well as the space industry.

Wagner, Raymond S.↗

Low-Cost Bio-Based Carbon Fibers for High Temperature Processing

GrafTech International Holdings Inc. (GTI), under Award No. DE-EE0005779, worked with Oak Ridge National Laboratory (ORNL) under CRADA No. NFE-15-05807 to develop lignin-based carbon fiber (LBCF) technology and to demonstrate LBCF performance in high-temperature products and applications. This work was unique and different from other reported LBCF work in that this study was application-focused and scalability-focused. Accordingly, the executed work was based on meeting criteria based on technology development, cost, and application suitability. High-temperature carbon fiber based insulation is used in energy intensive industries, such as metal heat treating and ceramic and semiconductor material production. Insulation plays a critical role in achieving high thermal and process efficiency, which is directly related to energy usage, cost, and product competitiveness. Current high temperature insulation is made with petroleum based carbon fibers, and one goal of this protect was to develop and demonstrate an alternative lignin (biomass) based carbon fiber that would achieve lower cost, CO2 emissions, and energy consumption and result in insulation that met or exceeded the thermal efficiency of current commercial insulation. In addition, other products were targeted to be evaluated with LBCF. As the project was designed to proceed in stages, the initial focus of this work was to demonstrate lab-scale LBCF from at least 4 different lignin precursor feedstock sources that could meet the estimated production cost of $5.00/pound and have ash level of less than 500 ppm in the carbonized insulation-grade fiber. Accordingly, a preliminary cost model was developed based on publicly available information. The team demonstrated that 4 lignin samples met the cost criteria. In addition, the ash level for the 4 carbonized lignin samples was below 500 ppm. Processing as-received lignin to produce a high purity lignin fiber was a significant accomplishment in that most industrial lignin, prior to purification, had greater than 4X the ash level needed for this project, and prior to this work there was not a clear path of how to achieve the purity target. The lab scale development of LBCF was performed with a specific functional application in mind, specifically for high temperature rigid insulation. GTI is a consumer of foreign-sourced pitch and rayon based carbon fibers for use in its high temperature insulation products, and the motivation was that LBCF had potential to decrease costs and increase product competitiveness in the marketplace through lowered raw material costs, lowered energy costs, and decreased environmental footprint. At the end of this project, the Technology Readiness Level (TRL) remained at 5 for LBCF in high temperature insulation.

09 BIOMASS FUELS↗

Tracking system performance tests in the MDS era

Tracking system performance tests as developed to support DSN Mark III Data Subsystem implementation project and prepass readiness tests are described. The system test design, the rationale chosen for implementation, and the inevitable compromises imposed by schedule constraints and reserves are discussed.

Buckles, B. J.↗

X-ray satellite (ROSAT)

With regards to technical performance, the project is running according to plan. An increase in total cost outlay was required. The new Dornier Systems schedule projects ROSAT launch readiness for April 27, 1988. However, as a result of the Challenger accident, no binding launch date has been received from NASA. The thirteenth status review was conducted at the prime contractor in March, 1986. Assembly of the FM mirror system has been interrupted due to irregularities in the gold damping; in addition, mission operation and simulator development are effected by understaffing. Postponements have been announced in the data transmission and components acquisition subsystems.

Source record↗

A small solar electric ion propulsion spacecraft for lunar science

A lightweight spacecraft design concept has been developed which employs solar-electric ion propulsion to conduct a lunar science mission. The design relies on off-the-shelf technology to achieve high reliability and near-term launch readiness status. Overall project costs are kept to a minimum through the concentration of mission objectives, as well as through the minimization of payload launch costs by resort to the Space Shuttle's Get-Away Special canister. Attention is given to the spacecraft's instrumentation configuration.

Salazar, R. P.↗

An Overview of the TROPICS NASA Earth Venture Mission

The Time-Resolved Observations of Precipitation structure and storm Intensity with a Constellation of Smallsats (TROPICS) mission was selected by NASA as part of the Earth Venture-Instrument (EVI-3) program. The overarching goal for TROPICS is to provide nearly all-weather observations of 3D temperature and humidity, as well as cloud ice and precipitation horizontal structure, at high temporal resolution to conduct high-value science investigations of tropical cyclones. TROPICS will provide rapid-refresh microwave measurements (median refresh rate better than 60 min for the baseline mission) which can be used to observe the thermodynamics of the troposphere and precipitation structure for storm systems at the mesoscale and synoptic scale over the entire storm life cycle. TROPICS comprises six Cube-Sats in three low-Earth orbital planes. Each CubeSat will host a high-performance radiometer to provide temperature profiles using seven channels near the 118.75 GHz oxygen absorption line, water vapour profiles using three channels near the 183 GHz water vapour absorption line, imagery in a single channel near 90 GHz for precipitation measurements (when combined with higher-resolution water vapour channels), and a single channel near 205 GHz which is more sensitive to precipitation-sized ice particles. This observing system offers an unprecedented combination of horizontal and temporal resolution to measure environmental and inner-core conditions for tropical cyclones on a nearly global scale and is a major leap forward in the temporal resolution of several key parameters needed for assimilation into advanced data assimilation systems capable of utilizing rapid-update radiance or retrieval data.Launch readiness is currently projected for late 2019.

TROPICS↗

Flow Simulations for Martian and Lunar Lander Plume-Surface Interaction Prediction

Landing vehicle propulsive systems introduce several risks associated with plume/surface interactions (PSI) during the final stages of descent. For example, view obscuration during descent due to the liberation of dust driven by the rocket plume’s interaction with the lunar surface was reported on several Apollo missions. Plume-driven debris impacts on vehicle and nearby assets as well as landing instabilities due to crater formation are also potential risks associated with plume/surface interactions. The importance of studying these plume/surface interactions has been elevated due to NASA’s mission to land humans on the Moon by 2024. Existing and under-development predictive simulation tools are currently being brought to application readiness under a project awarded by the NASA Space Technology Mission Directorate (STMD) Game Changing Development (GCD) program. This tool development is divided into four tasks: (1) simulating plume structure in low-pressure environments, (2) simulating crater development and ejecta, (3) regolith particle phase modeling, and (4) gas-particle interaction modeling. Recent efforts under task 1 include demonstrating existing computational fluid dynamics (CFD) tools for simulating plume structure in low pressure environments similar to those found on Mars. The results of these demonstrative simulations are compared to available experimental data. Emerging capability being developed under task 2 is also presented, demonstrating simulations of crater formation in Lunar conditions.

Thomas P Shurtz↗

Deep Analysis Net with Causal Embedding for Coal-fired Power Plant Fault Detection and Diagnosis (DANCE4CFDD)

Fault detection and diagnosis is critical to power plant operation to ensure attaining high reliability while reducing operation cost. As more renewable power is introduced to the power grid, traditional fossil power plants take on the extra burden of excessive load cycling to compensate the generation variability from renewable power. Such load cycling will pose more reliability challenges to power plant operation. There are a number of challenges faced by today’s asset health management system in coal- fired (or gas) power plants: 1) high-dimensional nonlinear interaction among multiple time series measurements; 2) high measurement variance induced by operational conditions/modes; 3) variation among asset types and plant configurations; and 4) a small number of faulty events to learn from. To cope with these challenges, today’s fielded asset health management systems rely heavily on manual efforts from domain experts and hand-crafted features or rules based on domain knowledge. Despite its role in plant reliability, such a practice is costly and hinders its scalability and sustainability, particularly when a plant undergoes modifications. The objective of this project is to develop a novel end-to-end AI learning system that is trainable (i.e., the AI representation of a complex system behavior can be directly learned from properly labeled data) for accurate fault detection and root cause analysis. The ability to create a fault detection model directly from time series could alleviate the efforts associated with today’s asset management solution development. In the course of this project, we have achieved the following: Created an AI model development environment incorporating state-of-the-art neural network architectures for rapid model development and evaluation; Developed novel learning strategies for training of fault detection model; Developed special-purpose neural network architecture embedded with variable association graph aiming for better interpretability; Developed a learning strategy to leverage a small number of faulty events for enhanced fault detection capability; Conducted detailed experimental study based on public benchmark datasets and demonstrated the effectiveness of the proposed solution; and Validated the developed system with data from both a coal-fired plant boiler dynamic simulation model and real-world coal-fired power plant covering multiple asset and fault types. Overall, the project attained a technology readiness level of TRL 5 from TRL 2 at the beginning of the project.

20 FOSSIL-FUELED POWER PLANTS↗

Optimization to Generate Equations of State for Hydrogen Production

On a high level, the larger project in question, HydroGEN, aims to develop software used for finding equations of state (EOS) to optimize catalyst configuration for H 2 production through water splitting. In particular, this summer project focused on solving the nonlinear equations used in fitting the equations. This problem involved using Python to solve a linear system with nonlinear constraints. In order for this to be achieved, Pyomo was used to build a model and the solver Ipopt, interior point optimizer, was used. Pyomo is a Python-based language developed at Sandia; it is an optimization modeling language. Rather than solving the entire problem at once, a toy problem was created, simplifying the problem down to the most important focus. This problem had a known solution, comparable to the calculated solution to assess accuracy and as progress was made towards finding solutions, complexity was gradually added to the problem. After building and solving the toy problem, it was found that it gave reasonably accurate solutions, better compared to the two existing solvers previously used with this project in terms of functionality. The solver is now ready for implementation into the project’s main software.

08 HYDROGEN↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Revisiting Training and Verification Process Implementation for Risk Reduction on New Missions at NASA Jet Propulsion Laboratory

In 2003 we proposed an effort to develop a core program of standardized training and verification practices and standards against which the implementation of these practices could be measured. The purpose was to provide another means of risk reduction for deep space missions to preclude the likelihood of a repeat of the tragedies of the 1998 Mars missions. We identified six areas where the application of standards and standardization would benefit the overall readiness process for flight projects at JPL. These are Individual Training, Team Training, Interface and Procedure Development, Personnel Certification, Interface and procedure Verification, and Operations Readiness Testing. In this paper we will discuss the progress that has been made in the tasks of developing the proposed infrastructure in each of these areas. Specifically we will address the Position Training and Certification Standards that are now available for each operational position found on our Flight Operations Teams (FOT). We will also discuss the MGSS Baseline Flight Operations Team Training Plan which can be tailored for each new flight project at JPL. As these tasks have been progressing, the climate and emphasis for Training and for V and V at JPL has changed, and we have learned about the expansion, growth, and limitations in the roles of traditional positions at JPL such as the Project's Training Engineer, V and V Engineer, and Operations Engineer. The need to keep a tight rein on budgets has led to a merging and/or reduction in these positions which pose challenges to individual capacities and capabilities. We examine the evolution of these processes and the roles involved while taking a look at the impact or potential impact of our proposed training related infrastructure tasks. As we conclude our examination of the changes taking place for new flight projects, we see that the importance of proceeding with our proposed tasks and adapting them to the changing climate remains an important element in reducing the risk in the challenging business of space exploration.

verifications↗