Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space robotics survey”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Desert Research and Technology Studies (RATS) 2007 Field Campaign Objectives and Results

Desert "RATS" (Research and Technology Studies) is a combined, multi-discipline group of inter-NASA center scientists and engineers, net-working and collaborating with representatives of industry and academia, for the purpose of conducting planetary surface exploration-focused remote field exercises. These integrated testing exercises conducted under representative analog Lunar and Mars surface terrain conditions, provide NASA the capability to validate experimental prototype hardware and software systems as well as to evaluate and develop mission operational techniques in order to identify and establish technical requirements and identify potential technology "gaps" applicable for future planetary human exploration. The 2007 D-RATS field campaign test activities were initiated based on the major themes and objectives of a notional 5-year plan developed for conducting relative analog test activities in support of the engineering evaluation and assessment of various system architectural requirements, conceptual prototype support equipment and selected technologies necessary for the establishment of a lunar outpost. Specifically, the major objectives included measuring task efficiency during robot, human, and human-robot interactive tasks associated with lunar outpost site surveying and reconnaissance activities and deployment of a representative solar panel power and distribution system. In addition, technology demonstrations were conducted with a new Lithium-ion battery and autonomous software to coordinate multiple robot activities. Secondary objectives were evaluating airlock concept mockups and prototype removable space suit over-garment elements for dust mitigation, and upgrades to the prototype extravehicular activities (EVA) communication and information system. Dry run test activities, prior to testing at a designated remote field site location, were initially conducted at the Johnson Space Center (JSC) Remote Field Demonstration Test Site. This is a multi-acre external test site located at JSC and has detailed representative terrain features simulating both Lunar and Mars surface characteristics. Both the local JSC and remote field test sites have terrain conditions that are representative and characteristic of both the Moon and Mars, such as strewn rock and volcanic ash fields, craters, rolling plains, hills, gullies, slopes, and outcrops. The D-RATS 2007 field campaign, representing the completion of its tenth year of analog testing, was conducted at the large Cinder Lake volcanic ash bed area adjacent to Flagstaff, Arizona.

Kosmo, Joseph↗

State of the Profession Considerations: NASA Langley Research Center Capabilities / Technologies for Autonomous In-Space Assembly and Modular Persistent Assets

Successfully implementing OSAM into next generation revolutionary observatories requires integrating expertise and technologies in modular space structures, assembly operations, autonomy, and modeling/simulation. LaRC OSAM technologies/capabilities have been presented to inform the Planetary Science and Astrobiology Decadal Survey community of the robust and mature existing capability to support an OSAM based architecture for their next observatory. LaRC Structures and Assembly capabilities enable; a modular telescope architecture, high-performance structural modules, and robotic assembly techniques. LaRC Autonomy capabilities ensure that the robotic assembly will be accomplished in a safe and robust manner and only require humans in a supervisory role. The LaRC toolbox of Modeling and Simulation capabilities that is calibrated using module-level ground testing, will ensure that the performance of the fully assembled observatory, a very large zero-g system that will never be assembled/tested in a gravity environment, meets all performance requirements when it enters into service. Integrating all three LaRC capabilities and including embedded metrology, will enable servicing, repair, instrument upgrades (and/or replacement) while ensuring a very long lifetime for the observatory and providing a return-on-investment that is substantially greater than the initial cost. Further confidence will be achieved as OSAM technologies are validated in a new LaRC OSAM laboratory that allows large-scale collaborative testing of modular hardware, simulation software and algorithms, and autonomous agents.

Large space structures↗

NEA Scout and Lunar Flashlight: Two NearTerm Interplanetary CubeSat Missions

NASA is developing two small satellite missions as part of the Advanced Exploration Systems (AES) Program, both of which will use a solar sail to enable their scientific objectives. Solar sails reflect sunlight from a large, mirror‐like sail made of a lightweight, highly reflective material to provide thrust. This continuous photon pressure provides propellantless thrust, allowing for very high delta V maneuvers in space. Lunar Flashlight, managed by the NASA Jet Propulsion Laboratory, will search for and map volatiles in permanently shadowed lunar craters using a solar sail as a gigantic mirror to steer sunlight into them, then examine the reflected light with a spectrometer. The Lunar Flashlight spacecraft will also use the solar sail to maneuver into a lunar polar orbit. The mission will demonstrate a low‐cost capability to explore, locate and estimate the size and composition of ice deposits on the Moon. The Near Earth Asteroid (NEA) Scout mission, managed by the NASA Marshall Space Flight Center will survey and image a Near Earth Asteroid for possible future human exploration using a smallsat propelled by a solar sail. Detections of NEAs are expected to grow in the near future, offering increasing target opportunities. Obtaining and analyzing relevant data about these bodies via robotic precursors before committing a crew to visit them is essential. The NEA Scout spacecraft is nearly identical to the one being developed for Lunar Flashlight, with the science instrument package being the primary difference. The NEA Scout solar sail will provide the primary propulsion taking the 6U cubesat from near the Earth to its final asteroid destination and the Lunar Flashlight sail will provide the propulsion necessary for its spacecraft to enter lunar orbit. Both projects will use an 85 m2 solar sail developed by NASA MSFC. The NEA Scout and Lunar Flashlight flight systems are based on a 6U cubesat form factor, with a stowed envelope of 10 x 20 x 30 cm and a mass of less than 12 kg. The solar sail for NEA Scout and Lunar Flashlight will be based on the technology developed and flown by the NASA NanoSail‐D and The Planetary Society's Lightsail‐A. Four 7 m stainless steel booms wrapped on two spools (two overlapping booms per spool) will be motor deployed and pull the sail from its stowed volume. The sail material will be 3 micron CP1, an aluminized polyimide that was extensively tested for solar sail applications. The sail will spooled rather than Z‐folded. This paper will describe both the Lunar Flashlight and NEA Scout missions and their solar sails.

Johnson, Les↗

Prospects for Future Human Space Flight Missions to Near-Earth Asteroids

The forthcoming Near-Earth Object (NEO) Surveyor space telescope is a foundational asset designed to complete NASA’s congressionally-mandated goal of cataloging ≥90% of NEOs ≥140 meters in size as soon as practical, and discover Earth impactors far in advance. NEO Surveyor is also critical to near-Earth asteroid (NEA) exploration because it will find suitable low-Δv NEAs for robotic and human missions, often on Earth-like orbits with long synodic periods. Such NEAs have usually not been detected until imminent Earth launch opportunities because they were not observable until close to Earth. Discovering them far enough in advance to deploy missions requires a deep-space infrared survey telescope such as NEO Surveyor. In addition to posing hazards and being scientifically important, NEAs contain resources, such as water (OH), that could be utilized off-Earth. They also offer unique opportunities for the most ambitious human voyages ever undertaken. The Apollo program forever changed humanity’s perspective by showing us Earthrise from our Moon through human eyes. Crewed missions to NEAs will forever change our perspective again by showing us Earth as a distant point of light in the heavens as seen from an asteroid by astronauts. Planetary defense endeavors to understand asteroid and comet impact risks and develop mitigation capabilities. NEA exploration is synergistic in multiple ways. NEO Surveyor will discover and help characterize Earth impactors and accessible NEAs. Heavy-lift launch is highly enabling for both human NEA missions and planetary defense. Reconnaissance missions for planetary defense can also characterize NEAs prior to crewed missions. In situ resource utilization (ISRU) systems may be applicable to deflecting or destroying hazardous NEAs. NEA characterization data critically inform planetary defense efforts and indicate NEA types suitable for human exploration or ISRU. In 2010, NASA performed the Near-Earth Object (NEO) Human Space Flight (HSF) Accessible Targets Study (NHATS), creating an automated online system monitoring mission accessibility of NEAs 2 . NHATS database NEAs meet criteria that require less total mission Δv and/or round-trip mission duration than the Martian surface or even Mars orbit. There are currently 4,658 NHATS NEAs, and many rival or exceed lunar orbit/surface accessibility. Thus, NHATS NEAs could be explored by humans prior to attempting a Mars mission. Human missions to NEAs would test human-rated spacecraft systems with less cost and risk than Mars missions. Thus, human missions to NEAs are compelling in their own right while also providing prudent preparation for more demanding Mars missions. Lunar missions can offer similar opportunities, but they differ from NEA missions in important ways. Lunar missions pose less demanding psychological challenges to crew and ground staff. Earth light-time delay for communications is significantly longer during NEA missions. NEA missions are available that require more propulsion system consumables than lunar missions but less than Mars missions. In this paper, we summarize NEA accessibility for human missions, discuss motivations for such missions, survey knowledge about NEAs that informs future human missions, present exemplar mission opportunities to the currently known NHATS NEAs, and describe future work towards enabling human NEA missions.

Near-Earth asteroids↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool the majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit for the ammonia leak was the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high-definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Darnell Cowan↗

Return to Flight: Crew Activities Resource Reel 1 of 2

The crew of the STS-114 Discovery Mission is seen in various aspects of training for space flight. The crew activities include: 1) STS-114 Return to Flight Crew Photo Session; 2) Tile Repair Training on Precision Air Bearing Floor; 3) SAFER Tile Inspection Training in Virtual Reality Laboratory; 4) Guidance and Navigation Simulator Tile Survey Training; 5) Crew Inspects Orbital Boom and Sensor System (OBSS); 6) Bailout Training-Crew Compartment; 7) Emergency Egress Training-Crew Compartment Trainer (CCT); 8) Water Survival Training-Neutral Buoyancy Lab (NBL); 9) Ascent Training-Shuttle Motion Simulator; 10) External Tank Photo Training-Full Fuselage Trainer; 11) Rendezvous and Docking Training-Shuttle Engineering Simulator (SES) Dome; 12) Shuttle Robot Arm Training-SES Dome; 13) EVA Training Virtual Reality Lab; 14) EVA Training Neutral Buoyancy Lab; 15) EVA-2 Training-NBL; 16) EVA Tool Training-Partial Gravity Simulator; 17) Cure in Place Ablator Applicator (CIPAA) Training Glove Vacuum Chamber; 16) Crew Visit to Merritt Island Launch Area (MILA); 17) Crew Inspection-Space Shuttle Discovery; and 18) Crew Inspection-External Tank and Orbital Boom and Sensor System (OBSS). The crew are then seen answering questions from the media at the Space Shuttle Landing Facility.

Source record↗

Mars Commercial-Compatible Initial Human-Precursor Surveying and Instrument-Deployment Concepts

Water is a critical resource need for future human exploration and habitation of Mars and other planetary environments. An integral scientific question in the search for life outside of Earth is: What are the constraints on life in planetary environments? One of the most critical features of habitable environments is the availability of water - both as an environment for prebiotic chemistry, abiogenesis, and life; and as a vehicle for generating geo- and electro- chemical systems that can support metabolism. Seeking evidence of life prior to human arrival is important both to preserve signs of any existing or past evidence of Martian life, reducing the risks of unintentional forward contamination of Martian environments, and to potentially protect the health of any human crews. Looking forward towards Mars, future human exploration will require a rapid, but thorough, initial survey of any local “area of operations” on Mars to determine the spatial distribution, quantity, and quality (e.g., salt/mineral/organic content) of any local water, as well as to evaluate any signs of current or extinct life. We will discuss several candidate field survey methodologies, involving humans, a teamed instrument platform and a surveying/sampling rover. These are proposed to be validated in a given terrestrial Mars analog environment exhibiting varying distributions of water (ice, permafrost, rock-bound) to evaluate the constraints on life. Commercial space exploration brings the future possibility of unprecedented mass, power and in situ instrument capability, potentially enabling thorough exploration of the geology, hydrology and astrobiology of a km-radius study-zone around a future Mars human/commercial space landing site. We propose to study several representative planetary surface precursor-survey architectures and mission concepts (that are commercial-Mars-compatible), and to test and compare them in field application. We will examine some of the performance issues, using given metrics and controls, of spacesuited humans using handheld and standalone instruments, vs. a robotic human-tended rover/drill, robot arm and instruments. The latter rover-based architecture can in turn be viewed in terms of returned-to-base sample in-situ analyses vs sample analysis performed on a standalone instrument platform deployed away from the primary area of operations.

astrobiology↗

SpaceVPX Interoperability Assessment

The existing VMEbus (VersaModular Eurocard bus) International Trade Association (VITA)-78 industry standard, also known as SpaceVPX, is an avionics board- and chassis-level standard derived from the OpenVPX standard as defined in VITA-65. While VITA-65 defines backplane and board-level profiles from COTS vendors to ensure interoperability of products used in developing systems and subsystems, the VITA-78 standard defines SpaceVPX to incorporate fault tolerance features that are required by many spaceflight systems. However, VITA-78 allows so much flexibility that interoperability between modules cannot be assured. This assessment provides guidelines on the use of, and extensions to, the VITA-78 standard to enable avionics interoperability for future NASA missions. The assessment team was comprised of subject matter experts (SMEs) from Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory (JPL), Johnson Space Center (JSC), and Langley Research Center (LaRC). The team included valuable external consulting support from a SME who was a key participant in the development of the VITA-78 standard. The team had extensive collaboration with the NASA Space Technology Mission Directorate (STMD) High Performance Spaceflight Computing (HPSC) project, specifically in the development of SpaceVPX interconnect findings, observations, and NESC recommendations. To provide an understanding of the breadth of implementations that SpaceVPX must accommodate, multiple NASA use cases were analyzed to assess the requirements for SpaceVPX implementations across a wide range of NASA missions (Appendix C). Applications included crewed missions, science missions, and orbital and surface robotic systems. Product surveys were conducted to assess the level of industry support for SpaceVPX, applications, and the variations in their implementations (Appendix D). In-depth analysis was conducted in the areas of: (a) power management and distribution, (b) form factors and daughtercards, (c) interconnect, and (d) fault tolerance. Leveraging the use cases, product surveys, and SMEs from multiple NASA Centers, these areas were analyzed to determine the range of implementations permitted by the VITA-78 standard and potential interoperability issues. Applicable findings and NESC recommendations were provided for each area. During this assessment, there were multiple opportunities to engage with other agencies to learn about their interest in SpaceVPX, their strategies for implementing SpaceVPX-based systems, and their internal development efforts. These engagements also generated findings and NESC recommendations. Based on this assessment analysis, NESC recommendations were made regarding the feature set and module profiles to support NASA SpaceVPX implementations. This feature set includes restrictions on features in VITA-78, and extensions to the standard. Key recommendations in this area include the use of 10 Gigabit Ethernet and Peripheral Component Interconnect Express (PCIe) as high bandwidth interconnect on the backplane, the retention of SpaceWire interconnect for control functions, and support for 3U (unit) and 6U, form factors for NASA systems. Restrictions were proposed on the usage of user-defined signals to promote interoperability, and specific power managements and distribution schemes for 3U systems. Beyond the technical implementation of SpaceVPX, recommendations were made on areas that warrant further investigation. Primary among these is the recommendation for NASA to collaborate with other space-going agencies and industry to incorporate recommendations into a future ‘dot spec’ of VITA-78. This would ensure wide adoption and availability of the modules that comply with the specification. The assessment includes appendices with candidate module profiles that can be considered as a starting point for this activity, and example systems based on the recommendations. Follow-on studies are recommended for architectures beyond SpaceVPX to address potential enhancements including condensed set of interconnect, software required to implement protocol layers on the interconnect (and other features), alternative power architectures, and system-level testability.

SpaceVPX↗

Thermal and evolved gas analyzer

The Thermal and Evolved Gas Analyzer (TEGA) instrument will perform calorimetry and evolved gas analysis on soil samples collected from the Martian surface. TEGA is one of three instruments, along with a robotic arm, that form the Mars Volatile and Climate Survey (MVACS) payload. The other instruments are a stereo surface imager, built by Peter Smith of the University of Arizona and a meteorological station, built by JPL. The MVACS lander will investigate a Martian landing site at approximately 70 deg south latitude. Launch will take place from Kennedy Space Center in January, 1999. The TEGA project started in February, 1996. In the intervening 24 months, a flight instrument concept has been designed, prototyped, built as an engineering model and flight model, and tested. The instrument performs laboratory-quality differential-scanning calorimetry (DSC) over the temperature range of Mars ambient to 1400K. Low-temperature volatiles (water and carbon dioxide ices) and the carbonates will be analyzed in this temperature range. Carbonates melt and evolve carbon dioxide at temperatures above 600 C. Evolved oxygen (down to a concentration of 1 ppm) is detected, and C02 and water vapor and the isotopic variations of C02 and water vapor are detected and their concentrations measured. The isotopic composition provides important tests of the theory of solar system formation.

Williams, M. S.↗

A Strategic Roadmap to Centauri

This paper discusses the connectivity between in-space propulsion and in-space fabrication/repair and is based upon a workshop presentation by Les Johnson, manager of the In-Space Propulsion (ISP) Technology Project at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Ala.. Technologies under study by ISP include aerocapture, advanced solar-electric propulsion, solar-thermal propulsion, advanced chemical propulsion, tethers and solar-photon sails. These propulsion systems are all approaching technology readiness levels (TRLs) at which they can be considered for application in space-science and exploration missions. Historically, human frontiers have expanded as people have learned to live off the land in new environments and to exploit local resorces. With this expansion, frontier settlements have required development of transportation improvements to carry tools and manufactured products to and from the frontier. It is demonstrated how ISP technologies will assist in the development of the solar-system frontier. In-space fabrication and repair will both require and assist the development of ISP propulsion systems, whether humans choose to settle planetary surfaces or to exploit resources of small Solar System bodies. As was true for successful terrestrial pioneers, in-space settlement and exploitation will require sophisticated surveys of inner and outer Solar System objects. ISP technologies will contribute to the success of these surveys, as well as to the efforts to retrieve Solar System resources. In a similar fashion, the utility of ISP products will be greatly enhanced by the technologies of in-space repair and fabrication. As in-space propulsion, fabrication and repair develop, human civilization may expand well beyond the Earth. In the future, small human communities (preceded by robotic explorers) may utilize these techniques to set sail f or the nearest stars.

Johnson, Les↗

Heatshield for Extreme Entry Environment Technology (HEEET) Development Status

The Heatshield for Extreme Entry Environment Technology (HEEET) Project is a NASA STMD (Space Technology Mission Directorate) and SMD (Science Mission Directorate) co-funded effort. The goal is to develop and mission infuse a new ablative Thermal Protection System that can withstand extreme entry. It is targeted to support NASA's high priority missions, as defined in the latest decadal survey, to destinations such as Venus and Saturn in-situ robotic science missions. Entry into these planetary atmospheres results in extreme heating. The entry peak heat-flux and associated pressure are estimated to be between one and two orders of magnitude higher than those experienced by Mars Science Laboratory or Lunar return missions. In the recent New Frontiers community announcement NASA has indicated that it is considering providing an increase to the PI (Principal Investigator) managed mission cost (PIMMC) for investigations utilizing the Heatshield for Extreme Entry Environment Technology (HEEET) and in addition, NASA is considering limiting the risk assessment to only their accommodation on the spacecraft and the mission environment.

Thermal Protection System↗

Astrobee: A New Platform for Free-Flying Robotics on the International Space Station

The Astrobees are next-generation free-flying robots that will operate in the interior of the International Space Station (ISS). Their primary purpose is to provide a flexible platform for research on zero-g freeflying robotics, with the ability to carry a wide variety of future research payloads and guest science software. They will also serve utility functions: as free-flying cameras to record video of astronaut activities, and as mobile sensor platforms to conduct surveys of the ISS. The Astrobee system includes two robots, a docking station, and a ground data system (GDS). It is developed by the Human Exploration Telerobotics 2 (HET-2) Project, which began in Oct. 2014, and will deliver the Astrobees for launch to ISS in 2017. This paper covers selected aspects of the Astrobee design, focusing on capabilities relevant to potential users of the platform.

robotics↗

Mars exploration advances: Missions to Mars - Mars base

An overview is presented of Mars missions and related planning with attention given to four mission architectures in the light of significant limitations. Planned unpiloted missions are discussed including the Mars Orbital Mapping Mission, the Mars Rover Sample Return, the Mars Aeronomy Orbiter, and the Mars Environmental Survey. General features relevant to the missions are mentioned including launch opportunities, manned-mission phases, and propulsion options. The four mission architectures are set forth and are made up of: (1) the Mars-exploration infrastructures; (2) science emphasis for the moon and Mars; (3) the moon to stay and Mars exploration; and (4) space resource utilization. The possibility of robotic missions to the moon and Mars is touched upon and are concluded to be possible by the end of the century. The ramifications of a Mars base are discussed with specific reference to habitability and base activities, and the human missions are shown to require a heavy-lift launcher and either chemical/aerobrake or nuclear-thermal propulsion system.

Dejarnette, Fred R.↗

A Lunar Communications and Navigation Satellite Concept for the Robotic Lunar Exploration Program

The Second Robotic Lunar Exploration Program (RLEP) mission has two primary objectives. Broadly stated, they are "To See the Light" and "To Touch the Ice", meaning one mission objective is to survey the lighting conditions on the rim of a candidate crater over the course of a year, and the second objective is to descend into th.! s crater to search for water ice. The Space Communications Program Office at NASA/GSFC is supporting the RLEP-2 Project by developing a communications and navigation architecture for the mission. The primary candidate crater studied is the Shackleton Crater near the South Pole of the Moon. The rim of this crater has approximately 14 contiguous days of visibility to the Earth over the course of a month, while mission elements in the crater have no line of sight to either the Earth or potentially an element on the rim of the crater. One solution studied is to launch a relay spacecraft with RLEP-2 to provide communications and navigation services to the elements on the lunar surface. To support operations concepts requiring long duration contacts between the relay and the elements in the crater, an inclined elliptical orbit originally conceived by Todd Ely a t JPL was chosen for the relay. The orbit was adjusted to lower the maximum range while maintaining its "frozen" nature, meaning once placed in this orbit little delta-V is required for orbit maintenance. The orbital parameters were adjusted such that the relay has visibility into the crater for approximately 8.7 hours of the 12 hour orbital period. The relay satellite design draws heavily upon heritage concepts and hardware to achieve a very low risk implementation. The design concept is a 3-axis spacecraft that is capable of supporting return communication links from multiple surface elements concurrently through a four-element S-Band Multiple Access phased array with two forward links provided through single dedicated elements. The payload is a bent-pipe relay with beamforming performed on the ground (Earth). To mitigate concerns with multipath observed during Mars missions, the preliminary design employs PN-spread signal structures which have been used successfully by Tracking and Data Relay Satellite System (TDRSS) users for simultaneous real-time and recorded data playback. Details of the relay communication trade studies and rationale for the selected design elements are discussed in the paper.

Gramling, Jeffrey J.↗

Comparison of Communication Architectures for Spacecraft Modular Avionics Systems

This document is a survey of publicly available information concerning serial communication architectures used, or proposed to be used, in aeronautic and aerospace applications. It focuses on serial communication architectures that are suitable for low-latency or real-time communication between physically distributed nodes in a system. Candidates for the study have either extensive deployment in the field, or appear to be viable for near-term deployment. Eleven different serial communication architectures are considered, and a brief description of each is given with the salient features summarized in a table in appendix A. This survey is a product of the Propulsion High Impact Avionics Technology (PHIAT) Project at NASA Marshall Space Flight Center (MSFC). PHIAT was originally funded under the Next Generation Launch Technology (NGLT) Program to develop avionics technologies for control of next generation reusable rocket engines. After the announcement of the Space Exploration Initiative, the scope of the project was expanded to include vehicle systems control for human and robotics missions. As such, a section is included presenting the rationale used for selection of a time-triggered architecture for implementation of the avionics demonstration hardware developed by the project team

Gwaltney, D. A.↗

Assessing the Biohazard Potential of Putative Martian Organisms for Exploration Class Human Space Missions

Exploration Class missions to Mars will require precautions against potential contamination by any native microorganisms that may be incidentally pathogenic to humans. While the results of NASA's Viking biology experiments of 1976 have been generally interpreted as inconclusive for surface organisms, the possibility of native surface life has never been ruled out and more recent studies suggest that the case for biological interpretation of the Viking Labeled Release data may now be stronger than it was when the experiments were originally conducted. It is possible that, prior to the first human landing on Mars, robotic craft and sample return missions will provide enough data to know with certainty whether or not future human landing sites harbor extant life forms. However, if native life is confirmed, it will be problematic to determine whether any of its species may present a medical risk to astronauts. Therefore, it will become necessary to assess empirically the risk that the planet contains pathogens based on terrestrial examples of pathogenicity and to take a reasonably cautious approach to bio-hazard protection. A survey of terrestrial pathogens was conducted with special emphasis on those pathogens whose evolution has not depended on the presence of animal hosts. The history of the development and implementation of Apollo anticontamination protocol and recent recommendations of the NRC Space Studies Board regarding Mars were reviewed. Organisms can emerge in nature in the absence of indigenous animal hosts and both infectious and non-infectious human pathogens are theoretically possible on Mars. The prospect of Martian surface life, together with the existence of a diversity of routes by which pathogenicity has emerged on Earth, suggests that the possibility of human pathogens on Mars, while low, is not zero. Since the discovery and study of Martian life can have long-term benefits for humanity, the risk that Martian life might include pathogens should not be an obstacle to human exploration. As a precaution, however, it is recommended that EVA suits be decontaminated when astronauts enter surface habitats when returning from field activity and that biosafety protocol approximating laboratory BSL 2 be developed for astronauts working in laboratories on the Martian surface. Quarantine of astronauts and Martian materials arriving on Earth should also be part of a human Mars mission and this and the surface biosafety program should be integral to human expeditions from the earliest stages of the mission planning.

Warmflash, David↗