Search NASA⌕ Search

SEARCH · Search NASA

Results for “Rescheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Real-time hierarchically distributed processing network interaction simulation

The Telerobot Testbed is a hierarchically distributed processing system which is linked together through a standard, commercial Ethernet. Standard Ethernet systems are primarily designed to manage non-real-time information transfer. Therefore, collisions on the net (i.e., two or more sources attempting to send data at the same time) are managed by randomly rescheduling one of the sources to retransmit at a later time interval. Although acceptable for transmitting noncritical data such as mail, this particular feature is unacceptable for real-time hierarchical command and control systems such as the Telerobot. Data transfer and scheduling simulations, such as token ring, offer solutions to collision management, but do not appropriately characterize real-time data transfer/interactions for robotic systems. Therefore, models like these do not provide a viable simulation environment for understanding real-time network loading. A real-time network loading model is being developed which allows processor-to-processor interactions to be simulated, collisions (and respective probabilities) to be logged, collision-prone areas to be identified, and network control variable adjustments to be reentered as a means of examining and reducing collision-prone regimes that occur in the process of simulating a complete task sequence.

Zimmerman, W. F.↗

Artificial intelligence approaches in space power systems automation at Marshall Space Flight Center

Various applications of AI to spacecraft electrical power systems are described. Particular attention is given to NICBES (nickel-cadmium battery expert system which is interfaced with the Hubble Space Telescope electrical power system test bed); the SSES; the three cooperating AI systems in the Space Station module power management and distribution system test bed; and I-DARE, the intelligent data reduction expert. It is found that the utilization of AI approaches permits comprehensive fault management and dynamic rescheduling capabilities for the electrical power system.

Weeks, David J.↗

Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

Richards, Stephen F.↗

CRYOSTAT (18-IML-1)

The CRYOSTAT is an autonomously working rack mounted equipment. It provides two thermostat chambers, independently controlled by a processor via on/off switching of the current through peltier elements. The temperature profiles of the freezer and stabilizer are subdivided in a common number of steps, each one with a preprogrammable temperature gradient or at constant temperature. Core parameters can be reprogrammed by crew interaction in case of rescheduling the CRYOSTAT operation time due to changed mission requirements or contingency. Actions of the CRYOSTAT (e.g., opening the slide), the steps, actual temperature of the thermostat chambers, experiment time, and the housekeeping data are recorded on a built-in RAM and a tape. In each thermostat chamber, a specific sample container can be inserted which consists of a transparent Plexiglas block accommodating seven crystallization experiments.

Source record↗

The effect of nitric acid exposure on Galileo spacecraft titanium alloy Ti-6Al-4V propellant tanks

The Ti-6Al-4V-constructed retropropulsion-module tanks of the Galileo spacecraft were purged with nitrogen tetroxide in order to wait out a major launch rescheduling; nitric acid is among the residual products of such an operation. A test program was conducted on representative samples to ascertain the fracture toughness and stress corrosion threshold of the tanks' material, in view of Space Shuttle safety and mission-reliability requirements. It was found that the tanks' structural integrity was not degraded by nitric acid exposure.

Hsieh, Cheng↗

Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

Drummond, Mark↗

Scheduling lessons learned from the Autonomous Power System

The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

Ringer, Mark J.↗

Time management situation assessment (TMSA)

TMSA is a concept prototype developed to support NASA Test Directors (NTDs) in schedule execution monitoring during the later stages of a Shuttle countdown. The program detects qualitative and quantitative constraint violations in near real-time. The next version will support incremental rescheduling and reason over a substantially larger number of scheduled events.

Richardson, Michael B.↗

SRB Environment Evaluation and Analysis. Volume 2: RSRB Joint Filling Test/Analysis Improvements

Following the Challenger accident a very comprehensive solid rocket booster (SRB) redesign program was initiated. One objective of the program was to develop expertise at NASA/MSFC in the techniques for analyzing the flow of hot gases in the SRB joints. Several test programs were undertaken to provide a data base of joint performance with manufactured defects in the joints to allow hot gases to fill the joints. This data base was used also to develop the analytical techniques. Some of the test programs were Joint Environment Simulator (JES), Nozzle Joint Environment Simulator (NJES), Transient Pressure Test Article (TPTA), and Seventy-Pound Charge (SPC). In 1988 the TPTA test hardware was moved from the Utah site to MSFC and several RSRM tests were scheduled, to be followed by tests for the ASRM program. REMTECH Inc. supported these activities with pretest estimates of the flow conditions in the test joints, and post-test analysis and evaluation of the measurements. During this support REMTECH identified deficiencies in the gas-measurement instrumentation that existed in the TPTA hardware, made recommendations for its replacement, and identified improvements to the analytical tools used in the test support. Only one test was completed under the TPTA RSRM test program, and those scheduled for the ASRM were rescheduled to a time after the expiration of this contract. The attention of this effort was directed toward improvements in the analytical techniques in preparation for when the ASRM program begins.

Knox, E. C.↗

Update to the safety program for the general-purpose heat source radioisotope thermoelectric generators for the Galileo and Ulysses missions

With the rescheduling of the Galileo and Ulysses launches and the use of new upper stages following the Challenger accident, the aerospace nuclear safety program for the general-purpose heat source radioisotope thermoelectric generators (GPHS-RTGs) was extended to accommodate the new mission scenarios. As in the original safety program, the objectives were to determine the response of the GPHS-RTG to the various postulated accident environments and to determine the risk (if any) associated with these postulated accidents. The extended GPHS-RTG safety program was successfully completed in sufficient time to prepare an updated Final Safety Analysis Report (FSAR) with revisions for the October 1989 launch of the Galileo spacecraft.

Bennett, Gary L.↗

Concepts in distributed planning, scheduling, and control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling, and control must allow for: (1) interactive real-time remote operations; (2) responsive scheduling and rescheduling; (3) support of the full range of distributed science, application and commercial users; (4) interaction and cooperation among distributed users; and (5) efficient use of often onboard, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe approaches to distributed planning, scheduling and control functions that are based on resources and on a distributed knowledge hierarchy. We describe the scheduling functions as the component of the integrated space-ground Operations Management System. We include the integration of the planning and scheduling functions with the real-time operations control system, and we discuss automated scheduling assistants. These suggested approaches, taken from the users' point-of-view, have resulted in two prototype systems: Operations and Science Instrument Support package and Science User Resource Planning and Scheduling System.

Hansen, Elaine↗

OMS event evaluator and scheduler

An Operations Management System (OMS) is being designed for Space Station Freedom to improve productivity, reliability, and safety while reducing operations and maintenance costs. Central to the concept is a short term plan containing mixes of man-readable and machine-executable procedures used in an environment of distributed processing and execution. An OMS event evaluator to check upcoming short-term plan events for validity of execution is under development. The first version checks time and resource constraints against operational conditions for current or expected stations. In work are the handling of environmental and other operational constraints, as well as detailed modeling of resources and station operational states. The Ada Program also has the ability to reschedule all or part of the events.

Eckelkamp, Richard E.↗

Portable computing - A fielded interactive scientific application in a small off-the-shelf package

Experience with the design and implementation of a portable computing system for STS crew-conducted science is discussed. Principal-Investigator-in-a-Box (PI) will help the SLS-2 astronauts perform vestibular (human orientation system) experiments in flight. PI is an interactive system that provides data acquisition and analysis, experiment step rescheduling, and various other forms of reasoning to astronaut users. The hardware architecture of PI consists of a computer and an analog interface box. 'Off-the-shelf' equipment is employed in the system wherever possible in an effort to use widely available tools and then to add custom functionality and application codes to them. Other projects which can help prospective teams to learn more about portable computing in space are also discussed.

Groleau, Nicolas↗

DYNACLIPS (DYNAmic CLIPS): A dynamic knowledge exchange tool for intelligent agents

In a dynamic environment, intelligent agents must be responsive to unanticipated conditions. When such conditions occur, an intelligent agent may have to stop a previously planned and scheduled course of actions and replan, reschedule, start new activities and initiate a new problem solving process to successfully respond to the new conditions. Problems occur when an intelligent agent does not have enough knowledge to properly respond to the new situation. DYNACLIPS is an implementation of a framework for dynamic knowledge exchange among intelligent agents. Each intelligent agent is a CLIPS shell and runs a separate process under SunOS operating system. Intelligent agents can exchange facts, rules, and CLIPS commands at run time. Knowledge exchange among intelligent agents at run times does not effect execution of either sender and receiver intelligent agent. Intelligent agents can keep the knowledge temporarily or permanently. In other words, knowledge exchange among intelligent agents would allow for a form of learning to be accomplished.

Cengeloglu, Yilmaz↗

Re-scheduling as a tool for the power management on board a spacecraft

The scheduling of events on board a spacecraft is based on forecast energy levels. The real time values of energy may not coincide with the forecast values; consequently, a dynamic revising to the allocation of power is needed. The re-scheduling is also needed for other reasons on board a spacecraft like the addition of new event which must be scheduled, or a failure of an event due to many different contingencies. This need of rescheduling is very important to the survivability of the spacecraft. In this presentation, a re-scheduling tool will be presented as a part of an overall scheme for the power management on board a spacecraft from the allocation of energy point of view. The overall scheme is based on the optimal use of energy available on board a spacecraft using expert systems combined with linear optimization techniques. The system will be able to schedule maximum number of events utilizing most energy available. The outcome is more events scheduled to share the operation cost of that spacecraft. The system will also be able to re-schedule in case of a contingency with minimal time and minimal disturbance of the original schedule. The end product is a fully integrated planning system capable of producing the right decisions in short time with less human error. The overall system will be presented with the re-scheduling algorithm discussed in detail, then the tests and results will be presented for validations.

Albasheer, Omar↗

Fault Diagnosis of Power Systems Using Intelligent Systems

The power system operator's need for a reliable power delivery system calls for a real-time or near-real-time Al-based fault diagnosis tool. Such a tool will allow NASA ground controllers to re-establish a normal or near-normal degraded operating state of the EPS (a DC power system) for Space Station Alpha by isolating the faulted branches and loads of the system. And after isolation, re-energizing those branches and loads that have been found not to have any faults in them. A proposed solution involves using the Fault Diagnosis Intelligent System (FDIS) to perform near-real time fault diagnosis of Alpha's EPS by downloading power transient telemetry at fault-time from onboard data loggers. The FDIS uses an ANN clustering algorithm augmented with a wavelet transform feature extractor. This combination enables this system to perform pattern recognition of the power transient signatures to diagnose the fault type and its location down to the orbital replaceable unit. FDIS has been tested using a simulation of the LeRC Testbed Space Station Freedom configuration including the topology from the DDCU's to the electrical loads attached to the TPDU's. FDIS will work in conjunction with the Power Management Load Scheduler to determine what the state of the system was at the time of the fault condition. This information is used to activate the appropriate diagnostic section, and to refine if necessary the solution obtained. In the latter case, if the FDIS reports back that it is equally likely that the faulty device as 'start tracker #1' and 'time generation unit,' then based on a priori knowledge of the system's state, the refined solution would be 'star tracker #1' located in cabinet ITAS2. It is concluded from the present studies that artificial intelligence diagnostic abilities are improved with the addition of the wavelet transform, and that when such a system such as FDIS is coupled to the Power Management Load Scheduler, a faulty device can be located and isolated from the rest of the system. The benefit of these studies provides NASA with the ability to quickly restore the operating status of a space station from a critical state to a safe degraded mode, thereby saving costs in experimentation rescheduling, fault diagnostics, and prevention of loss-of-life.

Momoh, James A.↗

Delta XTE Launch Activities (Scrub #2)

This NASA Kennedy Space Center video presents Delta XTE (X-Ray Timing Explorer) launch activities on 12/11/95. The launch was rescheduled for next weekend due to out of limit upper level wind conditions.

Source record↗

Reliability Constrained Priority Load Shedding for Aerospace Power System Automation

The need for improving load shedding on board the space station is one of the goals of aerospace power system automation. To accelerate the optimum load-shedding functions, several constraints must be involved. These constraints include congestion margin determined by weighted probability contingency, component/system reliability index, generation rescheduling. The impact of different faults and indices for computing reliability were defined before optimization. The optimum load schedule is done based on priority, value and location of loads. An optimization strategy capable of handling discrete decision making, such as Everett optimization, is proposed. We extended Everett method to handle expected congestion margin and reliability index as constraints. To make it effective for real time load dispatch process, a rule-based scheme is presented in the optimization method. It assists in selecting which feeder load to be shed, the location of the load, the value, priority of the load and cost benefit analysis of the load profile is included in the scheme. The scheme is tested using a benchmark NASA system consisting of generators, loads and network.

Momoh, James A.↗