At least 73 records · Page 4

Hanford Waste End Effector Prototype Test Plan – Phase II

This test plan describes the Phase II testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions (WRPS) Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This task builds on Phase I development testing completed in August 2017 and reported in PNNL-26856 to address some key actual tank waste challenges. The task includes demonstrating retrieval of a mixed layered simulant and retrieval of uneven simulant profiles like that found near tank walls. A separate demonstration using only the HWEE conveyance jet pump will start to assess the lifting capabilities of this device for transporting waste out of an underground tank. The PNNL-designed robotic gantry system and associated systems (e.g., tanks, high-pressure water delivery and valves, instruments, etc.) used at CTF during Phase I have been modified and upgraded to implement the Phase II test program and measure various process parameters. The tests will involve retrieval of water and kaolin (sludge) simulant to determine pumping rate, dilution factors, and screen fouling rate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aluminum Clad Spent Nuclear Fuel Task 2: Oxide Layer Radiolytic Gas Generation Resolution Experiment Test Plan

This document presents the test plan for Task 2 of the Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Technical Issues Action Plan. This task’s overarching goal is the resolution of gas generation resulting from the radiolytic degradation of the oxide layers on aluminum. The uncertainty associated with the build-up of gaseous radiolytic products inside the ASNF storage canisters is one of the dominant technical challenges associated with long term dry storage of aluminum clad fuel. The objectives of the Task 2 test plan are to: 1. Understand how radiation chemistry inside the ASNF dry storage canister impacts extended dry storage performance. 2. Understand the radiation induced mechanisms governing the production of radiolytic gases and alteration of gas composition within a canister. 3. Correlate the observed changes in material properties of ASNF with the radiolytic degradation of aluminum oxide in fill environments of variable moisture and gas composition. 4. Compile a predictive kinetic modeling tool, to provide quantitative mechanistic insight into the in-cask radiation chemistry of ASNF. 5. Interface with the canister modeling activity of Task 3 to deliver degradation rates for package performance of both sealed and vented scenarios.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Seismic Shake Table Test Plan

This report is a preliminary test plan of the seismic shake table test. The final report will be developed when all decisions regarding the test hardware, instrumentation, and shake table inputs are made. A new revision of this report will be issued in spring of 2022. The preliminary test plan documents the free-field ground motions that will be used as inputs to the shake table, the test hardware, and instrumentation. It also describes the facility at which the test will take place in late summer of 2022.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Washington Clean Energy Fund: Energy Storage System Performance Test Plans and Data Requirements

This report documents the test plans, including detailed duty cycles, used in evaluating the technical performance of five energy storage systems (ESSs) sponsored by the Washington State Clean Energy Fund (CEF). These ESSs were installed at three participating utilities’ (Avista, Snohomish Public Utility District or SnoPUD, and Puget Sound Energy or PSE) designated sites. Under each test plan, a number of baseline and use case tests are defined. This report documents the test plan for each utility, including duty cycles, data and performance reporting requirements. Baseline tests defined in this report mainly focus on determining an initial or reference performance for each ESS, which may be compared with the performance at any later time to assess the state of health of the ESS. Parameter values of a given ESS obtained from baseline tests are applied for different modeling purposes and use case tests. The stored energy capacity test is the first test conducted in the baseline test program, which generates data to calculate round trip efficiency (RTE). The response time and ramp rate tests provide the time required for an ESS to change from zero to full charging/discharging rate and hence the ramp rate, which is important in understanding ESS performance for applications calling for fast response. Internal resistance testing of ESS cells is also conducted in conjunction with the response time and ramp rate tests. Finally, the baseline tests include frequency regulation (FR) and peak shaving (PS) tests based on real-world duty cycles. Upon completion of the baseline tests, use case tests are conducted at each of the storage sites with duty cycles developed to meet the site-specific criteria and conditions. The use cases are grouped according to their intended target benefits within the electric infrastructure topology (e.g., transmission versus distribution). Although an ESS may be located on the low-voltage side of a substation that provides power to a distribution feeder, a use case that addresses bulk power services could still be provided and would be grouped under the transmission or bulk-power benefits. Use cases for ESS applications deep into the distribution circuit would be categorized under the distribution system cases.

25 ENERGY STORAGE↗

Test Plan for Reirradiation and 1400°C Heating Test of AGR-3/4 Compact 10-1

Post irradiation examination (PIE) and heating tests of tristructural isotropic (TRISO)-coated fuel particles, fuel compacts, and graphite from Advanced Gas Reactor (AGR) irradiation experiment AGR 3/4 are in progress. The AGR-3/4 test train consisted of twelve separate capsules irradiated in the northeast flux trap of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from December 14, 2011, to April 12, 2014 (Collin 2015b). This test plan describes the reirradiation and subsequent heating test of AGR-3/4 Compact 10-1. One of the main goals of this test is to assess the retention of short-lived fission products I-131 (t1/2 = 8.02 d) and Xe-133 (t1/2 = 5.2 d) in fuel kernels. To generate short-lived fission products, the compact will first be reirradiated in the Neutron Radiography Reactor (NRAD). Following reirradiation, the compact will be removed from NRAD, gamma scanned on the Precision Gamma Scanner (PGS), and then loaded into the Fuel Accident Condition Simulator (FACS) furnace for heating at 1400°C. Fission gases and condensable fission products released from the compact will be collected in the Fission Gas Monitoring System (FGMS) and the FACS condensation plates, respectively.

42 ENGINEERING↗

Test Plan for DOE-GENIORS Dyanamic Irradiation Tests

Dynamic irradiation tests will be performed within the DOE-GENIORS collaboration, to be finished by the end of March 2021. These tests will be performed using three different setups, one at INL, one at CEA, and one at CIEMAT. The cis-mTDDGA/PTD chemical system will be used, applying both "extraction" (cis-mTDDGA - n-dodecane/HNO3) and "stripping" (cis-mTDDGA - n-dodecane/PTD - HNO3) conditions. This test plan provides the details and parameters to be used to perform irradiation at the INL using the INL Radiolysis Test Loop.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Visualization of the High-Burnup Spent Fuel Rod Phase 1 Test Plan: Technical Memo - Spent Fuel and Waste Disposition (Technical Memo)

Twenty-five high-burnup fuel rods were extracted from seven different fuel assemblies used for power production at the North Anna nuclear power plant and shipped to Oak Ridge National Laboratory (ORNL) in 2016 for detailed non-destructive examination (NDE) and destructive examination (DE). The spent fuel rods were from 17×17 lattices and consist of four cladding types—Zirlo ® , M5 ® , Zircaloy-4, and low tin Zircaloy-4 (Zirc-4). These spent fuel rods are being tested to provide: (a) baseline characterization and mechanical property data that can be used as a comparison to fuel that was loaded into a modified TN-32B cask in November 2017, as part of the high-burnup confirmatory data project and (b) data applicable to high-burnup fuel rods (>45 GWd/MTU) currently stored and to be stored in the dry-cask fleet. The TN-32B cask is referred to as the “Demo” cask and is currently expected to be transported to a separate location and the internal contents inspected in approximately ten years. ORNL has completed the NDE of the twenty-five fuel rods. The purpose of this technical memorandum is to present a simplified summary of the first phase of destructive examinations and test conditions that will be used for communicating with various stakeholders. The destructive examinations will leverage the expertise and capabilities from multiple national laboratories for performing independent measurements of relevant data. Close coordination is required to ensure that all examinations follow well documented procedures and are performed so that measured data and characteristics can be readily compared. Pacific Northwest National Laboratory (PNNL) has published a detailed overview of the test program. ORNL and PNNL developed detailed draft test plans for testing to be performed at their facilities. ORNL and PNNL are in the process of refining these test plans to apply specifically to the testing described in this memorandum. Argonne National Laboratory (ANL) contributed to the ORNL test plan by describing tests to be conducted at ANL. Testing will be based on continuous learning. If a test produces results that are inconsistent with expectations or current trends, further testing will be paused until a path forward is established to understand the results and to identify follow-on testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aluminum Clad Spent Nuclear Fuel Task 6: Surrogate Sample Preparation and Validation Experiment Test Plan

This document presents the experimental test plan for Task 6: Surrogate Preparation and Validation. Task 6 will produce and validate surrogate oxyhydroxide materials used in other experimental tasks within the larger Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Project. Task 6 includes both the preparation and characterization of surrogate oxyhydroxide materials as well as the analysis of oxide/oxyhydroxide layers on Savannah River Site Spent Nuclear Fuel Materials. This test plan provides experimental design details and the task’s overall quality assurance approach.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The General Mission Analysis Tool (GMAT) System Test Plan

This document serves as the System Test Approach for the GMAT Project. Preparation for system testing consists of three major stages: 1) The Test Approach sets the scope of system testing, the overall strategy to be adopted, the activities to be completed, the general resources required and the methods and processes to be used to test the release. It also details the activities, dependencies and effort required to conduct the System Test. 2) Test Planning details the activities, dependencies and effort required to conduct the System Test. 3) Test Cases documents the tests to be applied, the data to be processed, the automated testing coverage and the expected results. This document covers the first two of these items, and established the framework used for the GMAT test case development. The test cases themselves exist as separate components, and are managed outside of and concurrently with this System Test Plan.

Conway, Darrel J.↗

EPRI/DOE High Burnup Fuel Sister Pin Test Plan Simplification and Visualization

The EPRI/DOE High Burnup Confirmatory Data Project (herein called the "Demo") is a multi-year, multi-entity confirmation demonstration test with the purpose of providing quantitative and qualitative data to show how high-burnup fuel ages in dry storage over a ten-year period. The Demo involves obtaining 32 assemblies of high-burnup PWR fuel of four common cladding alloys from the North Anna Nuclear Power Plant, drying them according to standard plant procedures, and then storing them in an NRC-licensed TN-3 2B cask on the North Anna dry storage pad for ten years. After the ten-year storage time, the cask will be opened and the rods will be examined for signs of aging. Twenty-five rods from assemblies of similar claddings, in-reactor placement, and burnup histories (herein called "sister rods") have been shipped from the North Anna Nuclear Power Plant and are currently being nondestructively tested at Oak Ridge National Laboratory. After the non-destructive testing has been completed for each of the twenty-five rods, destructive analysis will be performed at ORNL, PNNL, and ANL to obtain mechanical data. Opinions gathered from the expert interviews, ORNL and PNNL Sister Rod Test Plans, and numerous meetings has resulted in the Simplified Test Plan described in this document. Some of the opinions and discussions leading to the simplified test plan are included here. Detailed descriptions and background are in the ORNL and PNNL plans in the appendices . After the testing described in this simplified test plan h as been completed , the community will review all the collected data and determine if additional testing is needed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Test Plan for the Technology Maturation of Supersonic Inflatable Aerodynamic Decelerators

Supersonic inflatable aerodynamic decelerators (IADs) are drag devices intended to be deployed at high Mach numbers. In the application considered here they assist in the descent and landing of spacecraft on Mars. Although promising, present IAD technology is not yet sufficiently mature for use in the near future. This paper describes a technology maturation plan for tension cone IADs using subscale test articles to reduce development costs. As envisioned, the proposed test plan includes three phases: wind tunnel tests (subsonic), unpowered high-altitude flight tests (transonic), and powered high-altitude tests (supersonic). This test plan is based on a building block approach in which successful completion of each phase adds to the understanding of the behavior of IADs and reduces the risk of the subsequent, more expensive phases. By properly scaling the IADs, test articles of the same size and nearly the same construction can be used for all three phases. The final phase is a dynamically scaled flight test with IAD deployment at the same Mach number as the full-scale vehicle on Mars. Two full-scale example cases are presented: one for a single-stage system (15 m dia. IAD to subsonic retropropulsion), and another for a two-stage system (10.5 m dia. IAD to subsonic parachute). Using scale factors of 0.333 and 0.476 yield subscale test IADs of 5 m dia. The dynamically scaled powered flight test starts at Mach 4 and an altitude of 33.5 km. Existing balloons and rocket motors are shown to be adequate to meet the required test conditions.

Kelly, Jenny R.↗

The influence of various test plans on mission reliability

Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.

Stahle, C. V.↗

AGR-5/6/7 Irradiation Experiment Test Plan

This document presents the test plan for the AGR-5/6/7 irradiation experiment, the combined fifth, sixth, and seventh irradiations of the United States Department of Energy Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. The combined irradiation tests will consist of fuel qualification tests (AGR-5/6) and a margin test (AGR-7) for the industrially produced uranium oxycarbide (UCO) tristructural isotropic (TRISO) coated particle fuel developed by the AGR Program. The objective of the AGR-5/6/7 irradiation experiment is to establish the performance of UCO TRISO fuel fabricated using engineering-scale equipment in a production environment under and beyond normal operating conditions. Specifically, the goals of the AGR 5/6/7 irradiation experiment are: 1. Irradiate reference design fuel containing low-enriched UCO TRISO fuel particles to support fuel qualification. 2. Establish the operating margins for the fuel beyond normal operating conditions. 3. Provide irradiated fuel performance data and irradiated fuel samples for post-irradiation examination and safety testing. 4. Support the refinement of fuel performance and fission product transport models with online, post-irradiation examination and safety test data. In order to achieve the test objectives, the AGR-5/6/7 experiment will be irradiated in the northeast flux trap position of the Advanced Test Reactor at Idaho National Laboratory. The larger diameter of the northeast flux trap provides greater flexibility for test train design, significantly enhancing the capability for the combined irradiations. The test train contains five separate and independently controlled and monitored capsules. The middle capsule contains the AGR 7 margin test fuel. The two bottom and two top capsules contain the AGR 5/6 fuel. Each capsule contains a variable number of fuel compacts filled with UCO TRISO particles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Vanguard/PLACE experiment system design and test plan

A system design and test plan are described for operational evaluation of the NASA-Goddard position location and aircraft communications equipment (PLACE), at C band (4/6GHz), using NASA's ship, the USNS Vanguard, and the ATS 3 and ATS 5 synchronous satellites. The Sea Test phase, extending from March 29, 1973 to April 15, 1973 was successfully completed; the principal objectives of the experiment were achieved. Typical PLACE-computed, position-location data is shown for the Vanguard. Position location and voice-quality measurements were excellent; ship position was determined within 2 nmi; high-quality, 2-way voice transmissions resulted as determined from audience participation, intelligibility and articulation-index analysis. A C band/L band satellite trilateration experiment is discussed.

Taylor, R. E.↗

Vanguard/PLACE experiment system design and test plan

A system design and test plan are described for operational evaluation of the NASA-Goddard position location and aircraft communications equipment (PLACE), at C-band (4/6 GHz), using NASA's ship, the USNS Vanguard, and the ATS-3 and ATS-5 synchronous satellites. The sea test phase, extending from Mar. 29, 1973 to Apr. 15, 1973 has been successfully completed; the principal objectives of the experiment were achieved. Typical PLACE-computed, position-location data are shown for the Vanguard. Position location and voice-quality measurements were excellent; ship position was determined within 2 n mi; high-quality, 2-way voice transmissions resulted as determined from audience participation, intelligibility and articulation-index analysis. A C-band/L-band satellite trilateration experiment is discussed.

Taylor, R. E.↗

Aluminum Clad Spent Nuclear Fuel Task 5: Oxide Layer Response to Drying Experiment Test Plan

This document presents a test plan developed to assess the fundamental effectiveness of two widely accepted processes for drying spent nuclear fuel: vacuum drying and helium forced-gas drying. The experimental activities planned for Task 5 follow from the “Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Technical Issues Action Plan.” The objectives are to evaluate the response of the oxide corrosion layer on aluminum clad spent nuclear fuel (ASNF), processed at temperatures above 100°C, to understand and compare the behavior of oxide corrosion layer compositions resulting from a range of credible procedural variations during the transition of ASNF from wet storage to dry storage.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aluminum Clad Spent Nuclear Fuel Task 5: Oxide Layer Response to Drying Experiment Test Plan

This document presents a test plan developed to assess the fundamental effectiveness of two widely accepted processes for drying spent nuclear fuel: vacuum drying and helium forced-gas drying. The experimental activities planned for Task 5 follow from the “Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Technical Issues Action Plan.”[Connolly, INL/EXT-17-43908] The objectives are to evaluate the response of the oxide corrosion layer on aluminum clad spent nuclear fuel (ASNF), processed at temperatures above 100°C, to understand and compare the behavior of oxide corrosion layer compositions resulting from a range of credible procedural variations during the transition of ASNF from wet storage to dry storage.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗