Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Agent-Based, Bottom-Up Medium- and Heavy-duty Electric Vehicle Economics, Operation, Charging and Adoption (Research Performance Final Report)

This is the research performance final report for the project entitled: Agent-Based, Bottom-Up Medium- and Heavy-duty Electric Vehicle Economics, Operation, Charging and Adoption This project was able to achieve the DOE’s goals of developing new modeling tools to understand MDHD vehicle operation and adoption. The first modeling tool is a fleet-level techno-economic analysis model capable of estimating energy use and associated environmental and cost impacts for electrified and conventional vehicles of any MDHD vocation, using real-world cost and operations data, including approaches to optimizing schedules for charging and/or vehicle dispatch. The second modeling tool is a system-level, bottom-up, agent-based adoption model capable of generating geographically-resolved estimates of market projections for MDHD vehicles and charging infrastructure. These tools will be developed and published to serve dual purposes as analysis tools for researchers, and decision-support tools for decision makers within the MDHD system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impact of Glen Canyon Generation Loss

Colorado River Basin hydropower generation has faced challenges due to droughts and ecological and social water requirements. Specifically, Glen Canyon hydropower generation fluctuates substantially with recent extreme weather trends. Further, the western grid evolves with higher wind and solar share, and Glen Canyon hydropower's contribution to grid flexibility services is essential. The Western Area Power Administration (WAPA) markets and schedules electricity production at GCD, and the loss of this power could have significant financial consequences for the WAPA Colorado River Storage Project's (CRSP) Office because it may need to purchase relatively large amounts of energy to serve its firm electrical obligations. In addition, GCD provides grid reliability services for the WAPA Colorado-Missouri (WACM) balancing authority (BA). Both WAPA and DOE's Water & Power Technology Office (WPTO) are interested in researching how these drier hydrological conditions will impact federal electrical energy production, the Western Electricity Coordinating Council (WECC) power grid, and the value of hydropower in the face of lower production. We study multiple hydrologic and power grid scenarios to understand the grid impacts of the loss of Glen Canyon generation. The study uses a production cost model, water resources planning models, water-centric grid models, and various data analytic techniques. The study progress presentation discusses the selection of probable CRSP' hydropower scenarios and power grid scenarios to understand the impacts of Glen Canyon generation, which includes technologies that compensate the Glen Canyon energy and ancillary services contributions, transmission availability, and energy local marginal prices at interested grid locations of WAPA operation.

droughts↗

Transformational Molecular Layer Deposition Tailor-Made Size-Sieving Sorbents for Post-Combustion CO 2 Capture

This report summarizes the carbon capture research and development conducted by The State University of New York at Buffalo (UB), University of South Carolina (USC), GTI Energy (GTI), and Rensselaer Polytechnic Institute (RPI) for U.S. Department of Energy (DOE) project DE-FE0031730 titled “Transformational Molecular Layer Deposition Tailor-made Size-Sieving Sorbents for Post-Combustion CO 2 capture.” The objective of this project was to develop a transformational molecular layer deposition (MLD) tailor-made size-sieving sorbent integrated with a pressure swing adsorption (PSA) cycle schedule that can be installed in new or retrofitted into existing pulverized coal (PC) power plants for CO 2 capture with a cost of electricity at least 30% lower than a supercritical PC power with CO 2 capture, or approximately $\$$30 per tonne of CO 2 captured, and with it being ready for demonstration by 2030.

20 FOSSIL-FUELED POWER PLANTS↗

ORNL National Hydropower Fish Passage Database

Fish passage facilities are used to mitigate impacts of hydropower dams to migratory fish in rivers, but information on the location, types, and characteristics of this infrastructure is incomplete at a national scale. Researchers at Oak Ridge National Laboratory (ORNL) partnered with fish passage engineers and hydropower experts from the US Fish and Wildlife Service (USFWS), the National Oceanic Atmospheric Administration’s National Marine Fisheries Service (NOAA NMFS), and the Low Impact Hydropower Institute (LIHI) to create the first national scale database of fish passage infrastructure at US hydropower developments. This database consists of the ORNL_Fish_Passage_Dataset.zip file with 13 individual .csv files that contain information on fish passage facility engineering characteristics, targeted fish species, operational schedule, and costs. which is of great value to a diverse range of stakeholders. This information was collected between December 2023 and July 2025 from project partners, other hydropower stakeholders, online datasets available for download, and a stakeholder questionnaire Information. This data resource addresses a large gap in knowledge of the deployment of fish passage technology and is freely available to members of the hydropower community, including federal and state regulators and resource agencies, non-governmental organizations (NGOs), industry, and other user groups to support project planning and regulatory (re)licensing activities. This database supports the US Department of Energy Water Power Technologies Office objective to develop decision support tools and data resources that improve environmental performance and ensure hydropower’s long-term value to the American public.

Matson, Paul [Oak Ridge National Laboratory (ORNL)↗

LLGoMAX : Enhancing Industry-Standard Tools for AC Optimal Unit Commitment

In 2018, the Advanced Research Project Agency – Energy (ARPA-E) launched the Grid Optimization Competition (GOC) [1], a series of competitive challenges intended to accelerate innovation in decision support software used to schedule power grid operations, making them as efficient as possible, while respecting operational constraints of power equipment and operational security. This report covers the participation of the LLGoMAX team—a collaboration of the Lawrence Livermore National Laboratory (LLNL) and ECCO International, Inc.—in Challenge 3 of the competition.

97 MATHEMATICS AND COMPUTING↗

Expanding market opportunities: cogeneration strategies for integrated PWR and thermal energy storage systems

We assess the economic viability of nuclear cogeneration by investigating three different modes—fixed dispatch, fully flexible dispatch, and flexible dispatch with minimum heat supply requirements. The analysis focuses on an existing pressurized water reactor (PWR) integrated with thermal energy storage (TES). Heat production costs are estimated under these modes for two U.S. electricity markets: the Electric Reliability Council of Texas (ERCOT) and the Pennsylvania–New Jersey–Maryland Interconnection (PJM). A sensitivity analysis examines profitability at varying heat market prices. Results indicate that fixed heat dispatch inflates heat production costs, often rendering projects economically feasible only at higher heat price levels. Fully-flexible dispatch lowers heat production costs by an average of 43 % compared to fixed dispatch. However, the current 30 % thermal dispatch limit may be insufficient to serve high baseline industrial demands cost‐effectively; higher maximum dispatch rates could enhance project economics. Markets with higher and more volatile electricity prices (e.g., ERCOT) offer greater total energy sales potential (i.e., heat and electricity), but also increase opportunity costs when heat production scheduling restrictions are imposed. In contrast, lower-price, less volatile markets (e.g., PJM) experience smaller impacts from such constraints and provide greater flexibility in accommodating varying cogeneration modes. In conclusion, these findings provide a framework to guide nuclear plant operators in aligning cogeneration strategies with industrial process requirements and electricity market conditions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a Test-Bed for Testing and Refining EarthEn’s Supercritical CO 2 Based Energy Storage System

EarthEn’s energy storage concept leverages supercritical carbon dioxide (sCO 2 ) as a working fluid and relies on compact, high-performance components operating at elevated pressures and temperatures. To accelerate component development and reduce technical risk prior to larger-scale demonstrations, Oak Ridge National Laboratory (ORNL) developed a 100 kW-scale sCO 2 test-bed under a Cooperative Research and Development Agreement with EarthEn (CRADA NO. NFE-24-10050). The objective of the work was to design and construct a flexible experimental facility capable of reproducing key thermodynamic state points and heat-transfer conditions relevant to EarthEn’s thermal energy storage (TES) cycle, with particular emphasis on enabling development and evaluation of next-generation heat exchangers and TES concepts. The test-bed consists of a closed-loop sCO 2 circulation system housed within an open-topped enclosure. In its as-installed configuration, dense-phase sCO 2 is recirculated through a printed circuit recuperator, an electrically heated section, a throttling device used to simulate turbine expansion, and a water-cooled printed circuit heat exchanger that rejects heat to the building chilled-water system before returning to the pump. The pump is driven by a variable frequency drive, enabling controlled adjustment of flow and operating point. A comprehensive instrumentation suite was integrated to support both safe operation and high-quality data collection. Installed sensors include Coriolis flow meters for sCO 2 flow rate and density, resistance temperature detectors and thermocouples distributed throughout the loop (including the heated section and key heat exchanger ports), and pressure transducers for absolute and differential pressure measurements. The facility was designed to support high-pressure (19 MPa nominal) and high-temperature (575°C nominal) operation with credited overpressure protection provided by a rupture disk. Nominal operating conditions were selected to support 100 kW-class testing while maintaining flexibility for non-heated and heated shakedown, control development, and future integration of advanced TES test sections. In parallel with facility development, a system-level thermal-hydraulic model was created using Modelica-based tools to support component sizing, anticipate performance over targeted test conditions, and establish a framework for future model calibration against experimental data. At the conclusion of the project performance period, the facility was in final assembly, and the pressure boundary was nearly completed. However, several practical challenges associated with high-pressure/high-temperature systems and specialized component procurement impacted schedule and prevented initial pump-driven operation and full commissioning within the available resources. This report documents the as-built design, operating capabilities, and instrumentation, and it summarizes key lessons learned related to heater fabrication and testing, first-of-a-kind assembly factors, specialty flange supply constraints, and fill pump corrective actions. Finally, it outlines a phased plan for future commissioning and experimental campaigns, including control and instrumentation shakedown, heater characterization, model calibration, and testing at state points representative of EarthEn’s TES cycle.

25 ENERGY STORAGE↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

MICROREACTOR APPLICATIONS, RESEARCH, VALIDATION, AND EVALUATION (MARVEL) REACTOR ? STATUS, CONSTRUCTION, AND TESTING

The paper presents the current status of the Microreactor Applications, Research, Validation, and Evaluation (MARVEL) microreactor design, qualification testing, fabrication, and high-level construction schedule. An overview of initial criticality, low power physics testing, and start-up testing is included, as well as an overview of the envisioned processes in which end-users can engage the project for access to operational data or specific demonstrations. Designed by the Idaho National Laboratory (INL) under the auspices of the US Department of Energy’s Microreactor Program for construction and operation at the INL, MARVEL is a small, fully functional advanced reactor with UZrH fuel and thermal output of 85 kW. It offers a unique opportunity for scaled demonstrations that can dramatically accelerate the design, licensing, and deployment of commercial microreactors for power production or process heat applications. MARVEL’s objective is to build a small liquid-metal thermal reactor at the INL to demonstrate design and operating processes for microreactors, microgrid integration, and process heat applications. MARVEL finished 90%-final-design in September 2023 and completed an independent project assessment in early 2024. Fabrication of long-lead components and fuel, safety analysis review, and procurement for construction are underway. MARVEL assembly and construction will start in 2025 and fuel loading is expected in mid- 2027. Initial criticality will be performed in a dry condition in late 2027, followed by loading of NaK coolant and start-up testing. Approximately six months later, release for unrestricted operations will enable subsequent testing of microreactor characteristics, microgrid integration and select heat extraction applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Simulation Tools for Scheduling Solar Plus Storage Power Plants

This is the final technical report for the Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) under the Solar Energy Technology's Office Balance of Systems program, Award Number 38429. This report summarizes the key outputs and findings of the project, which was focused on long-duration energy storage (LDES) and solar. In particular, one of the most significant challenges of maximizing the value of variable solar energy is the timing of charging and discharging stored energy from LDES devices. Power systems often fail to capture the benefits of LDES and can undervalue the role of storage in providing energy arbitrage, reliability support, and resiliency. This project examined those challenges and proposed alternative methodologies that better capture the value that LDES can provide.

14 SOLAR ENERGY↗

EVI-EnSitePy (Electric Vehicle Infrastructure – Energy Estimation and Site Optimization Tool in Python) [EVI-X Modeling Suite] [SWR-25-07]

EVI-EnSitePy is a comprehensive agent-based tool designed for the analysis and design of high-power charging sites, encompassing a wide array of site agents including Electric Vehicles (EVs), chargers, energy storage units (ESS), renewable energy resources (DER), and loads. This versatile tool offers diverse functionalities and a modular modeling approach, allowing detailed configuration of agents based on power ratings, port numbers, energy capacities, demand requirements, charger interfaces, and flexibility to customize the tool for project specific goals. By simulating agent interactions and employing various metrics, EVI-EnSitePy enables the assessment of site performance, exploration of energy management systems (EMS), and implementation of innovative EV charging policies. Utilizing EV charge schedules and arrival states, the tool performs thorough charging site simulations, with outputs consisting of agent and site-level power profiles and statistical metrics. Employing a tree graph structure, EVI-EnSitePy supports nested site structures and power distribution modeling. The tool's ability to generate charging schedules deterministically or via stochastic analysis further enhances its versatility. Through its features and capabilities, EVI-EnSitePy offers a powerful platform for informed decision-making in the realm of high-power charging site design and operation.

Jackson, Derek [National Renewable Energy Laborato↗

Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CESER I-Corps (Final Report)

Energy I-Corps is a U.S. Department of Energy (DOE) sponsored entrepreneurial training program for laboratory researchers aimed at accelerating the commercialization of lab-developed technologies. The program, developed and managed by DOE's Office of Technology Commercialization (OTC) in partnership with the National Laboratory of the Rockies (NLR), uses a customized curriculum built on the Lean Launch Methodology and delivers a rigorous 10- to 12-week training program to selected laboratory-based teams. The Energy I-Corps team at NLR worked with the DOE's OTC and Office of Cybersecurity, Energy Security, and Emergency Response (CESER) to develop and implement commercialization programming for awardees of the CESER Cybersecurity for Distributed Energy Resources Research, Development, and Demonstration Research Call, funded under Provision 40125(b) of the Infrastructure Investment and Jobs Act (IIJA). 40125(b) Projects were overseen by a technical monitor at the National Energy Technology Laboratory (NETL). The CESER Energy I-Corps Program is considered an Energy I-Corps "lite" or "mini" program, with a lighter lift to accommodate scheduling and funding per participant. This final report describes the CESER I-Corps program and provides recommendations on behalf of OTC to CESER to consider if CESER were to run an I-Corps program in future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Challenges and Opportunities for HVAC + Phase Change Material Thermal Energy Storage in Buildings

Phase-change material (PCM) thermal-energy storage (TES) integrated with HVAC and domestic hot water (DHW) can shift a large share of building thermal loads. By flattening and shifting loads, PCM TES reduces peak electricity use, eases stress on local and grid infrastructure, and lowers costs. It can also defer costly upgrades to service panels, distribution, and transmission. Higher energy density relative to chilled or hot water storage makes PCM TES practical for small, space limited, and retrofit projects, while packaged HVAC-integrated systems expand cost-effective load shifting to commercial buildings that previously lacked options. Despite this promise, deployment faces barriers. This paper presents challenges, opportunities, and lessons learned from lab and field integrations of PCM TES with packaged HVAC systems. Key challenges include misalignment between default heat pump controls tuned for direct-to-load operation and TES charge/discharge objectives, PCM properties that diverge from manufacturer claims and evolve with cycling, and high integration and deployment costs with off-the-shelf products. These studies underscore the need for factory built, integrated systems that arrive as prepackaged modules with proven controls, reducing design and installation effort and delivering predictable performance across projects. The paper outlines steps to enable viable and scalable PCM TES HVAC and DHW systems, including 1) validated methods that can be used to characterize PCM properties and TES system performance, 2) supervisory controls that optimize charge/discharge scheduling, and 3) factory integrated packaging that eliminates bespoke field engineering.

Dutton, Spencer↗

Aerial and Processed Model Data Representing As-built Conditions in Coastal Port Arthur, Texas in May 2025

This dataset was collected by the Co-Design Team of the Southeast Texas Urban Integrated Field Lab, a research initiative led by the University of Texas at Austin and funded by the U.S. Department of Energy. The broader project focuses on developing climate-resilient design solutions for the Beaumont–Port Arthur region, with more information available at www.setx-uifl.org. Our team conducted aerial surveys of the Port Arthur coastal neighborhood in May 2025, before the start of construction scheduled for Summer 2026. These pre-construction datasets are designed to facilitate comparative analyses, including pre- and post-construction assessments and simulated inundation scenario evaluations. Aerial images were captured using DroneDeploy autonomous flight systems, with imagery processed through the DroneDeploy engine. All original aerial photographs are provided in JPG format and organized in zipped folders by area. The processed data package includes: 3D surface models Orthomosaics Geospatial and topographic mappings Point clouds For guidance on file contents, structure, and recommended usage, please refer to the included README file.

2D mapping↗

Overview of the distributed image processing infrastructure to produce the Legacy Survey of Space and Time

The Vera C. Rubin Observatory is preparing to execute the most ambitious astronomical survey ever attempted, the Legacy Survey of Space and Time (LSST). Currently the final phase of construction is under way in the Chilean Andes, with the Observatory’s ten-year science mission scheduled to begin in 2025. Rubin’s 8.4-meter telescope will nightly scan the southern hemisphere collecting imagery in the wavelength range 320–1050 nm covering the entire observable sky every 4 nights using a 3.2 gigapixel camera, the largest imaging device ever built for astronomy. Automated detection and classification of celestial objects will be performed by sophisticated algorithms on high-resolution images to progressively produce an astronomical catalog eventually composed of 20 billion galaxies and 17 billion stars and their associated physical properties. In this article we present an overview of the system currently being constructed to perform data distribution as well as the annual campaigns which reprocess the entire image dataset collected since the beginning of the survey. These processing campaigns will utilize computing and storage resources provided by three Rubin data facilities (one in the US and two in Europe). Each year a Data Release will be produced and disseminated to science collaborations for use in studies comprising four main science pillars: probing dark matter and dark energy, taking inventory of solar system objects, exploring the transient optical sky and mapping the Milky Way. Also presented is the method by which we leverage some of the common tools and best practices used for management of large-scale distributed data processing projects in the high energy physics and astronomy communities. We also demonstrate how these tools and practices are utilized within the Rubin project in order to overcome the specific challenges faced by the Observatory.

79 ASTRONOMY AND ASTROPHYSICS↗

High Fidelity Digital Twins for BWRX-300 Critical Systems

This project developed and demonstrated digital-twin technology for advanced nuclear systems under the ARPA-E GEMINA program, with a focus on the BWRX-300 small modular reactor. The primary objective was to reduce operation and maintenance (O&M) costs through predictive health monitoring and model-based fault detection. The project combined MIT’s high-fidelity physics models and machine-learning and digital-twin algorithms, and GE Hitachi’s digital-twin algorithms and operational expertise to build physics-based digital twins capable of real-time system monitoring and maintenance scheduling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Circular Economy for Photovoltaics in Service of Energy Transition

The challenge of energy transition is immediate and immense; current projections target 75 TW of photovoltaics (PV) capacity by 2050. While any transition to renewable energy technology is preferable to the current fossil-based system, it is ideal to improve the sustainability of PV to minimize negative environmental and social impacts. Circular economy (CE) has been proposed as a method to improve the sustainability of PV, especially for emerging materials like perovskites. CE is a set of actions, principles, and systems which aim to design out waste and keep products and materials in use, to reduce environmental impacts and enable sustainable development. At the most basic level, CE is "reduce, reuse, recycle", the R-actions, in ranked order. CE of a PV technology can be metricized in a variety of ways, such as the Material Circularity Indicator (Smith and Jones, Ellen MacArthur Foundation, 2019) or recycling rates. Unfortunately, standard CE metrics have several shortcomings for measuring renewable energy technologies in the context of deployment for energy transition (Figge 2018, Saidani 2019): 1) Only measure mass flows; 2) De-prioritization of the use phase in favor of mass circularity when scoring; and 3) Tight focus on a single product scale The use phase and energy flows of PV are key to energy transition, and therefore need to be quantified. Additionally, correlating product-scale to system-scale is necessary for quantifying the environmental impacts of energy transition. Life Cycle Assessment (LCA) can address some of these concerns, but also focuses on a single product scale and has trouble capturing the dynamics of system-scale energy transition, such as the interaction of module lifetime with manufacturing demands for energy transition deployment schedules. Therefore, we developed an open-source Python-based system dynamics model to quantify the mass, energy and carbon impacts of CE R-actions for PV technologies in the energy transition; PV in the CE (PV ICE) (Ovaitt & Mirletz 2021). The tool captures supply chains from material extraction through end of life, incorporating 5 circular end of life pathways. PV ICE takes in any evolving bill of materials, module properties and deployment schedule to support researchers and decision makers with data-backed insights. In this work, we quantify and compare proposed CE sustainable PV module designs and lifecycle management strategies, spanning currently commercialized technologies, government and industry technology targets, and several low Technology Readiness Level (TRL) emerging PV technologies, including perovskites. Our analyses capture the projected evolutions of lifetime, efficiency and material circularity of these PV technologies, as well as their material supply chains. Our analyses emphasize the importance of examining a suite of metrics to identify priorities and tradeoffs, and inform design or lifecycle management decisions holistically. Previous analyses have demonstrated the central importance of PV module lifetime to support energy transition while minimizing impacts. High levels of material circularity (>90%) enable minimizing lifecycle wastes, can reduce virgin material demands if paired with improving efficiency, but demonstrate tradeoffs in energy return on investment. In the fervor of new material and technology development, it is important to remember that CE is not the end goal; decarbonization and energy transition are the end goal. CE should be used in service to improve the sustainability of PV, and R-actions evaluated for their usefulness and efficacy to this end.

carbon↗