Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technical Integration Office”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

NASA guidelines for assuring the adequacy and appropriateness of security safeguards in sensitive applications

The Office of Management and Budget (OMB) Circular A-71, transmittal Memorandum No. 1, requires that each agency establish a management control process to assure that appropriate administrative, physical and technical safeguards are incorporated into all new computer applications. In addition to security specifications, the management control process should assure that the safeguards are adequate for the application. The security activities that should be integral to the system development process are examined. The software quality assurance process to assure that adequate and appropriate controls are incorporated into sensitive applications is also examined. Security for software packages is also discussed.

Tompkins, F. G.↗

Integration of Biological, Physical/Chemical and Energy Efficient Systems in the CELSS Antarctic Analog: Performance of Prototype Systems and Issues for Life Support

The Controlled Ecological Life Support System (CELSS) Antarctic Analog Project (CAAP) is a joint endeavor between the National Science Foundation, Office of Polar Programs (NSF-OPP), and the National Aeronautics and Space Administration (NASA). The fundamental objective is to develop, deploy, and operate a testbed of advanced life support technologies at the Amundsen-Scott South Pole Station that enable the objectives of both the NSF and NASA. The functions of food production, water purification, and waste treatment, recycle, and reduction provided by CAAP will improve the quality of life for the South Pole inhabitants, reduce logistics dependence, enhance safety, and minimize environmental impacts associated with human presence on the polar plateau. Because of the analogous technical, scientific, and mission features with Planetary missions, such as a mission to Mars, CAAP provides NASA with a method for validating technologies and overall approaches to supporting humans. Prototype systems for waste treatment, water recycle, resource recovery and crop production are being evaluated in a testbed at Ames Research Center. The combined performance of these biological and physical/chemical systems as an integrated function in support of the human habitat will be discussed. Overall system performance will be emphasized. The effectiveness and efficiency of component technologies will be discussed in the context of energy and mass flow within the system and contribution to achieving a mass and energy conservative system. Critical to the discussion are interfaces with habitat functions outside of the closed-loop life support: the ability of the system to satisfy the life support requirements of the habitat and the ability to define input requirements. The significance of analog functions in relation to future Mars habitats will be discussed.

Bubenheim, David L.↗

PowerAmerica (Final Technical Report)

The U.S. Department of Energy’s Advanced Manufacturing Office (predecessor to AMMTO) established PowerAmerica in December 2014 to develop and accelerate the adoption of wide bandgap (WBG) semiconductor chips and power electronics in manufacturing. The objective was to spark early commercialization of energy efficient products; educate and train the workforce; create high-tech jobs; and nurture the growth of the U.S. WBG semiconductor manufacturing industry. PowerAmerica isled by North Carolina State University by way of a five-year, $140M cooperative agreement with DoE. This private-public partnership with DoE includes member companies ranging from startups and small-medium enterprises to large system integrators, world-class universities, and national labs. The WBG power electronic ecosystem formed by our diverse membership is focused on using advanced manufacturing to 1) lower the cost of silicon carbide and gallium nitride semiconductor devices to be comparable to silicon devices; 2) demonstrate the system benefits and energy efficiency advantages of WBG semiconductor power electronics through system demonstrations that validate their effectiveness; and 3) build an education pipeline for a skilled workforce to meet the future demand for emerging WBG semiconductor markets — and enhance U.S. economic competitiveness globally. PowerAmerica was initially funded in six budget periods, each lasting 12 to 18 months. By the end of Budget Period 6 (August 2023), PowerAmerica had achieved its major objectives in technology development, semiconductor device cost reduction, ecosystem growth and engagement, and education and workforce development. Through strategic foundry investments, we helped to establish the first U.S. SiC foundry (X-FAB) and supported a lab (Microchip) to start SiC volume production. We’ve helped bring together companies from different parts of the supply chain, resulting in several successful new partnerships and business relationships. Through projects with some of the largest manufacturers of energy-intensive equipment in the U.S. — John Deere, GE, United Technologies, Raytheon, Carrier, Toshiba, and others — we have successfully demonstrated the energy and system benefits of WBG technology. We have also harnessed the unique capabilities and facilities of national labs — the Naval Research Laboratory, National Renewable Energy Laboratory, and Argonne National Laboratory — to help solve challenging technical problems for industry. Thanks to our many webinars, tutorials, annual events, and presence at major energy and electronics conferences around the world, the PowerAmerica name has become synonymous with WBG technology advancement. The commercial interest in WBG technology is higher than ever; companies and governments around the world have announced hundreds of millions of dollarsin future investment to build capacity — and compete with silicon in many markets and applications. We have trained hundreds of engineering students, from universities across the U.S., through hands-on projects and WBG coursework. Working professionals have also benefited through the years from our many targeted short courses, tutorials, and technical webinars. In short, PowerAmerica has made great strides in each of our key objectives, and the organization has been operating without government or NC State

14 SOLAR ENERGY↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE↗

Requirement for a standard language for test and ground operations

The basic requirements for a standard test and checkout language applicable to all phases of the space shuttle test and ground operations are determined. The general characteristics outlined here represent the integration of selected ideas and concepts from operational elements within Kennedy Space Center (KSC) that represent diverse disciplines associated with space vehicle testing and launching operations. Special reference is made to two studies conducted in this area for KSC as authorized by the Advanced Development Element of the Office of Manned Space Flight (MSF). Information contained in reports from these studies have contributed significantly to the final selection of language features depicted in this technical report.

Medlock, J. R.↗

Small Orbital Stereo Tracking Camera Technology Development

Any exploration vehicle assembled or Spacecraft placed in LEO or GTO must pass through this debris cloud and survive. Large cross section, low thrust vehicles will spend more time spiraling out through the cloud and will suffer more impacts.Better knowledge of small debris will improve survival odds. Current estimated Density of debris at various orbital attitudes with notation of recent collisions and resulting spikes. Orbital Debris Tracking and Characterization has now been added to NASA Office of Chief Technologists Technology Development Roadmap in Technology Area 5 (TA5.7)[Orbital Debris Tracking and Characterization] and is a technical gap in the current National Space Situational Awareness necessary to safeguard orbital assets and crews due to the risk of Orbital Debris damage to ISS Exploration vehicles. The Problem: Traditional orbital trackers looking for small, dim orbital derelicts and debris typically will stare at the stars and let any reflected light off the debris integrate in the imager for seconds, thus creating a streak across the image. The Solution: The Small Tracker will see Stars and other celestial objects rise through its Field of View (FOV) at the rotational rate of its orbit, but the glint off of orbital objects will move through the FOV at different rates and directions. Debris on a head-on collision course (or close) will stay in the FOV at 14 Km per sec. The Small Tracker can track at 60 frames per sec allowing up to 30 fixes before a near-miss pass. A Stereo pair of Small Trackers can provide range data within 5-7 Km for better orbit measurements.

Bryan, Tom↗

Aggregate Risk Tool for Human Space Flight

This tool utilizes Data fusion capabilities developed from the 2020-2022 Information Fusion (IFDA) IRAD to enhance functionality of a Human Spaceflight (HSF) Aggregate Risk Product developed by the JSC Flight Safety Office. The tool compiles and present risk data from multiple Program and Commercial Provider sources to provide a holistic assessment for Program Managers and Technical Authorities to evaluate residual risk prior to HSF Launches. The aggregation, or coupling of risks from multiple sources (Ex: PRA, variances, anomaly data bases, CRM data, technical review board minutes, Hazard Analysis, etc.) identifies areas of elevated risk in components, systems or mission phases that would otherwise be undetected by non-integrated program risk management tools and possesses. Data is then displayed in an interactive user interface/dashboard that enables users to see potential areas of concern requiring more in-depth analysis.

Patrick M Huckaby↗

Results of prototype software development for automation of shuttle proximity operations

A Rendezvous Expert System (REX) was implemented on a Symbolics 3650 processor and integrated with the 6 DOF, high fidelity Systems Engineering Simulator (SES) at the NASA Johnson Space Center in Houston, Texas. The project goals were to automate the terminal phase of a shuttle rendezvous, normally flown manually by the crew, and proceed automatically to docking with the Space Station Freedom (SSF). The project goals were successfully demonstrated to various flight crew members, managers, and engineers in the technical community at JSC. The project was funded by NASA's Office of Space Flight, Advanced Program Development Division. Because of the complexity of the task, the REX development was divided into two distinct efforts. One to handle the guidance and control function using perfect navigation data, and another to provide the required visuals for the system management functions needed to give visibility to the crew members of the progress being made towards docking the shuttle with the LVLH stabilized SSF.

Hiers, Harry K.↗

Solar System Exploration Research Virtual Institute: Year Three Annual Report 2016

NASA's Solar System Exploration Research Virtual Institute (SSERVI) is pleased to present the 2016 Annual Report. Each year brings new scientific discoveries, technological breakthroughs, and collaborations. The integration of basic research and development, industry and academic partnerships, plus the leveraging of existing technologies, has further opened a scientific window into human exploration. SSERVI sponsorship by the NASA Science Mission Directorate (SMD) and Human Exploration and Operations Mission Directorate (HEOMD) continues to enable the exchange of insights between the human exploration and space science communities, paving a clearer path for future space exploration. SSERVI provides a unique environment for scientists and engineers to interact within multidisciplinary research teams. As a virtual institute, the best teaming arrangements can be made irrespective of the geographical location of individuals or laboratory facilities. The interdisciplinary science that ensues from virtual and in-person interactions, both within the teams and across team lines, provides answers to questions that many times cannot be foreseen. Much of this research would not be accomplished except for the catalyzing, collaborative environment enabled by SSERVI. The SSERVI Central Office, located at NASA Ames Research Center in Silicon Valley, California, provides the leadership, guidance and technical support that steers the virtual institute. At the start of 2016, our institute had nine U.S. teams, each mid-way through their five-year funding cycle, plus nine international partnerships. However, by the end of the year we were well into the selection of four new domestic teams, selected through NASA's Cooperative Agreement Notice (CAN) process, and a new international partnership. Understanding that human and robotic exploration is most successful as an international endeavor, international partnerships collaborate with SSERVI domestic teams on a no-exchange of funds basis, but they bring a richness to the institute that is priceless. The international partner teams interact with the domestic teams in a number of ways, including sharing students, scientific insights, and access to facilities. We are proud to introduce our newest partnership with the Astrophysics and Planetology Research Institute (IRAP) in Toulouse, France. In 2016, Principal Investigator Dr. Patrick Pinet assembled a group of French researchers who will contribute scientific and technological expertise related to SSERVI research. SSERVI's domestic teams compete for five-year funding opportunities through proposals to a NASA CAN every few years. Having overlapping proposal selection cycles allows SSERVI to be more responsive to any change in direction NASA might experience, while providing operational continuity for the institute. Allowing new teams to blend with the more seasoned teams preserves corporate memory and expands the realm of collaborative possibilities. A key component of SSERVI's mission is to grow and maintain an integrated research community focused on questions related to the Moon, Near-Earth asteroids, and the moons of Mars. The strong community response to CAN-2 demonstrated the health of that effort. NASA Headquarters conducted the peer-review of 22 proposals early in 2017 and, based on recommendations from the SSERVI Central Office and NASA SSERVI program officers, the NASA selecting officials determined the new teams in the spring of 2017. We are pleased to welcome the CAN-2 teams into the institute, and look forward to the collaborations that will develop with the current teams. The new teams are: The Network for Exploration and Space Science (NESS) team (Principal Investigator (PI) Prof. Jack Burns/U. Colorado); the Exploration Science Pathfinder Research for Enhancing Solar System Observations (ESPRESSO) team (PI Dr. Alex Parker/Southwest Research Institute); the Toolbox for Research and Exploration (TREX) team (PI Dr. Amanda Hendrix/ Planetary Science Institute); and the Radiation Effects on Volatiles and Exploration of Asteroids & Lunar Surfaces (REVEALS) team (PI Prof. Thomas Orlando/ Georgia Institute of Technology). In this report, you will find an overview of the 2016 leadership activities of the SSERVI Central Office, reports prepared by the U.S. teams from CAN-1, and achievements from several of the SSERVI international partners. Reflecting on the past year's discoveries and advancements serves as a potent reminder that there is still a great deal to learn about NASA's target destinations. Innovation in the way we access, sample, measure, visualize, and assess our target destinations is needed for further discovery. At the same time, let us celebrate how far we have come, and strongly encourage a new generation that will make the most of future opportunities.

Pendleton, Yvonne↗

Digital Prototyping Methods to Enable Product Development Analysis Cycle Compression in Aerospace Systems

Historically, the product development life cycle (spanning from origination of a systems concept to initial delivery or fielding) for large-scale aerospace systems is 10-25 years. Examples of recent programs exhibiting this timeline are the Space Shuttle (13 years), , International Space Station (18 years), NASA Hubble telescope (16 years), USAF F-35 Strike Fighter (22 years), Missile Defense Agency THAAD (21 years), USAF V-22 Osprey (26 years), USAF B-2 Spirt (19 years), US Army RAH-66 Comanche (22 years, cancelled prior to fielding), James Webb Space Telescope (25 years), Space Launch System (10 years). This list illustrates the challenges of developing and fielding a modern integrated multi-disciplinary aerospace system. These development timelines are often preceded by significant research and development programs and followed by multiple increments, blocks, or spirals to reach planned operational capability. In the modern era of aerospace system acquisition, there is significant pressure to reduce system development timelines to meet system objectives and enable competitiveness in the current industry and landscape. Across the aerospace industry, a range of rapid acquisition and prototyping programs are seeking to achieve system development within timelines considerably less than 10 years. Notably, in September of 2019, NASA issued a solicitation for the development and demonstration of a Human Landing System (HLS) to deliver humans to the lunar surface by 2024 (5 years) and for the development and demonstration of a more sustainable HLS by 2026 (7 years). Lengthy product development cycle timelines are a product of multiple factors ranging from programmatic, sociological, technical, and systems engineering issues. New approaches in systems engineering provide new ways to enable these compressed development timelines. These approaches employ expanded application of advanced systems engineering methods and cross-cutting digital tools to accelerate system development, utilizing digital prototyping to connect maturing sub-system or component technologies into system or system-of-systems hardware prototypes. Approaches such as the use of system integrating physics relationships to reduce the number of design analysis cycle iterations and state analysis modeling to reduce necessary software testing (and improving coverage of system execution scenarios) represent steps forward in reducing the engineering time needed to field new systems. In addition to cost, schedule and performance benefits, expanded digital exploration and demonstration reduce risk in live system test and demonstration. This incremental demonstration approach, where digital prototyping and demonstration leads and informs full system test and demonstration, could be more important for space applications because of the increased difficulty of test and demonstration of space systems and architectures. The Advanced Concepts Office (ACO) at Marshall Space Flight Center merges traditional multi-disciplinary concept definition methods with modern, cross-cutting systems engineering concepts to enable iterative design and analysis of space architectures and systems through coordinated, strategic management of human capital, technical processes, and technology. This paper provides an overview of that approach, including recent examples and a strategic path forward to enabling continued reduction of aerospace system product development life cycles.

Michael D Watson↗

Estimating Return on Investment for Energy Technical Assistance Programs

The U.S. Department of Energy's Office of State and Community Energy Programs engaged the National Laboratory of the Rockies to assess the return on investment (ROI) of technical assistance (TA) programs that support state, local, and Tribal energy planning. Although TA delivers value through capacity building, stakeholder engagement, and knowledge transfer, these benefits are often intangible and challenging to monetize. This study reviews existing ROI frameworks and synthesizes the most relevant elements into a hybrid approach tailored to energy TA programs. The proposed framework integrates monetary and non-monetary outcomes through early logic model development, baseline data collection, and the use of proxies for intangible benefits. As a case study, this paper applies this approach to the Communities Local Energy Action Program (Communities LEAP), demonstrating how ROI can inform program design, data strategy, and performance assessment. Findings underscore that ROI should be applied selectively and planned from the outset to ensure data alignment and attribution accuracy. The framework offers TA practitioners a structured approach that can be leveraged for future programs to evaluate and communicate the multifaceted value of TA investments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Airport Ground Support Equipment Infrastructure & Logistics Electrification Assessment Tool: 2025 Data Development, Modeling and Analysis for DFW

The aviation industry is increasingly turning to modernize freight facilities by integrating electric Ground Support Equipment (eGSE) to enhance operational efficiency of freight facility moving vehicles and equipment. Airports worldwide are adopting eGSE to streamline cargo movement, reduce fuel and maintenance costs, and improve logistics coordination.1 North America, with its advanced aviation infrastructure, leads this transition, leveraging Internet of things (IoT)-enabled automation and zero emission technologies to boost reliability and reduce human errors.2 Electrification of freight facility moving vehicles and equipment boosts turnaround times, improves equipment reliability, and optimizes logistics coordination, giving operators a competitive advantage. With rising fuel price volatility and the pressure to meet stringent performance benchmarks, airports are focusing on cost-effective, scalable solutions for long-term financial and operational gains. To further accelerate electrification, airports are integrating Zero Emission Vehicles (ZEVs) into rental car fleets and deploying electric baggage carts, requiring strategic investments in charging infrastructure. 3 The shift, however, presents challenges, such as limited technical expertise, high capital costs, and complex procurement processes. By forging strategic partnerships, leveraging advanced technologies, and optimizing infrastructure investments, airports can create a resilient, future-ready ecosystem that enhances the movement of people and goods through electrification-driven efficiency. Supported by the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO), this electrification effort provides a scalable, cost-effective solution to improve airport freight operations. Through targeted investments and innovation, airports enhance efficiency, reduce costs, and meet performance benchmarks while advancing toward a resilient, electrified future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of an expert planning system for OSSA

This paper presents concepts related to preliminary work for the development of an expert planning system for NASA's Office for Space Science and Applications (OSSA). The expert system will function as a planner's decision aid in preparing mission plans encompassing sets of proposed OSSA space science initiatives. These plans in turn will be checked against budgetary and technical constraints and tested for constraint violations. Appropriate advice will be generated by the system for making modifications to the plans to bring them in line with the constraints. The OSSA Planning Expert System (OPES) has been designed to function as an integral part of the OSSA mission planning process. It will be able to suggest a best plan, be able to accept and check a user-suggested strawman plan, and should provide a quick response to user request and actions. OPES will be written in the C programming language and have a transparent user interface running under Windows 386 on a Compaq 386/20 machine. The system's sorted knowledge and inference procedures will model the expertise of human planners familiar with the OSSA planning domain. Given mission priorities and budget guidelines, the system first sets the launch dates for each mission. It will check to make sure that planetary launch windows and precursor mission relationships are not violated. Additional levels of constraints will then be considered, checking such things as the availability of a suitable launch vehicle, total mission launch mass required vs. the identified launch mass capability, and the total power required by the payload at its destination vs. the actual power available. System output will be in the form of Gantt charts, spreadsheet hardcopy, and other presentation quality materials detailing the resulting OSSA mission plan.

Groundwater, B.↗

New Mission Concepts for Astrophysics Large Area X-Ray Spectroscopy Mission

Work at SAO was performed under the overall direction of Dr. Harvey Tananbaum, the Principal Investigator for the program. Dr. Jay Bookbinder was responsible for day to day program coordination at SAO and liaison with GSFC. Dr. Nicholas E. White served as GSFC Technical Officer for the Grant. The effort was directed at formulating the general characteristics and scientific requirements of the contemplated mission. While funding and therefore effort was limited, nonetheless SAO was involved in a broad range of activities. These activities were defined by our SAO proposal to GSFC that were subsequently accepted and funded by this Grant. The main activities were: Support of mission studies. Support the development of science requirements. and Performance of selected engineering studies and trades. During this period, an integrated GSFC/SAO management team began to form and work together. Jean F. Grady was appointed Project Formulation Manager at GSFC and assumed the overall management direction of the project including coordination of work performed under the grant.

Tananbaum, Harvey↗

Flight and Integrated Testing: Blazing the Trail for the Ares Launch Vehicles

It has been 30 years since the United States last designed and built a human-rated launch vehicle. The National Aeronautics and Space Administration (NASA) has marshaled unique resources from the government and private sectors that will carry the next generation of astronauts into space safer and more efficiently than ever and send them to the Moon to develop a permanent outpost. NASA's Flight and Integrated Test Office (FITO) located at Marshall Space Flight Center and the Ares I-X Mission Management Office have primary responsibility for developing and conducting critical ground and flight tests for the Ares I and Ares V launch vehicles. These tests will draw upon Saturn and the Space Shuttle experiences, which taught the value of using sound systems engineering practices, while also applying aerospace best practices such as "test as you fly" and other lessons learned. FITO will use a variety of methods to reduce the technical, schedule, and cost risks of flying humans safely aboard a launch vehicle.

Taylor, James L.↗

Co-developing a SAR for Disasters Reference Guide for the International Applications Community

Synthetic Aperture Radar (SAR) data are widely applicable for disaster monitoring, especially in Central and South America where atmospheric effects are a frequent obstacle for disaster monitoring. There is a growing interest in the application of SAR data to diverse disasters, ranging from landslides to volcanic eruptions and floods. With this interest comes a growing need for user-friendly guides that facilitate the integration of SAR into existing workflows. A joint effort between AmeriGEO, university networks in the Americas, NASA SERVIR’s Science Coordination Office (SCO), and the NASA Earth Science Disasters Program, culminated in the “SAR for Disasters” Guide. The guide is modeled after the one-page informational sheets created for SERVIR’s SAR Handbook, with the aim to succinctly communicate the key considerations needed to apply relevant analyses using SAR. Developed with contributors from diverse backgrounds, this guide is designed to be a useful reference for experienced technical users and beginners alike.

SAR↗

Exploration EVA System

In January 2004, the President announced a new Vision for Space Exploration. NASA's Office of Exploration Systems has identified Extravehicular Activity (EVA) as a critical capability for supporting the Vision for Space Exploration. EVA is required for all phases of the Vision, both in-space and planetary. Supporting the human outside the protective environment of the vehicle or habitat and allow ing him/her to perform efficient and effective work requires an integrated EVA "System of systems." The EVA System includes EVA suits, airlocks, tools and mobility aids, and human rovers. At the core of the EVA System is the highly technical EVA suit, which is comprised mainly of a life support system and a pressure/environmental protection garment. The EVA suit, in essence, is a miniature spacecraft, which combines together many different sub-systems such as life support, power, communications, avionics, robotics, pressure systems and thermal systems, into a single autonomous unit. Development of a new EVA suit requires technology advancements similar to those required in the development of a new space vehicle. A majority of the technologies necessary to develop advanced EVA systems are currently at a low Technology Readiness Level of 1-3. This is particularly true for the long-pole technologies of the life support system.

Kearney, Lara↗