The nasa satellite instrumentation network.
Tracking, data acquisition, command and support facility requirements for NASA worldwide Satellite Instrumentation Network
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Tracking, data acquisition, command and support facility requirements for NASA worldwide Satellite Instrumentation Network
Various issues associated with "Simulation of a NASA LEO Satellite Hybrid Network" are presented in viewgraph form. Specific topics include: 1) Objective of the investigation; 2) Satellite orbit description and included nodes; 3) TCP and FTP simulation descriptions; 4) Simulation results; and 5) Derived conclusions.
A close integration of satellite networks and the integrated services digital network (ISDN) is essential for satellite networks to carry ISDN traffic effectively. This also shows how a given (pre-ISDN) satellite network architecture can be enhanced to handle ISDN signaling and provide ISDN services. It also describes the functional architecture and high-level protocols that could be implemented in the NASA Advanced Communications Technology Satellite (ACTS) low burst rate communications system to provide ISDN services.
From the 1960's and into the early 1980's satellite operations and control were conducted by Air Force Systems Command (AFSC), now Air Force Materiel Command (AFMC), out of the Satellite Control Facility at Onizuka AFB, CA. AFSC was responsible for acquiring satellite command and control systems and conducting routine satellite operations. The daily operations, consisting of satellite health and status contacts and station keeping activities, were performed for AFSC by a Mission Control Team (MCT) staffed by civilian contractors who were responsible for providing their own technically 'qualified' personnel as satellite operators. An MCT consists of five positions: mission planner, ground controller, planner analyst, orbit analyst, and ranger controller. Most of the training consisted of On-the-Job-Training (OJT) with junior personnel apprenticed to senior personnel until they could demonstrate job proficiency. With most of the satellite operators having 15 to 25 years of experience, there was minimal risk to the mission. In the mid 1980's Air Force Space Command (AFSPACOM) assumed operational responsibility for a newly established control node at Falcon AFB (FAFB) in CO. The satellites and ground system program offices (SPO's) are organized under AFSC's Space and Missiles Systems Center (SMC) to function as a systems engineering and acquisition agency for AFSPACECOM. The collection of the satellite control nodes, ground tracking stations, computer processing equipment, and connecting communications links is referred to as the Air Force Satellite Control Network (AFSCN).
This paper aims to depict some basic concepts related to the definition of an integrated system for mobile communications, consisting of a satellite network and a terrestrial cellular network. In particular three aspects are discussed: (1) architecture definition for the satellite network; (2) assignment strategy of the satellite channels; and (3) definition of 'internetworking procedures' between cellular and satellite network, according to the selected architecture and the satellite channel assignment strategy.
A circuit switching architecture is described for a 30/20 GHz frequency division, multiple access uplink/time division multiplexed downlink (FDMA/TDM) geostationary satellite communications network. Critical subsystems and problem areas are identified and addressed. Work was concentrated primarily on the space segment; however, the ground segment was considered concurrently to ensure cost efficiency and realistic operational constraints.
A circuit-switching architecture is described for a 30/20-GHz frequency-division, multiple-access uplink/time-division-multiplexed downlink (FDMA/TDM) geostationary satellite communications network. Critical subsystems and problem areas are identified and addressed. Work was concentrated primarily on the space segment; however, the ground segment was considered concurrently to ensure cost efficiency and realistic operational constraints.
With the emergence of a new era in satellite communications brought about by NASA's thrust into the Ka band with multibeam and onboard processing technologies, new and innovative techniques for evaluating these concepts and systems are required. To this end, NASA, in conjunction with its extensive program for advanced communications technology development, has undertaken to develop a concept for the simulation and evaluation of a complete communications network. Incorporated in this network will be proof of concept models of the latest technologies proposed for future satellite communications systems. These include low noise receivers, matrix switches, baseband processors, and solid state and tube type high power amplifiers. To accomplish this, numerous supporting technologies must be added to those aforementioned proof of concept models. These include controllers for synchronization, order wire, and resource allocation, gain compensation, signal leveling, power augmentation, and rain fade and range delay simulation. Taken together, these will be assembled to comprise a system capable of addressing numerous design and performance questions. The simulation and evaluation system as planned will be modular in design and implementation, capable of modification and updating to track and evaluate a continuum emerging concepts and technologies.
With the emergence of a new era in satellite communications, brought about by NASA's thrust into the Ka band with multibeam and onboard processing technologies, new and innovative techniques for evaluating these concepts and systems are required. To this end, NASA, in conjunction with its extensive program for advanced communications technology development, has undertaken to develop a concept for the simulation and evaluation of a complete communications network. Incorporated in this network will be proof-of-concept models of the latest technologies proposed for future satellite communications systems. These include low noise receivers, matrix switches, baseband processors, and solid state and tube type high power amplifiers. To accomplish this, numerous supporting technologies must be added to those aforementioned proof-of-concept models. These include controllers for synchronization, order wire, resource allocation, gain compensation, signal leveling, power augmentation, and rain fade and range delay simulation. Taken together, these will be assembled to comprise a system capable of addressing numerous design and performance questions. The simulation and evaluation system, as planned, will be modular in design and implementation, capable of modification and updating to track and evaluate a continuum of emerging concepts and technologies. Previously announced in STAR as N84-13400
The European Space Agency (ESA) is presently procuring an L-band payload EMS, to be embarked on the ITALSAT-2 satellite due for launch in early 1996, in order to promote a regional European mobile system. One of the Land Mobile Communication systems supported by EMS is the MSBN (Mobile Satellite Business Network) voice and data system which will offer the services of a business network on a seamless European coverage. This paper will first recall the characteristics of the MSBN system, which is based on quasi-synchronized CDMA (Code Division Multiple Access) techniques in both directions, and then describe the CDMA receivers implementation. Main validation test results will also be reported confirming predicted performances.
Explore the source record for details and available documents.
NASA initiated an interagency ozone lidar observation network under the name TOLNet to promote cooperative multiple-station ozone-lidar observations to provide highly time-resolved (few minutes) tropospheric-ozone vertical profiles useful for air-quality studies, model evaluation, and satellite validation.
The Satellite Networks and Architectures Branch of NASA's Lewis Research is addressing the issue of seamless interoperability of satellite networks with terrestrial networks. One of the major issues is improving reliable transmission protocols such as TCP over long latency and error-prone links. Many tuning parameters are available to enhance the performance of TCP including segment size, timers and window sizes. There are also numerous congestion avoidance algorithms such as slow start, selective retransmission and selective acknowledgment that are utilized to improve performance. This paper provides a strategy to characterize the performance of TCP relative to various parameter settings in a variety of network environments (i.e. LAN, WAN, wireless, satellite, and IP over ATM). This information can then be utilized to develop expert-system-based Internet protocols.
This paper describes how the design of the Unified S-band Ground System evolved from the technology available in the NASA's Deep Space Network and Scientific Satellite Network as well as the Manned Space Flight Network to fulfill the requirements of the Apollo program. The project organization established for this program proved to be an effective management technique for controlling the widely dispersed activities and maintaining the necessary liaison with other organizations involved in the overall program. The Manned Space Flight Network includes systems at three locations employing 26 meter antennas to support the lunar phases of the mission and a number of systems at other locations employing 9 meter antennas for support of the near earth phases of the mission. The tradeoffs of mission requirements and technical capability established the equipment parameters and the network configuration. An extensive checkout program which included the use of aircraft and spacecraft provided a thorough evaluation of the system prior to its commitment to operational support of the missions.
This four part report evaluated the performance of high data rate transmission links using the ACTS satellite, and to provide a preparatory test framework for two of the space science applications that have been approved for tests and demonstrations as part of the overall ACTS program. The test plan will provide guidance and information necessary to find the optimal values of the transmission parameters and then apply these parameters to specific applications. The first part will focus on the satellite-to-earth link. The second part is a set of tests to study the performance of ATM on the ACTS channel. The third and fourth parts of the test plan will cover the space science applications, Global Climate Modeling and Keck Telescope Acquisition Modeling and Control.
The objective of this paper is to provide a survey of neural network trends as applied to the tracking of spacecrafts in deep space at Ka-band under various weather conditions and examine the trade-off between tracing accuracy and communication link performance.
Alternative transmission media for a CONUS-wide trunking network in the years 1990 and 2000 are examined. The alternative technologies comprised fiber optic cable, conventional C- and Ku-band satellites, and 30/20 GHz satellites. Three levels of implementation were considered - a 10-city network, a 20-city network, and a 40-city network. The cities selected were the major metropolitan areas with the greatest communications demand. All intercity voice, data, and video traffic carried more than 40 miles was included in the analysis. In the optimized network, traffic transmitted less than 500 miles was found to be better served by fiber optic cable in 1990. By the year 2000, the crossover point would be down to 200 miles, assuming availability of 30/20 GHz satellites.
The number of spacecraft designed and built over the next century will grow exponentially as communication satellite networks proliferate and NASA continues to push towards the development of many microspacecraft to replace its traditional.