Search NASA⌕ Search

SEARCH · Search NASA

Results for “SALT WASTE PROCESSING FACILITY (SWPF)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Characterization of Salt Waste Processing Facility August 2022 Tank 201 sample

Two Salt Waste Processing Facility (SWPF) Tank 201 samples were collected from the replacement of the decontaminated salt solution (DSS) coalescer at different times; one in December of 2021 and the other in August 2022. The December 2021 sample was collected after nitric and water flushing of the DSS Coalescer. The Aug 2022 sample was collected after water flushing only. The December 2021 Tank 201 solids were previously characterized and documented. SWPF requested the characterization of the August 2022 Tank 201 sample, and the comparison of the characterization results for these two Tank 201 solids collected at different dates.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Filtration Improvements in Support of Increased Salt Waste Processing Throughput at the Savannah River Site - 16173

Crossflow Filtration is currently used at the U.S. Department of Energy (DOE) Savannah River Site (SRS) for the removal of actinides, strontium and sludge solids from the high-level salt waste stored in underground tanks. At SRS, crossflow filtration is deployed in the Actinide Removal Process (ARP). Salt waste is transferred from an underground waste tank to one of two strike tanks where it is struck with Monosodium Titanate (MST), which adsorbs uranium, plutonium and strontium. The MST laden salt waste is then transferred to the ARP filtration facility, which contains the crossflow filter. The filtrate, which is called Clarified Salt Solution (CSS), is sent to a downstream facility for cesium removal, while the MST and sludge solids are concentrated at the filtration facility and eventually sent to the Defense Waste Processing Facility (DWPF) for vitrification. ARP and the downstream cesium removal facility, the Modular Caustic Side Solvent Extraction Unit (MCU), were both developed as an interim salt waste processing technology and as smaller scale radioactive demonstration plants for the Salt Waste Processing Facility (SWPF), which is currently under construction. Since the beginning of ARP in 2008, there have been challenges with achieving desired filtration rates through the crossflow filter system. Historically the crossflow filter system has been the flow limiter in salt waste processing and many changes have been made and are planned to achieve desired throughput, especially as MCU increases its processing capacity. Some of these changes include the design of a new crossflow filter, the implementation of a new process chemistry flowsheet and several operational changes. The modifications to the ARP crossflow filter have helped contribute to periods of record throughput in salt waste processing in FY 2015. This paper will discuss the technical challenges and system limitations of retrofitting an older facility as well as past, present and future modifications to the ARP filtration process in order to achieve salt waste processing goals at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction, scrub, and strip test results for the solvent transfer to salt waste processing facility

The Savannah River National Laboratory (SRNL) prepared approximately 240 gallons of Caustic-Side Solvent Extraction (CSSX) solvent for use at the Salt Waste Processing Facility (SWPF). An Extraction, Scrub, and Strip (ESS) test was performed on a sample of the prepared solvent using a salt solution prepared by Parsons to determine cesium distribution ratios (D(Cs)), and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams. This data will be used by Parsons to help qualify the solvent for use at the SWPF. The ESS test showed acceptable performance of the solvent for extraction, scrub, and strip operations. The extraction D(Cs) measured 15.5, exceeding the required value of 8. This value is consistent with results from previous ESS tests using similar solvent formulations. Similarly, scrub and strip cesium distribution ratios fell within acceptable ranges.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 21 and tank 24 blend and feed study: blending times, settling times, and transfers

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where salt solutions of up to 1.2 million gallons will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. In particular, Tanks 21 and 24 are planned to be used for blending and transferring to the SDI feed tank. These tanks were evaluated here to determine blending times, to determine a range of settling times for disturbed sludge, and to determine that the SWPF Waste Acceptance Criteria that less than 1200 mg/liter of solids will be entrained in salt solutions during transfers from the Tank 21 and Tank 24 will be met. Overall conclusions for Tank 21 and Tank 24 operations include: (1) Experimental correction factors were applied to CFD (computational fluid dynamics) models to establish blending times between approximately two and five hours. As shown in Phase 2 research, blending times may be as much as ten times greater, or more, if lighter fluids are added to heavier fluids (i.e., water added to salt solution). As the densities of two salt solutions converge this effect may be minimized, but additional confirmatory research was not performed. (2) At the current sludge levels and the presently planned operating heights of the transfer pumps, solids entrainment will be less than 1200 mg/liter, assuming a conservative, slow settling sludge simulant. (3) Based on theoretical calculations, particles in the density range of 2.5 to 5.0 g/mL must be greater than 2-4 {micro}m in diameter to ensure they settle adequately in 30-60 days to meet the SWPF feed criterion (<1200 mg/l). (4) Experimental tests with sludge batch 6 simulant and field turbidity data from a recent Tank 21 mixing evolution suggest the solid particles have higher density and/or larger size than indicated by previous analysis of SRS sludge and sludge simulants. (5) Tank 21 waste characterization, laboratory settling tests, and additional field turbidity measurements during mixing evolutions are recommended to better understand potential risk for extended (> 60 days) settling times in Tank 21.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BLENDING STUDY FOR SRR SALT DISPOSITION INTEGRATION: TANK 50H SCALE-MODELING AND COMPUTER-MODELING FOR BLENDING PUMP DESIGN, PHASE 2

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where 300,000-800,000 gallons of salt solution will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. Blending requires the miscible salt solutions from potentially multiple source tanks per batch to be well mixed without disturbing settled sludge solids that may be present in a Blend Tank. Disturbing solids may be problematic both from a feed quality perspective as well as from a process safety perspective where hydrogen release from the sludge is a potential flammability concern. To develop the necessary technical basis for the design and operation of blending equipment, Savannah River National Laboratory (SRNL) completed scaled blending and transfer pump tests and computational fluid dynamics (CFD) modeling. A 94 inch diameter pilot-scale blending tank, including tank internals such as the blending pump, transfer pump, removable cooling coils, and center column, were used in this research. The test tank represents a 1/10.85 scaled version of an 85 foot diameter, Type IIIA, nuclear waste tank that may be typical of Blend Tanks used in SDI. Specifically, Tank 50 was selected as the tank to be modeled per the SRR, Project Engineering Manager. SRNL blending tests investigated various fixed position, non-rotating, dual nozzle pump designs, including a blending pump model provided by the blend pump vendor, Curtiss Wright (CW). Primary research goals were to assess blending times and to evaluate incipient sludge disturbance for waste tanks. Incipient sludge disturbance was defined by SRR and SRNL as minor blending of settled sludge from the tank bottom into suspension due to blending pump operation, where the sludge level was shown to remain constant. To experimentally model the sludge layer, a very thin, pourable, sludge simulant was conservatively used for all testing. To experimentally model the liquid, supernate layer above the sludge in waste tanks, two salt solution simulants were used, which provided a bounding range of supernate properties. One solution was water (H{sub 2}O + NaOH), and the other was an inhibited, more viscous salt solution. The research performed and data obtained significantly advances the understanding of fluid mechanics, mixing theory and CFD modeling for nuclear waste tanks by benchmarking CFD results to actual experimental data. This research significantly bridges the gap between previous CFD models and actual field experiences in real waste tanks. A finding of the 2009, DOE, Slurry Retrieval, Pipeline Transport and Plugging, and Mixing Workshop was that CFD models were inadequate to assess blending processes in nuclear waste tanks. One recommendation from that Workshop was that a validation, or bench marking program be performed for CFD modeling versus experiment. This research provided experimental data to validate and correct CFD models as they apply to mixing and blending in nuclear waste tanks. Extensive SDI research was a significant step toward bench marking and applying CFD modeling. This research showed that CFD models not only agreed with experiment, but demonstrated that the large variance in actual experimental data accounts for misunderstood discrepancies between CFD models and experiments. Having documented this finding, SRNL was able to provide correction factors to be used with CFD models to statistically bound full scale CFD results. Through the use of pilot scale tests performed for both types of pumps and available engineering literature, SRNL demonstrated how to effectively apply CFD results to salt batch mixing in full scale waste tanks. In other words, CFD models were in error prior to development of experimental correction factors determined during this research, which provided a technique to use CFD models for salt batch mixing and transfer pump operations. This major scientific advance in mixing technology resulted in multi-million dollar cost savings to SRR. New techniques were developed for both experiment and analysis to complete this research. Supporting this success, research findings are summarized in the Conclusions section of this report, and technical recommendations for design and operation are included in this section of the report.

08 HYDROGEN↗

STATUS OF THE DEVELOPMENT OF IN-TANK/AT-TANK SEPARATIONS TECHNOLOGIES FOR FOR HIGH-LEVEL WASTE PROCESSING FOR THE U.S. DEPARTMENT OF ENERGY

Within the U.S. Department of Energy's (DOE) Office of Technology Innovation and Development, the Office of Waste Processing manages a research and development program related to the treatment and disposition of radioactive waste. At the Savannah River (South Carolina) and Hanford (Washington) Sites, approximately 90 million gallons of waste are distributed among 226 storage tanks (grouped or collocated in 'tank farms'). This waste may be considered to contain mixed and stratified high activity and low activity constituent waste liquids, salts and sludges that are collectively managed as high level waste (HLW). A large majority of these wastes and associated facilities are unique to the DOE, meaning many of the programs to treat these materials are 'first-of-a-kind' and unprecedented in scope and complexity. As a result, the technologies required to disposition these wastes must be developed from basic principles, or require significant re-engineering to adapt to DOE's specific applications. Of particular interest recently, the development of In-tank or At-Tank separation processes have the potential to treat waste with high returns on financial investment. The primary objective associated with In-Tank or At-Tank separation processes is to accelerate waste processing. Insertion of the technologies will (1) maximize available tank space to efficiently support permanent waste disposition including vitrification; (2) treat problematic waste prior to transfer to the primary processing facilities at either site (i.e., Hanford's Waste Treatment and Immobilization Plant (WTP) or Savannah River's Salt Waste Processing Facility (SWPF)); and (3) create a parallel treatment process to shorten the overall treatment duration. This paper will review the status of several of the R&D projects being developed by the U.S. DOE including insertion of the ion exchange (IX) technologies, such as Small Column Ion Exchange (SCIX) at Savannah River. This has the potential to align the salt and sludge processing life cycle, thereby reducing the Defense Waste Processing Facility (DWPF) mission by 7 years. Additionally at the Hanford site, problematic waste streams, such as high boehmite and phosphate wastes, could be treated prior to receipt by WTP and thus dramatically improve the capacity of the facility to process HLW. Treatment of boehmite by continuous sludge leaching (CSL) before receipt by WTP will dramatically reduce the process cycle time for the WTP pretreatment facility, while treatment of phosphate will significantly reduce the number of HLW borosilicate glass canisters produced at the WTP. These and other promising technologies will be discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of large tank monosodium titanate strike to increase salt processing at the Savannah river site - 15115

The treatment of high level waste (HLW) salt solutions using the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU) began at Savannah River Site (SRS) in 2008. Since that time, over 6 million gallons of liquid HLW have been treated and the resulting low level waste (LLW) effluent immobilized in cementitious grout at salt-stone. In addition to the continued stabilization of liquid HLW, operating experience from the ARP/MCU facilities has also been valuable in considering the design and construction of the Salt Waste Processing Facility (SWPF) which will utilize similar unit operations on a much larger scale. ARP removes actinides by contacting waste with monosodium titanate (MST) which is a solid adsorbent for soluble strontium and actinides. Once the sorption reaction is complete, the MST solids are separated from salt solution via ultrafiltration through a crossflow filter. The throughput of initial operations of ARP/MCU was limited by the flowrate through the extraction process. However, after the implementation of a new solvent flowsheet, filtration of MST will be the rate limiting step in salt processing. For the entirety of ARP/MCU operation, Savannah River Remediation (SRR) has sought to improve process efficiency and performance through optimization and modification of the original facility design. These efforts have resulted in a best-single-year throughput of 4.9 million liters of decontaminated salt solution. In keeping with these practices, SRR recently initiated a project to improve filtration throughput by relocating the MST strike from small batches immediately upstream of the filtration unit to the underground waste tank used to batch and store salt solution feed for ARP/MCU. This process change will allow the bulk of MST solids to decant in the waste tank prior to filtration which should improve both the nominal operational filter flux as well as the achieved utility of filter operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 23: Start-up of Three Major DOE Treatment Facilities - SWPF, IWTU and DFLAW

This panel focused on the DOE-EM planning to complete construction and start up three major treatment facilities in the next 18 months. This included the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste treatment Unit (IWTU) at Idaho and the Direct Feed Low-Activity Waste (DFLAW) at Hanford. DOE Site Managers from SC, ID and WA introduced each facility then the DOE Contractor provided the details on their biggest challenges in regulatory issues, construction, start-up and operations of each facility. Panelists with presentations: Lessons in Managing Risks in First of a Kind Nuclear Construction and Start-Up (Pamela Marks); Integrated Waste Treatment Unit (Connie Flohr); IWTI-Fluor (Frederick Hughes); Startup and Commissioning (Tom Fletcher)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Caustic-Side Solvent Extraction Full-Scale Test

A Full-Scale Test (FST) program was performed by Parsons and its team members General Atomics and Energy Solutions to assess the performance of full-scale centrifugal contactors specified for the Department of Energy Salt Waste Processing Facility (SWPF). The SWPF, to be located at the Savannah River Site (SRS) in Aiken, South Carolina, will remove highly radioactive waste constituents, principally actinides, strontium (Sr), and cesium (Cs) radionuclides, from salt waste solutions currently stored in SRS high-level waste tanks. Caustic-side Solvent Extraction (CSSX) removes Cs from waste feed that has been treated upstream to remove actinides and Sr. CSSX uses a custom solvent to extract Cs from the salt solution in a series of single stage centrifugal contactors. The test system comprised (a) eleven 25.4 cm (10'') full-scale contactors (versus 36 in SWPF) for the extraction, scrub, strip, and wash stages; (b) two solvent recovery coalescers; and (c) the associated hardware and control system, packaged in four skid mounted modules. This paper describes the results of tests performed to define both hydraulic performance parameters (maximum hydraulic capacity and phase carryover) and solvent extraction performance parameters (Cs mass transfer efficiencies) using simulated SWPF waste and actual CSSX solvent. The test results confirmed key design features of the CSSX process and, as a consequence, the use of CSSX in the SWPF. In conclusion: Total throughput was initially limited to 85% of maximum flow during FST. Minor system modifications performed prior to mass transfer testing series resulted in the realization of 100% throughput. The 100% flow equates to slightly more than 35.6 x 10{sup 6} L/yr (9.4 Mgal/yr) of waste processed in SWPF which is anticipated to be the peak plant throughput. To achieve the best hydraulic performance in extraction, it is recommended that the extraction contactors be operated at the highest reasonable speed possible (>2100 rpm). Vibration, hardware limitations, bearing life, and other factors should be considered prior to final selection of extraction contactor speeds in SWPF. In strip (also scrub and wash) aqueous carryover decreased and organic carryover increased as the rotor speeds increased. It is recommended that the strip, scrub, and wash contactors be operated at intermediate speeds (between 1500 and 2100 rpm) to achieve a performance compromise between aqueous and organic carryover. Curved-vane bottom plates showed a significant hydraulic performance (aqueous and organic carryover) advantage over straight-vane bottom plates in extraction. There was no significant mass transfer performance advantage for either plate type in extraction. Thus, curved-vane bottom plates in extraction may be the better option for use in SWPF. There was no significant hydraulic performance difference between the plate types in strip. Straight-vanes provided significantly better mass transfer performance in strip compared to curved-vanes. Based solely on mass transfer performance, straight-vane bottom plates in the strip, scrub, and wash contactors are recommended for use in SWPF. Utilizing straight-vanes in the stripping section, the overall SWPF CSSX performance is expected to meet or exceed the target DF of 40,000 with minimum extraction D{sub Cs} of 10. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Tank Mapping Method Improves Waste Removal Process

Savannah River Mission Completion is the Liquid Waste (LW) contractor at the Savannah River Site (SRS). The LW mission is tasked with treating and disposing of legacy nuclear waste. There are multiple facilities involved in this work, including the Concentration, Storage, and Transfer Facilities (CSTF), the Defense Waste Processing Facility (DWPF), the Salt Waste Processing Facility (SWPF), and the Saltstone Production Facility (SPF). The CSTF includes 43 underground waste tanks used to store and support processing of radioactive liquid waste. Waste removal activities, such as salt dissolution campaigns and sludge agitation, are conducted within the CSTF waste tanks to convert the waste into a form that allows for downstream processing at other LW facilities. While performing these waste removal campaigns, camera inspections are performed to assess the quantity and distribution of the remaining waste within the waste tank (i.e. saltcake or sludge). Understanding the quantity and distribution of the salt/sludge within the waste tanks allows for improved waste removal strategies (e.g. mixing pump operation) and refined safety controls. Typically, several camera inspections are performed during a waste removal transfer to verify the elevation of the visible salt/sludge mounds against the known elevation of the liquid surface. The camera inspection footage must then be interpreted by a trained engineer who will develop a 2-D map that depicts the waste distribution at various elevations within the waste tank. This tank mapping is then used in conjunction with conservative assumptions to evaluate the volume of saltcake or sludge that is present within the waste tank.

Mini, Melany↗

Integration of SWPF into the DWPF Flowsheet: Gap Analysis and Test Matrix Development

Based on Revision 19 of the High Level Waste (HLW) System Plan, it is anticipated that the Salt Waste Processing Facility (SWPF) will be integrated into the Defense Waste Processing Facility (DWPF) flowsheet in October 2018 (or with Sludge Batch 11 (SB11)). Given that, Savannah River Remediation (SRR) has requested a technical basis be developed that validates the current Product Composition Control System (PCCS) models for use during the processing of the SWPF-based coupled flowsheet or that leads to the refinements of or modifications to the models that are needed so that the models may be used during the processing of the SWPF-based coupled flowsheet. To support this objective, Savannah River National Laboratory (SRNL) has completed three key interim activities prior to validation of the current or development of refined PCCS models over the anticipated glass composition region for SWPF processing. These three key activities include: (1) defining the glass compositional region over which SWPF is anticipated to be processed, (2) comparing the current PCCS model validation ranges to the SWPF glass compositional region from which compositional gaps can be identified, and (3) developing a test matrix to cover the compositional gaps.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Increased Fissile Loading Flowsheet Review

A request was made by H-Canyon Process Engineering to assess the impact of blending dissolved, neutralized Spent Nuclear Fuel (SNF) with future sludge batches and their impact on downstream processing facilities including the Concentration, Storage and Transfer Facilities (CSTF), the Salt Waste Processing Facility (SWPF), the Defense Waste Processing Facility (DWPF), Saltstone, and the Effluent Treatment Facility (ETF). The purpose of this change is to accelerate the deinventory of SNF which is currently stored in the L-Area Disassembly Basin. The addition of SNF increases the mass of fissiles in each future sludge batch, due to their high enrichment. This high enrichment has the potential to complicate the programs to eliminate criticality events in the downstream processing facilities and will increase the number of canisters produced by DWPF because of the SNF mass increase. A separate report addressed the impacts to glass. The review and subsequent calculations were based on average predicted compositions of Accelerated Basin Deinventory (ABD) slurry, average compositions for predicted future sludge batches, average past salt batches and average past recycle batches to predict the feeds that will be processed in SWPF, DWPF, Saltstone, the 2H evaporator and ETF. Each of the processes was evaluated for potential issues.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Selection of glasses in support of the Sludge Batch 9 variability study for coupled operation with the Salt Waste Processing Facility

Prior to the processing of Sludge Batch 9 (SB9) with Frit 803 at the Defense Waste Processing Facility (DWPF), assessments and experimental glass work were completed to support the qualification of SB9 coupled processing with streams from the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU). This previous work did not address coupled processing with streams from the Salt Waste Processing Facility (SWPF) because the Product Composition Control System (PCCS) models limited the TiO 2 concentration in glass to 2 weight percent (wt.%). These high activity streams from SWPF include monosodium titanate (MST) and sludge solids from the Sludge Solids Receipt Tank as well as Cs-containing strip effluent. The incorporation of these SWPF streams is expected to reach TiO2 concentrations in glass greater than 2 wt.% based on an MST addition of 0.4 g MST/L of salt solution. If double strike operation is required, then the MST addition is increased to 0.8 g MST/L of salt solution. Therefore, revisions to the models contained in PCCS were completed to allow the evaluation of glasses containing greater than 2 wt.% TiO 2 , but less than 6 wt.%. To support the implementation of the revised PCCS for SB9 – Frit 803 processing at DWPF prior to SWPF startup, the applicability of the new durability models for the SB9 variability study glasses was verified. Since the initial SB9 qualification for ARP-MCU coupled operation, additional Tank 40 analyses have been completed, which served as the basis for an updated projection of the SB9 blend composition in Tank 40. To identify a frit optimized for SB9 coupled operation with SWPF, the Savannah River National Laboratory (SRNL) performed a paper-study by utilizing Measurement Acceptance Region (MAR) assessments with DWPF PCCS. Based on these MAR assessment results, Frit 625 was recommended for processing both single and double MST strike scenarios. Savannah River Remediation (SRR) requested that SRNL perform a variability study with both Frit 803 and Frit 625 for SB9 coupled operation with SWPF. The objective of the variability study is to demonstrate that the Product Consistency Test (PCT) responses of the glasses are acceptable relative to the chemical durability of the Environmental Assessment (EA) reference glass and predictable by the current DWPF PCCS models for durability. This report documents the development of a test matrix that will support the variability study. To provide operational flexibility prior to SWPF startup, the predictability of glasses within the glass region for Frit 625-SB9 coupled operation with ARP-MCU was also confirmed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of Glasses to Confirm the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10

In preparation for Sludge Batch 10 (SB10) processing, projections of sulfate (SO 4 2- ) in glass at 36% waste loading (WL) were calculated in May 2020 for Tank 40 blend projections representing 0.7M and 0.85M Na wash endpoints. The projected SO 4 2- ) concentrations for either sludge-only (SO) or coupled processing with the Salt Waste Processing Facility (SWPF) were either near or exceeded the current Sludge Batch 9 (SB9) limit of 0.65 weight percent (wt.%). Four nominal glass compositions were selected based on SO and coupled processing for the 0.85M Na wash endpoint Tank 40 blend projection to conduct an initial evaluation of the SB10 sulfate solubility behavior. A sulfate salt phase was absent from each of the prepared glasses, which provided preliminary results that supported the 0.65 wt.% SO 4 2- ) limit for SB10.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 078 - Panel: Start-Up of Three Major DOE Treatment Facilities -SWPF, IWTU and DFLAW (2/2) (R2.4)

This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MIXING MODELING ANALYSIS FOR SRS SALT WASTE DISPOSITION

Nuclear waste at Savannah River Site (SRS) waste tanks consists of three different types of waste forms. They are the lighter salt solutions referred to as supernate, the precipitated salts as salt cake, and heavier fine solids as sludge. The sludge is settled on the tank floor. About half of the residual waste radioactivity is contained in the sludge, which is only about 8 percentage of the total waste volume. Mixing study to be evaluated here for the Salt Disposition Integration (SDI) project focuses on supernate preparations in waste tanks prior to transfer to the Salt Waste Processing Facility (SWPF) feed tank. The methods to mix and blend the contents of the SRS blend tanks were evalutaed to ensure that the contents are properly blended before they are transferred from the blend tank such as Tank 50H to the SWPF feed tank. The work consists of two principal objectives to investigate two different pumps. One objective is to identify a suitable pumping arrangement that will adequately blend/mix two miscible liquids to obtain a uniform composition in the tank with a minimum level of sludge solid particulate in suspension. The other is to estimate the elevation in the tank at which the transfer pump inlet should be located where the solid concentration of the entrained fluid remains below the acceptance criterion (0.09 wt% or 1200 mg/liter) during transfer operation to the SWPF. Tank 50H is a Waste Tank that will be used to prepare batches of salt feed for SWPF. The salt feed must be a homogeneous solution satisfying the acceptance criterion of the solids entrainment during transfer operation. The work described here consists of two modeling areas. They are the mixing modeling analysis during miscible liquid blending operation, and the flow pattern analysis during transfer operation of the blended liquid. The modeling results will provide quantitative design and operation information during the mixing/blending process and the transfer operation of the blended liquid in the Salt Disposition Integration (SDI) facility. The results will also help validate the anticipated performance of the pump vendor's design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Potential Routes for Titanium and Mercury Concentrations within Salt Waste Processing Facility

Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC)/ Salt Waste Processing Facility (SWPF) personnel to investigate the potential routes for titanium and mercury accumulations within the SWPF Flowsheet. The first part of this work examined how various forms of mercury can migrate through the solvent extraction system. This entailed single stage distribution tests, a multi-stage Extraction-Scrub-Strip (ESS) test, and a detailed speciation analysis of several salt batch feed samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗