Search NASA⌕ Search

SEARCH · Search NASA

Results for “TSS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Tethered Satellite System-2 - A proposed program

A second mission (TSS-2) has been proposed for the reusable Tethered Satellite System (TSS) being developed jointly by the U.S. and Italy. The TSS-2 flight demonstration would use the TSS deployer/retriever system to deploy a research spacecraft attached to the end of a 100-km-long tether. The deployment would take place downward from the Space Shuttle into the outer atmosphere to an altitude of approximately 130 km. The objectives of the mission would be to demonstrate the atmospheric deployment of a tethered system, conduct scientific and aerothermodynamic research measurements, and conduct engineering measurements to verify flight system performance. Analytical studies have shown the feasibility of the TSS-2 mission from both the technology and operational dynamics standpoint. The TSS-1 mission (a 20 km tether deployed upward to conduct electrodynamic experiments) will validate the TSS itself as well as deployment and retrieval operations.

Anderson, John L.↗

Investigation of nonlinear E.M. phenomena in the tethered magnetospheric cloud

Nonlinear effects of parametric and of heating type, produced in a plasma under the action of an electric field E(sub 0)(e exp i(omega)t), are considered in this work in connection with the Tethered Magnetospheric Cloud (TMC) accompanying the Tether Satellite System (TSS). The theoretical results show that these phenomena should appear in the ionosphere at high altitudes Z greater than or = (150-200) km, particularly, at Z approximately = 300 km of the TSS system orbit. Therefore, it is of a special interest to search these phenomena by such a unique experiment as the forthcoming first TSS-I and by the future, perhaps modified TSS missions. Because of the parametric decay instability, new branches of wave may be excited both around the electron and ion Lengmuir frequencies Omega (sub 0) = 2(pi)f(sub 0) and Omega (sub 0) = 2(pi)f(sub 0) under the influence of high frequency (HF), (f less than or = 10(exp 6) to few 10(exp 6) Hz), strong electric waves. The heating of all the kinds of particles is growing up very quickly in the ionosphere with altitude in the extra low and very low frequency ranges, F approximately = (1 to 10(exp 4) Hz, discussed below. The temperatures (energies), for example, of the electrons accelerated by the electric field become larger than the ionization potential in this frequency range already at altitudes Z greater than or = (150 - 200) km when the amplitude of the electric field is the absolute value of E(sub 0) approximately = (1-2) mV/m. The sources of these electric fields may be in the TSS-I mission, that so called Phantom Loop (PL) - the Tethered Electrodynamic Tail (TET), and the different kind of electromagnetic oscillations produced by different kinds of instabilities in the TMC plasma. The growth rates of these instabilities will become very high in the TSS surrounding magnetoplasma. However, in the future TSS missions, special artificial sources (generators) of electric fields should be used for these investigations.

Alpert, Yakov L.↗

A Human-in-the Loop Evaluation of a Coordinated Arrival Departure Scheduling Operations for Managing Departure Delays at LaGuardia Airport

LaGuardia (LGA) departure delay was identified by the stakeholders and subject matter experts as a significant bottleneck in the New York metropolitan area. Departure delay at LGA is primarily due to dependency between LGA's arrival and departure runways: LGA departures cannot begin takeoff until arrivals have cleared the runway intersection. If one-in one-out operations are not maintained and a significant arrival-to-departure imbalance occurs, the departure backup can persist through the rest of the day. At NASA Ames Research Center, a solution called "Departure-sensitive Arrival Spacing" (DSAS) was developed to maximize the departure throughput without creating significant delays in the arrival traffic. The concept leverages a Terminal Sequencing and Spacing (TSS) operations that create and manage the arrival schedule to the runway threshold and added an interface enhancement to the traffic manager's timeline to provide the ability to manually adjust inter-arrival spacing to build precise gaps for multiple departures between arrivals. A more complete solution would include a TSS algorithm enhancement that could automatically build these multi-departure gaps. With this set of capabilities, inter-arrival spacing could be controlled for optimal departure throughput. The concept was prototyped in a human-in-the- loop (HITL) simulation environment so that operational requirements such as coordination procedures, timing and magnitude of TSS schedule adjustments, and display features for Tower, TRACON and Traffic Management Unit could be determined. A HITL simulation was conducted in August 2014 to evaluate the concept in terms of feasibility, controller workload impact, and potential benefits. Three conditions were tested, namely a Baseline condition without scheduling, TSS condition that schedules the arrivals to the runway threshold, and TSS+DSAS condition that adjusts the arrival schedule to maximize the departure throughput. The results showed that during high arrival demand period, departure throughput could be incrementally increased under TSS and TSS+DSAS conditions without compromising the arrival throughput. The concept, operational procedures, and summary results were originally published in ATM20151 but detailed results were omitted. This paper expands on the earlier paper to provide the detailed results on throughput, conformance, safety, flight time/distance, etc. that provide extra insights into the feasibility and the potential benefits on the concept.

trajectory-based operations↗

Tethered Satellite System Contingency Investigation Board

The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether control mechanism and to prepare a detailed plan for hardware inspection, test, and analysis including any appropriate hardware disassembly.

Source record↗

Enabling Performance-Based Navigation Arrivals: Development and Simulation Testing of the Terminal Sequencing and Spacing System

NASA has developed an advanced arrival management capability for terminal controllers, known as Terminal Sequencing and Spacing (TSS). TSS increases use of performance-based navigation (PBN) arrival procedures during periods of high traffic demand. It extends two Federal Aviation Administration's operational systems with terminal metering and controller spacing tools. Sixteen high-fidelity human-in-the-loop simulations, involving more than five hundred hours of evaluation time, were conducted to mature TSS from proof-of- concept design to fully functional prototype. These simulations modeled arrival procedures at several U.S. airports, incorporated a broad range of traffic demand profiles and wind conditions, and used controllers with extensive operational experience. Two fundamental metrics are evaluated for these simulations: PBN Success Rate and Inter-Arrival Spacing Error. The PBN Success Rate shows a definitive trend when TSS is used. It increases from 42 percent for today's operations to 68 percent for terminal metering only and 92 percent for terminal metering with controller-managed spacing tools. Meanwhile, the Inter-Arrival Spacing Error improves 25 to 35 percent when TSS is used compared to not used. The TSS technology was transferred to the FAA and, and it is targeted for deployment to several busy airports in the U.S. starting in 2018.

terminal metering↗

Investigation of dynamic noise affecting geodynamics information in a tethered subsatellite

Measurement of the gradient of the gravitational acceleration from a satellite platform is likely to provide the next improvement in knowledge of the Earth's gravity field after the upcoming Geopotential Research Mission. Observations from the subsatellite of a tethered satellite system (TSS) would increase sensitivity and resolution due to the low altitude possible. However, the TSS is a dynamically noisy system and would be perturbed by atmospheric drag fluctuations. The dynamic noise is being modeled in order to evaluate the feasibility of TSS gradiometry and to design methods of abating the error caused by this noise. The demonstration flights of the TSS are to provide an opportunity to directly observe the dynamical environment and refine modeling techniques. Random vibration analysis as a technique for modeling the TSS under atmospheric perturbation was studied.

Gullahorn, G. E.↗

Shuttle Tethered Satellite System Program Overview

The first of two demonstration flights of the tethered satellite system (TSS) is planned for the STS-52 flight and is designed to study tether electromagnetic interaction. The magnetospheric-ionospheric-atmospheric coupling processes in the lower troposphere are to be directly measured on the second TSS mission. An operational overview of the TSS-to-orbiter-to-ground interface is given and the TSS deployment concept is explained. Other aspects discussed include the tethered satellite-to-orbiter interface; tether control mechanisms; tether materials, and electrical interfaces. The design of the demonstration flight satellite and its instruments is described. The capabilities of the TSS for the demonstration flight are listed.

Crouch, D.↗

Atmospheric verification mission for the TSS/STARFAC tethered satellite

Two types of a tethered satellite system (TSS) - a basic 1.8-m-diameter spherical spacecraft and the Shuttle Tethered Aerothermodynamic Research Facility (STARFAC) are considered. Issues related to the deployment and retrieval of a large satellite with exceedingly long tethers are discussed, and the objectives of an Atmospheric Verification Mission (ATM) are outlined. Focus is concentrated on the ATM satellite which will fly after TSS-1 and before the fully instrumented and costlier TSS-2. The differences between the AVM and TSS-2, including the configuration of the aerodynamic stabilizers, instrumentation, and the materials of construction are outlined. The basic Kevlar tether defined for the TSS-2 is being considered for use with the AVM, however, a complex tether is under consideration as well.

Wood, George M., Jr.↗

Kuiper Airborne Observatory's Telescope Stabilization System: Disturbance Sensitivity Reduction Via Velocity Loop Feedback

In July of 1994 the Kuiper Airborne Observatory's (KAO) Telescope Stabilization System (TSS) was upgraded to meet performance goals necessary to view the Shoemaker-Levy 9 comet collision with Jupiter. The KAO is a modified C-141 Aircraft supporting a 36 inch Infrared telescope used to gather and analyze astronomical data. Before the upgrade, the TSS exhibited approximately a 10 arc-second resolution pointing accuracy. The majority of the inaccuracy was attributable to aircraft vibration and wind buffeting entering through the aircraft's telescope door opening; in other words, the TSS was overly sensitive to external disturbances. Because of power limitations and noise requirements, improving the pointing accuracy of the telescope required more sophistication than simply raising the bandwidth as some classical control strategies might suggest. Instead, relationships were developed between the disturbance sensitivity and closed loop transfer functions. These relationships suggested that employing velocity feedback along with an increase in current loop gain would dramatically improve the pointing resolution of the TSS by decreasing the control system's sensitivity to external disturbances. With the implementation of some classical control techniques and the above philosophy, the KAO's TSS's resolution was improved to approximately 2-3 arc-seconds.

Lawrence, David P.↗

Chesapeake Bay Water Resources: Examining Turbidity and Sediment Dynamics in the Chesapeake Bay

An increase in total suspended sediment (TSS) concentrations and turbidity have contributed to poor water quality in the Chesapeake Bay since the 1970s. Although turbidity and TSS have been moderately improving over the past few decades, poor water quality is detrimental to the Chesapeake Bay’s ecosystems and the surrounding watersheds. The Summer 2022 Chesapeake Bay Water Resources project observed sediment dynamics and turbidity in the York River watershed using remote sensing tools, models, and Earth observations including NASA and United States Geological Survey’s (USGS) Landsat satellite series, NASA DEVELOP’s Optical Reef Coastal Area Assessment Tool 2.0 (ORCAA), and Soil and Water Assessment Tool (SWAT). The collaborators on this project were the Chesapeake Bay National Estuarine Research Reserve (CBNERR), Group on Earth Observations (GEO) AquaWatch, the Committee on Earth Observation Satellites Coastal Observations, Applications, Services and Tools (CEOS COAST), and the Virginia Department of Environmental Quality (VA DEQ). The team concluded that the upstream sections of the York River watershed increased in TSS from 2009–2019. However, the seasonal TSS patterns often correlated with higher precipitation levels, although not necessarily major storm events. This may be due to factors like wind and waves contributing to the sedimentation trends observed. Although projects have been conducted to improve water quality, additional efforts like planting riparian buffers along areas with high TSS are needed to reduce the intensity of runoff. The team’s results will allow the end user, the VA DEQ, to inform their policymaking regarding future Bay conservation efforts.

Katherine Hahn↗

Chesapeake Bay Water Resources: Characterization of Sediment Dynamics for Enhanced Water Quality Monitoring in the Chesapeake Bay

An increase in total suspended sediment (TSS) concentrations and turbidity have contributed to poor water quality in the Chesapeake Bay since the 1970s. Although turbidity and TSS have been moderately improving over the past few decades, poor water quality is detrimental to the Chesapeake Bay’s ecosystems and the surrounding watersheds. The Summer 2022 Chesapeake Bay Water Resources project observed sediment dynamics and turbidity in the York River watershed using remote sensing tools, models, and Earth observations including NASA and United States Geological Survey’s (USGS) Landsat satellite series, NASA DEVELOP’s Optical Reef Coastal Area Assessment Tool 2.0 (ORCAA), and Soil and Water Assessment Tool (SWAT). The collaborators on this project were the Chesapeake Bay National Estuarine Research Reserve (CBNERR), Group on Earth Observations (GEO) AquaWatch, the Committee on Earth Observation Satellites Coastal Observations, Applications, Services and Tools (CEOS COAST), and the Virginia Department of Environmental Quality (VA DEQ). The team concluded that the upstream sections of the York River watershed increased in TSS from 2009–2019. However, the seasonal TSS patterns often correlated with higher precipitation levels, although not necessarily major storm events. This may be due to factors like wind and waves contributing to the sedimentation trends observed. Although projects have been conducted to improve water quality, additional efforts like planting riparian buffers along areas with high TSS are needed to reduce the intensity of runoff. The team’s results will allow the end user, the VA DEQ, to inform their policymaking regarding future Bay conservation efforts.

Katherine Hahn↗

Primary electric propulsion thrust subsystem definition

A review is presented of the current status of primary propulsion thrust subsystem (TSS) performance, packaging considerations, and certain operational characteristics. Thrust subsystem related work from recent studies by Jet Propulsion Laboratories (JPL), Rockwell and Boeing is discussed. Existing performance for 30-cm thrusters, power processors and TSS is present along with projections for future improvements. Results of analyses to determine (1) magnetic field distributions resulting from an array of thrusters, (2) thruster emitted particle flux distributions from an array of thrusters, and (3) TSS element failure rates are described to indicate the availability of analytical tools for evaluation of TSS designs.

Masek, T. D.↗

Tethered Satellite System Project Overview

The Skyhook concept is reviewed and the use of a tethered satellite system (TSS) to enable scientific investigations from the shuttle using a closed loop control system is examined. The tethered satellite system has capabilities for deployment toward or away from Earth, for multiple round trip missions, and for deployment at distances up to 100 KN from the orbiter. The deployer, which consists of an entendable boom, a reel for the tether, and the tether itself, permits deployment and retrieval at a safe distance, allows alignment of the force vector of the tether through the center of gravity of the shuttle, and gives some initial gravity gradient separation to aid in deployment and ultimate retrieval of the tethered satellite. Charts show TSS activities in terms of systems studies, key guidelines, Italian and U.S. responsibilities, user activities, and major science and applications accommodation features. Scientific objectives for TSS-1 and TSS-2 verification missions and the current status of the project are also given.

Laue, J. H.↗

Gravity gradiometry from the Tethered Satellite System

Measurement of the gradient of the gravitational acceleration from a satellite platform is likely to provide the next improvement in knowledge of the earth's gravity field after the upcoming Geopotential Research Mission (GRM). Observations from the subsatellite of a Tethered Satellite System (TSS) would increase sensitivity and resolution due to the low altitude possible. However, the TSS is a dynamically 'noisy' system and would be perturbed by atmospheric drag fluctuations. The dynamic noise is being modeled in order to evaluate the feasibility of TSS gradiometry and to design methods of abating the error caused by this noise. The demonstration flights of the TSS will provide an opportunity to directly observe the dynamical environment and refine modeling techniques.

Gullahorn, G. E.↗

Development status of first Tethered Satellite System

An MOU between NASA and Italian research organizations has assigned the responsibilities for the development, payload integration, launch and operation of a Tethered Satellite System (TSS). The TSS will include a deployer mounted on a Spacelab pallet, science equipment on a customized mission support structure and a satellite connected to the Orbiter by a tether. The satellite is 1.6 m in diameter and can weight up to 500 kg. The deployer will be insulated from the Orbiter because of the conductive nature of the tether. The first mission is to demonstrate the TSS technology, perform electrodynamic investigations of the interaction of the tether with ambient space plasma, and gather data on atmospheric interactions in the lower thermosphere, geomagnetic phenomena and gravimetric characteristics. The first TSS will be deployed 20 km outward from the Orbiter and the earth on a strand of tin-coated copper wire wrapped in Teflon insulation, braided Kevlar and a Nomek jacket. The first strand is designed to accommodate 53 N tension. The satellite on the end of the tether will be a multimission platform for facile changeout of the scientific package from mission-to-mission.

Sisson, J. M.↗

Thermal Synthesizer System - An integrated approach to spacecraft thermal analysis

The Thermal Synthesizer System (TSS), which is being developed to meet the thermal analysis needs of Space Station Freedom and of the proposed Space Exploration Initiative missions, is examined. The key requirements and design goals to be met by TSS are summarized, and the software engineering and user interface design philosophy are reviewed. The basic architecture for all applications within TSS is described. An overview is given of the main features of each of the applications of TSS.

Panczak, Tim↗

STS-75 Flight Day 1

On this first day of the STS-75 mission, the flight crew, Cmdr. Andrew Allen, Pilot Scott Horowitz, Payload Cmdr. Franklin Chang-Diaz, Payload Specialist Umberto Guidoni (Italy), and Mission Specialists Jeffrey Hoffman, Maurizio Cheli (ESA) and Claude Nicollier (ESA), were shown performing pre-launch and launching activities. This international space mission's primary objective is the deployment of the Tethered Satellite System Reflight (TSS-1R) to a 12 mile length from the shuttle, a variety of experiments, and the satellite retrieval. These experiments include: Research on Orbital Plasma Electrodynamics (ROPE); TSS Deployer Core Equipment and Satellite Core Equipment (DCORE/SCORE); Research on Electrodynamic Tether Effects (RETE); Magnetic Field Experiments for TSS Missions (TEMAG); Shuttle Electrodynamic Tether Systems (SETS); Shuttle Potential and Return Electron Experiment (SPREE); Tether Optical Phenomena Experiment (TOP); and Observations at the Earth's Surface of Electromagnetic Emissions by TSS (OESSE). The mission's secondary objectives were those experiments found in the United States Microgravity Payload-3 (USMP-3), which include: Advanced Automated Directional Solidification Furnace (AADSF); Material pour l'Etude des Phenomenes Interessant la Solidification sur Terre et en Orbite (MEPHISTO); Space Acceleration Measurement System (SAMS); Orbital Acceleration Research Experiment (OARE); Critical Fluid Scattering Experiment (ZENO); and Isothermal Dendritic Growth Experiment (IDGE).

Source record↗

Electron Flow to a Satellite at High Positive Potential

The Tethered Satellite System (TSS) is designed to deploy a 1.6 m diameter spherical satellite a distance of 20 km above the space shuttle orbiter on an insulated conducting tether. Because of the passage of the conducting tether through the earth's magnetic field, an emf is generated producing a positive satellite potential of about 5000 V. Electron flow under the influence of this high positive potential is the focus of the present analysis. The ionospheric parameters at TSS orbit altitude are; thermal velocity of electrons, 1.9 x 10(exp 5) M/S, thermal velocity of the ions, 1.1 x 10(exp 3) m/s, velocity of the satellite 8 x 10(exp 3) m/s. The electrons, with a Debye length, lambda(D) = 0.49 cm, spiral about the earth's magnetic field lines (0.4 Gauss) with a radius of about 3 cm and the ions spiral with a radius of 5 m. Under these conditions, the electron thermal energy, kT is 0.17 eV. The TSS satellite radius, r(p) is 163 Debye lengths. There is an extensive literature on the interaction of satellites with the near-earth ionospheric plasma. The space charge limitation to the electron current collected by a sphere at positive electrical potential was calculated by Langmuir and Blodgett (1924). Parker and Murphy (1967) recognized the importance of the influence of the earth's magnetic field and used the guiding center approximation to calculate the electron current collected by a positive charged satellite. More recently Ma and Schunk (1989) have calculated the time dependent flow of electrons to a spherical satellite at positive potential utilizing numerical methods and Sheldon (1994) used similar methods to solve this problem for the steady state. In order to analyze some of the phenomena that occurred in the ionosphere during the TSS flights, it would be useful to have analytic expressions for these electron flows. The governing equations are very complex and an exact analytical solution is not likely. An approximate analytical solution is feasible however, and the results of one attempt are presented herein.

Sheldon, John W.↗