3706 and MLLW update for WIPP Task Force [Slides]
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Geothermal heat pumps (GHPs), also referred to as ground-source heat pumps or Geo-exchange, have been proven capable of producing large reductions in energy use and associated carbon emissions for space conditioning and water heating in buildings. However, the current adoption rate of GHPs in the United States is still low, and GHPs receive little attention from either the public or policy makers. This report gives an overview of the status of GHP technology and its application in the United States, cost and performance of the state-of-the art GHP systems, barriers preventing wider adoption, and technologies under development that have potential to help overcome these barriers.
A new layout and optics for the Electron Storage Ring (ESR) have been produced with revised spin rotators in IRs 6 and 8, a redesign of IR10, and a new geometric layout for the ring. In this report, the efforts to produce this lattice are documented, including the motivation for design decisions. This new lattice, version 5.5, will be used as the baseline for future studies.
Today's rapidly increasing levels of wind, solar, storage, and load flexibility require the industry to rethink reliability planning and resource adequacy methods for modern power systems. Periods with a risk of shortfall often no longer coincide with peak demand - reliability risks are less about peak load and more about the daily setting of the sun, extended cloud cover, wind speeds, cold snaps, and heat waves. In addition, demand is increasingly flexible. Key resources are time-sensitive, as batteries need time to recharge and electricity customers can only be asked to provide demand response for just so long. And reliability failures are often correlated - with one another and with the weather. Two driving factors require the industry to reconsider its analytical approach for resource adequacy: (1) Chronological grid operations: The increasing importance of variable renewable resources (such as wind and solar) and of energy-limited resources (storage and demand response) make it essential to understand the full year of chronological operation of the grid. Specific attention must be paid to hourly, seasonal, and inter-annual resource variability. The sequence of the variability is key, as energy-limited resources such as batteries or demand response require either a preceding period or subsequent period of high production to be useful for grid reliability. (2) Correlated events: Historically, resource adequacy analysis focused on shortfalls caused by random, discrete mechanical failures of large generating units. In contrast, shortfalls today are often caused by multiple, correlated events caused by common weather patterns. Resource adequacy analysis must increasingly shift its focus to these correlated events. The redesign of resource adequacy methods will benefit from a set of guiding principles to better allow for sharing of insights and best practices, interregional resource coordination, and a smoother regulatory process for resource procurement. The objective of this report is to move this redesign forward. It provides an overview of key drivers changing the way resource adequacy needs to be evaluated, identifies shortcomings of conventional approaches, and outlines first principles for practitioners to consider as they adapt their approaches. The central message is: what got us here won't get us there.
This document contains a detailed interoperability profile outlining how the components of the CIM can be used to implement DLR in support of the two use cases identified in the Use Case Document. An interoperability profile is defined by the Smart Electric Power Alliance (SEPA) as a document that “specifies standards-based requirements for interfaces or applications that are accepted by the user-community, testing authorities, and other stakeholders. It specifies configuration options within a standard’s requirements sufficient to deliver the desired level of interoperability and functionality.” To that end, this document is not in itself a standard, nor has it been approved by any formal body. Rather, it is an example of how to implement the CIM standard and has been reviewed by industry, including transmission operators and DLR vendors.
The increased electrification of buildings across the United States is being driven by technical advancements, cost reductions for some building technologies, consumer preferences, and policy goals for decarbonization. However, the effects of this load growth on the electric distribution system are often only a minor consideration in policymaking and long-term planning studies. The long lead time and useful life of power system equipment means that the decisions taken today are expected to support our society well into the 2060s and beyond. Distribution planning stakeholders can take steps today to establish a grid foundation that captures the new challenges presented by building electrification. This report focuses on building electrification for the residential and commercial sectors, focusing most heavily on space heating, as this end use stands to most strongly impact demand.1 Across all end uses, building electrification could require somewhere between 10% and 70% more electricity generation capacity than exists today depending on technology adoption and energy efficiency.
Forecasting electricity usage is a foundational planning activity for utilities, underpinning billions of dollars in grid investments that ensure system reliability. Historically, forecasting relied on trends in economic and population growth; however, transportation electrification presents a new and complex planning challenge. Unlike conventional loads, electric vehicle (EV) charging has relatively limited usage history. In addition, charging is driven by complex human behaviors, is mobile, and at the same time can concentrate geographically in ways that, without proper planning, can quickly overwhelm local distribution systems.
Possible consequences of stratospheric ozone reduction due to fluorocarbon contamination are evaluated. The fluorocarbon industry, economic factors, and Federal roles in this area are also discussed.
An advanced technology program is described for reduced fuel consumption in air transport. Cost benefits and estimates are given for improved engine design and components, turboprop propulsion systems, active control systems, laminar flow control, and composite primary structures.
Explore the source record for details and available documents.
Data needs for state natural resources programs, state capabilities for using satellite technology, and the existing remote sensing technology are reviewed. State programs in land use planning, wetlands management, coastal zone management, transportation planning, and forestry management are summarized. Emphasis is placed on the use of LANDSAT imagery.
The technological needs and opportunities related to future civil and military rotorcraft were determined and a program plan for NASA research which was responsive to the needs and opportunities was prepared. In general, the program plan places the primary emphasis on design methodology where the development and verification of analytical methods is built upon a sound data base. The four advanced rotorcraft technology elements identified are aerodynamics and structures, flight control and avionic systems, propulsion, and vehicle configurations. Estimates of the total funding levels that would be required to support the proposed program plan are included.
Tomas Garza relates how the Research Center for Applied Mathematics Systems and Services in Mexico became the Research Institute for Applied Mathematics and Systems and what the type of work performed is.
Space station planning quidelines; architecture; functions; preliminary mission data base; scope for international and commercial participation; schedules; servicing capability; technology development; and space station program interfaces are discussed.
The Ground Operations Concept embodied in this report provides for safe multi-user utilization of the Space Station, eases user integration, and gives users autonomy and flexibility. It provides for meaningful multi-national participation while protecting U.S. interests. The concept also supports continued space operations technology development by maintaining NASA expertise and enabling technology evolution. Given attention here are pre/post flight operations, logistics, sustaining engineering/configuration management, transportation services/rescue, and information systems and communication.
The space station program goads, operations and the characteristics of the expected user community are summarized. Strategies for operations and recommendations for implementation are included.
The capacity of global power systems must be increased by a factor of ten to provide the predicted power needs of electric power by the year 2050. The Lunar Power System (LPS) would collect solar energy at power bases located on opposing limbs of the moon as seen from Earth. LPS can provide dependable, economic, renewable, and environmentally benign solar energy to Earth. A preliminary engineering and cash flow model of the LPS was developed. Results are shown for a system scaled to a peak capacity of 355 GWe on Earth and to provide 13,600 GWe-Yrs of energy over a 70 year life cycle of construction and full operation. The growth in capacity of the reference system from start of installation on the moon in 2005 to completion of its nominal life cycle in the year 2070 is shown. World needs for power could be accommodated by expansion in capacity of the reference LPS beyond 344 GWe. This would be done by steadily incorporating newer technology during full operation and by establishing additional bases. The results presented encourage consideration of a faster paced program than is assumed herein.
It is often proposed that the redundancy in choosing a force distribution for multiple arms grasping a single object should be handled by minimizing a quadratic performance index. The performance index may be formulated in terms of joint torques or in terms of the Cartesian space force/torque applied to the body by the grippers. The former seeks to minimize power consumption while the latter minimizes body stresses. Because the cost functions are related to each other by a joint angle dependent transformation on the weight matrix, it might be argued that either method tends to reduce power consumption, but clearly the joint space minimization is optimal. A comparison of these two options is presented with consideration given to computational cost and power consumption. Simulation results using a two arm robot system are presented to show the savings realized by employing the joint space optimization. These savings are offset by additional complexity, computation time and in some cases processor power consumption.