Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technical Capability Level 4”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

62 records · Page 4

An Examination of Two Non-Cooperative Detect and Avoid Well Clear Definitions

NASA’s Unmanned Aircraft Systems Integration into the National Airspace System (UAS in the NAS) project examines the technical barriers associated with the operation of UAS in civil airspace. The present study explored the differential effects of two candidate non-cooperative Detect-and-Avoid Well Clear (DWC)definitions on pilot and system performance in a human-in-the-loop simulation. Active-duty UAS pilots were recruited to maintain DWC against representative Class 4 encounter types with a low size, weight, and power (SWaP) radar declaration range of 3.5 nautical miles (nmi). Objective performance indicated that pilots could consistently maintain DWC against non-cooperative intruders with either DWC candidate, with negligible differences in response times and separation performance against caution and warning-level threats. While losses of DWC were avoided at rates comparable to Phase 1 findings, pilots uploaded their responses to caution-level alerts over 5 seconds faster in the current setup relative to Phase 1. Encounters with faster closure rates were susceptible to shortened caution-level alert durations, especially when employing the DWC criterion with the additional ‘Tau’ (temporal) component. Consequently, caution-level threats frequently elevated to warning-level status (nearly twice as often with theTau candidate). The variable caution alert durations appeared to impact pilots’ coordination with air traffic control (ATC), as ATC approval rates were lower with the ‘Tau’and ‘Disc’ candidates relative to Phase 1 research. Ultimately, the increased alerting time enabled by the Disc candidate deemed it more suitable for any reductions to the assumed radar declaration range requirement, which was re-evaluated in a follow-on study. Findings from this study will inform Phase 2 Minimum Operational Performance Standards (MOPS)development for UAS with alternative surveillance equipment and performance capabilities.

Kevin J Monk↗

An Interoperability Concept for Detect and Avoid and Collision Avoidance Systems: Results from a Human-In-The-Loop Simulation

The integration of Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS) poses a variety of technical challenges to UAS developers and aviation regulators. In response to growing demand for access to civil airspace in the United States, the Federal Aviation Administration (FAA) has produced a roadmap identifying key areas requiring further research and development. One such technical challenge is the development of a "detect and avoid" system (DAA) capable of providing a means of compliance with the "see and avoid" requirement in manned aviation. The purpose of the DAA system is to support the pilot, situated at a ground control station (GCS), in maintaining "DAA well clear" of nearby aircraft through the use of GCS displays and alerts. In addition to its primary function of aiding the pilot in maintaining DAA well clear, the DAA system must also safely interoperate with existing NAS systems and operations, such as the airspace management procedures of air traffic controllers (ATC) and Collision Avoidance (CA) systems currently in use by manned aircraft, namely the Traffic Alert and Collision Avoidance System (TCAS II). It is anticipated that many UAS architectures will integrate both a DAA system and a TCAS II. It is therefore necessary to explicitly study the integration of DAA and TCAS II alerting structures and maneuver guidance formats to ensure that pilots understand the appropriate type and urgency of their response to the various alerts. This paper presents a concept of interoperability for the two systems. The concept was developed with the goal of avoiding any negative impact on the performance level of TCAS II while retaining a DAA system that still effectively enables pilots to maintain DAA well clear. The interoperability concept described in the paper focuses primarily on facilitating the transition from a late-stage DAA encounter (where a loss of DAA well clear is imminent) to a TCAS II Corrective Resolution Advisory (RA), which requires pilot compliance within five seconds of its issuance. The interoperability concept was presented to 10 participants (6 active UAS pilots and 4 active commercial pilots) in a medium-fidelity, human-in-the-loop simulation designed to stress different aspects of the DAA and TCAS II systems. Pilots' ability to maintain separation, their rate of compliance and response times using the interoperability concept are reported. Results indicated that pilots exhibited comprehension of, and appropriate prioritization within, the DAA-TCAS II combined alert structure. Pilots demonstrated a high rate of compliance with TCAS II RAs and were also seen to respond to corrective RAs within the five second requirement established for manned aircraft. The DAA system presented under test was also shown to be effective in supporting pilots' ability to maintain DAA well clear in the overwhelming majority of cases in which pilots had sufficient time to respond.

Rorie, R. Conrad↗

Space Power Free-Piston Stirling Engine Scaling Study

The design feasibility study is documented of a single cylinder, free piston Stirling engine/linear alternator (FPSE/LA) power module generating 150 kW-electric (kW sub e), and the determination of the module's maximum feasible power level. The power module configuration was specified to be a single cylinder (single piston, single displacer) FPSE/LA, with tuning capacitors if required. The design requirements were as follows: (1) Maximum electrical power output; (2) Power module thermal efficiency equal to or greater than 20 percent at a specific mass of 5 to 8 kg/kW(sub e); (3) Heater wall temperature/cooler wall temperature = 1050 K/525 K; (4) Sodium heat-pipe heat transport system, pumped loop NaK (sodium-potassium eutectic mixture) rejection system; (5) Maximum power module vibration amplitude = 0.0038 cm; and (6) Design life = 7 years (60,000 hr). The results show that a single cylinder FPSE/LA is capable of meeting program goals and has attractive scaling attributes over the power range from 25 to 150 kW(sub e). Scaling beyond the 150 kW(sub e) power level, the power module efficiency falls and the power module specific mass reaches 10 kg/kW(sub e) at a power output of 500 kW(sub e). A discussion of scaling rules for the engine, alternator, and heat transport systems is presented, along with a detailed description of the conceptual design of a 150 kW(sub e) power module that meets the requirements. Included is a discussion of the design of a dynamic balance system. A parametric study of power module performance conducted over the power output range of 25 to 150 kW(sub e) for temperature ratios of 1.7, 2.0, 2.5, and 3.0 is presented and discussed. The results show that as the temperature ratio decreases, the efficiency falls and specific mass increases. At a temperature ratio of 1.7, the 150 kW(sub e) power module cannot satisfy both efficiency and specific mass goals. As the power level increases from 25 to 150 kW(sub e) at a fixed temperature ratio, power module efficiency is seen to increase slightly, but at the expense of increased specific mass. An empirical equation relating power module thermal efficiency as a function of power module specific mass, power output, and temperature ratio is developed. Alternative configurations to the single cylinder, direct coupled linear alternator approach are also evaluated, but are shown to have technical drawbacks that lessen their attractiveness. The dynamic balance assembly mass (moving mass and structure) represents 20 to 30 percent of the total single cylinder power module mass. Joining two modules in a balanced opposed configuration eliminates the need for the balancer, and a hot end junction can be made without significant addition of structural mass. Recommendations are made for evaluation of advanced heat pipe concepts, tests of radial flow heat exchangers, and evaluation of high temperature alternator materials.

Jones, D.↗

Strawman Philosophical Guide for Developing International Network of GPM GV Sites

The creation of an international network of ground validation (GV) sites that will support the Global Precipitation Measurement (GPM) Mission's international science programme will require detailed planning of mechanisms for exchanging technical information, GV data products, and scientific results. An important component of the planning will be the philosophical guide under which the network will grow and emerge as a successful element of the GPM Mission. This philosophical guide should be able to serve the mission in developing scientific pathways for ground validation research which will ensure the highest possible quality measurement record of global precipitation products. The philosophical issues, in this regard, partly stem from the financial architecture under which the GV network will be developed, i.e., each participating country will provide its own financial support through committed institutions -- regardless of whether a national or international space agency is involved.At the 1st International GPM Ground Validation Workshop held in Abingdon, UK in November-2003, most of the basic tenants behind the development of the international GV network were identified and discussed. Therefore, with this progress in mind, this presentation is intended to put forth a strawman philosophical guide supporting the development of the international network of GPM GV sites, noting that the initial progress has been reported in the Proceedings of the 1st International GPM GV Workshop -- available online. The central philosophical issues themselves, all flow from the fact that each participating institution can only bring to the table, GV facilities and scientific personnel that are affordable to the sanctioning (funding) national agency (be that a research, research-support, or operational agency). This situation imposes on the network, heterogeneity in the measuring sensors, data collection periods, data collection procedures, data latencies, and data reporting capabilities. Therefore, in order for the network to be effective in supporting the central scientific goals of the GPM mission, there must be a basic agreed upon doctrine under which the network participants function vis-a-vis: (1) an overriding set of general scientific requirements, (2) a minimal set of policies governing the free flow of GV data between the scientific participants, (3) a few basic definitions concerning the prioritization of measurements and their respective value to the mission, (4) a few basic procedures concerning data formats, data reporting procedures, data access, and data archiving, and (5) a simple means to differentiate GV sites according to their level of effort and ability to perform near real-time data acquisition - data reporting tasks. Most important, in case they choose to operate as a near real-time data collection-data distribution site, they would be expected to operate under a fairly narrowly defined protocol needed to ensure smooth GV support operations. This presentation will suggest measures responsive to items (1) - (5) from which to proceed,. In addition, this presentation will seek to stimulate discussion and debate concerning how much heterogeneity is tolerable within the eventual GV site network, given that the any individual GV site can only be considered scientifically useful if it supports the achievement of the central GPM Mission goals. Only ground validation research that has a direct connection to the space mission should be considered justifiable given the overarching scientific goals of the mission. Therefore each site will have to seek some level of accommodation to what the GPM Mission requires in the way of retrieval error characterization, retrieval error detection and reporting, and generation of GV data products that support assessment and improvement of the mission's standard precipitation retrieval algorithms. These are all important scientific issues that will be best resolved in open scientific debate.

Smith, Eric A.↗

Overview of Heatshield for Extreme Entry Environment Technology (HEEET) Project

The objective of the Heatshield for Extreme Entry Environment Technology (HEEET) projects is to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations such as Venus and Saturn. Destinations that have extreme entry environments with heat fluxes up to 5000 watts per square centimeter and pressures up to 5 atmospheres, entry environments that NASA has not flown since Pioneer-Venus and Galileo. The scope of the project is broad and can be split into roughly four areas, Manufacturing/Integration, Structural Testing and Analysis, Thermal Testing and Analysis and Documentation. Manufactruing/Integration covers from raw materials, piece part fabrication to final integration on a 1-meter base diameter 45-degree sphere cone Engineering Test Unit (ETU). A key aspect of the project was to transfer as much of the manufacturing technology to industry in preparation to support future mission infusion. The forming, infusion and machining approaches were transferred to Fiber Materials Inc. and FMI then fabricated the piece parts from which the ETU was manufactured. The base 3D-woven material consists of a dual layer weave with a high density outer layer to manage recession in the system and a lower density, lower thermal conductivity inner layer to manage the heat load. At the start of the project it was understood that due to weaving limitations the heat shield was going to be manufactured from a series of tiles. And it was recognized that the development of a seam solution that met the structural and thermal requirements of the system was going to be the most challenging aspect of the project. It was also recognized that the seam design would drive the final integration approach and therefore the integration of the ETU was kept in-house within NASA. A final seam concept has been successfully developed and implemented on the ETU and will be discussed. The structural testing and analysis covers from characterization of the different layers of the infused material as functions of weave direction and temperature, to sub-component level testing such as 4-pt bend testing at sub-ambient and elevated temperature. ETU test results are used to validate the structural models developed using the element and sub-component level tests. Given the seam has to perform both structurally and aerothermally during entry a novel 4-pt bend test fixture was developed allowing articles to be tested while the front surface is heated with a laser. These tests are intended to establish the system's structural capability during entry. A broad range of aerothermal tests (arcjet tests) are being performed to develop material response models for predicting the required TPS thickness to meet a mission's needs and to evaluate failure modes. These tests establish the capability of the system and assure robustness of the system during entry. The final aspect of the project is to develop a comprehensive Design and Data Book such that a future mission will have the information necessary to adopt the technology. This presentation will provide an overview and status of the project and describe the status of the tehnology maturation level for the inner and outer planet as well as earth entry sample return missions.

Ellerby, Don↗

A Technology Development Roadmap for a Near-Term Probe-Class X-ray Astrophysics Mission

This document presents a roadmap, including proposed budget and schedule, for maturing the instrumentation needed for an X-ray astrophysics Probe-class mission. The Physics of the Cosmos (PCOS) Program Office was directed to create this roadmap following the December 2012 NASA Astrophysics Implementation Plan (AIP). Definition of this mission is called for in the AIP, with the possibility of selection in 2015 for a start in 2017. The overall mission capabilities and instrument performance requirements were defined in the 2010 Astronomy and Astrophysics Decadal Survey report, New Worlds, New Horizons in Astronomy and Astrophysics (NWNH), in connection with the highly ranked International X-ray Observatory (IXO). In NWNH, recommendations were provided regarding the size of, and instrumentation needed by, the next large X-ray observatory. Specifically, the key instrumental capability would be an X-ray calorimeter spectrometer at the focus of a large mirror with angular resolution of 10 arc seconds (arcsec) or better. If possible, a grating spectrometer should also be incorporated into the instrument complement. In response to these recommendations, four instrumentation technologies are included in this roadmap. Three of these are critical for an X-ray mission designed to address NWNH questions: segmented X-ray mirrors, transition edge sensor calorimeters, and gratings. Two approaches are described for gratings, which represent the least mature technology and thus most in need of a parallel path for risk reduction. Also, while current CCD detectors would likely meet the mission needs for grating spectrum readout, specific improvements are included as an additional approach for achieving the grating system effective area requirement. The technical steps needed for these technologies to attain technology readiness levels (TRL) of 5 and 6 are described, as well as desirable modest risk reduction steps beyond TRL-6. All of the technology development efforts are currently funded through the NASA Physics of the Cosmos (PCOS) Strategic Astrophysics Technology (SAT) program; some through the end of FY13, others though FY14. These technology needs are those identified as critical for a near-term mission and briefly described in the 2012 NASA X-ray Mission Concepts Study. This Technology Development Roadmap (TDR) provides a more complete description of each, updates the status, and describes the steps to mature them. For each technology, a roadmap is presented for attaining TRL-6 by 2020 at the latest, and 2018 for most. The funding required for each technology to attain TRL-5 and TRL-6 is presented and justified through a description of the steps needing completion. The total funding required for these technologies to reach TRL-6 is relatively modest, and is consistent with the planned PCOS SAT funding over the next several years. The approximate annual cost through 2018 is $8M. The total cost for all technologies to be matured is $62M (including funding already awarded for FY13 and FY14). This can be contrasted to the $180M recommended by NWNH for technology development for IXO, primarily for the maturation of the mirror technology. The technology described in Section 3 of this document is exclusively that needed for a near-term Probe-class mission, to start in 2017, or for a mission that can be recommended by the next Decadal survey committee for an immediate start. It is important to note that there are other critical X-ray instrumentation technologies under development that are less mature than the ones discussed here, but are essential for a major X-ray mission that might start in the late 2020s. These technologies, described briefly in Section 4, are more appropriately funded through the Astronomy and Physics Research and Analysis (APRA) program.

Development↗

Safety Case for Small Uncrewed Aircraft Systems (sUAS) Beyond Visual Line of Sight (BVLOS) Operations at NASA Langley Research Center

This Technical Memorandum (TM) is written to provide for dissemination of the methods and safety considerations for operations of small Uncrewed Aerial Systems (sUAS) Beyond Visual Line-of-Sight (BVLOS)at NASA Langley Research Center. It includes the Safety Case used to acquire a BVLOS Certificate of Authorization (COA) from the FAA and is being published to enable others to benefit from this work. The intended operations, subject to approval from the Federal Aviation Administration (FAA) and the National Aeronautics and Space Administration (NASA), will include a combination of Within Visual Line of Sight (WVLOS) and Beyond Visual Line of Sight (BVLOS) flights, comprising of at most five sUAS operating concurrently, with no more than three operating BVLOS. Flights will occur in a subset of the Langley Air Force Base (LAFB) Class D airspace (KLFI) at a maximum altitude of 400 ft AGL. Most operations within this subset will take place in the City Environment Range Testing for Autonomous Integrated Navigation (CERTAIN) Range. The CERTAIN Range includes airspace inside the borders of NASA Langley Research Center (LaRC). Additional airspace over the northern section of CERTAIN will be requested as part of the Certificate of Authorization (COA). NASA LaRC BVLOS operations on the CERTAIN Range can be broken down into five critical components needed to meet the 14 CFR § 91.113 see and avoid requirement: 1) procedural deconfliction with LAFB for UAS operations at or below 400 ft and manned aircraft at or above 900’ AGL; 2) ground equipment for detection of intruder aircraft and to support communications between crewmembers ; 3) sUAS vehicles with advanced onboard automation capable of autonomously maintaining safe separation; 4) BVLOS standardized operating procedures (SOPs); 5) and personnel to execute the flight operations in accordance with the SOPs and respond to airborne contingencies. The introduction of new ground equipment includes the use of the Remote Operations for Autonomous Missions (ROAM) UAS Operations Center, development and use of an Integrated Airspace Display (IAD), use of the L-STAR and GA-9120 radars, and the incorporation of standardized Vertiports. The ROAM Operations Center will be the central point for all BVLOS sUAS operations. All command and control (C2), voice communications and airspace awareness displays will reside inside ROAM. The IAD will provide raw data from ADS-B, FLARM, radar tracks and telemetered GPS vehicle positions for interpretation by an Airspace Monitor. The radars will search the class D airspace around the CERTAIN Range and serve as a backup to procedural deconfliction procedures coordinated with LAFB. In the event of a procedural deconfliction breakdown, radar detections of non-participating aircraft will be available so that the 91.113 see and avoid requirement can still be safely met. Finally, the incorporation of Vertiports will have video and network connectivity that enables large numbers of sUAS launches and recoveries from a single location. This is a continuation of the remote command and control of unpiloted aircraft component focused on evaluating unpiloted aircraft flight crew roles and responsibilities, control interfaces and the associated data links needed to operate a fleet of aircraft within a UAM Ecosystem. This work supports the development of future aviation operational concepts based on an Urban Air Mobility Maturity Level (UML) 4 environment (Patterson, 2020). It is assumed that future airspace will include hundreds of simultaneous aircraft operations within the airspace, therefore scalable operations are essential for enabling this future airspace to become a reality. Follow on work includes envisioned flights that expand operations beyond the CERTAIN range and lead to an effective Maritime Surveillance capability.

Matthew W Coldsnow↗

The Athena Mars Rover Science Payload

The Mars Surveyor missions that will be launched in April of 2001 will include a highly capable rover that is a successor to the Mars Pathfinder mission's Sojourner rover. The design goals for this rover are a total traverse distance of at least 10 km and a total lifetime of at least one Earth year. The rover's job will be to explore a site in Mars' ancient terrain, searching for materials likely to preserve a record of ancient martian water, climate, and possibly biology. The rover will collect rock and soil samples, and will store them for return to Earth by a subsequent Mars Surveyor mission in 2005. The Athena Mars rover science payload is the suite of scientific instruments and sample collection tools that will be used to perform this job. The specific science objectives that NASA has identified for the '01 rover payload are to: (1) Provide color stereo imaging of martian surface environments, and remotely-sensed point discrimination of mineralogical composition. (2) Determine the elemental and mineralogical composition of martian surface materials. (3) Determine the fine-scale textural properties of these materials. (4) Collect and store samples. The Athena payload has been designed to meet these objectives. The focus of the design is on field operations: making sure the rover can locate, characterize, and collect scientifically important samples in a dusty, dirty, real-world environment. The topography, morphology, and mineralogy of the scene around the rover will be revealed by Pancam/Mini-TES, an integrated imager and IR spectrometer. Pancam views the surface around the rover in stereo and color. It uses two high-resolution cameras that are identical in most respects to the rover's navigation cameras. The detectors are low-power, low-mass active pixel sensors with on-chip 12-bit analog-to-digital conversion. Filters provide 8-12 color spectral bandpasses over the spectral region from 0.4 to 1.1 micron Narrow-angle optics provide an angular resolution of 0.28 mrad/pixel, nearly a factor of four higher than that of the Mars Pathfinder and Mars Surveyor '98 cameras. Image compression will be performed using a wavelet compression algorithm. The Mini-Thermal Emission Spectrometer (Mini-TES) is a point spectrometer operating in -the thermal IR. It produces high spectral resolution (5 /cm) image cubes with a wavelength range of 5-40 gm, a nominal signal/noise ratio of 500:1, and a maximum angular resolution of 7 mrad (7 cm at a distance of 10 in). The wavelength region over which it operates samples the diagnostic fundamental absorption features of rockforming minerals, and also provides some capability to see through dust coatings that could tend to obscure spectral features. The mineralogical information that Mini-TES provides will be used to select from a distance the rocks and soils that will be investigated in more detail and ultimately sampled. Mini-TES is derived from the MO/MGS TES instrument, but is significantly smaller and simpler. The instrument uses an 8-cm Cassegrain telescope, a Michelson interferometer, and uncooled pyroelectric detectors. Along with its mineralogical capabilities, Mini-TES can provide information on the thermophysical properties of rocks and soils. Viewing upward, it can also provide temperature profiles through the martian atmospheric boundary layer. Elemental and Mineralogical Composition: Once promising samples have been identified from a distance using Pancam/Mini-TES, they will be studied in detail using up to three compositional sensors that can be placed directly against them by an Instrument Arm. The two compositional sensors, presently on the payload are an Alpha-Proton-X-Ray Spectrometer (APXS), and a Mossbauer Spectrometer. The APXS is derived closely from the instrument that flew on Mars Pathfinder. Radioactive alpha sources and three detection modes (alpha, proton, and x-ray) provide elemental abundances of rocks and soils to complement and constrain mineralogical data. The Athena APXS will have a revised mechanical design that will cut down significantly on backscattering of alpha particles from martian atmospheric carbon. It will also include a target of known elemental composition that will be used for calibration purposes. The Athena Mossbauer Spectrometer is a diagnostic instrument for the mineralogy and oxidation state of Fe-bearing phases, which are particularly important on Mars. The instrument measures the resonant absorption of gamma rays produced by a Co-57 source to determine splitting of nuclear energy levels in Fe atoms that is related to the electronic environment surrounding them. It has been under development for space flight for many years at the Technical University of Darmstadt. The Mossbauer Spectrometer (and the other arm instruments) will be able to view a small permanent magnet array that will attract magnetic particles in the martian soil. The payload may also include a Raman Spectrometer. If included, the Raman Spectrometer will provide precise identification of major and minor mineral phases. It requires no sample preparation, and is also sensitive to organics. Fine-Scale Texture: The Instrument Arm a also carries a Microscopic Imager that will obtain high-resolution monochromatic images of the same materials for which compositional data will be obtained. Its spatial resolution is 20 micron/pixel over a 1 cm depth of field, and 40 micron/pixel over a 1-cm depth of field. Like Pancam, it uses the same active pixel sensor detectors and electronics as the rover's navigation cameras. The Instrument Arm is a three degree-of-freedom arm that uses designs and components from the Mars Pathfinder and Mars Surveyor '98 projects. Its primary function is instrument positioning. Along with the instruments noted above, it also carries a brush that can be used to remove dust and other loose coatings from rocks. Sample Collection and Storage: Martian rock and soil samples will be collected using a low-power rotary coring drill called the Mini-Corer. An important characteristic of this device is that it can obtain intact samples of rock from up to 5 cm within strong boulders and bedrock, Nominal core dimensions are 8xl7 mm. The Mini-Corer drills a core to the commanded depth in a rock, shears it off, retains it, and extracts it. It can also acquire samples of loose soil, using soil sample cups that are pressed downward into loose material. The Mini-Corer can drill at angles from vertical to 45' off vertical. It has six interchangeable bits for long life. Mechanical damage to the sample during drilling is minimal, and heating is negligible. After acquisition, the sample may be viewed by the arm instruments, and/or placed in one of 104 compartments in the Sample Container. A subset of the acquired samples may be replaced with other samples obtained later if desired. The Sample Container has no moving parts, and is mounted external to the rover for easy removal by the Mars Surveyor 2005 flight system. Operation of the rover will make extensive use of automated onboard navigation and hazard avoidance capabilities. Otherwise, use of onboard autonomy is minimal. Data downlink capability is about 40 Mbit/sol, and the use of the Mars Surveyor '01 orbiter for data relay imposes a limit of at most two command cycles per sol. Because of the significant amount of time available between command cycles, all payload elements will be operated sequentially, rather than in parallel.; this approach also significantly simplifies operations and minimizes peak power usage. The landing site for the '01 rover has not been selected yet. Site selection will make as full use as possible of Mars Global Surveyor data, and will involve substantial input from the broad Mars science community. Summary: The following table describes the mass, power, providers, and key scientific objectives of all the major elements of the Athena payload. Additional Athena payload information may be found at: http://astrosun.tn.cornell.edu/athena/index.html. Additional information contained in the original.

Squyes, S. W.↗