A project management system for the X-29A flight test program

The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

Stewart, J. F.↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

New challenges for Life Sciences flight project management

Scientists have conducted studies involving human spaceflight crews for over three decades. These studies have progressed from simple observations before and after each flight to sophisticated experiments during flights of several weeks up to several months. The findings from these experiments are available in the scientific literature. Management of these flight experiments has grown into a system fashioned from the Apollo Program style, focusing on budgeting, scheduling and allocation of human and material resources. While these areas remain important to the future, the International Space Station (ISS) requires that the Life Sciences spaceflight experiments expand the existing project management methodology. The use of telescience with state-the-art information technology and the multi-national crews and investigators challenges the former management processes. Actually conducting experiments on board the ISS will be an enormous undertaking and International Agreements and Working Groups will be essential in giving guidance to the flight project management Teams forged in this matrix environment must be competent to make decisions and qualified to work with the array of engineers, scientists, and the spaceflight crews. In order to undertake this complex task, data systems not previously used for these purposes must be adapted so that the investigators and the project management personnel can all share in important information as soon as it is available. The utilization of telescience and distributed experiment operations will allow the investigator to remain involved in their experiment as well as to understand the numerous issues faced by other elements of the program The complexity in formation and management of project teams will be a new kind of challenge for international science programs. Meeting that challenge is essential to assure success of the International Space Station as a laboratory in space.

NASA Discipline General Space Life Sciences↗

Issues in NASA program and project management. Special Report: 1993 conference

This volume is the seventh in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1993 Conference: perspectives in NASA program/project management; the best job in aerospace; improvements in project management at NASA; strategic planning...mapping the way to NASA's future; new NASA procurement initiatives; international cooperation; and industry, government and university partnership. A section on resources for NASA managers rounds out the publication.

Hoffman, ED↗

Project Management in NASA: The system and the men

An analytical description of the NASA project management system is presented with emphasis on the human element. The NASA concept of project management, program managers, and the problems and strengths of the NASA system are discussed.

Pontious, R. H.↗

Was Project Management Life Really Better in Apollo?

This slide presentation discusses the question of "Was Project Management Life Really Better in Apollo?" Was money really flowing freely all through Apollo? Are we wallowing in nostalgia and comparing current circumstances to a managerial time which did not exist? This talk discusses these and other questions as background for you as today s project managers. There are slides showing the timelines from before the speech that Kennedy gave promising to land a man on the moon, to the early 60's, when the manned space center prepared the preliminary lunar landing mission design, an NASA organization chart from 1970, various photos of the rockets, and the astronauts are presented. The next slides discuss the budgets from the 1960's to the early 1970's. Also the results of a survey of 62 managers, who were asked "What problems pose the greatest obstacles to successful project performance?"

Source record↗

Space Program Advocacy Can Distort Project Management and Damage Systems Engineering

Over-optimistic project advocacy often causes exaggerated performance claims and underestimated costs and schedules. This can distort project management and damage systems engineering. NASA projects such as the space shuttle and Hubble are extreme examples. NASA's spectacular success in the Apollo moon landings seems to have produced overconfidence and carelessness, but also to have gained tolerance for unrealistic claims and forgiveness when they were proven wrong. Apollo risk analysis predicted many astronaut fatalities. This was believed but was potentially damaging to the Apollo program, so risk analysis was discontinued. The moon landings beat bad odds because Apollo obsessively reduced risk. Its success seemed to confirm that risk analysis was unreasonably pessimistic and that risk could be overcome by good engineering. This understanding caused risk to be increased during space shuttle engineering and led to an unnecessarily dangerous approach. The shuttle design placed a fragile spacecraft next to the fuel tanks and failed to provide crew escape or launch abort. These design decisions directly caused the Challenger and Columbia tragedies. After Challenger, risk analysis was re-established. The current rocket and capsule design does consider risk and the result strongly resembles Apollo. Apollo advocacy led NASA to abandon risk analysis and this was ultimate cause of the Shuttle tragedies. Excessive advocacy that distorts risk, cost, and schedule could be prevented in an ideal organization that used systems engineering to make rational and fair decisions. However, most real organizations accommodate human and group needs using informal methods often described as "the system." Humans have biases, use innate decision making heuristics, instinctively rely on "gut feel," and establish deviant groups through groupthink. Expecting organizations to become totally rational is impractical, but specific problems such as neglecting risk and underestimating cost and schedule can be directly challenged with some hope of success.

Jones, Harry W.↗

Issues in NASA program and project management. Special report: 1995 conference

This volume is the tenth in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1996 Conference as follows: international partnerships; industry/interagency collaboration; technology transfer; and project management development process. A section on resources for NASA managers rounds out the publication.

Hoffman, Edward J.↗

A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

Mizell, Carolyn↗

PC tools for project management: Programs and the state-of-the-practice

The use of microcomputer tools for NASA project management; which features are the most useful; the impact of these tools on job performance and individual style; and the prospects for new features in project management tools and related tools are addressed. High, mid, and low end PM tools are examined. The pro's and con's of the tools are assessed relative to various tasks. The strengths and weaknesses of the tools are presented through cases and demonstrations.

Bishop, Peter C.↗

Project management techniques for highly integrated programs

The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

Stewart, J. F.↗

2020 Mitigation and Monitoring Report for the Arroyo Las Positas Management Project

This report describes maintenance, monitoring, and mitigation conducted in 2020 as part of the Arroyo Las Positas Management Project (the project) at Lawrence Livermore National Laboratory’s (LLNL’s) Livermore Site. The purpose of this project is to enhance habitat value for the California red-legged frog (Rana draytonii) within the LLNL reach of Arroyo Las Positas and protect LLNL facilities from flooding. The project description, in addition to the monitoring and mitigation requirements for this project are described in the October 2015 Revised Mitigation and Monitoring Plan for the Arroyo Las Positas Management Project (MMP) and the Formal Consultation on the Proposed Arroyo Maintenance Project on Arroyo Las Positas at Lawrence Livermore National Laboratory (biological opinion; Service File Numbers 1-1-97-F-173 and 1-1-98-I-1562).

54 ENVIRONMENTAL SCIENCES↗

Program/Project Management Resources: A collection of 50 bibliographies focusing on continual improvement, reinventing government, and successful project management

These Program/Project Management Resource Lists were originally written for the NASA project management community. Their purpose was to promote the use of the NASA Headquarters Library Program/Project Management Collection funded by NASA Headquarters Code FT, Training & Development Division, by offering introductions to the management topics studied by today's managers. Lists were also written at the request of NASA Headquarters Code T, Office of Continual improvements, and at the request of NASA members of the National Performance Review. This is the second edition of the compilation of these bibliographies; the first edition was printed in March 1994.

Michaels, Jeffrey↗