Search NASA⌕ Search

SEARCH · Search NASA

Results for “Round Trip Time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Advances in High-rate Delay Tolerant Networking On-board the International Space Station

The High-rate Delay Tolerant Networking (HDTN) project at the NASA John H. Glenn Research Center (GRC) is developing a performance optimized Delay Tolerant Networking (DTN) implementation which is able to provide reliable multigigabit per second automated network communications for near-Earth and deep space missions. To that end, this paper provides an overview of the testing and integration efforts culminating in a high-rate DTN demonstration onboard the International Space Station (ISS). Over several years, the HDTN team has performed a series of end-to-end tests between the Software Development and Integration Laboratory (SDIL) at the Lyndon B. Johnson Space Center (JSC) and Marshall Space Flight Center’s Huntsville Operations Support Center (HOSC). The testing has focused on a realistic emulation of the ISS Ku-band RF link, which operates at a maximum of 500 Mbps downlink with a 600 ms round-trip time. In this environment, the HDTN onboard gateway has been tested for interoperability with ISS payload nodes and the DTN ground gateway, store and forward capability, reliable transport using the Licklider Transmission Protocol (LTP), and successful recovery from unexpected loss of signal. In addition to integration testing, HDTN has developed a series of software engineering practices to ensure the stability and maturity of the implementation. As the result, HDTN has successfully demonstrated high-rate DTN services onboard the ISS. This paper concludes with a summary of preliminary flight testing results from the Integrated LCRD LEO User Modem and Amplifier Terminal networking experiments.

Delay tolerant networking↗

SERENE: Saturn Enceladus Return Explorer with Nuclear Electric Propulsion

A ‘quick’ Enceladus sample return mission concept was developed based on the scientist recommendations at the recent ‘Accelerating Space Science with Nuclear Technology Workshop’. The Nuclear Electric Propulsion spacecraft assumed a follow-on 40 kWe nuclear reactor using the demonstrated 40 kWe Fission Surface Power system, expected in the early 2030s. The NEP vehicle also utilized a set of NEXT-C ion thrusters as well as planned Artemis commercial launchers. By launching the 40 kW NEP vehicle on a Starship and adding the propellants of 15 tankers, the 27t probe could be sent on a direct trajectory to Saturn (no Earth or Jupiter flybys) where NEP was used for Saturn capture, spiral down, spiral up and return to the Earth. A small lander obtained the surface Enceladus sample. Using the 40 kW NEP provided a round-trip time of only 16.5 years. A second option was more attractive from a science perspective whereby the NEP vehicle would deliver a large, 6t chemical lander to low Enceladus orbit where it would grab and return a sample to Earth (similar to the recent Orbilander design but in reverse). After deploying the lander, the NEP vehicle would stay in Saturn space performing a moon tour by orbiting four more moons and mapping the large moon of Titan. This option took slightly longer (18.5 yrs) due to the chemical return leg limitations. Both options demonstrated the agility, payload capability, and sample return goals the workshop recommended. An all-chemical option with two stages was roughly analyzed but took 21.5 yrs and required a Jupiter gravity assist.

Nuclear Electric Propulsion↗

Machine Learning Methods for Connection RTT and Loss Rate Estimation Using MPI Measurements Under Random Losses

Scientific computations are expected to be increasingly distributed across wide-area networks, and Message Passing Interface (MPI) has been shown to scale to support their communications over long distances. Application-level measurements of MPI operations reflect the connection Round-Trip Time (RTT) and loss rate, and machine learningmethods have been previously developed to estimate them under deterministic periodic losses. In this paper, we consider more complex, random losses with uniform, Poisson and Gaussian distributions. We study five disparate machine leaning methods, with linear and non-linear, and smooth and non-smooth properties, to estimate RTT and loss rate over 10 Gbps connections with 0–366 ms RTT. The diversity and complexity of these estimators combined with the randomness of losses and TCP’s non-linear response together rule out the selection of a single best among them; instead, we fuse them to retain their design diversity. Overall, the results show that accurate estimates can be generated at low loss ratesbut become inaccurate at loss rates 10% and higher, thereby illustrating both their strengths and limitations.

Rao, Nageswara S.↗

Systems and methods for authentication and key agreement in a smart grid

Systems and methods for authentication and key agreement are provided and can utilize a scheme that uses dynamic key generation to achieve replay-attack resistance in zero round trip time (0-RTT). The hash-chain concept can be integrated with the Diffie-Hellman (DH) key exchange scheme. With this scheme, a device can securely determine the new shared key immediately (i.e., in 0-RTT) and start using it.

Akkaya, Kemal↗

Novel, Middle and Long Wave Infrared Laser Sources For Accelerator Applications

The main accomplishment during Years 2020-2024 of the DOE Accelerator Stewardship Program is proof-of-principle demonstration of amplification of an ultrashort 10 µm seed pulse in a multiatmosphere CO 2 laser optically pumped by nanosecond pulses of either a ~4.3 µm Fe:ZnSe laser or a 2.8 µm electro-optically (EO) Q-switched Er: Laser. This has been accomplished at the UCLA Neptune Laboratory by using about 100 mJ, ~100 ns long pulses generated by the pump laser built for this purpose by the UAB team. Implementation of EO Q-switching regime in the solid-state Er:laser system made possible nanosecond synchronization between the pump pulse and the 0.5 ps seed pulse produced by a commercial Ti:sapphire laser based mid-IR OPA/DFG. The injection mode-locking regime realized in a compact Mult atmosphere 3 Hz CO 2 -He regenerative amplifier enabled generation of a train of ultrashort pulses separated by the cavity round-trip time of ~3.2 ns. The measured gain lifetime of ~1 µs at a total pressure of ~12-15 atm indicates that lifetime of the upper laser level is a critical limiting factor in designing high-pressure CO 2 amplifiers. A single picosecond 10 mm pulse with an energy 0.1-0.2 mJ was extracted from the amplifier’s cavity using an ultrafast Ge semiconductor switch whose reflectivity was photo-induced by a femtosecond 800 nm pulse. For direct amplification regime, nonlinear absorption in Ge at 10 mm at GW/cm 2 intensities limited the extracted energy. Therefore, the generated energy could be further increased by minimizing losses in the switch and optimizing the cavity mode size. Based on the obtained data in collaboration with BNL colleagues, we have designed a high-pressure CO 2 amplifier to be used as a preamplifier for the future experiments at the ATF BNL. The latter work is the subject of funding availability.

60 APPLIED LIFE SCIENCES↗

Key Differences in Operating a Rover on the Moon vs. Mars

The command and control model for spacecraft operations, as well as the distribution of tasks between ground assets and in space assets, whether with a crew or solely robotic, is fundamentally constrained by the round trip light time between the space asset and the control facility (presumably on Earth, though not required). For an asset on Mars, the round trip light time varies, from roughly fourteen minutes to up to forty minutes. For a Lunar asset the round-trip light time is measured in only a few seconds, but current communications systems may more than double the latency with system overhead. For a Lunar Asset the total command latency may range from six seconds to more than forty, depending on communications overhead and data rates. Further, these variables are not always predictable, thus complicating operations. There are several differentiating factors for Lunar vs. Mars operations, Round trip light time/Atmosphere/Lighting and ShadowsTerrain type and knowledge/Round trip light time has implications for the distribution of tasks between ground and in space assets. Even at Lunar Distances, the combination of round trip light time plus communications systems overhead does not enable joy stick driving of a rover. The best that can be done, if driving from Earth, is near real time command and control. By 2030, driving from in space may be possible. Productivity on Mars requires either long operational sequences of commands, as is done for current rovers such as Curiosity, significant autonomous capability or, as may be possible by 2030, command and control support from space. Another implication of the long round trip light time from Earth to Mars, is that flight software functions must be resident on the in space asset. On the Moon, there is considerably more flexibility, enabling processing functions, to be resident on Earth or in space. This provides the opportunity to take advantage of the considerable processing power available on the ground, but may be constrained by data rates. On the Moon, for practical operational purposes, there is no atmosphere. Hence there is no scattering of light in the shadows. This has implications for image interpretation and driving near the poles. The Moon has permanently shadowed regions (PSR), unique terrain with unknown surface properties. With no scattering of light in shadows, driving on the Moon, particularly at the poles, where we have strong evidence of water, may prove to be hazardous and complex, requiring non-optical sensors, such as LIDAR.

Trimble, Jay↗

Fast round-trip Mars trajectories

This paper is concerned with the effect of limiting the overall duration or else the one-way flight time of a round trip to Mars, as reflected in the sum of impulsive velocity increments required of the spacecraft propulsion system. Ignition-to-burnout mass ratios for a hypothetical single stage spacecraft, obtained from the rocket equation by combining these delta-V sums with appropriate values of specific impulse, are used to evaluate the relative effectiveness of four high-thrust propulsion alternatives. If the flight crew goes to the surface of Mars and stays there for the duration of their stopover, it is much cheaper (in terms of delta-V) to minimize their zero-g exposure by limiting the interplanetary transit time of a conjunction-class mission (round trip time = 800-1000 days, Mars stopover = 450-700 days) than to impose the same limit on an opposition-class mission (round trip time less than 600 days, stopover = 40 days). Using solid-core nuclear thermal propulsion to fly a conjunction-class mission, for a moderate mass penalty the interplanetary transit time (each way) probably could be limited to something in the range of 4 to 6 months, depending on the launch year.

Wilson, Sam↗

Improved Method of Locating Defects in Wiring Insulation

An improved method of locating small breaches in insulation on electrical wires combines aspects of the prior dielectric withstand voltage (DWV) and time-domain reflectometry (TDR) methods. The method was invented to satisfy a need for reliably and quickly locating insulation defects in spacecraft, aircraft, ships, and other complex systems that contain large amounts of wiring, much of it enclosed in structures that make it difficult to inspect. In the DWV method, one applies a predetermined potential (usually 1.5 kV DC) to the wiring and notes whether the voltage causes any arcing between the wiring and ground. The DWV method does not provide an indication of the location of the defect (unless, in an exceptional case, the arc happens to be visible). In addition, if there is no electrically conductive component at ground potential within about 0.010 in. (approximately equal to 0.254 mm) of the wire at the location of an insulation defect, then the DWV method does not provide an indication of the defect. Moreover, one does not have the option to raise the potential in an effort to increase the detectability of such a defect because doing so can harm previously undamaged insulation. In the TDR method as practiced heretofore, one applies a pulse of electricity having an amplitude of less than 25 V to a wire and measures the round-trip travel time for the reflection of the pulse from a defect. The distance along the wire from the point of application of the pulse to the defect is then calculated as the product of half the round-trip travel time and the characteristic speed of a propagation of an electromagnetic signal in the wire. While the TDR method as practiced heretofore can be used to locate a short or open circuit, it does not ordinarily enable one to locate a small breach in insulation because the pulse voltage is too low to cause arcing and thus too low to induce an impedance discontinuity large enough to generate a measurable reflection. The present improved method overcomes the weaknesses of both the prior DWV and the prior TDR method.

Greulich, Owen R.↗

Design of Round-trip Trajectories to Near-Earth Asteroids Utilizing a Lunar Flyby

There are currently over 7,700 known Near-Earth Asteroids (NEAs), and more are being discovered on a continual basis. Current models predict that the actual order of magnitude of the NEA population may range from 10' to 10 6 . The close proximity of NEA orbits to Earth's orbit makes it possible to design short duration round-trip trajectories to NEAs under the proper conditions. In previous work, 59 potentially accessible NEAs were identified for missions that depart Earth between the years 2016 and 2050 and have round-trip flight times of a year or less. We now present a new method for designing round-trip trajectories to NEAs in which the Moon's gravity aids the outbound trajectory via a lunar flyby. In some cases this gravity assist can reduce the overall spacecraft propellant required for the mission, which in turn can allow NEAs to be reached which would otherwise be inaccessible to a given mission architecture. Results are presented for a specific case study on NEA 2003 LN6.

Hernandez, Sonia↗

Ultrasonic thermometry using pulse techniques.

Ultrasonic pulse techniques have been developed which, when applied to inert gases, provide temperature measurements up to 8000 K. The response time can be less than 1 msec. This is a significant feature in studying shock-heated or combusting gases. Using a momentary contact coupling technique, temperature has been measured inside steel from 300 to 1500 K. Thin-wire sensors have been used above 2000 K in nuclear and industrial applications where conditions preclude the use of thermocouples, resistance devices, or optical pyrometers. At 2500 K, temperature sensitivity of 0.1% is obtained in Re wire sensors 5 cm long by timing five round trips with an electronic instrument that resolves the time interval between selected echoes to 0.1 microsec. Sensors have been operated at rotational speeds over 2000 rpm and in noisy environments. Temperature profiling of up to ten regions using only a single guided path or beam has also been accomplished.

Lynnworth, L. C.↗

Agile Science Operations: A New Approach for Primitive Exploration Bodies

Primitive body exploration missions such as potential Comet Surface Sample Return or Trojan Tour and Rendezvous would challenge traditional operations practices. Earth-based observations would provide only basic understanding before arrival and many science goals would be defined during the initial rendezvous. It could be necessary to revise trajectories and observation plans to quickly characterize the target for safe, effective observations. Detection of outgassing activity and monitoring of comet surface activity are even more time constrained, with events occurring faster than round-trip light time. "Agile science operations" address these challenges with contingency plans that recognize the intrinsic uncertainty in the operating environment and science objectives. Planning for multiple alternatives can significantly improve the time required to repair and validate spacecraft command sequences. When appropriate, time-critical decisions can be automated and shifted to the spacecraft for immediate access to instrument data. Mirrored planning systems on both sides of the light-time gap permit transfer of authority back and forth as needed. We survey relevant science objectives, identifying time bottlenecks and the techniques that could be used to speed missions' reaction to new science data. Finally, we discuss the results of a trade study simulating agile observations during flyby and comet rendezvous scenarios. These experiments quantify instrument coverage of key surface features as a function of planning turnaround time. Careful application of agile operations techniques can play a significant role in realizing the Decadal Survey plan for primitive body exploration

Agile science↗

Polarized-interferometer feasibility study

The feasibility of using a polarized-interferometer system as a rendezvous and docking sensor for two cooperating spacecraft was studied. The polarized interferometer is a radio frequency system for long range, real time determination of relative position and attitude. Range is determined by round trip signal timing. Direction is determined by radio interferometry. Relative roll is determined from signal polarization. Each spacecraft is equipped with a transponder and an antenna array. The antenna arrays consist of four crossed dipoles that can transmit or receive either circularly or linearly polarized signals. The active spacecraft is equipped with a sophisticated transponder and makes all measurements. The transponder on the passive spacecraft is a relatively simple repeater. An initialization algorithm is developed to estimate position and attitude without any a priori information. A tracking algorithm based upon minimum variance linear estimators is also developed. Techniques to simplify the transponder on the passive spacecraft are investigated and a suitable configuration is determined. A multiple carrier CW signal format is selected. The dependence of range accuracy and ambiguity resolution error probability are derived and used to design a candidate system. The validity of the design and the feasibility of the polarized interferometer concept are verified by simulation.

Raab, F. H.↗

Mars Rover Sample Return mission delivery and return challenges

The Mars Rover Sample Return mission is a robotic exploration mission culminating in the return of atmospheric and surface samples from Mars to Earth. To accomplish this complex mission requires sophisticated autonomous systems for many time-critical operations associated with the delivery and return phases, since the round trip light times preclude Earth-based control of these operations. In addition, there are significant engineering and technology challenges to be addressed to meet the mission science and exploration objectives.

Cohen, Aaron↗

Design of teleoperation system with a force-reflecting real-time simulator

We developed a force-reflecting teleoperation system that uses a real-time graphic simulator. This system eliminates the effects of communication time delays in remote robot manipulation. The simulator provides the operator with predictive display and feedback of computed contact forces through a six-degree of freedom (6-DOF) master arm on a real-time basis. With this system, peg-in-hole tasks involving round-trip communication time delays of up to a few seconds were performed at three support levels: a real image alone, a predictive display with a real image, and a real-time graphic simulator with computed-contact-force reflection and a predictive display. The experimental results indicate the best teleoperation efficiency was achieved by using the force-reflecting simulator with two images. The shortest work time, lowest sensor maximum, and a 100 percent success rate were obtained. These results demonstrate the effectiveness of simulated-force-reflecting teleoperation efficiency.

Hirata, Mitsunori↗

Optical techniques for time and frequency transfer

Light has been used as a means for time synchronization for a long time. The flight time was supposed to be negligible. The first scientific determination of the velocity of the light was done by measuring a round trip flight time on a given distance. The well known flying clock experiment leading to Einstein's General Relativity is another example. The advent of lasers, particularly short pulse and modulated ones, as well as the improvements of the timing equipments have led to new concepts for time and frequency transfer. We describe some experiments using different techniques and configurations which have been proposed and tested in this field since the beginning of the space age. Added to that, we set out advantages, drawbacks, and performances achieved in the different cases.

Baumont, Francoise↗

Project LOCOST: Laser or Chemical Hybrid Orbital Space Transport

A potential mission in the late 1990s is the servicing of spacecraft assets located in GEO. The Geosynchronous Operations Support Center (GeoShack) will be supported by a space transfer vehicle based at the Space Station (SS). The vehicle will transport cargo between the SS and the GeoShack. A proposed unmanned, laser or chemical hybrid orbital space transfer vehicle (LOCOST) can be used to efficiently transfer cargo between the two orbits. A preliminary design shows that an unmanned, laser/chemical hybrid vehicle results in the fuel savings needed while still providing fast trip times. The LOCOST vehicle receives a 12 MW laser beam from one Earth orbiting, solar pumped, iodide Laser Power Station (LPS). Two Energy Relay Units (ERU) provide laser beam support during periods of line-of-sight blockage by the Earth. The baseline mission specifies a 13 day round trip transfer time. The ship's configuration consist of an optical train, one hydrogen laser engine, two chemical engines, a 18 m by 29 m box truss, a mission-flexible payload module, and propellant tanks. Overall vehicle dry mass is 8,000 kg. Outbound cargo mass is 20,000 kg, and inbound cargo mass is 6,000 kg. The baseline mission needs 93,000 kg of propellants to complete the scenario. Fully fueled, outbound mission mass is 121,000 kg. A regeneratively cooled, single plasma, laser engine design producing a maximum of 768 N of thrust is utilized along with two traditional chemical engines. The payload module is designed to hold 40,000 kg of cargo, though the baseline mission specifies less. A proposed design of a laser/chemical hybrid vehicle provides a trip time and propellant efficient means to transport cargo from the SS to a GeoShack. Its unique, hybrid propulsion system provides safety through redundancy, allows baseline missions to be efficiently executed, while still allowing for the possibility of larger cargo transfers.

Dixon, Alan↗

Human Flight to Lunar and Beyond - Re-Learning Operations Paradigms

For the first time since the Apollo era, NASA is planning on sending astronauts on flights beyond LEO. The Human Space Flight (HSF) program started with a successful initial flight in Earth orbit, in December 2014. The program will continue with two Exploration Missions (EM): EM-1 will be unmanned and EM-2, carrying astronauts, will follow. NASA established a multi-center team to address the communications, and related tacking/navigation needs. This paper will focus on the lessons learned by the team designing the architecture and operations for the missions. Many of these Beyond Earth Orbit lessons had to be re-learned, as the HSF program has operated for many years in Earth orbit. Unlike the Apollo missions that were largely tracked by a dedicated ground network, the HSF planned missions will be tracked (at distances beyond GEO) by the DSN, a network that mostly serves robotic missions. There have been surprising challenges to the DSN as unique modern human spaceflight needs stretch the experience base beyond that of tracking robotic missions in deep space. Close interaction between the DSN and the HSF community to understand the unique needs (e.g. 2-way voice) resulted in a Concept of Operations (ConOps) that leverages both the deep space robotic and the Human LEO experiences. Several examples will be used to highlight the unique challenges the team faced in establishing the communications and tracking capabilities for HSF missions beyond Earth Orbit, including: Navigation. At LEO, HSF missions can rely on GPS devices for orbit determination. For Lunar-and-beyond HSF missions, techniques such as precision 2-way and 3-way Doppler and ranging, Delta-Difference-of-range, and eventually possibly on-board navigation will be used. At the same time, HSF presents a challenge to navigators, beyond those presented by robotic missions - navigating a dynamic/"noisy" spacecraft. Impact of latency - the delay associated with Round-Trip-Light-Time (RTLT). Imagine trying to have a 2-way discussion (audio or video) with an astronaut, with a 2-3 sec or more delay inserted (for lunar distances) or 20 minutes delay (for Mars distances). Balanced communications link. For robotic missions, there has been a heavy emphasis on higher downlink data rates, e.g. bringing back science data. Higher uplink data rates were of secondary importance, as uplink was used only to send commands (and occasionally small files) to the spacecraft. The ratio of downlink-to-uplink data rates was often 10:1 or more. For HSF, a continuous forward link is established and rates for uplink and downlink are more similar.

Kenny, Edward (Ted)↗