Search NASA⌕ Search

SEARCH · Search NASA

Results for “SATURN V LAUNCH VEHICLE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Saturn V - Design Considerations and Launch Issues

Objectives include: a) Understand some of the design considerations that went into creating the Saturn V launch vehicle; b) Gain an appreciation for some of the manufacturing issues concerning the Saturn V; and c) Review three major problems that affected Saturn V launches.

Interbartolo, Michael↗

Evolution and Impact of Saturn V on Space Launch System from a Guidance, Navigation, and Mission Analysis Perspective

The Saturn V launch vehicle represented a jump in capability for heavy lift launch vehicles, enabling the Lunar Orbit Rendezvous approach to planetary exploration employed by the Apollo program 50 years ago. Following Apollo, and the development of the Space Transportation System, the NASA space exploration program shifted focus from lunar exploration to long-term, sustained, re-usable access to Low Earth Orbit. With the recent focus of NASA on the Artemis program and continued exploration of cislunar space as a precursor to Martian exploration, the shift has swung back to heavy lift capability. To meet this need, NASA has developed the Space Launch System. While the vehicle is a new design, it is heavily influenced by the engineering solutions and approach used on the Saturn V while taking advantage of the state of the art of launch vehicle design. The approach to abort, for example, shares many familiarities with the triggers and concept of operations used on Saturn V. Analysis approaches to dispersed trajectory performance are also very similar, but advances in computing technology have enabled a much more expanded set of inputs that can be modelled and assessed in a rapid manner. Additionally, guided flight algorithms share similar first principles but have expanded to include day of launch wind information. Trajectory optimization has also advanced significantly due to the availability of computing resources, but similar maneuvers and profiles are flown across both vehicles. Also, while the approach of onboard inertial navigation has been maintained between the two programs, the shift from platform to strapdown systems enables reduced complexity in the system design while maintaining required performance. As described, the Space Launch System is the evolution of NASA launch vehicle designs, owing a large heritage to the Saturn vehicle program and incorporating advances in propulsion systems, avionics, computing, and sensor technology over the past 50 years.

Ahmad, Naeem↗

NASA'S MSFC Welding Development for Ares I

This slide presentation reviews the development of welding for the Ares I launch vehicle. Shown are views of the Ares I and Ares 5, and comparisons with the space shuttle and Saturn V launch vehicles. The elements, and the contractor charged with developing each is shown. The various types of welding capabilities are reviewed. Pictures of the various welding systems available at Marshall Space Flight Center are shown.

Ding, Jeff↗

SKYLAB II - Making a Deep Space Habitat from a Space Launch System Propellant Tank

Called a "House in Space," Skylab was an innovative program that used a converted Saturn V launch vehicle propellant tank as a space station habitat. It was launched in 1973 fully equipped with provisions for three separate missions of three astronauts each. The size and lift capability of the Saturn V enabled a large diameter habitat, solar telescope, multiple docking adaptor, and airlock to be placed on-orbit with a single launch. Today, the envisioned Space Launch System (SLS) offers similar size and lift capabilities that are ideally suited for a Skylab type mission. An envisioned Skylab II mission would employ the same propellant tank concept; however serve a different mission. In this case, the SLS upper stage hydrogen tank is used as a Deep Space Habitat (DSH) for NASA s planned missions to asteroids, Earth-Moon Lagrangian point and Mars.

Griffin, Brand N.↗

Independent Review of the Failure Modes of F-1 Engine and Propellants System

The F-1 is the powerful engine, that hurdled the Saturn V launch vehicle from the Earth to the moon on July 16,1969. The force that lifted the rocket overcoming the gravitational force during the first stage of the flight was provided by a cluster of five F-1 rocket engines, each of them developing over 1.5 million pounds of thrust (MSFC-MAN-507). The F-1 Rocket engine used RP-1 (Rocket Propellant-1, commercially known as Kerosene), as fuel with lox (liquid Oxygen) as oxidizer. NASA terminated Saturn V activity and has focused on Space Shuttle since 1972. The interest in rocket system has been revived to meet the National Launch System (NLS) program and a directive from the President to return to the Moon and exploration of the space including Mars. The new program Space Launch Initiative (SLI) is directed to drastically reduce the cost of flight for payloads, and adopt a reusable launch vehicle (RLV). To achieve this goal it is essential to have the ability of lifting huge payloads into low earth orbit. Probably requiring powerful boosters as strap-ons to a core vehicle, as was done for the Saturn launch vehicle. The logic in favor of adopting Saturn system, a proven technology, to meet the SLI challenge is very strong. The F-1 engine was the largest and most powerful liquid rocket engine ever built, and had exceptional performance. This study reviews the failure modes of the F-1 engine and propellant system.

Ray, Paul↗

Testing to Transition the J-2X from Paper to Hardware

The J-2X Upper Stage Engine (USE) will be the first new human-rated upper stage engine since the Apollo program of the 1960s. It is designed to carry the Ares I and Ares V into orbit and send the Ares V to the Moon as part of NASA's Constellation Program. This paper will provide an overview of progress on the design, testing, and manufacturing of this new engine in 2009 and 2010. The J-2X embodies the program goals of basing the design on proven technology and experience and seeking commonality between the Ares vehicles as a way to minimize risk, shorten development times, and live within current budget constraints. It is based on the proven J-2 engine used on the Saturn IB and Saturn V launch vehicles. The prime contractor for the J-2X is Pratt & Whitney Rocketdyne (PWR), which is under a design, development, test, and engineering (DDT&E) contract covering the period from June 2006 through September 2014. For Ares I, the J-2X will provide engine start at approximately 190,000 feet, operate roughly 500 seconds, and shut down. For Ares V, the J-2X will start at roughly 190,000 feet to place the Earth departure stage (EDS) in orbit, shut down and loiter for up to five days, re-start on command and operate for roughly 300 seconds at its secondary power level to perform trans lunar injection (TLI), followed by final engine shutdown. The J-2X development effort focuses on four key areas: early risk mitigation, design risk mitigation, component and subassembly testing, and engine system testing. Following that plan, the J-2X successfully completed its critical design review (CDR) in 2008, and it has made significant progress in 2009 and 2010 in moving from the drawing board to the machine shop and test stand. Post-CDR manufacturing is well under way, including PWR in-house and vendor hardware. In addition, a wide range of component and sub-component tests have been completed, and more component tests are planned. Testing includes heritage powerpack, turbopump inducer water flow, turbine air flow, turbopump seal testing, main injector and gas generator, injector testing, augmented spark igniter testing, nozzle side loads cold flow testing, nozzle extension film cooling flow testing, control system testing with hardware in the loop, and nozzle extension emissivity coating tests. In parallel with hardware manufacturing, work is progressing on the new A-3 test stand to support full duration altitude testing. The Stennis A-2 test stand is scheduled to be turned over to the Constellation Program in September 2010 to be modified for J-2X testing also. As the structural steel was rising on the A-3 stand, work was under way in the nearby E complex on the chemical steam generator and subscale diffuser concepts to be used to evacuate the A-3 test cell and simulate altitude conditions.

Byrd, Tom↗

Earthquake Testing

During NASA's Apollo program, it was necessary to subject the mammoth Saturn V launch vehicle to extremely forceful vibrations to assure the moonbooster's structural integrity in flight. Marshall Space Flight Center assigned vibration testing to a contractor, the Scientific Services and Systems Group of Wyle Laboratories, Norco, California. Wyle-3S, as the group is known, built a large facility at Huntsville, Alabama, and equipped it with an enormously forceful shock and vibration system to simulate the liftoff stresses the Saturn V would encounter. Saturn V is no longer in service, but Wyle-3S has found spinoff utility for its vibration facility. It is now being used to simulate earthquake effects on various kinds of equipment, principally equipment intended for use in nuclear power generation. Government regulations require that such equipment demonstrate its ability to survive earthquake conditions. In upper left photo, Wyle3S is preparing to conduct an earthquake test on a 25ton diesel generator built by Atlas Polar Company, Ltd., Toronto, Canada, for emergency use in a Canadian nuclear power plant. Being readied for test in the lower left photo is a large circuit breaker to be used by Duke Power Company, Charlotte, North Carolina. Electro-hydraulic and electro-dynamic shakers in and around the pit simulate earthquake forces.

Source record↗

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record↗

Absolute stability analysis of attitude control systems for large boosters.

A method for performing absolute stability analyses of attitude control systems for large launch vehicles is presented. Absolute stability of these systems is shown in a finite region of the state space. The regions are computed by using the Lur'e-Postnikov Liapunov function. This function is chosen to provide additional information about the exponential property of absolute stability. Significant advantages of the method proposed in this paper are: it is independent of the order of the system; algebraic operations involved in the computations are relatively simple and convenient for machine implementation; and the obtained results are valid not only for a particular nonlinearity but also for an entire class of nonlinear characteristics that satisfy certain general conditions. A system model representing the Saturn V launch vehicle is used to illustrate the method.

Seltzer, S. M.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Dynamic verification of a digital flight control system.

Development of a digital control system dynamic variation technique which accounts for the limitation of available frequency response analyzers. Digital control system theory is briefly reviewed, and generation of the necessary theoretical frequency responses is discussed. Results of the dynamic verification of a digital control system for a Saturn V launch vehicle are presented, and attention is given to the limitations of this technique along with its applicability to other types of digital control systems. A technique for performing open-loop frequency response analyses of a flight program implemented in a 'flight-type' digital computer and interface hardware with vehicle dynamics simulated on an analog computer is described.

Nabers, J. P., Jr.↗