Search NASA⌕ Search

SEARCH · Search NASA

Results for “STEP system engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Numerical System Solver Developed for the National Cycle Program

As part of the National Cycle Program (NCP), a powerful new numerical solver has been developed to support the simulation of aeropropulsion systems. This software uses a hierarchical object-oriented design. It can provide steady-state and time-dependent solutions to nonlinear and even discontinuous problems typically encountered when aircraft and spacecraft propulsion systems are simulated. It also can handle constrained solutions, in which one or more factors may limit the behavior of the engine system. Timedependent simulation capabilities include adaptive time-stepping and synchronization with digital control elements. The NCP solver is playing an important role in making the NCP a flexible, powerful, and reliable simulation package.

Binder, Michael P.↗

Electronic/electric technology benefits study

The benefits and payoffs of advanced electronic/electric technologies were investigated for three types of aircraft. The technologies, evaluated in each of the three airplanes, included advanced flight controls, advanced secondary power, advanced avionic complements, new cockpit displays, and advanced air traffic control techniques. For the advanced flight controls, the near term considered relaxed static stability (RSS) with mechanical backup. The far term considered an advanced fly by wire system for a longitudinally unstable airplane. In the case of the secondary power systems, trades were made in two steps: in the near term, engine bleed was eliminated; in the far term bleed air, air plus hydraulics were eliminated. Using three commercial aircraft, in the 150, 350, and 700 passenger range, the technology value and pay-offs were quantified, with emphasis on the fiscal benefits. Weight reductions deriving from fuel saving and other system improvements were identified and the weight savings were cycled for their impact on TOGW (takeoff gross weight) and upon the performance of the airframes/engines. Maintenance, reliability, and logistic support were the other criteria.

Howison, W. W.↗

Cyber-Informed Engineering Implementation Guide: Version 1.0 [Slides]

This Implementation Guide describes the principles of Cyber-Informed Engineering (CIE) and outlines questions that engineering teams should consider during each phase of a system's lifecycle to effectively employ these principles. It describes what it means to engineer systems in a cyber-informed way, rather than offering a comprehensive, step-by-step process or procedure for CIE implementation. This guide complements - but does not replace - the application of cybersecurity standards or practices currently in place within an organization. Engineers and technicians that design critical energy infrastructure installations can use this Implementation Guide to integrate the 12 principles of CIE into each phase of the engineering lifecycle, from concept to retirement. The guide is aimed at system or design engineers, rather than software engineers or operational cybersecurity practitioners. The engineers who design, build, operate, and maintain the physical infrastructure are best positioned to leverage a system's engineering design to diminish the severity of cyber attacks or digital technology failures. CIE expands cybersecurity decisions into the engineering space, not by asking engineers to become cyber experts, but by calling on engineers to apply engineering tools and make engineering decisions that improve cybersecurity outcomes. CIE examines the engineering consequences that a sophisticated cyber attacker could achieve and drives engineering changes that may provide deterministic mitigations to limit or eliminate those consequences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber-Informed Engineering Implementation Guide

This Implementation Guide describes the principles of Cyber-Informed Engineering (CIE) and outlines questions that engineering teams should consider during each phase of a system’s lifecycle to effectively employ these principles. It describes what it means to engineer systems in a cyber-informed way, rather than offering a comprehensive, step-by-step process or procedure for CIE implementation. This guide complements—but does not replace—the application of cybersecurity standards or practices currently in place within an organization. Engineers and technicians that design critical energy infrastructure installations can use this Implementation Guide to integrate the 12 principles of CIE into each phase of the engineering lifecycle, from concept to retirement. The guide is aimed at system or design engineers, rather than software engineers or operational cybersecurity practitioners. The engineers who design, build, operate, and maintain the physical infrastructure are best positioned to leverage a system’s engineering design to diminish the severity of cyber attacks or digital technology failures. CIE expands cybersecurity decisions into the engineering space, not by asking engineers to become cyber experts, but by calling on engineers to apply engineering tools and make engineering decisions that improve cybersecurity outcomes. CIE examines the engineering consequences that a sophisticated cyber attacker could achieve and drives engineering changes that may provide deterministic mitigations to limit or eliminate those consequences.

42 ENGINEERING↗

Validation & Verification of Electrical Components B2 Test Facility

The research focus of this project is to assist in the closure of Measurement, Monitoring and Control System (MMCS) and other electrical requirements in support of the B2 Space Launch System (SLS) Core Stage Green Run Test Project. Alongside this goal I am to understand project management tools to analyze and control activities/tasks associated with those items. The project I am working on will assist electrical engineers in developing and or identifying closure rationale for the MMCS and electrical requirements. Also as serving the role of a training project manager, I am to develop and maintain a method for tracking progress with estimate completion dates specifically identifying those items during this performance window. The methods I used in order to perform the research consisted of worddocuments, excel sheets, and pdf documents needed for review. For example, documents consisted of: a SLS Core Stage Green Run Facility Requirement Document (FRD) identifying the SSC MMCS and electrical requirements, a Stage Controller to SSC Interface Control Document (ICD) identifying the SSC requirements, and the B2 SLS Core Stage Green Run Test project System Requirements Document (SRD) which identifies the MMCS and electrical requirements. The files were sent to me by both mentors, Mr. Barry Robinson and Ms. Dawn Davis. Overall, the review process for the word documents and excel spreadsheets proved to be successful. The data for the electrical components were accurate and were consistent with the original recorded data. However, the consistency with the pdf documents did not follow up all the way. Attention to this mistake was made and further revisions were done in order for the data to agree with each other. Furthermore, an itinerary was designed using Microsoft Outlook in order to track progress with estimated completion dates. This project contributes to NASA/Center Missions and Goals through the Waterfall Model. The Waterfall Model is a linear system used for engineering design. In the Waterfall Model, the fourth step is Verification and Validation. This involves installation, testing, and debugging of the B2 SLS Core Stage electrical components. For the SLS Core Stage Green Run Test Project, each requirement contained in this approved requirements set will have at least one Verification Item (VI) assigned to it. During the design phase, VIs will mostly consist of Analysis or Inspection types. Design phase VIs and closure information will be documented in Dynamics Data Management System (DDMS) in the form of analysis reports and design documentation.

Bastian, Tyler↗

The MAP Autonomous Mission Control System

The Microwave Anisotropy Probe (MAP) mission is the second mission in NASA's Office of Space Science low-cost, Medium-class Explorers (MIDEX) program. The Explorers Program is designed to accomplish frequent, low cost, high quality space science investigations utilizing innovative, streamlined, efficient management, design and operations approaches. The MAP spacecraft will produce an accurate full-sky map of the cosmic microwave background temperature fluctuations with high sensitivity and angular resolution. The MAP spacecraft is planned for launch in early 2001, and will be staffed by only single-shift operations. During the rest of the time the spacecraft must be operated autonomously, with personnel available only on an on-call basis. Four (4) innovations will work cooperatively to enable a significant reduction in operations costs for the MAP spacecraft. First, the use of a common ground system for Spacecraft Integration and Test (I&T) as well as Operations. Second, the use of Finite State Modeling for intelligent autonomy. Third, the integration of a graphical planning engine to drive the autonomous systems without an intermediate manual step. And fourth, the ability for distributed operations via Web and pager access.

Breed, Juile↗

TRA Warm Waste Treatment Facility Process Controller Replacement

This poster details the work I did to replace the TRA Warm Waste Treatment System Process Controller. Additionally, my poster explains what Warm waste is, how the warm waste treatment system functions, and the next steps moving forward in the engineering process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing Software Safety in the NASA Environment

Until recently, NASA did not consider allowing computers total control of flight systems. Human operators, via hardware, have constituted the ultimate safety control. In an attempt to reduce costs, NASA has come to rely more and more heavily on computers and software to control space missions. (For example. software is now planned to control most of the operational functions of the International Space Station.) Thus the need for systematic software safety programs has become crucial for mission success. Concurrent engineering principles dictate that safety should be designed into software up front, not tested into the software after the fact. 'Cost of Quality' studies have statistics and metrics to prove the value of building quality and safety into the development cycle. Unfortunately, most software engineers are not familiar with designing for safety, and most safety engineers are not software experts. Software written to specifications which have not been safety analyzed is a major source of computer related accidents. Safer software is achieved step by step throughout the system and software life cycle. It is a process that includes requirements definition, hazard analyses, formal software inspections, safety analyses, testing, and maintenance. The greatest emphasis is placed on clearly and completely defining system and software requirements, including safety and reliability requirements. Unfortunately, development and review of requirements are the weakest link in the process. While some of the more academic methods, e.g. mathematical models, may help bring about safer software, this paper proposes the use of currently approved software methodologies, and sound software and assurance practices to show how, to a large degree, safety can be designed into software from the start. NASA's approach today is to first conduct a preliminary system hazard analysis (PHA) during the concept and planning phase of a project. This determines the overall hazard potential of the system to be built. Shortly thereafter, as the system requirements are being defined, the second iteration of hazard analyses takes place, the systems hazard analysis (SHA). During the systems requirements phase, decisions are made as to what functions of the system will be the responsibility of software. This is the most critical time to affect the safety of the software. From this point, software safety analyses as well as software engineering practices are the main focus for assuring safe software. While many of the steps proposed in this paper seem like just sound engineering practices, they are the best technical and most cost effective means to assure safe software within a safe system.

Wetherholt, Martha S.↗

A real-time distributed solid oxide electrolysis cell (SOEC) model for cyber-physical simulation

System integration and dynamic operability between SOEC and balance-of-plant (BoP) components are major technical challenges before realizing rapid load following of SOEC systems. Cyber-physical simulation (CPS) is a leading-edge digital engineering approach and is regarded as the next step beyond Digital Twins. CPS approach can be used to research SOEC system integration and develop dynamic controls prior to actual pilot testing without using a real SOEC. To seamlessly couple with BoP hardware and access non-observable operational parameters (e.g., local temperature gradient) during transients, a distributed one-dimensional (1D) real-time SOEC model was developed. Its real-time execution was demonstrated for 20 to 640 nodes at the fixed time step of 5 ms. A higher excess air ratio enabled smaller local temperature gradients on SOEC solid materials and faster transients upon current density step change from 0.15 to 0.55 A cm -2 . During the transients, the magnitude of the peak temperature gradient nearly doubled in 10 s from -3.5 to -5.9 °C cm -1 . This represents a significant operating risk that can impact the dynamic operability of SOEC systems. In addition, the local temperature gradient was found to change directions on all nodes in SOEC solid materials, with the greatest impact on the upstream nodes. The SOEC model was also tested at the thermal neutral voltage using actual process air flow parameters as variable model inputs. Variable process air temperatures were found to induce alternating local temperature gradients on SOEC solid materials. These are new operational mechanisms for SOEC degradation relevant for load following operational modes yet distinct from previous reports. To mitigate these unfavorable features, the SOEC can be operated at voltages that are slightly (±20 mV) deviated from the thermal neutral voltage. Here, the corresponding net thermal energy change was less than 1.6% of the electric power consumption. This 1D real-time SOEC model established the basis of cyber-physical simulation of SOEC hybrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mission to the Solar System: Exploration and Discovery. A Mission and Technology Roadmap

Solar System exploration addresses some of humanity's most fundamental questions: How and when did life form on Earth? Does life exist elsewhere in the Solar System or in the Universe? - How did the Solar System form and evolve in time? - What can the other planets teach us about the Earth? This document describes a Mission and Technology Roadmap for addressing these and other fundamental Solar System Questions. A Roadmap Development Team of scientists, engineers, educators, and technologists worked to define the next evolutionary steps in in situ exploration, sample return, and completion of the overall Solar System survey. Guidelines were to "develop aa visionary, but affordable, mission and technology development Roadmap for the exploration of the Solar System in the 2000 to 2012 timeframe." The Roadmap provides a catalog of potential flight missions. (Supporting research and technology, ground-based observations, and laboratory research, which are no less important than flight missions, are not included in this Roadmap.)

Gulkis, S.↗

Common Analysis Tool Being Developed for Aeropropulsion: The National Cycle Program Within the Numerical Propulsion System Simulation Environment

The NASA Lewis Research Center is developing an environment for analyzing and designing aircraft engines-the Numerical Propulsion System Simulation (NPSS). NPSS will integrate multiple disciplines, such as aerodynamics, structure, and heat transfer, and will make use of numerical "zooming" on component codes. Zooming is the coupling of analyses at various levels of detail. NPSS uses the latest computing and communication technologies to capture complex physical processes in a timely, cost-effective manner. The vision of NPSS is to create a "numerical test cell" enabling full engine simulations overnight on cost-effective computing platforms. Through the NASA/Industry Cooperative Effort agreement, NASA Lewis and industry partners are developing a new engine simulation called the National Cycle Program (NCP). NCP, which is the first step toward NPSS and is its initial framework, supports the aerothermodynamic system simulation process for the full life cycle of an engine. U.S. aircraft and airframe companies recognize NCP as the future industry standard common analysis tool for aeropropulsion system modeling. The estimated potential payoff for NCP is a $50 million/yr savings to industry through improved engineering productivity.

Follen, Gregory J.↗

Space Solar Power Demonstrations: Challenges and Progress

The prospects of using electrical power beamed from space are coming closer to reality with the continued pursuit and improvements in the supporting space solar research and technology. Space Solar Power (SSP) has been explored off and on for approximately three decades as a viable alternative and clean energy source. Results produced through the more recent Space Solar Power Exploratory Research and Technology (SERT) program involving extensive participation by industry, universities, and government has provided a sound technical basis for believing that technology can be improved to the extent that SSP systems can be built, economically feasible, and successfully deployed in space. Considerable advancements have been made in conceptual designs and supporting technologies including solar power generation, wireless power transmission, power management distribution, thermal management and materials, and the integrated systems engineering assessments. Basic technologies have progressed to the point were the next logical step is to formulate and conduct sophisticated demonstrations involving prototype hardware as final proof of concepts and identify high end technology readiness levels in preparation for full scale SSP systems designs. In addition to continued technical development issues, environmental and safety issues must be addressed and appropriate actions taken to reassure the public and prepare them for the future use of this alternative renewable energy resource. Accomplishing these objectives will allow informed future decisions regarding further SSP and related R&D investments by both NASA management and prospective external partners. In particular, accomplishing these objectives will also guide further definition of SSP and related technology roadmaps including performance objectives, resources and schedules; including 'multi-purpose' applications (terrestrial markets, science, commercial development of space, and other government missions).

Howell, Joe T.↗

Systems Engineering Management Plan NASA Traffic Aware Planner Integration Into P-180 Airborne Test-Bed

NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).

Maris, John↗

The ABC's required for establishing a practical computerized plant engineering management data base system

A system's approach is outlined in the paper to assist facility and Plant Engineers improve their organization's data management system. The six basic steps identified may appear somewhat simple; however, adequate planning, proper resources, and the involvement of management will determine the success of a computerized facility management data base. Helpful suggestions are noted throughout the paper to insure the development of a practical computerized data management system.

Maiocco, F. R.↗

An expert system prototype for aiding in the development of software functional requirements for NASA Goddard's command management system: A case study and lessons learned

At NASA Goddard, the role of the command management system (CMS) is to transform general requests for spacecraft opeerations into detailed operational plans to be uplinked to the spacecraft. The CMS is part of the NASA Data System which entails the downlink of science and engineering data from NASA near-earth satellites to the user, and the uplink of command and control data to the spacecraft. Presently, it takes one to three years, with meetings once or twice a week, to determine functional requirements for CMS software design. As an alternative approach to the present technique of developing CMS software functional requirements, an expert system prototype was developed to aid in this function. Specifically, the knowledge base was formulated through interactions with domain experts, and was then linked to an existing expert system application generator called 'Knowledge Engineering System (Version 1.3).' Knowledge base development focused on four major steps: (1) develop the problem-oriented attribute hierachy; (2) determine the knowledge management approach; (3) encode the knowledge base; and (4) validate, test, certify, and evaluate the knowledge base and the expert system prototype as a whole. Backcasting was accomplished for validating and testing the expert system prototype. Knowledge refinement, evaluation, and implementation procedures of the expert system prototype were then transacted.

Liebowitz, Jay↗

NSF-NASA Extreme Design & Wicked Problems Workshop

To learn how we might solve some important and challenging problems that require us to step into extreme or “wicked problem” domains. Where systems-level engineering and design are required to integrate with other domains. Connect with the external community to cross-pollinate on best methods, processes, and tools.

Innovation↗

Exploitation of a Validation Hierarchy for Modeling and Simulation

Across engineering there is an evolving need to increase reliance on physics-based simulation to develop, design and optimize engineering systems. This increased reliance on modeling and simulation has highlighted a growing need to transform the confidence that modeling and simulation analysts have in their results into credibility for systems engineers to design and field systems more quickly and with less physical testing. For isolated components of a complex system, where a single discipline may drive product design, this is less of a concern as the relationship is often straightforward and easy to explain. However, when these isolated components are integrated, and are expected to operate in a multi-disciplinary context in which safety critical systems are involved, new concepts and model assurance standards are required. In this paper we address this challenge by showing how a model validation hierarchy can be exploited to identify those model validation experiments that will contribute most to increasing confidence and credibility of modeling and simulation predictions. The approach that is adopted contains four main steps. The first step is the construction of a model validation hierarchy that links subsystems, assemblies, and components to a hierarchy of physical experiments that can be used support model validation. This hierarchy connects the concerns of systems engineers to those of the modeling and simulation analyst in a clear and logical way. The structure and content of this hierarchy is then used in a second step to establish which physical phenomena have the greatest impact on overall system performance metrics. A gap analysis technique, based upon modeling and simulation concerns, is then used to prioritize the important physical phenomenon. Unfortunately, a common outcome of such gap analyses is the identification of many important gaps and so, in the final step of our process, we advocate the use of a global sensitivity analysis as a means to complete the prioritization.

Verification and Validation↗

Exploitation of a Validation Hierarchy for Modeling and Simulation

Across engineering there is an evolving need to increase reliance on physics-based simulation to develop, design and optimize engineering systems. This increased reliance on modeling and simulation has highlighted a growing need to transform the confidence that modeling and simulation analysts have in their results into credibility for systems engineers to design and field systems more quickly and with less physical testing. For isolated components of a complex system, where a single discipline may drive product design, this is less of a concern as the relationship is often straightforward and easy to explain. However, when these isolated components are integrated, and are expected to operate in a multi-disciplinary context in which safety critical systems are involved, new concepts and model assurance standards are required. In this paper we address this challenge by showing how a model validation hierarchy can be exploited to identify those model validation experiments that will contribute most to increasing confidence and credibility of modeling and simulation predictions. The approach that is adopted contains four main steps. The first step is the construction of a model validation hierarchy that links subsystems, assemblies, and components to a hierarchy of physical experiments that can be used support model validation. This hierarchy connects the concerns of systems engineers to those of the modeling and simulation analyst in a clear and logical way. The structure and content of this hierarchy is then used in a second step to establish which physical phenomena have the greatest impact on overall system performance metrics. A gap analysis technique, based upon modeling and simulation concerns, is then used to prioritize the important physical phenomenon. Unfortunately, a common outcome of such gap analyses is the identification of many important gaps and so, in the final step of our process, we advocate the use of a global sensitivity analysis as a means to complete the prioritization.

Verification and Validation↗