Search NASA⌕ Search

SEARCH · Search NASA

Results for “Requirement analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Spacelab user implementation assessment study (software requirements analysis). Volume 1: Executive study

The primary objective of this study was to develop an integrated approach for the development, implementation, and utilization of all software that is required to efficiently and cost-effectively support advanced technology laboratory flight and ground operations. It was recognized that certain aspects of the operations would be mandatory computerized services; computerization of other aspects would be optional. Thus, the analyses encompassed not only alternate computer utilization and implementations but trade studies of the programmatic effects of non-computerized versus computerized approaches to the operations. A general overview of the study is presented.

Source record↗

Simulation Framework to Estimate the Performance of CO2 and O2 Sensing from Space and Airborne Platforms for the ASCENDS Mission Requirements Analysis

The Active Sensing of CO2 Emissions over Nights Days and Seasons (ASCENDS) mission recommended by the NRC Decadal Survey has a desired accuracy of 0.3% in carbon dioxide mixing ratio (XCO2) retrievals requiring careful selection and optimization of the instrument parameters. NASA Langley Research Center (LaRC) is investigating 1.57 micron carbon dioxide as well as the 1.26-1.27 micron oxygen bands for our proposed ASCENDS mission requirements investigation. Simulation studies are underway for these bands to select optimum instrument parameters. The simulations are based on a multi-wavelength lidar modeling framework being developed at NASA LaRC to predict the performance of CO2 and O2 sensing from space and airborne platforms. The modeling framework consists of a lidar simulation module and a line-by-line calculation component with interchangeable lineshape routines to test the performance of alternative lineshape models in the simulations. As an option the line-by-line radiative transfer model (LBLRTM) program may also be used for line-by-line calculations. The modeling framework is being used to perform error analysis, establish optimum measurement wavelengths as well as to identify the best lineshape models to be used in CO2 and O2 retrievals. Several additional programs for HITRAN database management and related simulations are planned to be included in the framework. The description of the modeling framework with selected results of the simulation studies for CO2 and O2 sensing is presented in this paper.

Plitau, Denis↗

An Integrated Tool for Functional Requirements Analysis, Function Allocation and Task Analysis

The software application is called "HFE-Trace". This is an integrated method and tool for the management of Human Factors Engineering analyses and related data. Its primary purpose is to support the coherent and consistent application of the nuclear industry's best practices for human factors engineering work. The software is a custom Microsoft® Access® application. The application is used (in conjunction with other tools such as spreadsheets, checklists and normal documents where necessary) to collect data on the design of a new nuclear power plant from subject matter experts and other sources. This information is then used to identify potential system and functional breakdowns of the intended power plant design. This information is expanded by developing extensive descriptions of all functions, as well as system performance parameters, operating limits and constraints, and operational conditions. Once these have been verified, the human factors elements are added to each function, including intended operator role, function allocation considerations, prohibited actions, primary task categories, and primary work station. In addition, the application includes a computational method to assess a number of factors such as system and process complexity, workload, environmental conditions, procedures, regulations, etc.) that may shape operator performance. This is a unique methodology based upon principles described in NUREG/CR-3331 ("A methodology for allocating nuclear power plant control functions to human or automatic control") and it results in a semi-quantified allocation of functions to three or more levels of automation for a conceptual automation system. The aggregate of all this information is then linked to the Task Analysis section of the application where the existing information on all operator functions is transformed into task information and ultimately into design requirements for Human-System Interfaces and Control Rooms. This final step includes assessment of methods to prevent potential operator errors.

Hugo, Jacques↗

Coal liquefaction processes and development requirements analysis for synthetic fuels production

Focus of the study is on: (1) developing a technical and programmatic data base on direct and indirect liquefaction processes which have potential for commercialization during the 1980's and beyond, and (2) performing analyses to assess technology readiness and development trends, development requirements, commercial plant costs, and projected synthetic fuel costs. Numerous data sources and references were used as the basis for the analysis results and information presented.

Source record↗

Reliability and availability requirements analysis for DEMO: fuel cycle system

The Demonstration Power Plant (DEMO) will be a fusion reactor prototype designed to demonstrate the capability to produce electrical power in a commercially acceptable way. Two of the key elements of the engineering development of the DEMO reactor are the definitions of reliability and availability requirements (or targets). The availability target for a hypothesized Fuel Cycle has been analysed as a test case. The analysis has been done on the basis of the experience gained in operating existing tokamak fusion reactors and developing the ITER design. Plant Breakdown Structure (PBS) and Functional Breakdown Structure (FBS) related to the DEMO Fuel Cycle and correlations between PBS and FBS have been identified. At first, a set of availability targets has been allocated to the various systems on the basis of their operating, protection and safety functions. 75% and 85% of availability has been allocated to the operating functions of fuelling system and tritium plant respectively. 99% of availability has been allocated to the overall systems in executing their safety functions. The chances of the systems to achieve the allocated targets have then been investigated through a Failure Mode and Effect Analysis and Reliability Block Diagram analysis. The following results have been obtained: 1) the target of 75% for the operations of the fuelling system looks reasonable, while the target of 85% for the operations of the whole tritium plant should be reduced to 80%, even though all the tritium plant systems can individually reach quite high availability targets, over 90% - 95%; 2) all the DEMO Fuel Cycle systems can reach the target of 99% in accomplishing their safety functions. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Plug and Process Loads Capacity and Power Requirements Analysis

This report addresses gaps in actionable knowledge that would help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. Limited initial data, however, suggest that actual PPL densities in leased buildings are substantially lower. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems. Better guidance will enable improved sizing and design of these systems, decrease upfront capital costs, and allow systems to operate more energy efficiently. The main focus of this report is to provide industry with reliable, objective third-party guidance to address the information gap in typical PPL densities for commercial building tenants. This could drive changes in negotiations about PPL energy demands.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Better Building Alliance, Plug and Process Loads in Commercial Buildings: Capacity and Power Requirement Analysis (Brochure)

This brochure addresses gaps in actionable knowledge that can help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. This brochure should be used to make these decisions so systems can operate more energy efficiently; upfront capital costs will also decrease. This information can also be used to drive changes in negotiations about PPL energy demands. It should enable brokers and tenants to agree about lower PPL capacities. Owner-occupied buildings will also benefit. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Software Requirements Analysis as Fault Predictor

Waiting until the integration and system test phase to discover errors leads to more costly rework than resolving those same errors earlier in the lifecycle. Costs increase even more significantly once a software system has become operational. WE can assess the quality of system requirements, but do little to correlate this information either to system assurance activities or long-term reliability projections - both of which remain unclear and anecdotal. Extending earlier work on requirements accomplished by the ARM tool, measuring requirements quality information against code complexity and test data for the same system may be used to predict specific software modules containing high impact or deeply embedded faults now escaping in operational systems. Such knowledge would lead to more effective and efficient test programs. It may enable insight into whether a program should be maintained or started over.

Wallace, Dolores↗

A practical approach to object based requirements analysis

Presented here is an approach developed at the Unisys Houston Operation Division, which supports the early identification of objects. This domain oriented analysis and development concept is based on entity relationship modeling and object data flow diagrams. These modeling techniques, based on the GOOD methodology developed at the Goddard Space Flight Center, support the translation of requirements into objects which represent the real-world problem domain. The goal is to establish a solid foundation of understanding before design begins, thereby giving greater assurance that the system will do what is desired by the customer. The transition from requirements to object oriented design is also promoted by having requirements described in terms of objects. Presented is a five step process by which objects are identified from the requirements to create a problem definition model. This process involves establishing a base line requirements list from which an object data flow diagram can be created. Entity-relationship modeling is used to facilitate the identification of objects from the requirements. An example is given of how semantic modeling may be used to improve the entity-relationship model and a brief discussion on how this approach might be used in a large scale development effort.

Drew, Daniel W.↗

Nuclear Thermal Propulsion Requirements Analysis of the ESAS Reference Human Mars Mission Architecture

The Nuclear Thermal Propulsion Mission and System Analysis (NTP MSA) Phase 2 Study was initiated by Marshall Space Flight Center’s (MSFC) Advanced Concepts Office (VP11) in December, 2005 in support of MSFC’s Nuclear Systems Office (VP31) NTP for Exploration Study. The Mission and Systems Analysis Study was task # 6 of a set of 14 tasks within the NTP for Exploration Study. The primary goal of the NTP MSA Phase 2 Study was to identify the range of potential NTP engine and vehicle requirements for NASA Exploration Systems Mission Directorate (ESMD) Mars human exploration reference mission.

mars↗

Parallel runway requirement analysis study. Volume 1: The analysis

The correlation of increased flight delays with the level of aviation activity is well recognized. A main contributor to these flight delays has been the capacity of airports. Though new airport and runway construction would significantly increase airport capacity, few programs of this type are currently underway, let alone planned, because of the high cost associated with such endeavors. Therefore, it is necessary to achieve the most efficient and cost effective use of existing fixed airport resources through better planning and control of traffic flows. In fact, during the past few years the FAA has initiated such an airport capacity program designed to provide additional capacity at existing airports. Some of the improvements that that program has generated thus far have been based on new Air Traffic Control procedures, terminal automation, additional Instrument Landing Systems, improved controller display aids, and improved utilization of multiple runways/Instrument Meteorological Conditions (IMC) approach procedures. A useful element to understanding potential operational capacity enhancements at high demand airports has been the development and use of an analysis tool called The PLAND_BLUNDER (PLB) Simulation Model. The objective for building this simulation was to develop a parametric model that could be used for analysis in determining the minimum safety level of parallel runway operations for various parameters representing the airplane, navigation, surveillance, and ATC system performance. This simulation is useful as: a quick and economical evaluation of existing environments that are experiencing IMC delays, an efficient way to study and validate proposed procedure modifications, an aid in evaluating requirements for new airports or new runways in old airports, a simple, parametric investigation of a wide range of issues and approaches, an ability to tradeoff air and ground technology and procedures contributions, and a way of considering probable blunder mechanisms and range of blunder scenarios. This study describes the steps of building the simulation and considers the input parameters, assumptions and limitations, and available outputs. Validation results and sensitivity analysis are addressed as well as outlining some IMC and Visual Meteorological Conditions (VMC) approaches to parallel runways. Also, present and future applicable technologies (e.g., Digital Autoland Systems, Traffic Collision and Avoidance System II, Enhanced Situational Awareness System, Global Positioning Systems for Landing, etc.) are assessed and recommendations made.

Ebrahimi, Yaghoob S.↗

Requirements analysis for a multi-spacecraft flight system

The StarLight mission scheduled to launch June 2006, will demonstrate the separated spacecraft technologies of formation flying, precision formation, estimation, and long baseline stellar interferometry.

StarLight systems engineering requirements↗

Midland College Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. In April of 2022, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from LEARN and Midland College for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

97 MATHEMATICS AND COMPUTING↗

McLennan Community College Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. In March of 2022, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from LEARN and McLennan Community College (MCC) for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

99 GENERAL AND MISCELLANEOUS↗

South Plains College Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Between October 2021 and January 2022, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from LEARN and South Plains College (SPC) for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

99 GENERAL AND MISCELLANEOUS↗

Sinclair Community College and OARnet Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Between October 2021 and March 2022 staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from Sinclair Community College (SCC) and OARnet with the purpose of performing a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

San Diego State University Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Between December 2021 and April 2022 staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from San Diego State University (SDSU) the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗