Search NASA⌕ Search

SEARCH · Search NASA

Results for “Streamlined quality”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Telemetry Tracking and Control Through Commercial LEO Satellites

Personnel from the Goddard Space Flight Center Wallops Flight Facility (GSFC/WFF in Virginia have successfully tested commercial LEO communications satellites for sounding rocket, balloon and aircraft flight TT&C. The Flight Modern became a GSFC/WFF Advanced Range Technology Initiative (ARTI) in an effort to streamline TT&C capability to the user community at low cost. Ground tests of the Flight Modem verified duplex communications quality of service and measured transmission latencies. These tests were completed last year and results reported in the John Hopkins University (JHU) Applied Physics Laboratory (APL) 4th International Symposium on Reducing Spacecraft Costs for Ground Systems and Operations. The second phase of the Flight Modem baseline test program was a demonstration of the ruggedized version of the WFF Flight Modem flown on a sounding rocket launched it the Swedish rocket range (Esrangc) near Kiruna, Sweden, with results contained in this paper. Aircraft flight tests have been and continue to be conducted. Flights of opportunity are being actively pursued with other centers, ranges and users at universities. The WFF Flight Modem contains a CPS receiver to provide vehicle position for tracking and vehicle recovery. The system architecture, which integrates antennas, CPS receiver, commercial satellite packet data modem and a single board computer with custom software, is described. Small satellite use of the WFF Flight Modem is also being investigated, The Flight Modem provides an independent vehicle position source for Range Safety applications. The LEO communication system contains a coarse position location system, which is compared to GPS ace acy. This comparison allows users, to determine the need for a CPS receiver in addition to the satellite packet data modem for their application.

Streich, Ronald C.↗

An Open-Source Python Package for CFD Solution Verification

Informed decision-making using computational fluid dynamics (CFD) results requires quantifying the errors and uncertainties of a simulation. Verification, validation, and uncertainty quantification (VVUQ) methods were developed to address this need and have matured. However, these VVUQ analyses are often non-trivial and require CFD analysts and practitioners to have specific skill sets. This has led to the uneven adoption of VVUQ analyses, in part, based on the availability of software tools to aid CFD analysts and practitioners. Solution verification, a procedure to evaluate the accuracy of a simulation by estimating potential errors arising from the computational model and computing the uncertainties without comparing to results from a physical system, is one of the lagging VVUQ analyses as the absence of software has forced CFD analysts and practitioners to develop their own codes or piece together incomplete software from across the internet. This work presents an opensource Python package, CFDverify, to lower the barrier of entry and fill in the technological gap in solution verification. CFDverify also provides a streamlined framework to remove some potential errors in post-processing CFD results. The hope is that CFDverify can improve the quality and quantity of CFD solution verification in scientific and research studies and attract interest in developing a communal tool. This paper describes the design, features, and an example use of CFDverify.

Weinmeister, Justin [ORNL] (ORCID:0000000160090237↗

NEPATEC2.0: NEPA Text Corpus v2.0

The National Environmental Policy Act of 1969, as amended (NEPA), is a major environmental law in the United States, requiring Federal agencies to consider and document potential environmental impacts before deciding on a proposed action. Modernization of NEPA and permitting processes faces significant challenges due to the lack of standardized formats and interoperable systems for organizing and sharing NEPA-related information across agencies. Much of the information gathered during NEPA reviews is written into documents such as categorical exclusions, environmental assessments, and environmental impact statements, then filed in predominately independent agency file stores that may or may not be publicly accessible. The application of metadata and data standards, such as those recommended by the Council on Environmental Quality (CEQ), to NEPA documents offers a shared vocabulary and structure for key entities like projects, processes, and documents that can streamline information exchange and enhance collaboration across systems. In this work, we publicly release NEPATEC2.0, an expanded corpus of NEPA documents with associated metadata. NEPATEC2.0 encompasses approximately 120,000 documents from 60,000 projects prepared by more than 60 different agencies. Modeled to align with CEQ metadata standards, NEPATEC2.0 promotes consistency in environmental reviews and supports the ongoing effort to modernize permitting technologies by facilitating more transparent, efficient, and data-driven decision-making. Importantly, NEPATEC2.0 demonstrates the possibilities and limitations of large language model-based prompting to extract information from NEPA documents at scale.

environmental review↗

NEPATEC v2.0: Standardized Metadata and Text Corpus of National Environmental Policy Act Documents

The National Environmental Policy Act of 1969, as amended (NEPA), is a major environmental law in the United States, requiring Federal agencies to consider and document potential environmental impacts before deciding on a proposed action. Modernization of NEPA and permitting processes faces significant challenges due to the lack of standardized formats and interoperable systems for organizing and sharing NEPA-related information across agencies. Much of the information gathered during NEPA reviews is written into documents such as categorical exclusions, environmental assessments, and environmental impact statements, then filed in predominately independent agency file stores that may or may not be publicly accessible. The application of metadata and data standards, such as those recommended by the Council on Environmental Quality (CEQ), to NEPA documents offers a shared vocabulary and structure for key entities like projects, processes, and documents that can streamline information exchange and enhance collaboration across systems. In this work, we publicly release NEPATEC2.0, an expanded corpus of NEPA documents with associated metadata. NEPATEC2.0 encompasses approximately 120,000 documents from 60,000 projects prepared by more than 60 different agencies. Modeled to align with CEQ metadata standards, NEPATEC2.0 promotes consistency in environmental reviews and supports the ongoing effort to modernize permitting technologies by facilitating more transparent, efficient, and data-driven decision-making. Importantly, NEPATEC2.0 demonstrates the possibilities and limitations of large language model-based prompting to extract information from NEPA documents at scale.

54 ENVIRONMENTAL SCIENCES↗

915rwpprecipcor

Radar Wind Profiler (RWP) has operational modes: short duration high resolution (referred to as 'high' or 'high mode') and long duration low resolution (referred to as 'low' or 'low mode'). The motivation for this is to create a VAP that quality controls (noise, sig echo filtering), merges, co-grids, and performs initial analyses on these RWP modes. This is done to streamline downstream VAP development on the RWP, as well as enable incorporation of echo properties into the ARSCL chain. The proposed VAP will use the RWPPRECIP b0/b1 level data stream as input. Additional consideration for the incorporation of other ARM data streams to improve this VAP was performed, but not included at this time.

54 ENVIRONMENTAL SCIENCES↗

Streamlined acquisition handbook

NASA has always placed great emphasis on the acquisition process, recognizing it as among its most important activities. This handbook is intended to facilitate the application of streamlined acquisition procedures. The development of these procedures reflects the efforts of an action group composed of NASA Headquarters and center acquisition professionals. It is the intent to accomplish the real change in the acquisition process as a result of this effort. An important part of streamlining the acquisition process is a commitment by the people involved in the process to accomplishing acquisition activities quickly and with high quality. Too often we continue to accomplish work in 'the same old way' without considering available alternatives which would require no changes to regulations, approvals from Headquarters, or waivers of required practice. Similarly, we must be sensitive to schedule opportunities throughout the acquisition cycle, not just once the purchase request arrives at the procurement office. Techniques that have been identified as ways of reducing acquisition lead time while maintaining high quality in our acquisition process are presented.

Source record↗

TT and C - First TDRSS, Then Commercial GEO and Big LEO and Now through LEO

The advent of low earth orbit (LEO) commercial communications satellites provides an opportunity to dramatically reduce Telemetry Tracking and Control (TT&C) costs of launch vehicles and Unpiloted Aerial Vehicles (UAVs) by reducing or eliminating ground infrastructure. Personnel from the Goddard Space Flight Center Wallops Flight Facility (GSFC/WFF) in Virginia have successfully used commercial GEO & Big LEO communications satellites for Long Duration Balloon flight TT&C. In addition, TDRSS capability for these balloons has been developed by WFF for the Ultra Long Duration Balloons with the first test flight launch in January 2001 for one global circumnavigation at 120,000 feet altitude launched from Alice Springs. Australia. Numerous other low cost applications can new utilize the commercial LEO satellites for TT&C. The Flight Modern became a GSFC/WFF Advanced Range Technology Initiative (ARTI) in an effort to streamline TT&C capability to the user community at low cost. Phase I ground tests of The Flight Modem verified downlink communications quality of service and measured transmission latencies. These tests were completed last year, Phase II consisting of aircraft flight tests provide much of the data presented in this paper. Phase III of the Flight Modern baseline test program is a demonstration of the ruggedized version of the WFF Flight Modem flown on one sounding rocket launched from Sweden. Flights of opportunity have been and are being actively pursued with other centers, ranges and users at universities. The WFF goal is to reduce TT&C costs by providing a low cost COTS Flight Modem with a User Handbook containing system capability and limitation descriptions. Additionally, since data transmission is by packetized Internet Protocol (IP), data can be received and commands initialed from practically any location with no infrastructure. The WFF, like most ranges, has been using GPS receivers on sounding rockets and long duration balloons for several years, The WFF Flight Modem contains a GPS receiver to provide vehicle position for tracking and vehicle recovery. The system architecture which integrates antennas, GPS receiver, commercial satellite packet data modem. and a single board computer with custom software is described and a number of technical challenges are discussed along with the plan for their resolution. These include antenna development, high Doppler rates, reliability, environmental ruggedness, hand over between satellites and data security. An aggressive test plan is included which in addition to environmental Testing measures bit error rate latency and antenna patterns. Additional flight tests are planned far the near future on aircraft, long duration balloons and sounding rockets and these results as well as the current status of the project arc reported. Use of the WFF Flight Modem on small satellites is also being pursued. The LEO satellite constellation altitude above 1400 km is not an obstacle because most spacecraft do not require continuous Communications. The challenge is scheduling where store and forward techniques for command are required and downlink when the communications link allows connection (above 60 percent of the time depending on the satellite altitude). Sophisticated scheduling techniques utilizing 2-line orbital element sets available on the NASA/NORAD Internet site could be implemented for rare special cases. The current 9600 baud rate of the LEO communications link may be increased With special techniques that are planned for development in the WFF Flight Modem project.

Morgan, Dwayne↗

Clinical implementation of radiosurgery using the Helical TomoTherapy unit

The American Society of Radiation Oncology has recently recommended the use of radiosurgery to manage brain metastases. For such a recommendation to be implemented in a widespread manner, radiosurgery must be accessible at community radiation therapy facilities. The work presented here describes our clinical experience in the implementation of radiosurgery using a Helical TomoTherapy unit. Helical TomoTherapy is a unique dose-delivery system designed to perform intensity-modulated radiation therapy (IMRT). The system built on the ring-based gantry has the tight machine tolerances required for radiosurgery. A frameless system consisting of a thermoplastic mask and a noninvasive ''stereotactic radiosurgery (SRS)-stereotactic radiotherapy (SRT)'' fixation device is used for patient immobilization. Treatment planning is performed using the TomoHD treatment planning system designed for IMRT. The image-guidance system on the Helical TomoTherapy is used for patient localization. Our clinical experience demonstrated that the radiosurgery procedure can be streamlined as we do for IMRT patients. The treatment time of about 10 minutes is comparable with that for IMRT patients. The same patient-specific quality assurance for IMRT is used for radiosurgery. As demonstrated, SRS using Helical TomoTherapy is not a whole-day event, unlike SRS using other dose-delivery systems or SRS performed in the past.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Graphical simulation for aerospace manufacturing

Simulation software has become a key technological enabler for integrating flexible manufacturing systems and streamlining the overall aerospace manufacturing process. In particular, robot simulation and offline programming software is being credited for reducing down time and labor cost, while boosting quality and significantly increasing productivity.

Babai, Majid↗

Environmental process improvement feasibility study and demonstration program

This report is the final product of an environmental study conducted by Western Commercial Space Center, Inc. under contract to Tennessee-Calspan Center for Space Transportation and Applied Research. The purpose of this investigation is to accurately document the current environmental and permitting processes associated with commercial space launch activity at Vandenberg AFB, and make recommendations to streamline those processes. The particular areas of interest focus on: identifying applicable Federal, state, and local laws, Department of Defense directives, and Air force regulations; defining the environmental process on Vandenberg AFB and how it relates with other agencies, including Federal and state regulatory agencies; and defining the air quality permit process. Study investigation results are applied to an example Pilot Space Launch Vehicle (PSLV) planning to launch from Vandenberg AFB. The PSLV space hardware is analyzed with respect to environmental and permitting issues associated with vehicle processing, facilities required (existing or new), and launch. The PSLV verified the earlier findings of the study and gave insight into streamlining recommendations.

Martin, Rodger L.↗

Streamlining Payload Integration

Payload integration onto space transport vehicles and the International Space Station (ISS) is a complex process. Yet, cargo transport is the sole reason for any space mission, be it for ferrying humans, science, or hardware. As the largest such effort in history, the ISS offers a wide variety of payload experience. However, for any payload to reach the Space Station under the current process, Payload Developers face a list of daunting tasks that go well beyond just designing the payload to the constraints of the transport vehicle and its stowage topology. Payload customers are required to prove their payload s functionality, structural integrity, and safe integration - including under less than nominal situations. They must also plan for or provide training, procedures, hardware labeling, ground support, and communications. In addition, they must deal with negotiating shared consumables, integrating software, obtaining video, and coordinating the return of data and hardware. All the while, they must meet export laws, launch schedules, budget limits, and the consensus of more than 12 panel and board reviews. Despite the cost and infrastructure overhead, payload proposals have increased. Just in the span from FY08 to FY09, the NASA Payload Space Station Support Office budget rose from $78M to $96M in attempt to manage the growing manifest, but the potential number of payloads still exceeds available Payload Integration Management manpower. The growth has also increased management difficulties due to the fact that payloads are more frequently added to a flight schedule late in the flow. The current standard ISS template for payload integration from concept to payload turn-over is 36 months, or 18 months if the payload already has a preliminary design. Customers are increasingly requiring a turn-around of 3 to 6-months to meet market needs. The following paper suggests options for streamlining the current payload integration process in order to meet customer schedule needs and reduce costs for both the integration support teams and the developers, without reducing quality or compromising safety. Issues for the key integration areas of planning, training, verification, and safety are presented in a Root-Cause Analysis study, with plausible solutions provided that involve technology and tools already available to the ISS community. Although based upon the ISS process, the payload integration techniques outlined herein also offer an integration template for any space transport endeavor.

Lufkin, Susan N.↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. The purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.

54 ENVIRONMENTAL SCIENCES↗

Alaska's First Thermalize Campaign: An Effort to Reduce Fuel Reliance in Juneau, AK

In 2018, the Bureau and City of Juneau set the goal of reaching 80% renewable energy in the sectors of transportation and space heating by 2045. This effort will minimize their reliance on fossil fuels, reduce their carbon footprint and increase their resilience in the event of a natural disaster as fuel oil reaches Juneau by boat and such shipments may be disrupted in a disaster. The community's resilience in the face of a disaster and lower carbon footprint goes hand-in-hand with public safety and health. The Cold Climate Housing and Research Center (CCHRC) partnered with several local and statewide groups, including Alaska Heat Smart and Information Insights, Inc, to lead Alaska's first thermalize campaign. Thermalize Juneau 2021 is an energy campaign working to lower the cost of heating homes in Juneau through beneficial electrification and increased energy efficiency. The goal of the campaign was to offer homeowners a streamlined and more affordable way to install heat pumps and energy efficiency improvements into their homes. Converting household heating from fuel to electricity also helps improve indoor and outdoor air quality and reduces maintenance requirements. The campaign had over 160 participants. As of Fall 2021, it is in its final stages of heat pump installations and energy efficiency improvements. In addition to tracking the energy savings and carbon reduction attributed to the campaign, the social equity was an important aspect. Thermalize Juneau attempted to include all the demographics present in Juneau in the campaign. The presentation will cover the goals and implementation of the campaign, current data on how it is improving community and household resilience, lessons learned, and next steps.

clean energy↗

The operational processing of wind estimates from cloud motions: Past, present and future

Current NESS winds operations provide approximately 1800 high quality wind estimates per day to about twenty domestic and foreign users. This marked improvement in NESS winds operations was the result of computer techniques development which began in 1969 to streamline and improve operational procedures. In addition, the launch of the SMS-1 satellite in 1974, the first in the second generation of geostationary spacecraft, provided an improved source of visible and infrared scanner data for the extraction of wind estimates. Currently, operational winds processing at NESS is accomplished by the automated and manual analyses of infrared data from two geostationary spacecraft. This system uses data from SMS-2 and GOES-1 to produce wind estimates valid for 00Z, 12Z and 18Z synoptic times.

Novak, C.↗

An Introduction to Flight Software Development: FSW Today, FSW 2010

Experience and knowledge gained from ongoing maintenance of Space Shuttle Flight Software and new development projects including Cockpit Avionics Upgrade are applied to projected needs of the National Space Exploration Vision through Spiral 2. Lessons learned from these current activities are applied to create a sustainable, reliable model for development of critical software to support Project Constellation. This presentation introduces the technologies, methodologies, and infrastructure needed to produce and sustain high quality software. It will propose what is needed to support a Vision for Space Exploration that places demands on the innovation and productivity needed to support future space exploration. The technologies in use today within FSW development include tools that provide requirements tracking, integrated change management, modeling and simulation software. Specific challenges that have been met include the introduction and integration of Commercial Off the Shelf (COTS) Real Time Operating System for critical functions. Though technology prediction has proved to be imprecise, Project Constellation requirements will need continued integration of new technology with evolving methodologies and changing project infrastructure. Targets for continued technology investment are integrated health monitoring and management, self healing software, standard payload interfaces, autonomous operation, and improvements in training. Emulation of the target hardware will also allow significant streamlining of development and testing. The methodologies in use today for FSW development are object oriented UML design, iterative development using independent components, as well as rapid prototyping . In addition, Lean Six Sigma and CMMI play a critical role in the quality and efficiency of the workforce processes. Over the next six years, we expect these methodologies to merge with other improvements into a consolidated office culture with all processes being guided by automated office assistants. The infrastructure in use today includes strict software development and configuration management procedures, including strong control of resource management and critical skills coverage. This will evolve to a fully integrated staff organization with efficient and effective communication throughout all levels guided by a Mission-Systems Architecture framework with focus on risk management and attention toward inevitable product obsolescence. This infrastructure of computing equipment, software and processes will itself be subject to technological change and need for management of change and improvement,

Gouvela, John↗

Technical Assistance for Rural Alaska Tribal Energy Solutions (Final Technical Report)

The original intent of this project was to provide technical assistance (TA) to rural Tribal communities across all regions of Alaska with a focus on public infrastructure. The Alaska Native Tribal Health Consortium (ANTHC) met this goal by providing more than 48 instances of energy-related technical assistance to rural Alaska Native communities, many of which led to them securing funding and implementing new projects that contributed to reducing the high cost of energy. Additionally, the Department of Energy (DOE) Office of Indian Energy staff saw the benefits of the energy technical assistance services being provided by ANTHC and, recognizing the value of having a trusted tribal non-profit entity providing technical support to its membership, amended the project to include standardization of TA services, internal capacity building, and regional outreach. This amended scope allowed ANTHC to streamline and standardize its technical assistance process, provide outreach to rural Alaska Native communities about DOE and ANTHC’s technical assistance program, and improve the ability of staff to provide even higher quality technical deliverables in support of energy projects. Overall, this project was successful in using technical assistance to empower both rural Alaska Native communities and the Alaska Native Tribal Health Consortium to develop and deploy energy efficiency and renewable energy solutions that will reduce the extremely high energy cost burdens facing Tribal communities in Alaska.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

WREF Halo Streamline scanning lidar / Derived data / High-frequency wind profiles

This dataset contains wind profiles retrieved from 6-beam Velocity Azimuth Display (VAD) scans done by the UC Davis scanning Lidar. The wind components (expressed as zonal, meridional and vertical) are retrieved through the algorithm of Paschke et al. (2015). The quality control of the radial wind speed is performed following the algorithm of Goring & Nikora (2002).

17 WIND ENERGY↗