Search NASA⌕ Search

SEARCH · Search NASA

Results for “TRUEX PROCESS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Contaminant Attenuation and Transport Characterization of 200-DV-1 Operable Unit Sediment Samples

A laboratory study was conducted to quantify contaminant attenuation processes and associated contaminant transport parameters that are needed to evaluate transport of contaminants through the vadose zone to the groundwater. The laboratory study information, in conjunction with transport analyses, can be used as input to evaluate the feasibility of Monitored Natural Attenuation and other remedies for the 200-DV-1 Operable Unit at the Hanford Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Vadose Zone-Applied Field Research Initiative Fiscal Year 2011 Annual Report

This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2011. The Department of Energy (DOE) Office of Technology Innovation and Development's (OTID) mission is to transform science into viable solutions for environmental cleanup. In 2010, OTID developed the Impact Plan, Science and Technology to Reduce the Life Cycle Cost of Closure to outline the benefits of research and development of the lifecycle cost of cleanup across the DOE complex. This plan outlines OTID's ability to reduce by $50 billion, the $200 billion life-cycle cost in waste processing, groundwater and soil, nuclear materials, and deactivation and decommissioning. The projected life-cycle costs and return on investment are based on actual savings realized from technology innovation, development, and insertion into remedial strategies and schedules at the Fernald, Mound, and Ashtabula sites. To achieve our goals, OTID developed Applied Field Research Initiatives to facilitate and accelerate collaborative development and implementation of new tools and approaches that reduce risk, cost and time for site closure. The primary mission of the Deep Vadose Zone-Applied Field Research Initiative (DVZ-AFRI) is to protect our nation's water resources, keeping them clean and safe for future generations. The DVZ-AFRI was established for the DOE to develop effective, science-based solutions for remediating, characterizing, monitoring, and predicting the behavior and fate of deep vadose zone contamination. Subsurface contaminants include radionuclides, metals, organics, and liquid waste that originated from various sources, including legacy waste from the nation's nuclear weapons complexes. The DVZ-AFRI project team is translating strategy into action by working to solve these complex challenges in a collaborative environment that leverages technology and scientific expertise from DOE, Pacific Northwest National Laboratory, CH2M HILL Plateau Remediation Company, and the broad scientific research community. As project manager for the DVZ-AFRI, I have had the privilege this past year to team with creative, talented members of the scientific community nationwide to develop effective long-term solutions to address deep vadose zone contamination. This report highlights how the DVZ-AFRI project team is delivering results by achieving significant programmatic accomplishments, and developing and field-testing transformational technologies to address the nation's most pressing groundwater and vadose zone contamination problems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of Real-Time Geophysical Monitoring with In Situ Uranium Remedy Implementation

An in situ injection of polyphosphate amendment was conducted to address a uranium source zone for a plume near the Columbia River at the U.S. Department of Energy Hanford Site. This treatment was applied as an enhanced attenuation approach, targeting uranium in a periodically wetted zone where groundwater inundates as the water table rises in response to the seasonal high river stage. Uranium within this zone is mobilized into the groundwater at the high river stage, resulting in a persistent groundwater plume. The polyphosphate amendment creates precipitates that decrease uranium mobility so that the amount of uranium flushed into groundwater when the zone is periodically wetted is significantly decreased. With a reduced flux of uranium into the plume, the plume concentrations are expected to decrease over time. During injection, real-time geophysical monitoring was applied to provide hourly images of injected-fluid distribution. The real-time autonomous data collection, processing, and reporting enabled the electrical resistivity tomography images to provide operational feedback during injection. These data were used in conjunction with operational information (e.g., flow rate, pressures) and subsurface data from 24 monitoring wells placed within and downgradient of the treatment area (e.g., water level and specific conductance probes, uranium concentration, phosphate concentration) to assess overall performance of the treatment.

Johnson, Timothy C.↗

Integration of Real-Time Geophysical Monitoring with In Situ Uranium Remedy Implementation - 19094

An in situ injection of polyphosphate amendment was conducted to address a uranium source zone for a plume near the Columbia River at the U.S. Department of Energy Hanford Site. This treatment was applied as an enhanced attenuation approach, targeting uranium in a periodically wetted zone where groundwater inundates as the water table rises in response to the seasonal high river stage. Uranium within this zone is mobilized into the groundwater at the high river stage, resulting in a persistent groundwater plume. The polyphosphate amendment creates precipitates that decrease uranium mobility so that the amount of uranium flushed into groundwater when the zone is periodically wetted is significantly decreased. With a reduced flux of uranium into the plume, the plume concentrations are expected to decrease over time. During injection, real-time geophysical monitoring was applied to provide hourly images of injected-fluid distribution. The real-time autonomous data collection, processing, and reporting enabled the electrical resistivity tomography images to provide operational feedback during injection. These data were used in conjunction with operational information (e.g., flow rate, pressures) and subsurface data from 24 monitoring wells placed within and downgradient of the treatment area (e.g., water level and specific conductance probes, uranium concentration, phosphate concentration) to assess overall performance of the treatment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated systems-based approach to monitoring environmental remediation

The U.S. Department of Energy is responsible for risk reduction and cleanup of its nuclear weapons complex. Remediation strategies for some of the contamination may include techniques that mitigate risk, but leave contaminants in place. Monitoring to verify remedy performance and long-term mitigation of risk is key to implementing these strategies and can be a large portion of the total cost of remedy implementation. Especially in these situations, there is a need for innovative monitoring approaches that move away from the cost- and labor-intensive point-source monitoring. In this paper, alternative approaches for monitoring are presented for vadose zone, groundwater, groundwater/surface water interface, and surface water. To illustrate integrated, systems-based monitoring, this paper focuses on vadose zone contaminant remediation to mitigate impact to groundwater. In this context, vadose zone contamination is a source, or potential source, to groundwater plumes. The monitoring design uses a systems-based approach focused on developing a conceptual site model that highlights key features that control contaminant flux to groundwater. These features are derived considering the unsaturated flow and contaminant transport processes in the vadose zone and the nature of the waste discharge. Diagnostic properties and/or parameters related to both short- and long-term contaminant flux to groundwater can be identified and targeted for monitoring. The resolution of monitoring data needed to correspond to a functionally useful indicator of flux to groundwater can be estimated using quantitative analyses and the associated unsaturated flow properties relevant to the targeted site and vadose zone features. This monitoring design approach follows the process of developing a quantitative conceptual model suitable for supporting projections of future flux to groundwater. Support for such projections is important because it is likely that, in many cases, remediation decisions for the vadose zone will need to be made based all or in part on projected impacts to groundwater, and monitoring will then be applied to verify that remedy goals are being met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3D Characterization and Time-Lapse Imaging of the Desiccation Treatability Test at the Hanford BC-Cribs and Trenches Site using High Performance Computing applied to Electrical Resistivity Imaging - 12271

Contaminated vadose zone materials are a potential source of long-term groundwater contamination at many sites across the Department of Energy (DOE) complex. Deep vadose zone contamination presents a particularly challenging remedial problem due to the difficultly of locating contaminants and the expense of access and ex situ treatment. In situ remediation techniques, whereby remedial amendments must be delivered to contaminated soils, have been identified as a potential alternative. However, amendment delivery is typically uncertain and post delivery remedial performance is often not well understood due to limited information available from sparsely spaced boreholes. Recent advancements in electrical resistivity tomography (ERT) are being used to address these challenges at the Hanford site by providing remote, three-dimensional images of contaminant distribution and four-dimensional (three spatial dimensions plus the time dimension) images of in-situ vadose zone remediation processes. These capabilities were recently demonstrated with a large scale surface characterization effort and during a smaller scale desiccation treatability test at the Hanford BC-Cribs area. The results of these efforts demonstrate the utility of leveraging high-performance computing resources to process ERT data for 3D reconnaissance mapping of subsurface contaminants and for detailed 3D monitoring of vadose zone remediation efforts. Two examples of ERT imaging at a former waste disposal facility have been demonstrated at different scales; a large scale reconnaissance survey spanning many hundreds of meters and a detailed monitoring application spanning a few tens of meters. Although ERT is applicable at many scales, resolution is generally governed by proximity to electrodes. For instance, the BCCT reconnaissance survey demonstrated herein lost resolution with depth (i.e. away from surface electrodes), and was unable to detect a high conductivity anomaly at approximately 75 m below ground surface in the cribs area; the deep anomalies were detected during highly focused borehole sampling. Conversely, the desiccation site characterization and monitoring demonstrated high resolution at a small scale, but only because of close proximity to survey electrodes. Although proximity to electrodes is not the only factor governing ERT resolution, it is often the primary factor for determining how an ERT system should be effectively deployed for a given application. Regardless of resolution limitations, the utility of ERT for remotely detecting wastes and monitoring subsurface processes is evident. ERT imaging is not a final detection or monitoring solution alone, but provides a necessary capability to remotely detect subsurface conditions and understand subsurface processes. Such a capability can significantly increase the efficacy and reduce the cost of remediation by guiding sampling efforts and informing remedial system design and operation. However, given the computational demands of 3D ERT characterization and monitoring inversions, the full imaging capability enabled by contemporary ERT survey systems can generally only be realized with high performance computing resources, both hardware and software. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Iodine Remediation for 200-UP-1 - 16379

From the 1940's through the 1990's, liquid wastes from materials used and produced at the Hanford Site were disposed to the ground through cribs, ditches, ponds, and trenches. The major sources that contributed to groundwater contamination within the 200-UP-1 Operable Unit (OU) were associated with plutonium-separation and uranium recovery operations at the S Plant and U Plant facilities, as well groundwater migration from 200-ZP-1 OU. Iodine-129 is present in the groundwater and vadose zone beneath the 200-UP-1 OU, and is one of the primary risk drivers for the site. Hydraulic containment is the currently selected remedy for I-129 in the groundwater. There is currently no remedy selected for controlling migration of I-129 from the vadose zone to the groundwater. A UP-1 Evaluation Plan for I-129 was developed to provide the scientific and technical understanding necessary for developing remediation approaches for I-contaminated groundwater as well as risk-based approaches for managing I-129 present in the vadose zone. A site conceptual model for understanding the biogeochemical drivers for iodine speciation and determine the processes that drive the fate and transport of I-129 through the vadose zone and into groundwater was included. These data will provide the information to decrease the uncertainty related to the inventory, distribution, and transport properties which will lead to appropriate treatment strategies for the I-129 plume(s). A wide range of technologies and approaches are being evaluated including consideration of removal, cost, and long-term impacts to the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification of Promising Remediation Technologies for Iodine in the UP-1 Operable Unit

Iodine-129 (129I) generated at the U.S. Department of Energy (DOE) Hanford Site during plutonium production was released to the subsurface, resulting in several large, though dilute, plumes in the groundwater, including the plume in the 200-UP-1 operable unit (OU). Because 129I is an uncommon contaminant, relevant remediation experience and scientific literature are limited, though work is under way to better understand the fate and transport of 129I in the environment and the effectiveness of potential remediation technologies. The recent UP-1 Evaluation Plan for Iodine and report on the Conceptual Model of Iodine Behavior in the Subsurface at the Hanford Site provide information on the history of contamination in the 200-UP-1 OU, relevant controlling processes (biological and geochemical), risk, the conceptual site model, and potential remedial options, which provided a foundation for this study. In this study, available information was compiled and used to categorize potential remediation technologies, culminating in a recommendation of promising technologies for further evaluation. Approaches to improve the technical information about promising technologies are also recommended in this study so that a subsequent evaluation of potential remediation alternatives can assess these technologies.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Identification of Promising Remediation Technologies for Iodine in the UP-1 Operable Unit

Iodine-129 ( 129 I) generated at the U.S. Department of Energy (DOE) Hanford Site during plutonium production was released to the subsurface, resulting in several large, though dilute, plumes in the groundwater, including the plume in the 200-UP-1 operable unit (OU). Because 129 I is an uncommon contaminant, relevant remediation experience and scientific literature are limited, though work is under way to better understand the fate and transport of 129 I in the environment and the effectiveness of potential remediation technologies. The recent UP-1 Evaluation Plan for Iodine and report on the Conceptual Model of Iodine Behavior in the Subsurface at the Hanford Site provide information on the history of contamination in the 200-UP-1 OU, relevant controlling processes (biological and geochemical), risk, the conceptual site model, and potential remedial options, which provided a foundation for this study. In this study, available information was compiled and used to categorize potential remediation technologies, culminating in a recommendation of promising technologies for further evaluation. Approaches to improve the technical information about promising technologies are also recommended in this study so that a subsequent evaluation of potential remediation alternatives can assess these technologies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field-Scale Assessment of Desiccation Implementation for Deep Vadose Zone Contaminants

Desiccation of the vadose zone has the potential to reduce the flux of contaminants to underlying groundwater by removing moisture and decreasing the aqueous-phase permeability of the desiccated zone. However, data to evaluate implementation of desiccation are needed to enable consideration of desiccation as a potential remedy. Implementation of desiccation was field tested by injecting dry nitrogen gas to a target treatment zone and monitoring the spatial and temporal progress of the drying process. Aqueous waste discharges to disposal cribs approximately 50 years ago distributed water and contaminants, including primarily technetium-99 and nitrate, within the 100-m deep vadose zone at the test site. A field test location was selected adjacent to one of the former disposal cribs. The test was conducted in a contaminated portion of the vadose zone dominated by fine sands with lenses of silt material. Desiccation reduced volumetric moisture content to as low as 0.01. The lateral and vertical distribution of drying from the injection well was influenced by the subsurface heterogeneity. However, over time, desiccation occurred in the initially wetter, lower permeability lenses.

Environmental Molecular Sciences Laboratory↗

Technical and Policy Challenges in Deep Vadose Zone Remediation of Metals and Radionuclides - 12025

Deep vadose zone contamination is a significant issue facing the U.S. Department of Energy's (DOE) Office of Environmental Management (EM). Contamination in the deep vadose zone is isolated from exposure such that direct contact is not a factor in risk to human health and the environment. Transport of deep vadose zone contamination and discharge to the groundwater creates the potential for exposure and risk to receptors, so limiting flux to groundwater is key for protection of groundwater resources. Remediation approaches for the deep vadose zone need to be considered within the regulatory context, targeted at mitigating the source of contamination and reducing contaminant flux to groundwater. Processes for deep vadose zone metal and radionuclide remediation are discussed, as well as challenges and opportunities for implementation. It may be useful to consider the risk and challenges with leaving contaminants in place as part of a flux-control remedy in comparison with risks associated with contaminant removal and final disposition elsewhere. Understanding and quantifying the ramifications of contaminant removal and disposition options are therefore warranted. While this review suggests that some additional development work is needed for deep vadose zone remediation techniques, the benefits of applying vadose zone remediation for groundwater protection are compelling and worthy of continued development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing Soil Vapor Extraction Remediation Performance and Closure: A Review

Soil vapor extraction (SVE) is a baseline remediation approach for volatile contaminants. While SVE is generally effective for removal of contaminants from higher permeability portions of the vadose zone, contamination in low-permeability zones can persist due to mass transfer processes that limit the removal effectiveness. Thus, a diminishing rate of contaminant extraction over time is typically observed, yet contamination may remain in low-permeability zones. Under these conditions, SVE performance needs to be evaluated to determine whether the system should be optimized, terminated, or transitioned to another technology to replace or augment SVE. Methodologies have been developed to quantify SVE performance over time and to evaluate the impact of persistent vadose zone contamination sources on groundwater quality. Recently, these methods have applied mass flux/discharge concepts to quantify contaminant source strength. Methods include field measurement techniques using the SVE system to quantify source strength and predictive analyses with analytical and numerical models to evaluate the impact of the contaminant source on groundwater.

remediation↗

Assessing Soil Vapor Extraction Remediation Performance and Closure: A Review - 12188

Soil vapor extraction (SVE) is a baseline remediation approach for volatile contaminants. While SVE is generally effective for removal of contaminants from higher permeability portions of the vadose zone, contamination in low-permeability zones can persist due to mass transfer processes that limit the removal effectiveness. Thus, a diminishing rate of contaminant extraction over time is typically observed, yet contamination may remain in low-permeability zones. Under these conditions, SVE performance needs to be evaluated to determine whether the system should be optimized, terminated, or transitioned to another technology to replace or augment SVE. Methodologies have been developed to quantify SVE performance over time and to evaluate the impact of persistent vadose zone contamination sources on groundwater quality. Recently, these methods have applied mass flux/discharge concepts to quantify contaminant source strength. Methods include field measurement techniques using the SVE system to quantify source strength and predictive analyses with analytical and numerical models to evaluate the impact of the contaminant source on groundwater. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternate Endpoints for Deep Vadose Zone Environments: Challenges, Opportunities, and Progress

Current requirements for site remediation and closure are standards-based and are often overly conservative, costly, and in some cases, technically impractical to achieve. Use of risk-informed alternate endpoints provide a means to achieve remediation goals that are permitted by regulations and are protective of human health and the environment. Alternate endpoints enable establishing a path for cleanup that may include intermediate remedial milestones and transition points and/or regulatory alternatives to standards-based remediation. A framework is presented that is centered around developing and refining conceptual models in conjunction with assessing risks and potential endpoints as part of a system-based assessment that integrates site data with scientific understanding of processes that control the distribution and transport of contaminants in the subsurface and pathways to receptors. This system based assessment and subsequent implementation of the remediation strategy with appropriate monitoring are targeted at providing a holistic approach to addressing risks to human health and the environment. This holistic approach also enables effective predictive analysis of contaminant behavior to provide defensible criteria and data for making long-term decisions. Developing and implementing an alternate endpoint-based approach for remediation and waste site closure presents a number of challenges and opportunities. Categories of these challenges include scientific and technical, regulatory, institutional, and budget and resource allocation issues. Opportunities exist for developing and implementing systems-based approaches with respect to supportive characterization, monitoring, predictive modeling, and remediation approaches.

endpoints↗

Deep vadose zone remediation: technical and policy challenges, opportunities, and progress in achieving cleanup endpoints

Current requirements for site remediation and closure are standards-based and are often overly conservative, costly, and in some cases, technically impractical. Use of risk-informed alternate endpoints provides a means to achieve remediation goals that are permitted by regulations and are protective of human health and the environment. Alternate endpoints enable the establishment of a path for cleanup that may include intermediate remedial milestones and transition points and/or regulatory alternatives to standards-based remediation. A framework is presented that is centered around developing and refining conceptual models in conjunction with assessing risks and potential endpoints as part of a system-based assessment that integrates site data with scientific understanding of processes that control the distribution and transport of contaminants in the subsurface and pathways to receptors. This system-based assessment and subsequent implementation of the remediation strategy with appropriate monitoring are targeted at providing a holistic approach to addressing risks to human health and the environment. This holistic approach also enables effective predictive analysis of contaminant behavior to provide defensible criteria and data for making long-term decisions. Developing and implementing an alternate endpoint-based approach for remediation and waste site closure presents a number of challenges and opportunities. Categories of these challenges include scientific and technical, regulatory, institutional, and budget and resource allocation issues. Opportunities exist for developing and implementing systems-based approaches with respect to supportive characterization, monitoring, predictive modeling, and remediation approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternate Endpoints for Deep Vadose Zone Environments: Challenges, Opportunities, and Progress - 13036

Current requirements for site remediation and closure are standards-based and are often overly conservative, costly, and in some cases, technically impractical to achieve. Use of risk-informed alternate endpoints provide a means to achieve remediation goals that are permitted by regulations and are protective of human health and the environment. Alternate endpoints enable establishing a path for cleanup that may include intermediate remedial milestones and transition points and/or regulatory alternatives to standards-based remediation. A framework is presented that is centered around developing and refining conceptual models in conjunction with assessing risks and potential endpoints as part of a system-based assessment that integrates site data with scientific understanding of processes that control the distribution and transport of contaminants in the subsurface and pathways to receptors. This system-based assessment and subsequent implementation of the remediation strategy with appropriate monitoring are targeted at providing a holistic approach to addressing risks to human health and the environment. This holistic approach also enables effective predictive analysis of contaminant behavior to provide defensible criteria and data for making long-term decisions. Developing and implementing an alternate endpoint-based approach for remediation and waste site closure presents a number of challenges and opportunities. Categories of these challenges include scientific and technical, regulatory, institutional, and budget and resource allocation issues. Opportunities exist for developing and implementing systems-based approaches with respect to supportive characterization, monitoring, predictive modeling, and remediation approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Porous Medium Heterogeneity on Vadose Zone Desiccation: Intermediate-scale Laboratory Experiments and Simulations

Soil desiccation (drying), involving water evaporation induced by dry gas injection, is a potentially robust vadose zone remediation process to limit contaminant transport through the vadose zone. A series of four intermediate-scale flow cell experiments was conducted in homogeneous and simple layered heterogeneous porous medium systems to investigate the effects of heterogeneity on desiccation of unsaturated porous media. The permeability ratios of porous medium layers ranged from about five to almost two orders of magnitude. The insulated flow cell was equipped with twenty humidity and temperature sensors and a dual-energy gamma system was used to determine water saturations at various times. The multiphase code STOMP was used to simulate the desiccation process. Results show that injected dry gas flowed predominantly in the higher permeability layer and delayed water removal from the lower permeability material. For the configurations tested, water vapor diffusion from the lower to the higher permeability zone was considerable over the duration of the experiments, resulting in much larger relative humidity values of the outgoing air than based on permeability ratios alone. Acceptable numerical matches with the experimental data were obtained when an extension of the saturation-capillary pressure relation below the residual water saturation was used. The agreements between numerical and experimental results suggest that the correct physics are implemented in the simulator and that the thermal and hydraulic properties of the porous media, flow cell wall and insulation materials were properly represented.

contaminant transport↗