Search NASASearch

SEARCH · Search NASA

Results for “Requirements Verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

NESC GN&C TDT Best Practices: Design Requirements for Satisfactory Handling Qualities of a Piloted Spacecraft

This document describes work to determine a proposed set of concise design requirements for manned spacecraft to yield satisfactory handling qualities when the pilot is performing manual control. This is done primary via the analysis of various historic spacecraft. Partial requirements verification is performed via the creation of a simulated pilot used to determine limits of satisfactory vehicle performance. Partial requirements validation is per-formed via example conceptual design of a spacecraft that is compliant with all relevant proposed requirements.

Cooper-Harper

The NASA Commercial Crew Program (CCP) Mission Assurance Process

In 2010, NASA established the Commercial Crew Program in order to provide human access to the International Space Station and low earth orbit via the commercial (non-governmental) sector. A particular challenge to NASA has been how to determine the commercial providers transportation system complies with Programmatic safety requirements. The process used in this determination is the Safety Technical Review Board which reviews and approves provider submitted Hazard Reports. One significant product of the review is a set of hazard control verifications. In past NASA programs, 100 percent of these safety critical verifications were typically confirmed by NASA. The traditional Safety and Mission Assurance (SMA) model does not support the nature of the Commercial Crew Program. To that end, NASA SMA is implementing a Risk Based Assurance (RBA) process to determine which hazard control verifications require NASA authentication. Additionally, a Shared Assurance Model is also being developed to efficiently use the available resources to execute the verifications. This paper will describe the evolution of the CCP Mission Assurance process from the beginning of the Program to its current incarnation. Topics to be covered include a short history of the CCP; the development of the Programmatic mission assurance requirements; the current safety review process; a description of the RBA process and its products and ending with a description of the Shared Assurance Model.

Commercial Crew Program

The Evolution of the NASA Commercial Crew Program Mission Assurance Process

In 2010, the National Aeronautics and Space Administration (NASA) established the Commercial Crew Program (CCP) in order to provide human access to the International Space Station and low Earth orbit via the commercial (non-governmental) sector. A particular challenge to NASA has been how to determine that the Commercial Provider's transportation system complies with programmatic safety requirements. The process used in this determination is the Safety Technical Review Board which reviews and approves provider submitted hazard reports. One significant product of the review is a set of hazard control verifications. In past NASA programs, 100% of these safety critical verifications were typically confirmed by NASA. The traditional Safety and Mission Assurance (S&MA) model does not support the nature of the CCP. To that end, NASA S&MA is implementing a Risk Based Assurance process to determine which hazard control verifications require NASA authentication. Additionally, a Shared Assurance Model is also being developed to efficiently use the available resources to execute the verifications.

Mission Assurance

ADEPT for Secondary Payloads

Deployable entry vehicles provide an enabling capability for large payloads at destinations across the solar system. The primary advantage of such systems derives from the fundamental limitation of available launch vehicle shroads preventing tried-and-true rigid aeroshell technology from being applied. However, little mission-pull exists for deployable entry vehicle technology for missions where the entry vehicle is the primary payload and can fit within available shrouds. The propensity toward applying rigid aeroshell technology is logical given that deployable concepts are higher risk and provide no marginal scientific benefit for missions where a rigid aeroshell is an option. A movement toward flying smaller spacecraft has emerged in recent years and is revealing novel applications for deployable entry vehicles as secondary payloads. Secondary payloads must minimize interference with the primary payload in order to ease accomodation. Advancements in small spacecraft technology have caught the attention of government entities who are now recognizing the high value proposition of small spacecraft for frequent, incremental technology development and science return rather than the traditional high cost and infrequent big-bang approaches. Worldwide, well over 200 small satellites (mass < 180 kg) have launched in recent years for such purposes as eduation, technology development, science, commerce, and defense. The Adaptable Deployable Entry and Placement Technology (ADEPT), a mechanically-deployable entry vehicle technology, has been under development at NASA since 2011. An Ames Center Innovation Fund (CIF) proposal was recently awarded to study ADEPT for EDL of small payloads. The unique capability of ADEPT for small science payloads comes from its ability to stow within a slender volume and deploy passively to achieve a mass-efficient drag surface with a high heat rate capability. The low ballistic coefficient results in entry heating and mechanical loads that can be met by a revolutionary three-dimensionally woven carbon fabric supported with rib structures. This carbon fabric has test-proven capability as both primary structure and payload thermal protection. This presentation will inform the EDL community of the capability of ADEPT for delivery of small secondary payloads as well as provide status of on-going technology development activities. Results of a mission applications study for secondary payloads to Mars and Venus will be presented. A primary goal of these mission design activities is to integrate high-value verification approaches wherever possible. For example, for some mission applications it is possible to test in NASA arc jet facilities at full-scale. This enables endto- end thermostructural requirement verification with a single test. Another important challenge that needs to be solved is the reliability of the decelerator to achieve the desired shape using simple passive mechanical actuators (such as springs) that do not require power from the primary payload for deployment. A configuration of ADEPT is being prototyped and used to evaluate the functionality and reliability of the deployment mechanism through bench-top testing. The prototype will then be tested in a low speed wind tunnel in late 2014 to evaluate aerodynamic load-carrying capability and deflected shape. Results of the deployment testing and status of wind tunnel test plans will be discussed.

Smith, B.

System Engineering on the Use for Ares I,V - the Simpler, the Better

The Ares I and Ares V Vehicles will utilize the J-2X rocket engine developed for NASA by the Pratt & Whitney Rocketdyne Company. The J-2X is an improved higher power version of the original J-2 engine used during the Apollo program. With higher power and updated requirements for safety and performance, the J-2X becomes a new engine using state-of-the-art design methodology, materials and manufacturing processes. The implementation of Systems Engineering (SE) principles enables the rapid J-2X development program to remain aligned with the ARES I and V vehicle programs, Meeting the aggressive development schedule is a challenge. Coordinating the best expertise thai NASA and PWR have to offer requires effectively utilizing resources at multiple sites. This presents formidable communication challenges. SE allows honest and open discussions of issues and problems. This simple idea is often overlooked in large and complex SE programs. Regular and effective meetings linking SE objectives to component designs are used to voice differences of opinions with customer and contractor in attendance so that the best mutual decisions can be made on the shortest possible schedule. Regular technical interchange meetings on secure program wide computer networks and CM processes are effective,in the "Controlled Change" process that exemplifies good SE. Good communication is a key effective SE implementation. The System of Systems approach is the vision of the Orion program which facilitates the establishment of dynamic SE processes at all levels including the engine. SE enables requirements evolution by facilitating organizational and process agility. Flow down and distribution of requirements is controlled by Allocation Reports which breakdown numerical design objectives (weight, reliability, etc.) into quanta goals for each component area. Linked databases of design and verification requirements helps eliminate redundancy and potential mistakes inherent m separated systems. Another tool, the Architecture Design Description, is being used to control J-2X system architecture and effectively communicate configuration changes to those involved in the design process. But the proof is in successful program accomplishment. The SE is the methodology being used to meet the challenge of completing J-2X engine certification 2 years ahead of any engine program ever developed at PWR. The Ares I SE system of systems has delivered according to expectations thus far. All major design reviews (SRR. PDR, CDR) have been successfully conducted to satisfy overall program objectives using SE as the basis for accomplishment. The paper describes SE tools and techniques utilized to achieve this success.

Kelly, William

Environmental monitoring of the orbiter payload bay and Orbiter Processing Facilities

Contamination control in the Orbiter Processing Facility (OPF) is studied. The clean level required in the OPF is generally clean, which means no residue, dirt, debris, or other extraneous contamination; various methods of maintaining this level of cleanliness are described. The monitoring and controlling of the temperature, relative humidity, and air quality in the OPF are examined. Additional modifications to the OPF to improve contamination control are discussed. The methods used to maintain the payload changeout room at a level of visually clean, no particulates are to be detected by the unaided eye, are described. The payload bay (PLB) must sustain the cleanliness level required for the specific Orbiter's mission; the three levels of clean are defined as: (1) standard, (2) sensitive, and (3) high sensitive. The cleaning and inspection verification required to achieve the desired cleanliness level on a variety of PLB surface types are examined.

Bartelson, D. W.

System Engineering for J-2X Development: The Simpler, the Better

The Ares I and Ares V Vehicles will utilize the J-2X rocket engine developed for NASA by the Pratt and Whitney Rocketdyne Company (PWR) as the upper stage engine (USE). The J-2X is an improved higher power version of the original J-2 engine used for Apollo. System Engineering (SE) facilitates direct and open discussions of issues and problems. This simple idea is often overlooked in large, complex engineering development programs. Definition and distribution of requirements from the engine level to the component level is controlled by Allocation Reports which breaks down numerical design objectives (weight, reliability, etc.) into quanta goals for each component area. Linked databases of design and verification requirements help eliminate redundancy and potential mistakes inherent in separated systems. Another tool, the Architecture Design Description (ADD), is used to control J-2X system architecture and effectively communicate configuration changes to those involved in the design process. But the proof of an effective process is in successful program accomplishment. SE is the methodology being used to meet the challenge of completing J-2X engine certification 2 years ahead of any engine program ever developed at PWR. This paper describes the simple, better SE tools and techniques used to achieve this success.

Kelly, William M.

Space station data management system - A common GSE test interface for systems testing and verification

This paper examines the fundamental problems and goals associated with test, verification, and flight-certification of man-rated distributed data systems. First, a summary of the characteristics of modern computer systems that affect the testing process is provided. Then, verification requirements are expressed in terms of an overall test philosophy for distributed computer systems. This test philosophy stems from previous experience that was gained with centralized systems (Apollo and the Space Shuttle), and deals directly with the new problems that verification of distributed systems may present. Finally, a description of potential hardware and software tools to help solve these problems is provided.

Martinez, Pedro A.

NASA's Evolutionary Xenon Thruster (NEXT) Component Verification Testing

Component testing is a critical facet of the comprehensive thruster life validation strategy devised by the NASA s Evolutionary Xenon Thruster (NEXT) program. Component testing to-date has consisted of long-duration high voltage propellant isolator and high-cycle heater life validation testing. The high voltage propellant isolator, a heritage design, will be operated under different environmental condition in the NEXT ion thruster requiring verification testing. The life test of two NEXT isolators was initiated with comparable voltage and pressure conditions with a higher temperature than measured for the NEXT prototype-model thruster. To date the NEXT isolators have accumulated 18,300 h of operation. Measurements indicate a negligible increase in leakage current over the testing duration to date. NEXT 1/2 in. heaters, whose manufacturing and control processes have heritage, were selected for verification testing based upon the change in physical dimensions resulting in a higher operating voltage as well as potential differences in thermal environment. The heater fabrication processes, developed for the International Space Station (ISS) plasma contactor hollow cathode assembly, were utilized with modification of heater dimensions to accommodate a larger cathode. Cyclic testing of five 1/22 in. diameter heaters was initiated to validate these modified fabrication processes while retaining high reliability heaters. To date two of the heaters have been cycled to 10,000 cycles and suspended to preserve hardware. Three of the heaters have been cycled to failure giving a B10 life of 12,615 cycles, approximately 6,000 more cycles than the established qualification B10 life of the ISS plasma contactor heaters.

Herman, Daniel A.

Cryogenic Optical Assembly (COA) cooldown analysis for the Cosmic Background Explorer (COBE)

The Cosmic Background Explorer (COBE) spacecraft, developed by Goddard Space Flight Center (GSFC), was successfully launched on November 18, 1989 aboard a Delta expendable launch vehicle. Two of the three instruments for this mission were mounted inside a liquid helium (LHe) dewar which operates at a temperature of 2 K. These two instruments are the Diffuse Infrared Background Experiment (DIRBE) and the Far Infrared Absolute Spectrophotometer (FIRAS). They are mounted to a common Instrument Interface Structure (IIS) and the entire assembly is called the Cryogenic Optical Assembly (COA). As part of the structural verification requirement, it was necessary to show that the entire COA exhibited adequate strength and would be capable of withstanding the launch environment. This requirement presented an unique challenge for COBE because the COA is built and assembled at room temperature (300 K), cooled to 2 K, and then subjected to launch loads. However, strength testing of the entire COA at 2 K could not be done because of facility limitations. Therefore, it was decided to perform the strength verification of the COA by analysis.

Coladonato, Robert J.

Design and Development Requirements for Mechanisms

This NASA Technical Standard is published by the National Aeronautics and Space Administration (NASA) to provide uniform engineering and technical requirements for processes, procedures, practices, and methods endorsed as standard for NASA programs and projects, including requirements for selection, application, and design criteria of an item. This Standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers; applicable technical requirements may be cited in contract, program, and other Agency documents. This language applies to the Jet Propulsion Laboratory (a Federally Funded Research and Development Center), other contractors, recipients of grants, cooperative agreements, or other agreements only to the extent specified or referenced in the applicable contracts, grants, or agreements. This Standard establishes uniform design, development, and verification requirements for mechanisms and mechanism components whose correct operation is required for safety or mission success.

Mechanism

Georgetown University – SYSM 5630 Systems Integration Verification and Validation : Todd Noste

At Lawrence Livermore National Laboratory in the National Ignition Facility Optics Group, we use the systems engineering approach for project management and as a design tool. Systems engineering is used in a graded approach to design and project management that is based on risk, informing how much rigor to apply. The tools and techniques from systems engineering offer a framework to organize projects with everyone speaking the same language to provide consistent and repeatable project success that satisfies the stakeholders’ needs and meets the mission. The classes have provided a framework with tools for communicating system design, requirements, verification and validation, and an operational context.

42 ENGINEERING

An Analysis of Extended Reality Mockups for Use in Verification: Phase 2

NASA commercial providers are increasing their use of Virtual Reality (VR) and Hybrid Reality (HR) technologies in their system development process. The use of these technologies, collectively referred to as Extended Reality (XR) technologies, has been limited to the development phase, but there have been requests to integrate VR and HR mockups into verifications. Verifications require, at minimum, a high-fidelity mockup for activities involving human participation (tests, demonstrations, inspections). HR technology shares many of the strengths but may not share some of the critical shortcomings of VR. Specifically, HR allows for integrating physical objects, such as a suit, which may be critical to evaluating a system. Adopting HR technology still has many of the same challenges as VR. Namely, there is little to no data about the validity of evaluations conducted with HR mockups, an established process, or criteria for evaluating the appropriateness of HR mockups. Because verifications are final and only need to happen once, HR mockups must be adequately vetted before being approved for use in verifications. Further hindering the adoption of these technologies is the lack of consensus on what constitutes a high-fidelity XR mockup. Even for physical mockups, there are guidelines and common criteria, but nothing has been formalized. Discussion about when an XR mockup can be used would be greatly helped by clearly defining what a high-fidelity XR mockup is and how it might be measured. The team will engage with relevant stakeholders to learn more about the benefits and challenges of adopting hybrid reality mockups for verification. The team will build upon work from Phase 1 by maturing a framework to guide decisions for evaluating XR mockups for use in verifications. The team will also conduct experimental studies to evaluate advantages and tradeoffs of hybrid/mixed reality relative to physical and virtual reality mockups. Finally, data from Phase 1 and Phase 2 will be synthesized into a set of best practices for developing and validating XR mockups for verification. We will highlight the work conducted to date in Phase 2. We will present the status of the XR for Verification Framework, a summary of best practices identified thus far, and give a synopsis of future work.

verification testing

Specification, space station program (modular)

The modular concepts of a long-term manned scientific laboratory in earth orbit using the space shuttle for orbital buildup and logistics delivery are presented. The specifications defining the performance, design and verification requirements for the Modular Space Program are included.

Source record

Design and flight experience with a digital fly-by-wire control system in an F-8 airplane

A digital fly-by-wire flight control system was designed, built, and for the first time flown in an airplane. The system, which uses components from the Apollo guidance system, is installed in an F-8 airplane as the primary control system. A lunar module guidance computer is the central element in the three-axis, single-channel, multimode, digital control system. A triplex electrical analog system which provides unaugmented control of the airplane is the only backup to the digital system. Flight results showed highly successful system operation, although the trim update rate was inadequate for precise trim changes, causing minor concern. The use of a digital system to implement conventional control laws proved to be practical for flight. Logic functions coded as an integral part of the control laws were found to be advantageous. Although software verification required extensive effort, confidence in the software was achieved.

Deets, D. A.

The infrared spectrum of Jupiter

The principal characteristics of Jupiter's infrared spectrum are reviewed with emphasis on their significance for our understanding of the composition and temperature structure of the Jovian upper atmosphere. The spectral region from 1 to 40 microns divides naturally into three regimes: the reflecting region, thermal emission from below the cloud deck (5-micron hot spots), and thermal emission from above the clouds. Opaque parts of the Jovian atmosphere further subdivide these regions into windows, and each is discussed in the context of its past or potential contributions to our knowledge of the planet. Recent results are incorporated into a table of atmospheric composition and abundance which includes positively identified constituents as well as several which require verification. The limited available information about spatial variations of the infrared spectrum is presented

Ridgway, S. T.

Verification test report on a solar heating and hot water system

Information is provided on the development, qualification and acceptance verification of commercial solar heating and hot water systems and components. The verification includes the performances, the efficiences and the various methods used, such as similarity, analysis, inspection, test, etc., that are applicable to satisfying the verification requirements.

Source record

Noise adding radiometer performance analysis

The DSN noise adding radiometer (NAR) measurement accuracy is analyzed. The NAR capability is part of the precision power monitor function recently introduced in the DSN. The potential system noise temperature measurement accuracy is estimated to be about 1.5% with the 1 kelvin noise diode. Performance verification requires comparison noise temperature measurements with the manual Y factor method and routine monitoring of critical elements in the NAR system such as system linearity and noise diode calibration. A technique is presented to calibrate and reduce the effects of the receiving system nonlinearity. Unsatisfactory performance or degradation of these critical NAR elements would require appropriate system upgrading.

Stelzried, C.