Experimental Testing of the Theoretically Predicted Magnetic Properties for Kagomé Compounds in the Li–Fe–Ge System
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
This paper presents a network hardware-in-the-loop (HIL) simulation system for modeling large-scale power systems. Researchers have developed many HIL test systems for power systems in recent years. Those test systems can model both microsecond-level dynamic responses of power electronic systems and millisecond-level transients of transmission and distribution grids. By integrating individual HIL test systems into a network of HIL test systems, we can create large-scale power grid digital twins with flexible structures at required modeling resolution that fits for a wide range of system operating conditions. This will not only significantly reduce the need for field tests when developing new technologies but also greatly shorten the model development cycle. In this paper, we present a networked OPAL-RT based HIL test system for developing transmission-distribution coordinative Volt-VAR regulation technologies as an example to illustrate system setups, communication requirements among different HIL test systems, and connection mechanisms. Impacts of communication delays, information exchange cycles, and computing delays are illustrated. Simulation results show that the performance of a networked HIL test system is satisfactory.
A testing system for testing a missile component having a sense axis includes a centrifuge, a support arm, an orientation assembly, and a controller. The centrifuge rotates the orientation assembly about a vertical axis in a substantially horizontal plane. The orientation assembly includes a first motor, a first gimbal, and a gimballed support. The first motor has a first rotatable shaft defining a first gimbal axis. The first gimbal is coupled with the first rotatable shaft to rotate about the first gimbal axis while the centrifuge rotates the orientation assembly about the vertical axis such that missile component is simultaneously rotated about both the vertical axis and the first gimbal axis to simulate a missile launch of the missile component. The gimballed support is coupled with the first gimbal for supporting the missile component such that the sense axis of the missile component is not parallel to the substantially horizontal plane. The orientation assembly may also include a second gimbal that is rotated about a second gimbals axis by a second motor.
A testing system for testing a missile component having a sense axis includes a centrifuge, a support arm, an orientation assembly, and a controller. The centrifuge rotates the orientation assembly about a vertical axis in a substantially horizontal plane. The orientation assembly includes a first motor, a first gimbal, and a gimballed support. The first motor has a first rotatable shaft defining a first gimbal axis. The first gimbal is coupled with the first rotatable shaft to rotate about the first gimbal axis while the centrifuge rotates the orientation assembly about the vertical axis such that missile component is simultaneously rotated about both the vertical axis and the first gimbal axis to simulate a missile launch of the missile component. The gimballed support is coupled with the first gimbal for supporting the missile component such that the sense axis of the missile component is not parallel to the substantially horizontal plane. The orientation assembly may also include a second gimbal that is rotated about a second gimbals axis by a second motor.
Disclosed herein are systems, devices and methods for creep testing selected materials within a high-temperature molten salt environment. Exemplary creep testing systems include a load train for holding a test specimen under a load within a heated inert gas vessel. An extensometry system can be included to measure elongation of the test specimen while under load. The extensometry system can include fixed members and axially translating member that move along with the elongation of the test specimen, and the system can include a sensor to measure the relative axial motion between such components to measure elongation of the test specimen over time. The test specimen can include a cylindrical gage portion having an internal void filled with a molten salt during creep testing to simulate the corrosive effect of the molten salt on the specimen material during testing.
A two-terminator RF adapter for background noise measurement in a test environment comprises a system test port comprising a system test port termination and a system test port connector to connect to a system under test; and a data acquisition port, comprising a data acquisition port termination and a data acquisition port connector to connect to a data acquisition system.
The explosion of new ideas for distributed energy resources and advanced distribution grid algorithms faces a critical challenge: how can one effectively develop and evaluate these breakthrough technologies without an adequate set of power systems network, load, and resource data to test against? Today's open test systems, particularly for distribution systems, are tiny and incomplete; and though with enough effort, obtaining utility data under NDA can overcome scale challenges, the results can't be openly shared, preventing fair comparison. The Smart-DS project-led by NREL in partnership with MIT, Universidad Pontificia Comillas, CYME, and EDD-is working to overcome this gap by generating multiple large-scale, open, synthetic, distribution systems that are realistic but not real. These datasets go beyond a single medium voltage feeder (~1000 customers) to cover entire metropolitan areas and their surrounds with up to hundreds of feeders and millions of customers, complete with low voltage customer connections and high voltage sub-transmission. This scale allows adequate testing and analysis of not just local controls and advanced DERs, but also multiple substation interactions, optimized switching, full-scale distribution-OPF, and more. To accompany these datasets, the project is also building a rich set of scenario generation tools that can be used for distribution and transmission systems alike. This includes automated, spatially aware access to world-class, high-resolution solar, wind, and weather data: forward looking generation mixes: and highly configurable DER, load, climate, outage, control-scheme, and other scenarios. We will also highlight DiTTo, an exciting open-source, multi-way distribution dataset transformation tool for many-to-many format translation with scenario, merge/split, and many other manipulation capabilities.
NREL's advanced distribution management system (ADMS) test bed is a vendor-neutral resource for evaluating existing and future ADMS functionalities in a realistic laboratory setting. The test bed uses Opal-RT's ePHASORsim and eMEGAsim products interfaced with an OpenDSS power system simulation through the HELICS cosimulation platform developed by multiple DOE laboratories; and with power and controller hardware. NREL will present an overview of the test bed and the technologies included within it, and also some examples of how the test bed has been used to address industry challenges.
A true stress testing system broadly comprising a force input machine, an imaging system, and a computer. The imaging system includes a light source for projecting a light beam at the specimen in a first direction and a camera positioned on an opposite side of the specimen for receiving portions of the light beam not blocked by the specimen such that a shadow image of the specimen is created via the camera. The computer may determine a minimum dimension of the specimen perpendicular to the first direction at a point in time over a plurality of points along the force axis via the shadow image of the specimen such that the processor accounts for changes in position of the minimum dimension along the specimen. A true stress of the specimen may then be determined according to the minimum dimension of the specimen perpendicular to the first direction at the point in time.
This presentation provides an overview of the National Renewable Energy Laboratory's advanced distribution management system test bed overview.
LLNL produced two lots of lyophilized LAMP assay containing cartridges, LNL022818 and LNL071818, for testing on Gen3 BioID systems. Thirty-nine cartridges were tested for lot LNL022818. All thirty-nine cartridges performed as expected regarding correct positive control (IPC) and negative control (NTC) reactions. Five different templates were tested on these 39 cartridges. The BioID system detected 79.1% true positives and 9.3% false positives along with 98.9% true negatives and 2.9% false negatives for cartridge lot LNL022818. Thirty cartridges were tested for lot LNL071818. It was noted early that due to a manufacturing issue with the cartridges related to incomplete sonic welding of the cartridge, a large fraction of lot LNL071818 cartridges leaked. Insufficient funds were available to replace this lot of cartridges. Twenty three of 30 cartridges performed as expected regarding correct positive control (IPC) and negative control (NTC) reactions. Four different templates were tested on these 30 cartridges. The BioID system detected 77% true positives and 23% false positives along with 96.9% true negatives and 3.1% false negatives for cartridge lot LNL071818. For all tested cartridges using DNA template, DNA was added at a final concentration of 25 pg/ul. All reactions contained positive control DNA at 2.5 pg/ul.
Tests were performed to evaluate a sample conditioning unit for stack monitoring at Hanford Tank Waste Treatment and Immobilization Plant (WTP) exhaust stacks with elevated air temperatures. The LV-S2, LV-S3, HV-S3A and HV-S3B exhaust stacks are expected to have elevated air temperature and dew point. At these emission points, exhaust temperatures are too high to deliver the air sample directly to the required stack monitoring equipment. As a result, a sample conditioning system is considered to cool and dry the air prior to its delivery to the stack monitoring system. The method proposed for the sample conditioning is a dilution system that will introduce cooler, dry air to the air sample stream. This method of sample conditioning is meant to reduce the sample temperature while avoiding condensation of moisture in the sample stream. An additional constraint is that the ANSI/HPS N13.1-1999 standard states that at least 50% of the 10 µm aerodynamic diameter (AD) particles present in the stack free stream must be delivered to the sample collector. In other words, depositional loss of particles should be limited to 50% in the sampling, transport, and conditioning systems. Based on estimates of particle penetration through the LV-S3 sampling system, the diluter should perform with about 80% penetration or better to ensure that the total sampling system passes the 50% or greater penetration criterion.
In this paper, we address the problem of the optimal power dispatch of Distributed Generators (DGs) in Alternating Current (AC) networks, better known as the Optimal Power Flow (OPF) problem. We used, as the objective function, the minimization of power losses (P loss ) associated with energy transport, which are subject to the set of constraints that compose AC networks in an environment of distributed generation. To validate the effectiveness of the proposed methodology in solving the OPF problem in any network topology, we employed one 10-node mesh test system and three radial text systems: 10, 33, and 69 nodes. In each test system, DGs were allowed to inject 20%, 40%, and 60% of the power supplied by the slack generator in the base case. To solve the OPF problem, we used a master–slave methodology that integrates the optimization method Salps Swarm Algorithm (SSA) and the load flow technique based on the Successive Approximation (SA) method. Moreover, for comparison purposes, we employed some of the algorithms reported in the specialized literature to solve the OPF problem (the continuous genetic algorithm, the particle swarm optimization algorithm, the black hole algorithm, the antlion optimization algorithm, and the Multi-Verse Optimizer algorithm), which were selected because of their excellent results in solving such problems. The results obtained by the proposed solution methodology demonstrate its superiority and convergence capacity in terms of minimization of P loss in both radial and mesh systems. It provided the best reduction in minimum P loss in short processing times and showed excellent repeatability in each test system and scenario under analysis.
This document serves to provide information on all aspects of a system level thermal qualification test including a description of the setup and conduct of a full system fuel fire test in the Thermal Test Complex (TTC) Crosswind Test Facility (XTF). This might be referred to as a “handbook” for future tests. This information is intended to assist technologists and test directors in performing these types of tests in the future.
Transform utility electric distribution management systems to enable the integration and management of all assets and functions across the utility enterprise regardless of vendor or technology. Four program areas: Platform: Develop an open-source platform; evaluate advanced applications. Test bed: Build a vendor-neutral test bed to evaluate existing and future advanced distribution management system (ADMS) functionalities in a realistic setting. Applications: Develop an initial suite of ADMS applications. Advanced control: Develop new integrated optimization and control solutions.
Tests were performed in a 0.1-m diameter small circulating fluidized bed (SCFB) and 0.3 m diameter cold flow circulating fluidized bed (CFCFB) riser systems located at the National Energy Technology Laboratory (NETL) to study the effects of riser diameter on the riser hydrodynamics. These tests were performed at solids circulation rates of G s = 20 and 75 kg/m 2 s and superficial gas velocities of U g = 5.8 and 6.5 m/s using high-density polyethylene (HDPE) pellets with a density of 0.863 g/cm 3 , particle size range of 600–1400 µm (with a Sauter mean diameter of 871 µm, placing them in the Geldart B classification). Comparisons of riser axial pressure and solids fraction profiles, radial particle velocity profiles, and radial profiles of higher statistical moments and select chaos analysis parameters were considered. The results showed that for a given U g and G s , the smaller diameter riser exhibited characteristics associated with more dilute solids flow than that observed in the larger diameter riser. Additionally, the larger diameter riser exhibited a downward flow of solids near the wall under all test conditions, whereas the smaller diameter riser data exhibited little or no indications of solids downflow near the wall. Overall, these findings suggest that, from an industrial standpoint, a direct scaleup of small-scale tests cannot readily be accomplished as the solids holdup and the solids velocity profiles in small units (those normally tested in the laboratory) are not similar to those of large units and the performance of large units can therefore not be predicted from small-scale tests.
Pavilion 2 is a critical component of system testing for LANL HPC systems. Pavilion 2 is system independent, which allows for the creation of a large suite of generalized tests than can be applied to multiple systems. These additions to Pavilion 2 improve our ability to test systems and diagnose issues. With such a large suite, running the proper tests when diagnosing and fixing a system can be difficult, as well as locating old tests for reference. Test configurations may contain several permutations of a test, not all of which may apply to a given system. The ability to run sets of test permutations lets the tester focus on specific parts of the test without having to edit the test configurations or run extraneous tests. The addition of the filter argument improves the ability to find test results based on test attributes, including past tests. Pavilion 2's system independence is largely based on various layers of configuration files. Configuration files for the host, test, and modes exist to allow generalized testing. The operating system configuration layer can provide helpful OS defaults to a test. Survey, a collection and reporting tool, can help us gauge the performance of a system as well as diagnose issues. The addition of a Survey mode in Pavilion 2 makes running tests with Survey very straightforward. The Survey results are combined with Pavilion 2's test results to make it easy to access.
Pavilion 2 is a critical component of system testing for LANL HPC systems. Pavilion 2 is system independent, which allows for the creation of a large suite of generalized tests than can be applied to multiple systems. These additions to Pavilion 2 improve our ability to test systems and diagnose issues. With such a large suite, running the proper tests when diagnosing and fixing a system can be difficult, as well as locating old tests for reference. Test configurations may contain several permutations of a test, not all of which may apply to a given system. The ability to run sets of test permutations lets the tester focus on specific parts of the test without having to edit the test configurations or run extraneous tests. The addition of the filter argument improves the ability to find test results based on test attributes, including past tests. Pavilion 2's system independence is largely based on various layers of configuration files. Configuration files for the host, test, and modes exist to allow generalized testing. The operating system configuration layer can provide helpful OS defaults to a test. Survey, a collection and reporting tool, can help us gauge the performance of a system as well as diagnose issues. The addition of a Survey mode in Pavilion 2 makes running tests with Survey very straightforward. The Survey results are combined with Pavilion 2's test results to make it easy to access.