At least 73 records · Page 4

RECENT PROCESS AND EQUIPMENT IMPROVEMENTS TO INCREASE HIGH LEVEL WASTE THROUGHPUT AT THE DEFENSE WASTE PROCESSING FACILITY

The Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) began stabilizing high level waste (HLW) in a glass matrix in 1996. Over the past few years, there have been several process and equipment improvements at the DWPF to increase the rate at which the high level waste can be stabilized. These improvements have either directly increased waste processing rates or have desensitized the process to upsets, thereby minimizing downtime and increasing production. Improvements due to optimization of waste throughput with increased HLW loading of the glass resulted in a 6% waste throughput increase based upon operational efficiencies. Improvements in canister production include the pour spout heated bellows liner (5%), glass surge (siphon) protection software (2%), melter feed pump software logic change to prevent spurious interlocks of the feed pump with subsequent dilution of feed stock (2%) and optimization of the steam atomized scrubber (SAS) operation to minimize downtime (3%) for a total increase in canister production of 12%. A number of process recovery efforts have allowed continued operation. These include the off gas system pluggage and restoration, slurry mix evaporator (SME) tank repair and replacement, remote cleaning of melter top head center nozzle, remote melter internal inspection, SAS pump J-Tube recovery, inadvertent pour scenario resolutions, dome heater transformer bus bar cooling water leak repair and new Infra-red camera for determination of glass height in the canister are discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Camera Inspection Arm for Boiling Water Reactors - 13330

Boiling Water Reactor (BWR) outage maintenance tasks can be time-consuming and hazardous. Reactor facilities are continuously looking for quicker, safer, and more effective methods of performing routine inspection during these outages. In 2011, S.A. Technology (SAT) was approached by Energy Northwest to provide a remote system capable of increasing efficiencies related to Reactor Pressure Vessel (RPV) internal inspection activities. The specific intent of the system discussed was to inspect recirculation jet pumps in a manner that did not require manual tooling, and could be performed independently of other ongoing inspection activities. In 2012, SAT developed a compact, remote, camera inspection arm to create a safer, more efficient outage environment. This arm incorporates a compact and lightweight design along with the innovative use of bi-stable composite tubes to provide a six-degree of freedom inspection tool capable of reducing dose uptake, reducing crew size, and reducing the overall critical path for jet pump inspections. The prototype camera inspection arm unit is scheduled for final testing in early 2013 in preparation for the Columbia Generating Station refueling outage in the spring of 2013. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated commissioning and inspection for PV systems

An electric system includes a local power controller and solar panel system that includes a plurality of solar modules on one or more branch circuits. A method for commissioning the electric system includes an installer using a commissioning device to send and receive information from a remote system and the local power controller performing an automatic self-test of the electric system. The results of the self-test may be packaged with photographs and measurements of the electric system and sent to a remote system where an inspector can inspect the electric system remotely. After receiving approval by the inspector, the local power controller may automatically activate each branch circuit of the electric system and thus enabling the electric system to generate electricity.

14 SOLAR ENERGY↗

Transducer Signal Noise Analysis for Sensor Authentication

The abstract is being passed through STIMS for submision to the conference. International safeguards organizations charged with promoting the peaceful use of nuclear energy employ unattended and remote monitoring systems supplemented with onsite inspections to ensure nuclear materials are not diverted for weaponization purposes. These systems are left unattended for periods of several months between inspections. During these periods physical security means are the main deterrent used to detect intentional monitoring system tampering. The information gathering components are locked in secure and sealed rooms. The sensor components (i.e. neutron and gamma detectors) are located throughout the plant in unsecure areas where sensor tampering could take place during the periods between inspections. Sensor tampering could allow the diversion of nuclear materials from the accepted and intended use to uses not consistent with the peaceful use of nuclear energy. A method and an apparatus is presented that address the detection of sensor tampering during the periods between inspections. It was developed at the Idaho National Laboratory (INL) for the Department of Energy (DOE) in support of the IAEA. The method is based on the detailed analysis of the sensor noise floor after the sensor signal is removed. The apparatus consists of a 2.1” x 2.6” electronic circuit board containing all signal conditioning and processing components and a laptop computer running an application that acquires and stores the analysis results between inspection periods. The sensors do not require any modification and are remotely located in their normal high radiation zones. The apparatus interfaces with the sensor signal conductors using a simple pass through connector at the normal sensor electronics interface package located in the already secure and sealed rooms. The apparatus does not require hardening against the effects of radiation due to its location. Presented is the apparatus design, the analysis method, and the test results as applied to tamper detection using three HE3 neutron sensors and two gamma sensors designed and built for safeguards monitoring.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

DOE Robotic and Remote Systems Assistance to the Government of Japan

At the request of the Government of Japan, DOE did a complex wide survey of available remotely operated and robotic systems to assist in the initial assessment of the damage to the Fukushima Daiichi reactors following an earthquake and subsequent tsunami. As a result several radiation hardened cameras and a Talon robot were identified as systems that could immediately assist in the effort and were subsequently sent to Japan. These systems were transferred to the Government of Japan and used to map radiation levels surrounding the damaged facilities. This report describes the equipment, its use, data collected, and lessons learned from the experience.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Photon Irradiation Effects on the Enduray Vision System for Nuclear Inspections

Video cameras with greater radiation hardening are needed for the operation and remote handling of equipment in nuclear reactor inspection and refueling applications. Vega Wave Systems has developed a radiation-hardened vision system for nuclear energy applications. The program described in this report provided radiation-hardness testing of this vision system using the Argonne Low-Energy Accelerator Facility (LEAF). This report presents the results of irradiation tests performed on several of Vega Wave System’s cameras at dose rates ranging from 1 kGy/hr up to 10 kGy/hr and up to total doses of >500 kGy. The results were excellent, providing proof of the camera system’s immunity to radiation effects at all levels tested.

36 MATERIALS SCIENCE↗

High Dose Rate Irradiations of Enduray Vision System for Nuclear Inspections

Higher radiation-hardened video cameras are needed in the operation and remote handling of equipment in nuclear reactor inspection and refueling applications. Vega Wave Systems, Inc. has developed a radiation-hardened vision system for nuclear energy applications. This vision system has been developed under several small business innovative research programs (SBIRs) from the U.S. Department of Energy, and the previous GAIN voucher program at Argonne National Laboratory (ANL) was successful in demonstrating that a prototype of the camera is radiation-hard up to at least 525 kGy (5.25 × 106 rad, Si equivalent) at dose rates of 10 kGy/hr with no measurable degradation in image quality and no measurable radiation-induced noise (RIN). Vega Wave Systems has developed a new version of the camera with more than 3X the resolution using a new design and new components, and this new design requires radiation-hardness qualification for marketplace acceptance. The program described in this report provided high radiation-hardness testing of this redesigned high-resolution vision system using the Argonne Low-Energy Accelerator Facility (LEAF). This report presents the results of irradiation tests performed on Vega Wave System’s redesigned high resolution vision system at a dose rate of 9.3 kGy/hr and up to total doses of 1823 kGy. This was an accumulation of 197 hours of irradiation. The results were excellent, providing proof of the redesigned high-resolution vision system’s immunity to high levels of radiation.

42 ENGINEERING↗

Visual Examination of Aluminum Containers for Extended Wet Storage of Non-Aluminum-Clad Spent Nuclear Fuel (FY 2021)

The goal of the Augmented Monitoring and Condition Assessment Program (AMCAP) program is to provide a condition assessment of the storage containers for non-aluminum-clad spent nuclear fuel (NASNF) in L Basin and demonstrate continued safe storage of all NASNF pending retrieval for ultimate disposition. The storage configuration of NASNF is vulnerable to inside-out corrosion attack. The approach being used in AMCAP is to develop and deploy examination methods for remote, in-situ inspection of the bundle storage in VTS and for OSC storage in the OSC racks. A method for Visual Examination (VE) using video-recording cameras was readied as part of the full-scale mockup development, and was deployed in L Basin for the initial condition assessment work. This report describes the development and the deployment of the VE for inspection of selected bundles in L Basin. The first deployment of the VE system was for visually examining five spent fuel bundles. Bundles were chosen based on their vulnerability in terms of inner fuel contents, history, storage duration, storage configuration, and possibility of inside out corrosion due to galvanic coupling of fuel cladding with the aluminum bundle wall.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Event-Based Data Acquisition for Acoustic Emission Monitoring of the Structural Integrity of Wind Turbine Blades [Slides]

DOE Alignment: Reduce the cost of floating offshore wind energy in deep waters to $45/MWh by 2035 from today’s estimated $150/MWh20 by: Developing operations and maintenance strategies and increasing wind turbine reliability to reduce periods of non-operation and reduce labor at sea through remote system health monitoring, inspection, and maintenance capabilities incorporating artificial intelligence and predictive maintenance.

17 WIND ENERGY↗

Linear-array ultrasonic waveguide transducer for under sodium viewing.

In this report, we first present the basic design of a low-noise waveguide and its performance followed by a review of the array transducer technology. The report then presents the concept and basic designs of arrayed waveguide transducers that can apply to under-sodium viewing for in-service inspection of fast reactors. Depending on applications, the basic waveguide arrays consist of designs for sideway and downward viewing. For each viewing application, two array geometries, linear and circular, are included in design analysis. Methods to scan a 2-D target using a linear array waveguide transducer are discussed. Future plan to develop a laboratory array waveguide prototype is also presented.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dry Canister Storage System Inspection and Robotic Delivery System Development

EPRI is working to develop and demonstrate technologies capable of inspecting welded stainless steel canisters used in dry cask storage systems in situ, without the need to remove them from their concrete casks. This involves the coupling of specialized cameras and inspection devices with small remotely operated vehicles (ROVs). The objective is to demonstrate the capability to identify any presence of (or precursors to) stress corrosion cracking (SCC) and other anomalies that may require additional investigation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Autonomous Aerial Power Plant Inspection in GPS-denied Environments

Inspection of coal-fired power plants is frequently dangerous, includes difficult places to reach, and can turn expensive due to the downtimes and cost of inspection crew. Robotic systems have shown capabilities to address some of these issues, but most of the current robotic inspection technology in power plants is designed for specific components. Conversely, recent advances in machine vision have empowered aerial platforms for long-range, remotely-controlled, GPS-based inspections of industrial plants. This capability has led to wide spread utilization of aerial robots (commonly termed Drones, UVS or UAS) platforms for inspection in less challenging environments where both collision avoidance, and GPS reception are not significant issues. The challenge in adapting airborne technology for power plant inspection lies in internal structures and the complex network of piping, and distribution systems, which impose significant risks for collision and can hinder the reception and transmission of GPS signals. The current state of the art in aerial inspection technology within the energy sector is controlled via radio control, and utilizes GPS-based navigation, for inspection of large-scale plants such as offshore platforms and wind turbine parks. Nevertheless, close-range and autonomous inspection in the GPS-denied environments of power plants has not yet been achieved, as it requires precise guidance and navigation with real-time situational awareness and obstacle avoidance capabilities. This endeavor introduced the use of rotary wing flying robots, due to their station keeping and vertical take-off capabilities for power plant components inspection. To enable close quarter inspection two methods were used. One method uses the 3D CAD (Three-dimensional Computer-Aided Design) model of the asset to inspect to generate the UAV’s inspection path. To acquire, analyze and process the 3D model, first, the STL file is produced to obtain surface points and vectors normal to the surface. Later, by introducing other variables such as wall offset and a controlled trajectory between each outline and each subsequent layer, the flight path is generated. The proposed framework will generate a path that will pass as close as desired from the surface and navigate in intricate environments. A second method, use advanced manufacturing techniques such as CNC (Computer Numerical Control) and additive manufacturing. Once the inspection flight path is obtained, vision-based navigation systems are employed to have the UAV autonomously tracking the provided trajectory. Finally, Artificial Intelligence-enabled developments are in charge of detecting cracks and corrosion in structural components of power plants. The proposed methods are validated in simulations, laboratory and industrial setups, where it is shown that the developed systems acting together enable close-quarter autonomous aerial inspection and mapping in power plant assets. The system can be further improved by adding more sensors to navigate in different GPS-denied environments, with non-homogeneous lighting conditions, dust and in general situations where vision-based systems may fail.

01 COAL, LIGNITE, AND PEAT↗

Fukushima inspection manipulator - 15485

After the March 2011 nuclear accident at Fukushima Daiichi NPP it was discovered that there was a large leak inside the Reactor Pressure Vessel (RPV). During the efforts to cool the reactor vessel following the accident, water that was injected into the RPV was found in a lower portion of the facility indicating a leak in the Primary Containment Vessel (PCV). Later, TEPCO announced its high level decommissioning and recovery plan that included equipment locate these leaks and plug them so that the RPV and PCV could be filled with water. Over the past two years Toshiba, IHI and Kurion have been teamed together on projects to find and ultimately to seal these leaks. In the first phase, which was demonstrated in August of 2014, Kurion provided a remote manipulator arm called the Fukushima Inspection Manipulator (FIM) in conjunction with a remotely operated vehicle (ROV) which was developed by Toshiba and IHI to inspect the lower portion of the PCV in Unit 2 of Fukushima Daiichi. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiation Testing for Nuclear Inspection Systems (Final CRADA Report)

Higher-radiation hardened video cameras are needed in the operation and remote handling of equipment in nuclear reactor inspection and refueling applications. Vega Wave Systems has developed a radiation-hardened vision system for Nuclear Energy applications. The high-radiation hardness testing of this vision system was conducted using the Argonne Low-Energy Accelerator Facility (LEAF).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Results of Inspections of Operation of the ORNL Mock Feed/Withdrawal System

Remote monitoring of process activities is one tool under consideration by the International Atomic Energy Agency (IAEA) to handle increasing demands for conducting verification inspections at safeguarded facilities. The ability for the IAEA to continuously monitor feed and withdrawal (F&W) station operations (e.g., load cells and other process attributes) would provide independent verification of normal plant operations, supply data that would make safeguards more effective and efficient, and enable information-driven inspections. Researchers at Oak Ridge National Laboratory (ORNL) have assembled a mock UF6 F&W system using water in lieu of UF6 to test the feasibility of advanced process monitoring systems and concepts (such as remote monitoring) for safeguards. One use of the F&W mockup involves exploring how a safeguards inspector would interact with the data and use it to perform onsite inspections more effectively, so the researchers divided staff into two groups: operators and inspectors. This paper will discuss this process and the promising results of the inspections that have been performed at the mock facility to verify operator declarations and detect material diversion. This paper also will present the intuitive and user-friendly graphic interface researchers used to analyze the information. Although the data gathered previously came from a computer local to the F&W system, future work will include remote transmission and analysis of the data.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

NDE Technology Engineering Program for Hanford DST Non-Visual Volumetric Inspection Technology: Phase II RAVIS Radiation Tolerance Test Report

This test report provides the results of radiation tolerance robustness testing that was performed on samples of robotic components and an ultrasonic guided wave air-slot sensor that represent components/sub-systems of the Robotic Air-slot Volumetric Inspection System (RAVIS) that has been engineered for volumetric inspection of Hanford tank bottom plates via under-tank refractory pad air-slots. The specific components tested for 1) functionality during active irradiation and 2) tolerance to cumulative radiation dose (until failure or upon reaching a cumulative dose test limit) were: • four samples each of a printed circuit board (PCB) and direct current (DC) motor, which are robotic components, and • 26 ultrasonic piezoelectric elements (samples) inside an air-slot sensor. The robotic components are part of the RAVIS air-slot inspection crawler drive control system that is responsible for remote communication with and actuation of the air-slot inspection crawler. The failure of either of these components during under-tank deployment would require manual retrieval via the crawler’s tether, which risks damage to the robot/refractory/tank. Preemptive replacement of the components at appropriately conservative dose/time intervals informed by failure dose would reduce the likelihood of under-tank failure. The components were included in radiation tolerance testing to quantify their failure doses to inform replacement intervals. The air-slot sensor is responsible for collecting ultrasonic inspection data (scan images) for the tank bottom plates during under-tank deployment. Compromised signal quality due to elevated noise levels caused by gamma radiation would compromise inspection performance. The air-slot sensor was included in radiation tolerance testing to quantify the impact of active irradiation on sensor signal quality. The irradiation and in-situ functional tests of the PCBs, DC motors and air-slot sensor took place in June and July 2020 at the Pacific Northwest National Laboratory. Testing was performed at a gamma dose rate near 300 rad/hr., which, in the absence of under-tank dose rate data, has been conservatively estimated to be the upper-bound dose rate beneath the primary tanks at Hanford. Irradiation took place at elevated temperatures of 150-200°F to determine failure doses that reflect the compounding effects of gamma radiation and heat. The test results revealed: • The DC motors can tolerate being actively irradiated at the high dose rate at 200°F and can tolerate a cumulative dose of 300,000 rad, that which would be incurred after 5 years of service at the 300 rad/hr dose rate. The component therefore meets minimum and preferred radiation tolerance and lifecycle requirements for robotic components. • The air-slot sensor can tolerate being actively irradiated at the high dose rate at 150°F and can tolerate a cumulative dose of 60,000 rad, that which would be incurred after 1 year of service at the 300 rad/hr dose rate. The sensor therefore meets minimum radiation tolerance and lifecycle requirements. • The PCB can tolerate being actively irradiated at the high dose rate, but can only tolerate a cumulative dose of 19,000 rad at 150-200°F. The PCB does not meet minimum radiation tolerance and lifecycle requirements; however, because the component is considered replaceable, it can be replaced before a cumulative dose of 19,000 rad is reached, determined through either monitoring with a dosimeter or scheduled time intervals that are calculated based on conservative estimates of under-tank dose rates.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

H-Canyon Tunnel Inspection System

Cable Analysis: The crawlers is controlled remotely via a long coax cable. In order to make sure we do not damage the cable which could cut our contact (data/power/control), we had to determine the bend radius of it at certain locations. This was done with dimensional analysis in Creo and inputting the information into a MATLAB program. Engineering Drawings: Since many of the crawlers parts, such as the main body, needed to be machined, part drawings were needed to communicate the details necessary for manufacture. Project Overview: The H-Canyon Ventilation Exhaust Tunnel due both to its long service history and exposure to aggressive process offgas chemistry has experienced degradation. In order to allow visual inspection of the condition of the radioactively-contaminated tunnel, a remote crawler was designed to deliver cameras as needed to return high definition video. My involvement included Vendor Searches, Cable Analysis, Thermal Analysis, and Engineering Drawings. Thermal Analysis: In order to see if internal active cooling is needed for the crawler, simplified thermal models were designed to approximate the internal temperatures: Conduction (assumes all heat sources are thermally-coupled to the crawler body); Convection (assumes no heat sources are thermally-bonded to crawler). Going Forward: Continue refining the cable analysis as the crawler model is updated and refined. Use my knowledge gained here to further my skills in engineering.