Search NASA⌕ Search

SEARCH · Search NASA

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Constraints in the Remediation of Uranium Former Uranium Mining Sites - 19586

Uranium mining and milling legacy sites still exist all over the world. Financial constraints play a key role in constraining the remediation of these sites, but a series of other factors must also be considered. The IAEA has been assisting its Member States in moving forward their remediation projects, and more specifically the Central Asian region has received dedicated attention in this aspect. In association with other international organisations such as the European Commission and European Bank of Reconstruction and Development among others in the scope of the CGULS initiative (Coordination Group of Uranium Legacy Sites), a series of activities have been put in place to assist the countries in that region. Through its Technical Cooperation Department, the IAEA has also supported other Member States to manage their legacies. The IAEA CIDER Project (Constraints in Decommissioning and Environmental Remediation) in its first phase investigated possible constraint to implementation of both decommissioning and environmental remediation projects, and collected successful experiences and lessons learned from remediation projects all over the world. It started with a survey in which almost 30 Member States participated. Constraints were examined in three main areas: i) Institutional Aspects (regulatory and policy); ii) Technological and iii) Social. These results have been published in a dedicated report available in the IAEA web page (also called the CIDER Baseline Report). Under the request of participating Member States, a second phase of CIDER has been initiated with a more focused (action oriented) character. In this regard experts developed a framework for helping countries in need under two major areas: Strategy Development and Implementation and Stakeholder Engagement Support. Two other initiatives under CIDER Phase II consisted of the Enhanced Capacity Building in Environmental Remediation (the so-called School of Environmental Remediation) and a database depicting the sites in and in need of remediation in a global perspective. This paper is intended to present and promote some aspects of the methodology conceived in CIDER Phase II to help countries establish remediation strategies that will facilitate overcoming some of the barriers mentioned above. Furthermore, it aims to discuss aspects that might be improved in the assistance provided by international organisations to countries in need of developing remediation projects, pointing out to some of the documented causes for not achieving more robust results. It is expected that the combination of different tools to share good practices e.g. web-based tools, e-Learning, webinars in addition to face-to-face training events, may enhance the chances of successful implementation of remediation of legacy sites, including former uranium production sites. This initiative opens a wide avenue for cooperation while providing a platform to bring together practitioners, regulators, contractors, funding organisations to enhance the support to be provided. By working together, more effective and sustainable results can be achieved and remediation of such sites implemented in a timely, safe and cost-effective way. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Remedial Amendment Delivery through Fluid Viscosity Modifications: Experiments and numerical simulations

Abstract Heterogeneity is often encountered in subsurface contamination characterization and remediation. Low-permeability zones are typically bypassed when remedial fluids are injected into subsurface heterogeneous aquifer systems. Therefore, contaminants in the bypassed areas may not be contacted by the amendments in the remedial fluid, which may significantly prolong the remediation operations. Laboratory experiments and numerical studies have been conducted to develop the Mobility-Controlled Flood (MCF) technology for subsurface remediation and to demonstrate the capability of this technology in enhancing the remedial amendments delivery to the lower permeability zones in heterogeneous systems. Xanthan gum, a bio-polymer, was used to modify the viscosity of the amendment-containing remedial solutions. Sodium mono-phosphate and surfactant were the remedial amendment used in this work. The enhanced delivery of the amendments was demonstrated in two-dimensional (2-D) flow cell experiments, packed with heterogeneous systems. The impact of polymer concentration, fluid injection rate, and permeability contract in the heterogeneous systems has been studied. The Subsurface Transport over Multiple Phases (STOMP) simulator was modified to include polymer-induced shear thinning effects. Shear rates of polymer solutions were computed from pore-water velocities using a relationship proposed in the literature. Viscosity data were subsequently obtained from empirical viscosity-shear rate relationships derived from laboratory data. The experimental and simulation results clearly show that the MCF technology is capable of enhancing the delivery of remedial amendments to subsurface lower permeability zones. The enhanced delivery significantly improved the NAPL removal from these zones and the sweeping efficiency on a heterogeneous system was remarkably increased when a polymer fluid was applied. MCF technology is also able to stabilize the fluid displacing front when there is a density difference between the fluids. The modified STOMP simulator was able to predict the experimental observed fluid displacing behavior. The simulator may be used to predict the subsurface remediation performance when a shear thinning fluid is used to remediate a heterogeneous system.

54 ENVIRONMENTAL SCIENCES↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Managing an Aging Pump-and-Treat Groundwater Remediation System at the Fernald Preserve - 19557

The Fernald Preserve, Ohio, Site underwent restoration and remediation under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). With the exception of the Great Miami Aquifer, the CERCLA remediation was declared physically complete on October 29, 2006, and the site was turned over to the US Department of Energy Office of Legacy Management for long-term care and maintenance. The Record of Decision under CERCLA specifies a concentration-based cleanup that requires the extraction and treatment of Great Miami Aquifer groundwater above Final Remediation Levels (FRLs) until the full, beneficial use potential of the aquifer is achieved, including use as a drinking water source. The area of the aquifer targeted for remediation is 126.5 hectares (312.70 acres). The groundwater pumping remediation was designed by modeling cleanup with the Variable Saturated Analysis Model in 3 Dimensions (VAM-3D) modeling code, developed by Hydrogeologic Inc. The original design called for 23 extraction wells operating at 379 liters per minute (lpm) (100 gallons per minute [gpm]) to 1135 lpm (300 gpm) each for a system total of 18,073 lpm (4775 gpm). In 2014, the system was optimized down to 20 extraction wells operating at 379 to 1893 lpm each for a system total of 19,180 lpm (5075 gpm). To date, pumping has been an effective remediation technology for the aquifer. At the end of 2017, the area of the aquifer remaining above FRLs was down to 38.2 hectares (94.4 acres). From August 1993 through December 2017 (24 years), 6235 kilograms (kg) (13,733 pounds) of uranium were removed from the aquifer by the pumping of 1.74 x 10{sup 11} liters (46.2 billion gallons) of water. Since 2010, treatment of groundwater to achieve regulatory discharge limits at the Great Miami River has not been needed on a routine basis. The ongoing remediation is now essentially a pumping operation, and this water does not require treatment. Metrics reported in the annual Site Environmental Report for the groundwater remediation indicate that, based on the model-predicted estimate of the mass of uranium that needs to be removed from the aquifer to achieve a concentration-based cleanup, the cleanup is approximately 86% - 87% complete. Current model predictions indicate that pumping will need to continue an additional 16 years (until 2035) in some of the wells. During the additional 16 years, it is estimated that approximately 1012 kg (2231 pounds) of uranium will be removed from the aquifer. System pumping rates are designed to decrease over the course of the remaining 16 years, dropping down to a system total of 11,638 lpm (3075 gpm) in 2022 and a system total of 4163 lpm (1100 gpm) in 2033. Even with the designed decreases in pumping rates, it is estimated that approximately 1 x 10{sup 11} liters (26.6 billion gallons) of water will be pumped from the aquifer to remove 1012 kg (2231 pounds) of uranium. This indicates that the remaining 16 years of operation will be much less efficient than the first 24 years. Decreasing efficiency is common for pumping operations. The worst-case scenario is that decreasing concentration trends stabilize above the cleanup FRLs and remediation goals are never achieved. Performance assessments of the pumping remedy will need to be routinely conducted to determine if pumping should be discontinued, if it should be continued but optimized, or if the pumping technology can be supplemented with a different technology that will improve the outcome of the remediation and make the operation more efficient and successful. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FOAM: NOVEL DELIVERY TECHNOLOGY FOR REMEDIATION OF VADOSE ZONE ENVIRONMENTS

Deep vadose zone environments can be a primary source and pathway for contaminant migration to groundwater. These environments present unique characterization and remediation challenges that necessitate scrutiny and research. The thickness, depth, and intricacies of the deep vadose zone, combined with a lack of understanding of the key subsurface processes (e.g., biogeochemical and hydrologic) affecting contaminant migration, make it difficult to create validated conceptual and predictive models of subsurface flow dynamics and contaminant behavior across multiple scales. These factors also make it difficult to design and deploy sustainable remedial approaches and monitor long-term contaminant behavior after remedial actions. Functionally, the methods for addressing contamination must remove and/or reduce transport of contaminants. This problem is particularly challenging in the arid western United States where the vadose zone is hundreds of feet thick, rendering transitional excavation methods exceedingly costly and ineffective. Delivery of remedial amendments is one of the most challenging and critical aspects for all remedy-based approaches. The conventional approach for delivery is through injection of aqueous remedial solutions. However, heterogeneous deep vadose zone environments present hydrologic and geochemical challenges which limit the effectiveness. Because the flow of solution infiltration is dominantly controlled by gravity and suction, injected liquid preferentially percolates through highly permeable pathways, by-passing low-permeability zones which frequently contain the majority of contamination. Moreover, the wetting front can readily mobilize and enhance contaminant transport to the underlying aquifer prior to stabilization. Development of innovative, in-situ technologies may be the only way to meet remedial action objectives and long-term stewardship goals. Surfactants can be used to lower the liquid surface tension and create stabile foams, which readily penetrate low permeability zones. Although surfactant foams have been utilized for subsurface mobilization efforts in the oil and gas industry, so far, the concept of using foams as a delivery mechanism for transporting remedial amendments into deep vadose zone environments to stabilize metal and long-lived radionuclide contaminants has not been explored. Foam flow can be directed by pressure gradients, rather than being dominated by gravity; and, foam delivery mechanisms limit the volume of water (< 5% vol.) required for remedy delivery and emplacement, thus mitigating contaminant mobilization. We will present the results of a numerical modeling and integrated laboratory- / intermediate-scale investigation to simulate, develop, demonstrate, and monitor (i.e. advanced geophysical techniques and advanced predictive biomarkers) foam-based delivery of remedial amendments to remediate metals and radionuclides in vadose zone environments.

Environmental Molecular Sciences Laboratory↗

Estimating the Effects of Soil Remediation on Children’s Blood Lead near a Former Lead Smelter in Omaha, Nebraska, USA

Lead exposures from legacy sources threaten children’s health. Soil in Omaha, Nebraska, was contaminated by emissions from a lead smelter and refinery. The U.S. Environmental Protection Agency excavated and replaced contaminated soil at the Omaha Lead Superfund Site between 1999 and 2016. The goal of this study was to assess the association of soil lead level (SLL) and soil remediation status with blood lead levels (BLLs) in children living near or on the site. We linked information on SLL at residential properties with children’s BLLs and assigned remediation status to children’s BLL measurements based on whether their measurements occurred during residence at remediated or unremediated properties. We examined the association of SLL and remediation status with elevated BLL (EBLL). We distinguished the roles of temporal trend and the intervention with time-by-intervention-status interaction contrasts. All analyses estimated odds ratios (ORs) with a generalized estimating equations approach to ensure robustness under the complex correlations among BLL measurements. All analyses controlled for relevant covariates including children’s characteristics. EBLL (> 5 μg/dL ) was associated with both residential SLL [e.g., OR=2.00; 95% confidence interval (CI): 1.83, 2.19; > 400–800 vs. ≤ 200 ppm] and neighborhood SLL [e.g., OR=1.85 (95% CI: 1.62, 2.11; > 400–800 vs. ≤ 200 ppm)] before remediation but only with neighborhood SLL after remediation. The odds of EBLL were higher before remediation [OR 1.52 (95% CI: 1.34, 1.72)]. Similarly, EBLL was positively associated with preremediation status in our interaction analysis [interaction OR=1.18 (95%CI: 1.02, 1.37)]. Residential and neighborhood SLLs were important predictors of EBLLs in children residing near or on this Superfund site. Neighborhood SLL remained a strong predictor following remediation. Our data analyses showed the benefit of soil remediation. Results from the interaction analyses should be interpreted cautiously due to imperfect correspondence of remediation times between remediation and comparison groups. https://doi.org/10.1289/EHP8657

54 ENVIRONMENTAL SCIENCES↗

DESCRIPTION OF MODELING ANALYSES IN SUPPORT OF THE 200-ZP-1 REMEDIAL DESIGN/REMEDIAL ACTION

The Feasibility Study/or the 200-ZP-1 Groundwater Operable Unit (DOE/RL-2007-28) and the Proposed Plan/or Remediation of the 200-ZP-1 Groundwater Operable Unit (DOE/RL-2007-33) describe the use of groundwater pump-and-treat technology for the 200-ZP-1 Groundwater Operable Unit (OU) as part of an expanded groundwater remedy. During fiscal year 2008 (FY08), a groundwater flow and contaminant transport (flow and transport) model was developed to support remedy design decisions at the 200-ZP-1 OU. This model was developed because the size and influence of the proposed 200-ZP-1 groundwater pump-and-treat remedy will have a larger areal extent than the current interim remedy, and modeling is required to provide estimates of influent concentrations and contaminant mass removal rates to support the design of the aboveground treatment train. The 200 West Area Pre-Conceptual Design/or Final Extraction/Injection Well Network: Modeling Analyses (DOE/RL-2008-56) documents the development of the first version of the MODFLOW/MT3DMS model of the Hanford Site's Central Plateau, as well as the initial application of that model to simulate a potential well field for the 200-ZP-1 remedy (considering only the contaminants carbon tetrachloride and technetium-99). This document focuses on the use of the flow and transport model to identify suitable extraction and injection well locations as part of the 200 West Area 200-ZP-1 Pump-and-Treat Remedial Design/Remedial Action Work Plan (DOEIRL-2008-78). Currently, the model has been developed to the extent necessary to provide approximate results and to lay a foundation for the design basis concentrations that are required in support of the remedial design/remediation action (RD/RA) work plan. The discussion in this document includes the following: (1) Assignment of flow and transport parameters for the model; (2) Definition of initial conditions for the transport model for each simulated contaminant of concern (COC) (i.e., carbon tetrachloride, technetium-99, iodine-129, nitrate [as NO{sub 3}], trichloroethene [TCE], total chromium, tritium), plus uranium; (3) Assumptions underlying the predictive simulations, including the phased implementation of the final full remedy; (4) Approximate number, locations, and rates of extraction and injection wells; and (5) Predicted amounts of contaminant mass extracted and influent concentrations at individual extraction wells for each COC and for uranium. This document is a companion report to pre-conceptual design document (DOE/RL-2008-56). Together these documents describe the sequential, progressive development of the modeling analyses and design basis for the 200-ZP-1 OU remedy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An approach to evaluating and monitoring ecological resources for sustainability on DOE remediation sites: Hanford as a case study - 15524

Protecting ecological and environmental resources is a worthy aspect of the Department of Energy's site missions, for each of its sites, during and after remediation. Ecological resources are important to a range of stakeholders, including regulatory agencies, resource agencies, natural resource trustees, Tribal governments, and the public, and may be an essential component of Native American cultural resources. Because the nature and value of ecological resources can change over time as a result of remediation, succession, and global climate change, it is imperative for DOE to have instituted an acceptable method of evaluating resources before initiation of active remediation, over the ensuing century when institutional and engineering controls are considered to be in effect. Having such a methodology in place also would be key to resource sustainability. Department of Energy sites generally have environmental programs, so instituting specific unified practices for evaluating resources should not be difficult to implement. Instituting these practices would assure the public that ecological resources, as well as human and cultural resources, are being protected now, and can be protected into the future. Key ecological species and/or unique habitats have been preserved at Department of Energy sites since the mid-20. century because of federal government stewardship. Such preservation is particularly true for the sites with larger land areas, including the Hanford Reservation, the Idaho National Laboratory and the Savannah River Site. Individual sites typically have extensive studies of site biodiversity, but site resources are not routinely examined within a regional or national context (Eco-region). The evaluation of the on-site resources with those resources in the appropriate Eco-region provides a context for 'valuing' on- site resources. On-site resources should also be evaluated in terms of federal and state legislation where species may have legal protection and require legal consideration during remediation if present or adjacent to the remediation site. A method is needed in this study for evaluating ecological resources prior to remediation and during remediation, and a paradigm is proposed that will ensure sustainability. Finally, in a period of climate change and instability, developing methods of evaluating ecological resources is essential to successful protection, enhancement, and sustainability. The ecological methodology is part of a Hanford site-wide Risk Review Project, conducted by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP). Our method adapts an existing methodology that includes using established levels for evaluating ecological resources by expanding the existing methodology to include field work for validating previous resource level designations, to assess the occurrence of invasive/exotic species, and to identify landscape scale features (patch size, connectivity). Evaluations should be conducted in the remediation unit itself, and in a buffer zone surrounding the remediation site. The methodology described has been applied to several remediation areas at Hanford, and issues that emerged during its application are discussed. The methodology can be applied at the major sites. Application of the Eco-region analysis will provide regulators and the public with an understanding of the value of the ecological resources in relation to the region, as well as an appreciation for the stewardship role the Department of Energy has played in protecting these resources since the beginning of the Cold War Era and can continue to do so sustainably. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling and Quantitative Assessment of Green and Sustainable Remediation Options for the M1 Air Stripper System at DOE SRS - 15660

The effectiveness of remediation systems needs to be reviewed periodically to assess their performance over the years relative to efficiency and effectiveness. New technologies and Best Management Practices have emerged that can improve existing remediation systems. From a Green and Sustainable Remediation analysis, the higher energy and/or water usage of older systems might not be justified from an environmental protection rationale. For example, remediation systems can run intermittently and with slower flow rates, use less power, and still provide the required level of environmental remediation and protection. This research by the Applied Research Center at Florida International University (FIU) is the preliminary phase of a Green and Sustainable Remediation (GSR) analysis of the operations of the M1 air stripper and the A/M Area groundwater remediation system at the Savannah River Site (SRS). An initial baseline analysis has helped identify opportunities for implementing Green and Sustainable Remediation (GSR) practices while maintaining the hydraulic containment and effectiveness of the remediation system. This study included the collection of contaminant recovery data from SRS reports into a database of trichloroethene (TCE) and tetrachloroethene (PCE) removal from contaminant recovery wells RWM-1 through RWM-12. Presented below are data and preliminary findings from these recovery wells. Findings show that 7 of 12 recovery wells have transitioned to more PCE removal than TCE removal; the nearby steam injection remediation of 'Dynamic Underground Stripping' mobilized DNAPL and resulted in increased recovery in nearby wells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. MNA can also be used after active remediation has been completed (e.g., pump-and-treat) as a polishing step to reach ultimate remedial action objectives. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When timescales for passive remediation extend to many decades, a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that receptors will not be impacted within the remediation timeframe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Evaluation of Remedial Technology Performance in the Laboratory: Multi-year Experimental Test Plan

An understanding of the long-term effectiveness of remediation technologies is central to sustainable environmental cleanup. Long-term experiments are valuable for reducing uncertainty and predicting remediation outcomes at scales required for regulatory compliance. However, these types of tests can be costly and challenging to interpret. Therefore, contaminated sites often rely on short-term laboratory experiments that may not account for the potentially significant effects of gradual, time- dependent processes governing contaminant retention, release, and species transformation. For example, short-term lab experiments (from months to a year) conducted with sediments from the unsaturated and saturated zones at the Hanford Site play an important role in initial evaluations of remediation technologies but cannot capture the full extent of time-dependent reactions, leaving uncertainties in field-scale deployment. Here, long-term testing will be conducted on select technologies based on their performance in short-term testing. The overall objective is to directly address the challenges described above by generating and analyzing data on long-term (2–10 years) efficacy of selected remediation technologies, integrating this understanding into models, and providing critical input for remediation planning, monitoring, and 5-year review cycles for field-implemented remedies. Specific objectives include: 1. Evaluating long-term efficiency of promising remedies under site-specific conditions. 2. Generating robust parameters for modeling, reducing uncertainty in predictive simulations. 3. Advancing integrated monitoring by combining geochemical and geophysical observations. 4. Informing field-scale implementation by incrementally advancing technologies, identifying failure mechanisms early, and prioritizing robust, cost-effective remedies. Through systematic evaluation of technologies in laboratory-scale column experiments, integrated monitoring, and modeling support, this project is designed to bolster confidence in the long-term robustness of selected technologies. The ultimate outcome is the identification and deployment of more reliable, cost-effective remedies that safeguard human health and the environment while reducing the uncertainties that have historically hindered cleanup progress at Hanford Site. An experimental approach was developed and initiated for long-term testing potentially up to 10 years. The table below summarizes the experimental approach developed for testing select technologies and presented in this multi-year experimental test plan.

54 ENVIRONMENTAL SCIENCES↗

Understanding Contaminant Transport Pathways at Rocky Flats - A Basis for the Remediation Strategy

The Rocky Flats Environmental Technology Site (RFETS) is a Department of Energy facility located approximately 16 miles northwest of Denver, Colorado. Processing and fabrication of nuclear weapons components occurred at Rocky Flats from 1952 through 1989. Operations at the Site included the use of several radionuclides, including plutonium-239/240 (Pu), americium-241 (Am), and various uranium (U) isotopes, as well as several types of chlorinated solvents. The historic operations resulted in legacy contamination, including contaminated facilities, process waste lines, buried wastes and surface soil contamination. Decontamination and removal of buildings at the site was completed in late 2005, culminating more than ten years of active environmental remediation work. The Corrective Action Decision/Record of Decision was subsequently approved in 2006, signifying regulatory approval and closure of the site. The use of RFETS as a National Wildlife Refuge is scheduled to be in full operation by 2012. To develop a plan for remediating different types of radionuclide contaminants present in the RFETS environment required understanding the different environmental transport pathways for the various actinides. Developing this understanding was the primary objective of the Actinide Migration Evaluation (AME) project. Findings from the AME studies were used in the development of RFETS remediation strategies. The AME project focused on issues of actinide behavior and mobility in surface water, groundwater, air, soil and biota at RFETS. For the purposes of the AME studies, actinide elements addressed included Pu, Am, and U. The AME program, funded by DOE, brought together personnel with a broad range of relevant expertise in technical investigations. The AME advisory panel identified research investigations and approaches that could be used to solve issues related to actinide migration at the Site. An initial step of the AME was to develop a conceptual model to provide a qualitative description of the relationships among potential actinide sources and transport pathways at RFETS. One conceptual model was developed specifically for plutonium and americium, because of their similar geochemical and transport properties. A separate model was developed for uranium because of its different properties and mobility in the environment. These conceptual models were guidelines for quantitative analyses described in the RFETS Pathway Analysis Report, which used existing data from the literature as well as site-specific analyses, including field, laboratory and modeling studies to provide quantitative estimates of actinide migration in the RFETS environment. For pathways where more than one method was used to estimate offsite loads for a specific pathway, the method yielding the highest estimated off-site was used for comparison purposes. For all actinides studied, for pre-remediation conditions, air and surface water were identified to be the dominant transport mechanisms. The estimated annual airborne plutonium-239/240 load transported off site exceeded the surface water load by roughly a factor of 40. However, despite being the largest transport pathway, airborne radionuclide concentrations at the monitoring location with the highest measurements during the period studied were less than two percent of the allowable 10 milli-rem standard governing DOE facilities. Estimated actinide loads for other pathways were much less. Shallow groundwater was approximately two orders of magnitude lower, or 1/100 of the load conveyed in surface water. The estimated biological pathway load for plutonium was approximately five orders of magnitude less, or 1/100,000, of the load estimated for surface-water. The pathway analysis results were taken into consideration during subsequent remediation activities that occurred at the site. For example, when the 903 Pad area was remediated to address elevated concentrations of Pu and Am in the surface soil, portable tent structures were constructed to prevent wind and water erosion from occurring while remediation activities took place. Following remediation of the 903 Pad and surrounding area, coconut erosion blankets were installed to mitigate erosion effects while vegetation was reestablished [2]. These measures were effective tools to address the primary transport mechanisms identified, coupling the scientific understanding of the site with the remediation strategy.

54 ENVIRONMENTAL SCIENCES↗

Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-term management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies that illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, time frame, and potential remedial effectiveness. This presentation is intended to inform DOE program managers, state regulators, practitioners and other stakeholders who are evaluating technical cleanup challenges within their own programs, and establishing programmatic approaches to evaluating and implementing long-term management approaches. Case studies provide examples of long-term management designations and strategies to manage and remediate groundwater at complex sites. At least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. Long-term management designations are not a way to 'do nothing' or walk away from a site. Instead, soil and groundwater within the zone is managed to be protective of human health and the environment. Understanding when and how to adopt a long-term management approach can lead to cost savings and the more efficient use of resources across DOE and at numerous other industrial and military sites across the U.S. This presentation provides context for assessing the use and appropriate role of alternative endpoints and supporting long-term management designations in final remedies. (authors)

54 ENVIRONMENTAL SCIENCES↗

Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered during remediation. A wide variety of industrial activity on the Pier including extensive foundry operations as well as the industrial nature of the fill used to construct the Pier has resulted in extensive contamination distribution. The Pier structure will require reinforcement to permit both the remediation of the Pier and the adjacent Harbour and remediation techniques will need to be well suited to minimize disruption of wall structures as well as being able to deal with fill ranging from ash to boulders. - Multiple stakeholders are responsible for building demolition, remediation of radiological impacts, remediation of industrial impacts and the use of the site as a staging area for Harbour sediment remediation. The successful remediation of the Centre Pier will require careful negotiation and planning for the various remediation activities noted above. - The depth of contamination on the Pier would result in the complete removal of the Pier if all contamination were to be excavated. Therefore, a Risk Assessment will be conducted to determine the appropriate means for in situ risk management for materials to be left in place below a proposed depth of 1.5 m below current grade. With the concurrence of the property owners and Provincial regulators, the Risk Assessment will be undertaken in accordance with the Provincial requirements that will ensure adequate protection of the environment and future users of the site. - The end use of the Pier has yet to be confirmed by the Municipality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs), data-sharing, real-time characterization reporting, surface and groundwater modeling and other interface planning activities were utilized to help facilitate and complete characterization and remediation activities. As a result of these strategies, the surgical extraction of one contiguous area of soil approximately 354 cubic meters is planned for FY12. The strategies discussed resulted in a major reduction of footprint remediation (i.e., 2.8% of the original estimate) which was originally estimated at over 26,759 cubic meters. The original estimate was developed using historical data collected at various times over the period of 20 years. By leveraging a hybrid sampling approach that involved both statistically-based and biased sampling locations, the area of contamination was significantly reduced resulting in both a compliant remedial design that is cost effective while mitigating a principle threat sources to surface and groundwater at the Y-12 plant. One remedial action boundary of 354 cubic meters was verified in the northern section of the Western OSY area known as the old drum de-header station for VOCs. The original estimate for disposal was in excess of 26,759 cubic meters. This area is scheduled for waste characterization and profile development in the first half of fiscal year 2012. The anticipated disposal facility is an on-site Oak Ridge CERCLA disposal landfill known as the Environmental Management Waste Management Facility (EMWMF). By utilizing the careful strategic planning, field-based screening and close cooperation of regulatory stakeholders as detailed in this paper, the total area of soil requiring remedial action within the Y-12 OSY footprint was 354 cubic meters or 2.8% of the original planned estimate. A potential waste reduction of 97.2% was realized over the original planned estimate for OSY Soils. Significant cost savings were achieved by - Minimizing the footprint of the remedial action; - Confirmatory analysis of soils instead of use of historical sampling results for waste profile development; - Targeting traditional laboratory analysis for soils that failed field screen protocols for radionuclides, heavy metals and VOCs; - Providing accurate and precise definition of RABs; and - Reduction of target contaminants for focused laboratory analysis instead of broad-range contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS and M) of remediated FUSRAP sites. DOE LTS and M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS and M. Over the life of the FUSRAP program from 1974 to the present, DOE's primary mission and responsibility has been to ensure that FUSRAP sites remain protective of human health and the environment. In fulfilling this mission, the DOE program includes the following key elements: eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close communication stakeholders as well as state and federal regulators. DOE programs are designed to preserve and present the information that future stewards and stakeholders will need to maintain site remedies and knowledge. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater remediation at the Fernald preserve, Cincinnati, Ohio modeling and resulting 2014 well field operational changes - 15324

The Fernald Preserve became a US DOE Office of Legacy Management site in November 2006, for long-term surveillance and maintenance following completion (with the exception of completing groundwater cleanup) of the Comprehensive Environmental Response, Compensation, and Liability Act; environmental remediation; and site restoration. When the site was turned over to the Office of Legacy Management, approximately 76 hectares (189 acres) of the Great Miami Aquifer (GMA) remained contaminated with uranium above the final remediation level of 30 micrograms per liter. Uranium contamination is being removed from groundwater in the GMA through a pump-and-treat operation that is predicted by groundwater modeling to continue until 2033. Certifying that cleanup objectives have been met and removing the remediation infrastructure after pump-and-treat (P and T) operations are complete will require a minimum of 3 additional years. The current P and T remedy has operated well. From August 1993 through December 2013 the remedy has been used to remove 5,345 kg (11,784 lb) of uranium from the GMA. A variety of metrics are used to track how the P and T operation is progressing and are reported each year in the Site Environmental Report for the Fernald site. The metrics show that the effectiveness of uranium removal is slowly decreasing (a common observation for P and T remedies) and that operational changes needed to be considered. Several different operational changes were modeled to determine if model-predicted cleanup dates could be shortened and if the effectiveness of the groundwater remediation could be improved. With the concurrence and support of US EPA, Ohio EPA, and site stakeholders, operational changes were agreed upon and implemented in 2014 that are predicted to increase the effectiveness of the ongoing operation and shorten cleanup times for a portion of the aquifer. Although the overall predicted length of the remediation was not shortened, modeling predicts that key areas of the uranium plume will be re-mediated sooner. This paper provides a status of the groundwater remediation under way at the Fernald Preserve near Cincinnati, presents the operational changes that were implemented in 2014, and summarizes the groundwater modeling that supported the changes. This paper also illustrates the potential benefits that can be gained by pro-actively managing a pump-and-treat operation and looking for innovative ways to adjust the operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The SRNL technical assistance program: transferring lessons learned from two decades of remedial successes to the DOE complex - 15438

The Savannah River Site has an established history of developing implementable risk reduction strategies, developing and deploying innovative technological solutions, and collaboratively achieving realistic and protective environmental end states for complex environmental problems. Part of this success results from the strong historical collaboration between site environmental restoration groups and the Savannah River National Laboratory which results in the promulgation of innovative technical approaches and technologies from the laboratory to ongoing remediation campaigns. Much of the underlying research and development effort was funded by DOE's Office on Environmental Management through a series of applied technology demonstration projects (Integrated Demonstration Project, Integrated Programs and the Applied Field Research Site). Concomitant with the research efforts, SRNL has managed a dynamic and efficient national program that provides teams of technical experts with a broad experience base to recommend strategies that reduce risk and/or technical uncertainty for challenging environmental problems at other DOE facilities. At many of these sites, standard remedial approaches (e.g., excavation, pump and treat, soil vapor extraction) have either failed or proved to be too costly, inadequate, or ineffective. Alternatively, other sites struggle with implementation of innovative but less well understood approaches. The technical assistance teams use a structured process that based on several basic concepts, specifically, development of site specific technical frameworks, and careful matching of remedies to site-specific chemical, geological and physical conditions. Development of technical frameworks is a key strategy to apply basic science to an applied field problem. When directed toward understanding complex real-world environmental remediation challenges, frameworks are tools that support practical identification and incorporation of the key-controlling scientific processes and principles. Frameworks can also be used to minimize technical risks, encourage efficiency and effectiveness, and provide the basis for innovative and creative solutions. Efficient and effective environmental cleanup also requires matching the character of remediation and stabilization methods to the nature of the target zone of contamination as the nature of the target zone evolves through the life of the remedial project. A contaminant plume can be divided into the following zones: the source zone, the impact zone, and the transitional zone that then can be used to identify classes of technologies that are appropriate to that zone. For example, physical and chemical methods (e.g., trapping, immobilization, destruction, or isolation) that directly address the source contaminants are often appropriate for the disturbed zone during the remedial process. A variety of methods that include both active treatments (e.g., pump and treat or active bioremediation) and enhanced attenuation technologies (e.g., geochemical manipulation or reactive barriers) are often suitable for the primary contamination zone or impact zone. Various strategies based on natural attenuation processes may be applicable to the primary contamination zone and these methods are typically applied for the transition or baseline portions of the plume. Careful matching of remedies to site-specific conditions is critical to long-term success in environmental cleanup and restoration. The matching process facilitates selection of technologies with particular strengths that align with real-world needs and constraints, encourages strategic use of multiple or combined technologies to address major plume sub-domains, and supports transitioning technologies in space and time as remediation progresses. Since 2006, the SRNL Technical Assistance program has focused on providing support across the DOE complex. During this time, over 25 teams have visited eleven DOE sites and made recommendations that yielded an estimated cost savings of $100 M. Examples will be provided that illustrate key aspects and significant successes of the technical assistance program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗