Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Spaceport Performance Measures

Spaceports have traditionally been characterized by performance measures associated with their site characteristics. Measures such as "Latitude" (proximity to the equator), "Azimuth" (range of available launch azimuths) and "Weather" (days of favorable weather) are commonly used to characterize a particular spaceport. However, other spaceport performance measures may now be of greater value. These measures can provide insight into areas of operational differences between competing spaceports and identify areas for improving the performance of spaceports. This paper suggests Figures of Merit (FOMs) for spaceport "Capacity" (number of potential launch opportunities per year and / or potential mass' to low earth orbit (LEO) per year); "Throughput" (actual mass to orbit per year compared to capacity); "Productivity" (labor effort hours per unit mass to orbit); "Energy Efficiency" (joules expended at spaceport per unit mass to orbit); "Carbon Footprint" tons CO2 per unit mass to orbit). Additional FOMS are investigated with regards to those areas of special interest to commercial launch operators, such as "Assignment Schedule" (days required for a binding assignment of a launch site from the spaceport); "Approval Schedule" (days to complete a range safety assessment leading to an approval or disapproval of a launch vehicle); "Affordability" (cost for a spaceport to assess a new launch vehicle); "Launch Affordability" (fixed range costs per launch); "Reconfigure Time" (hours to reconfigure the range from one vehicle's launch ready configuration to another vehicle's configuration); "Turn,Around Time" (minimum range hours required between launches of an identical type launch vehicle). Available or notional data is analyzed for the KSC/CCAFS area and other spaceports. Observations regarding progress over the past few decades are made. Areas where improvement are needed or indicated are suggested.

Finger, G. Wayne↗

STS-114: Discovery L-3 Countdown Status Briefing

Bruce Buckingham of NASA Public Affair hosted this briefing. Jeff Spaulding, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Jeff specifically noted that the mission represents NASA's first step towards fulfilling the President's visions of returning to the Moon and then on to Mars and beyond. Scott reports that the 28,000 pounds of ISS hardware that is in the payload bay of the Discovery is ready to go, and completed final close outs. Cathy mentioned that Hurricane Dennis is not a threat, however, main threat of inland thunderstorms would result to 30% weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast and with 24 hours and 48 hours turn around plan. Final inspections, ice formation, ice inspection, effect of weather conditions to the external tank, delays and contingencies were some of the topics covered with the News Media.

Source record↗

Autonomous System Operations for Lunar Safe Haven Establishment and Sustainment

To enable a sustainable, permanent human lunar presence, NASA must provide a safe haven shelter to protect astronauts and equipment from radiation, thermal extremes, and micro-meteoroids (MM). Planning and development for a robust Safe Haven includes an examination of NASA activities in site preparation, excavation, regolith transfer, surface operations, autonomous monitoring and maintenance, advanced manufacturing, and in-situ resource utilization (ISRU) for identifying the best approaches when implementing a safe haven shelter. These NASA activities were reviewed as a part of a trade study conducted at NASA Langley to assess technological needs and estimated technology readiness levels (TRL). This paper presents a thorough review of the role and level of autonomy in the establishment and sustainment operations of a Lunar Safe Haven.

Walter J Waltz↗

Autonomous System Operations for Lunar Safe Haven Establishment and Sustainment

To enable a sustainable, permanent human lunar presence, NASA must provide a safe haven shelter to protect astronauts and equipment from radiation, thermal extremes, and micro-meteoroids (MM). Planning and development for a robust Safe Haven includes an examination of NASA activities in site preparation, excavation, regolith transfer, surface operations, autonomous monitoring and maintenance, advanced manufacturing, and in-situ resource utilization (ISRU) for identifying the best approaches when implementing a safe haven shelter. These NASA activities were reviewed as a part of a trade study conducted at NASA Langley to assess technological needs and estimated technology readiness levels (TRL). This paper presents a thorough review of the role and level of autonomy in the establishment and sustainment operations of a Lunar Safe Haven.

Walter J Waltz↗

Free-Flight Terrestrial Rocket Lander Demonstration for NASA's Autonomous Landing and Hazard Avoidance Technology (ALHAT) System

The Autonomous Landing Hazard Avoidance Technology (ALHAT) Project is chartered to develop and mature to a Technology Readiness Level (TRL) of six an autonomous system combining guidance, navigation and control with terrain sensing and recognition functions for crewed, cargo, and robotic planetary landing vehicles. The ALHAT System must be capable of identifying and avoiding surface hazards to enable a safe and accurate landing to within tens of meters of designated and certified landing sites anywhere on a planetary surface under any lighting conditions. Since its inception in 2006, the ALHAT Project has executed four field test campaigns to characterize and mature sensors and algorithms that support real-time hazard detection and global/local precision navigation for planetary landings. The driving objective for Government Fiscal Year 2012 (GFY2012) is to successfully demonstrate autonomous, real-time, closed loop operation of the ALHAT system in a realistic free flight scenario on Earth using the Morpheus lander developed at the Johnson Space Center (JSC). This goal represents an aggressive target consistent with a lean engineering culture of rapid prototyping and development. This culture is characterized by prioritizing early implementation to gain practical lessons learned and then building on this knowledge with subsequent prototyping design cycles of increasing complexity culminating in the implementation of the baseline design. This paper provides an overview of the ALHAT/Morpheus flight demonstration activities in GFY2012, including accomplishments, current status, results, and lessons learned. The ALHAT/Morpheus effort is also described in the context of a technology path in support of future crewed and robotic planetary exploration missions based upon the core sensing functions of the ALHAT system: Terrain Relative Navigation (TRN), Hazard Detection and Avoidance (HDA), and Hazard Relative Navigation (HRN).

Rutishauser, David K.↗

Helicopter Field Testing of NASA's Autonomous Landing and Hazard Avoidance Technology (ALHAT) System fully integrated with the Morpheus Vertical Test Bed Avionics

The Autonomous Landing Hazard Avoidance Technology (ALHAT) Project was chartered to develop and mature to a Technology Readiness Level (TRL) of six an autonomous system combining guidance, navigation and control with real-time terrain sensing and recognition functions for crewed, cargo, and robotic planetary landing vehicles. The ALHAT System must be capable of identifying and avoiding surface hazards to enable a safe and accurate landing to within tens of meters of designated and certified landing sites anywhere on a planetary surface under any lighting conditions. This is accomplished with the core sensing functions of the ALHAT system: Terrain Relative Navigation (TRN), Hazard Detection and Avoidance (HDA), and Hazard Relative Navigation (HRN). The NASA plan for the ALHAT technology is to perform the TRL6 closed loop demonstration on the Morpheus Vertical Test Bed (VTB). The first Morpheus vehicle was lost in August of 2012 during free-flight testing at Kennedy Space Center (KSC), so the decision was made to perform a helicopter test of the integrated ALHAT System with the Morpheus avionics over the ALHAT planetary hazard field at KSC. The KSC helicopter tests included flight profiles approximating planetary approaches, with the entire ALHAT system interfaced with all appropriate Morpheus subsystems and operated in real-time. During these helicopter flights, the ALHAT system imaged the simulated lunar terrain constructed in FY2012 to support ALHAT/Morpheus testing at KSC. To the best of our knowledge, this represents the highest fidelity testing of a system of this kind to date. During this helicopter testing, two new Morpheus landers were under construction at the Johnson Space Center to support the objective of an integrated ALHAT/Morpheus free-flight demonstration. This paper provides an overview of this helicopter flight test activity, including results and lessons learned, and also provides an overview of recent integrated testing of ALHAT on the second Morpheus vehicle.

Rutishauser, David↗

Helicopter Field Testing of NASA's Autonomous Landing and Hazard Avoidance Technology (ALHAT) System fully Integrated with the Morpheus Vertical Test Bed Avionics

The Autonomous Landing and Hazard Avoidance Technology (ALHAT) Project was chartered to develop and mature to a Technology Readiness Level (TRL) of six an autonomous system combining guidance, navigation and control with real-time terrain sensing and recognition functions for crewed, cargo, and robotic planetary landing vehicles. The ALHAT System must be capable of identifying and avoiding surface hazards to enable a safe and accurate landing to within tens of meters of designated and certified landing sites anywhere on a planetary surface under any lighting conditions. This is accomplished with the core sensing functions of the ALHAT system: Terrain Relative Navigation (TRN), Hazard Detection and Avoidance (HDA), and Hazard Relative Navigation (HRN). The NASA plan for the ALHAT technology is to perform the TRL6 closed loop demonstration on the Morpheus Vertical Test Bed (VTB). The first Morpheus vehicle was lost in August of 2012 during free-flight testing at Kennedy Space Center (KSC), so the decision was made to perform a helicopter test of the integrated ALHAT System with the Morpheus avionics over the ALHAT planetary hazard field at KSC. The KSC helicopter tests included flight profiles approximating planetary approaches, with the entire ALHAT system interfaced with all appropriate Morpheus subsystems and operated in real-time. During these helicopter flights, the ALHAT system imaged the simulated lunar terrain constructed in FY2012 to support ALHAT/Morpheus testing at KSC. To the best of our knowledge, this represents the highest fidelity testing of a system of this kind to date. During this helicopter testing, two new Morpheus landers were under construction at the Johnson Space Center to support the objective of an integrated ALHAT/Morpheus free-flight demonstration. This paper provides an overview of this helicopter flight test activity, including results and lessons learned, and also provides an overview of recent integrated testing of ALHAT on the second Morpheus vehicle.

Epp, Chirold D.↗

Assessment of the Performance of the Atmospheric Correction Algorithm MAJA for Sentinel-2 Surface Reflectance Estimates

The correction of atmospheric effects on optical remote sensing products is an essential component of Analysis Ready Data (ARD) production lines. The MAJA processor aims at providing accurate time series of surface reflectances over land for satellite missions, such as Sentinel-2, Venμs, and Landsat 8. The Centre d’Études Spatiales de la Biosphère (CESBIO) and the Centre National d’Études Spatiales (CNES) share a common effort to maintain, validate, and improve the MAJA processor, using state-of-the-art ground measurement sites, and participating in processor inter-comparisons, such as the Atmospheric Correction Intercomparison Exercise (ACIX). While contributing to the second ACIX-II Land validation exercise, it was found that the candidate MAJA dataset could not adequately be compared to the main reference dataset. MAJA reflectances were corrected for adjacency and topography effects while the reference dataset was not, excluding MAJA from a part of the performance metrics of the exercise. The first part of the following study aims at providing complementary performance assessment to ACIX-II by reprocessing MAJA surface reflectances without adjacency nor topographic correction, allowing for an un-biased full resolution comparison with the reference Sentinel-2 dataset. The second part of the study consists of validating MAJA against surface reflectance measurements time series of up to five years acquired at three automated stations. Both approaches provide extensive insights on the quality of MAJA Sentinel-2 Level 2 products.

ROSAS↗

STS-114: Discovery L-2 Countdown Status Briefing

George Diller of NASA Public Affairs hosted this briefing. Pete Nickolenko, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Pete reports his team has completed the avionics system check ups, servicing of the cryogenic tanks will take about seven hours that day, and will perform engine system checks and pad close outs come evening. Pete also summarized other standard close out activities: check ups of the Orbiter and ground communications network, rotary service, structure retraction, and external tank load (ETL). Pete reported that the mission will be 12 days with two weather contingency days, and end of mission landing scheduled at Kennedy Space Center (KSC) at approximately 11:00 in the morning, Eastern time on July 25th. Scott briefly reported that all hardware is on board Discovery, closed out, and ready to fly. Cathy reported that hurricane Dennis moved to the North and looking forward to launch. She mentioned of a new hurricane looming and will be named Emily, spotted some crosswinds which will migrate to the west, there is 30% probability weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast, and with 24 hours and 48 hours turn around plan. Launch constraints, weather, crosswinds, cloud cover, ground imagery system, launch countdown, launch crews, mission management simulations, launch team simulations were topics covered with the News Media.

Source record↗

ERDA-NASA wind energy project ready to involve users

The NASA contribution to the Wind Energy Project is discussed. NASA is responsible for the following: (1) identification of cost-effective configurations and sizes of wind-conversion systems, (2) the development of technology needed to produce these systems, (3) the design of wind-conversion systems that are compatible with user requirements, particularly utility networks, and (4) technology transfer obtained from the program to stimulate rapid commercial application of wind systems. Various elements of the NASA program are outlined, including industry-built user operation, the evaluation phase, the proposed plan and schedule for site selection and user involvement, supporting research and technology (e.g., energy storage), and component and subsystem technology development.

Thomas, R.↗

The Assembly, Test, and Integration of LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelera-tor)

R.J. Bodkin Biography Mr. Bodkin worked in industry for a rapid prototype company focusing on UAVs and manned experimental aircraft. Later he served as the Inflation System Lead on IRVE-II and 3 and the Re-Entry Vehicle Lead for LOFTID at NASA Langley Research Center. Introduction: The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID), developed in partnership with United Launch Alliance (ULA) and flown in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Joint Polar Satellite System-2 (JPSS-2) satellite, demonstrated Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology has progressed and is ready for mission infusion. LOFTID’s success demonstrates that aeroshells are not limited to the internal diame-ter of the launch vehicle payload fairing, allowing larger payloads to be deployed to the surfaces of planetary bodies with atmospheres. The challenges of assembling, integrating, and testing this revolutionary spacecraft will be dis-cussed as well as issues associated with doing this with a fixed launch date the project did not control. Assembly: Because LOFTID flew as a rideshare partner with JPSS-2, it was constrained with addi-tional schedule, milestone, and technical require-ments that were beyond the project’s control. As-sembly of the LOFTID hardware was challenged with the normal mechanical fit issues while also having to navigate the SARS-COVID-II pandemic. Challenges ranged from availability of team per-sonnel required on-site for vehicle assembly to dif-ficulties associated with team collaboration while working remotely and increased costs and lead times of components due to supply chain con-straints. Numerous additional challenges cascaded from the additional time required. Integration: LOFTID flew as a secondary pay-load to JPSS-2 in a mission-unique configuration, directly under JPSS-2 primary payload, inside the Payload Adapter that integrated JPSS-2 to the Atlas V launch vehicle. A mission unique Payload Adapt-er Separation System (PASS) was required to sepa-rate the Payload Adapter from the Launch Vehicle prior to the start of the LOFTID flight demonstra-tion. Development of this system was challenging due to a shortened development schedule resulting from the iterative nature of Payload Adapter devel-opment with the partners at ULA. Preparations to integrate the main segments of the LOFTID vehicle posed unique challenges of having to accommodate issues with a fixed launch date that led to some cre-ative solutions to the integration. The partnership agreement with ULA and JPSS-2 resulted in a mass simulator designed to be installed late in the inte-gration in the event the LOFTID vehicle was not ready in time.. Test: LOFTID testing was carried out in several phases. Some components were tested at the com-ponent level, others at the sub-system levels and then finally the integrated vehicle level. This culmi-nated with the Complete Systems Test (CST) per-formed in a vacuum chamber as one of the final checkouts prior to disassembly for re-packing of the aeroshell. CST challenges will be discussed as well as obstacles encountered post-CST. After CST, the vehicle was disassembled so the HIAD could be repacked, and the vehicle was reassembled for ac-ceptance vibration testing. Testing concluded with the fully assembled vehicle being shipped to the launch site for final testing and integrations with the Payload Adapter to JPSS-2 for launch and opera-tions. Conclusion: The challenges posed by the AI&T for LOFTID could inform the planetary community of some of the opportunities and challenges of de-veloping technologies on a rideshare with a rela-tively small budget.

R.J. Bodkin↗

Model Output Is Data, Too: And Other Futuristic Views

The NASA space science data environment has been undergoing significant changes during the past decade: Data has become significantly more voluminous and more varied. At the same time it became much more openly available to the scientific community. As a result a number of efforts have been made to document the data content at NSSDC/SPDF, PDS, the ISTP program and more recently as part of the newly developing Virtual Observatories. Concurrently, our need to access data has become much more immediate dictating a distributed environment where users can obtain their data directly from the production sites. But where does this change lead? And what more needs to be done to further enable scientific productivity? A view of our data system 5- years in the future will be offered that envisions distributed data processing services whereby the user can obtain the type of data that is needed not necessarily what is produced. Moreover, in an ideal system the means should exist to treat models as instruments allowing the ready mixing of their output with spacecraft generated data.

Szabo, A.↗

Web-Based Satellite Products Database for Meteorological and Climate Applications

The need for ready access to satellite data and associated physical parameters such as cloud properties has been steadily growing. Air traffic management, weather forecasters, energy producers, and weather and climate researchers among others can utilize more satellite information than in the past. Thus, it is essential that such data are made available in near real-time and as archival products in an easy-access and user friendly environment. A host of Internet web sites currently provide a variety of satellite products for various applications. Each site has a unique contribution with appeal to a particular segment of the public and scientific community. This is no less true for the NASA Langley's Clouds and Radiation (NLCR) website (http://www-pm.larc.nasa.gov) that has been evolving over the past 10 years to support a variety of research projects This website was originally developed to display cloud products derived from the Geostationary Operational Environmental Satellite (GOES) over the Southern Great Plains for the Atmospheric Radiation Measurement (ARM) Program. It has evolved into a site providing a comprehensive database of near real-time and historical satellite products used for meteorological, aviation, and climate studies. To encourage the user community to take advantage of the site, this paper summarizes the various products and projects supported by the website and discusses future options for new datasets.

Phan, Dung↗

Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

Koenig, John C.↗

Atmospheric In-Situ Resource Utilization For Mars Application

NASA now looks to Mars as the next step in human space exploration. A couple of challenges of such a destination include affordability and weight/volume limitations. As a way to solve these issues NASA is looking into the practice of In-Situ Resource Utilization (ISRU). Instead of manufacturing and bringing all the supplies necessary for a Mars mission and return trip, the goal is to send a preliminary mission to produce reserves of propellant, water, and oxygen on site. Part of this effort includes the Atmospheric Processing Module (APM). The APM is part of a lander that is composed of multiple compartments, each having a unique function; regolith collection/processing, water processing, atmospheric processing, and product storage. The overall goal is to develop the capability to produce methane (CH4) and oxygen as a fuel/oxidizer combo via a Sabatier reaction using resources from the Martian environment. The APM still must undergo modifications in design, and perhaps method, to become flight-ready to produce methane at the level of purity and quantity needed for a vehicle.

isru↗

NASA Robotic Neurosurgery Testbed

The detection of tissue interface (e.g., normal tissue, cancer, tumor) has been limited clinically to tactile feedback, temperature monitoring, and the use of a miniature ultrasound probe for tissue differentiation during surgical operations. In neurosurgery, the needle used in the standard stereotactic CT (Computational Tomography) or MRI (Magnetic Resonance Imaging) guided brain biopsy provides no information about the tissue being sampled. The tissue sampled depends entirely upon the accuracy with which the localization provided by the preoperative CT or MRI scan is translated to the intracranial biopsy site. In addition, no information about the tissue being traversed by the needle (e.g., a blood vessel) is provided. Hemorrhage due to the biopsy needle tearing a blood vessel within the brain is the most devastating complication of stereotactic CT/MRI guided brain biopsy. A robotic neurosurgery testbed has been developed at NASA Ames Research Center as a spin-off of technologies from space, aeronautics and medical programs. The invention entitled 'Robotic Neurosurgery Leading to Multimodality Devices for Tissue Identification' is nearing a state ready for commercialization. The devices will: 1) improve diagnostic accuracy and precision of general surgery, with near term emphasis on stereotactic brain biopsy, 2) automate tissue identification, with near term emphasis on stereotactic brain biopsy, to permit remote control of the procedure, and 3) reduce morbidity for stereotactic brain biopsy. The commercial impact from this work is the potential development of a whole new generation of smart surgical tools to increase the safety, accuracy and efficiency of surgical procedures. Other potential markets include smart surgical tools for tumor ablation in neurosurgery, general exploratory surgery, prostate cancer surgery, and breast cancer surgery.

Mah, Robert↗

NASA Robotic Neurosurgery Testbed

The detection of tissue interface (e.g., normal tissue, cancer, tumor) has been limited clinically to tactile feedback, temperature monitoring, and the use of a miniature ultrasound probe for tissue differentiation during surgical operations, In neurosurgery, the needle used in the standard stereotactic CT or MRI guided brain biopsy provides no information about the tissue being sampled. The tissue sampled depends entirely upon the accuracy with which the localization provided by the preoperative CT or MRI scan is translated to the intracranial biopsy site. In addition, no information about the tissue being traversed by the needle (e.g., a blood vessel) is provided. Hemorrhage due to the biopsy needle tearing a blood vessel within the brain is the most devastating complication of stereotactic CT/MRI guided brain biopsy. A robotic neurosurgery testbed has been developed at NASA Ames Research Center as a spin-off of technologies from space, aeronautics and medical programs. The invention entitled "Robotic Neurosurgery Leading to Multimodality Devices for Tissue Identification" is nearing a state ready for commercialization. The devices will: 1) improve diagnostic accuracy and precision of general surgery, with near term emphasis on stereotactic brain biopsy, 2) automate tissue identification, with near term emphasis on stereotactic brain biopsy, to permit remote control of the procedure, and 3) reduce morbidity for stereotactic brain biopsy. The commercial impact from this work is the potential development of a whole new generation of smart surgical tools to increase the safety, accuracy and efficiency of surgical procedures. Other potential markets include smart surgical tools for tumor ablation in neurosurgery, general exploratory surgery, prostate cancer surgery, and breast cancer surgery.

Mah, Robert↗

Moon to Mars (M2M) Habitation Considerations: A Snap Shot As of January 2022

The following NASA Technical Memorandum (TM) is intended to provide a snapshot in time of NASA’s current considerations (ground rules and assumptions, functional allocations, logistics) for habitation systems for the lunar surface (non-roving) and Mars transits. As NASA continues to refine the reference designs to meet the needs of an evolving architecture, it is expected that this information will also be updated as a result. Where appropriate, relevant publicly released documents will be referenced to provide further detail. NASA’s human lunar exploration plan under the Artemis program calls for achieving the goal of sending the first woman and first person of color to the surface of the Moon in the mid- 2020s and working toward sustainable exploration by the end of the decade. Working with both commercial and international partners, NASA will establish a permanent human presence on the Moon to uncover new scientific discoveries and lay the foundation for private companies to build a lunar economy. Longer duration missions on the lunar surface and in lunar orbit will also serve as a test bed for technologies to support future Mars exploration campaigns. The agency will use what we learn on the Moon to prepare for humanity's next giant leap – sending astronauts to Mars. NASA intends to establish a sustained lunar presence with the development of the Artemis Base Camp to prove technologies and capabilities that will one day enable humans to live and work on Mars, beginning with core elements including the Lunar Terrain Vehicle (LTV), the Pressurized Rover (PR), the lunar Surface Habitat (SH), power systems, and in-situ resource utilization (ISRU) systems. For in space operations and eventual transport of humans to Mars, NASA will utilize a Mars Transit Habitat (TH). Following deployment, the TH will complete a series of longer duration missions and shakedown testing while docked at Gateway, leveraging Gateway’s habitation redundancy for safety measures. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. They will be the first operational readiness tests of our long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Both the SH and TH are major architectural elements of NASA’s Moon to Mars (M2M) approach, each with very different concepts of operation. The SH is intended for use on the lunar surface as a home for astronauts, surface operations base, science facility, hub for communications, extravehicular activity (EVA) equipment repair site, waste processing facility, and supply hub. It serves as an enabler for a sustained surface presence and preparation for partial gravity operations during Mars missions. The SH will be designed to be self-sufficient for operations on the lunar surface. The SH will independently provide several functions, including its own power generation, energy storage capability, sleep quarters, hygiene areas, work areas, and dining areas. It will be capable of communicating with surface assets, orbital assets, and directly with Earth ground stations. It is planned to operate with two crew in the habitat for ~28- day stays with crew swap-outs in which the PR crew of two trades places with the habitat crew. During the swap-out, the habitat will nominally support four crew for a short period of time. For contingency scenarios, the habitat must also be capable of supporting four crew for up to 7 days. The TH will be designed to be capable of up to ~1,200-day Mars missions with the ability to carry all food and supplies needed to support a crew of four for this duration. An assumed Mars mission profile for the TH is to carry crew and supplies for ~850-day roundtrips between Earth and Mars orbit that allows 30-day stays on the Martian surface. To test the systems for this long journey, the TH will be used to extend the duration of missions at Gateway, enabling the orbiting outpost to be used as a Mars analog. These analog missions will be accomplished by attaching the TH to Gateway and conducting lunar surface operations from the TH. The TH may also need to perform free-flying shakedown missions to test out all systems prior to leaving for Mars. The habitat provides many critical functions including: a contingency airlock, crew quarters, galley, hygiene areas, safe haven capability, and science equipment. It can receive docked items from either axial end or on a radial port.

Habitat↗