Search NASA⌕ Search

SEARCH · Search NASA

Results for “Thermal Energy Delivery System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

63 records · Page 4

Methane Mitigation Thermoelectric Generator (MMTEG) (Final Scientific/ Technical Report)

Gas Technology Institute (GTI) has completed a $1.815M (plus $500K cost share), 54-month Co-operative agreement with the Department of Energy’s National Energy Technology Laboratory to develop a Methane Mitigation Thermoelectric Generator (MMTEG) system for gas field applications. This novel system uses fugitive gas to produce electrical power and consists of Thermoelectric Generators (TEG) driven by a linear burner, an air compressor, an accumulator, valves, batteries, and power electronics. The electrical power generated by the system is used to compress air and, in turn, the air is used to operate the pneumatic valves at the well site instead of using natural gas (NG) which would then be vented. The team completed the project objectives which included (1) Design, fabricate and test an integrated 6We nominal MMTEG prototype system, (2) Design a “retrofit kit” MMTEG system capable of being field tested at a gas well production site, and (3) build and test the field MMTEG system in a laboratory environment. Multiple system options were developed prior to selecting a “Passive” system which meets cost, NG savings, and greenhouse gas (GHG) reduction targets although not as efficient as initially planned. The MMTEG system is built primarily from commercial off-the-shelf parts (in some cases re-purposed) including the heat exchanger, heat rejection, electronic components, and also the TEGs. The team developed and implemented a novel system including the control system developed by Morrison Applied Sciences (MAS). The team completed incremental demonstrations of the hardware prior to the MMTEG system demonstration. A one-year simulation of the air delivery and battery charging subsystems was completed prior to the integration into the MMTEG system. In addition, the team simulated two-years of thermal cycles for integrated Burner/TEG/heat rejection subsystem. Finally, the entire MMTEG system was assembled, and troubleshooting was completed over a two-week period. Next, the MMTEG system was tested to simulate over 15 weeks of entire system operation over approximately four weeks in an accelerated test fashion with minimal intervention (such as changing fuel tanks). The MMTEG system met the key goals of a unit cost of under $1500 while saving 97% of NG expended today (including leakage) on average by pneumatic systems venting to the atmosphere. The MMTEG system reduced GHG emissions by 1000X (using the methane intensification factor of 28 relative to CO2). GTI is currently pursuing a field test of the MMTEG system. Interfacing with producers has provided additional insight into system improvements. Planned improvements include additional weather protection and control system improvements including the implementation of a long- range radio capability to notify operators if there is a fault.

03 NATURAL GAS↗

Capillary-Enhanced Two-Phase Micro-Cooler Using Copper-Inverse-Opal Wick with Silicon Microchannel Manifold for High-Heat-Flux Cooling Application

In this work, we demonstrate a two-phase capillary-fed boiling micro-cooler that consists of a ~ 25-..mu..m-thick copper inverse opal (CIO) porous wicking structure for high-heat-flux boiling and a silicon 3D-manifold for distributed liquid delivery and vapor extraction across a 0.5 cm x 0.5 cm heated area. At low inlet water mass flow rates of 1.5 to 1.9 g(min)-1, the micro-cooler displays nearly two-phase boiling with exit vapor quality ~ 1 and a high critical heat flux (CHF) of 253 to 320 W cm-2 with low superheat of ~ 10 degrees C resulting in a thermal resistance of boiling ~ 0.025 cm2 degrees C W-1 or heat transfer coefficient of 0.4 MW m-2 degrees C-1. For higher flow rates of 5, 10, and 15 g(min)-1, the micro-cooler exhibits a hybrid single-phase and two-phase cooling regime where the contribution of the sensible heat (single-phase) cooling is linearly added to that of the two-phase cooling. For the highest flow rate of 15 g(min)-1, the CHF is increased to ~ 500 W cm-2 resulting in an overall thermal resistance of ~ 0.18 cm2 degrees C W-1. However, the two-phase heat transfer effectiveness, which estimates the utilization level of the inlet mass flow rate for two-phase boiling, is reduced to ~ 0.11. To achieve the best cooling system performances, the micro-cooler must operate entirely within the two-phase boiling regime (exit vapor quality or two-phase heat transfer effectiveness ~ 1). Ideally, the "coolant" should be delivered near its saturation temperature (~ 100 degrees C for water), which provides significant advantages for the energy-efficient operation of data centers and power electronics. We present detailed analysis with Infrared and high speed camera images at various inlet flow rates and heat fluxes to understand complex heat transfer in the micro-cooler. Furthermore, a conjugate thermofluidic simulation model, which incorporates the physics of capillary-fed boiling in a porous copper layer, agrees well with the experimental data.

capillary-enhanced boiling↗

An Integrated Energy Systems Prototype Human-System Interface for a Steam Extraction Loop System to Support Joint Electricity-Hydrogen Flexible Operations

Due to increasing economic competition from renewables and combined-cycle natural gas plants, nuclear power plants are looking toward flexible operations to enhance their cost competitiveness. The Integrated Energy Systems project under the Light Water Reactor Sustainability program of the U.S. Department of Energy focuses on joint electricity-hydrogen flexible operations. Joint electricity-hydrogen flexible operations entail the nuclear power plant diverting thermal energy via main steam to a hydrogen production plant located nearby. The steam serves to enhance the efficiency of the hydrogen production. Furthermore, high temperature electrolysis requires a large amount of electricity, which the plant can also provide. The plant provides steam and electricity to the hydrogen plant throughout the day, but during peak demand hours the nuclear power plant returns to solely providing electricity to meet the high demand. Through this flexible concept of operations, the plant can optimize the thermal energy it produces without having to maneuver the power of the plant. This report documents the human factors process to design and develop a prototype human-system interface for the steam extraction loop that serves as the conduit between the nuclear power plant and the adjacent hydrogen plant. The design process followed the human factors guidelines set by NUREG-0711, Human Factors Engineering Program Review Model (O’Hara, Higgins, & Fleger, 2012), and expanded upon by the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE; Boring, Ulrich, Joe, & Lew, 2015; Boring, Lew, & Ulrich, 2016). The design process entailed operator interviews to determine the concept of operations for the steam extraction loop, a review and adaptation of digital interface design concepts developed by the team in prior projects, an iterative design process, and reviews conducted by both operators and human factors experts. Several versions of the prototype human-system interface were developed. Operators were interviewed to determine what design features they found useful and would like to see in the interface. The design underwent a review by human factors experts against NUREG-0700, Human Interface Design Review Guidelines (U.S. Nuclear Regulatory Commission, 2019), to ensure compliance with the latest human factors standards for digital interfaces in nuclear applications. The design was then prototyped as a functional windows-based application integrated with the Generic Pressurized Water Reactor simulator modified to include the steam extraction loop. The simulation is supported by the Human Systems Simulation Laboratory at Idaho National Laboratory, which supports operator-in-the-loop testing. This is an ongoing project and the next phase of the project entails performing an operator-in-the-loop usability study to evaluate the interface and examine the proposed concept of operations to extraction steam from the nuclear power plant for delivery to the coupled hydrogen production plant.

99 GENERAL AND MISCELLANEOUS↗

Development of in-use engine speed/torque heat maps across multiple heavy-duty commercial vehicle vocations

The U.S. Department of Energy (DOE) established the SuperTruck program with the goal of achieving brake thermal efficiency (BTE) greater than or equal to 55% as demonstrated in an operational heavy-duty (HD) diesel engine at a 65-miles-per-hour (mph) cruise point. Beyond the line-haul application, HD engines operate in a wide range of speed and torque conditions that are unlikely to yield the same efficiency under real-world operation. Thereby, the in-use engine heat maps described in this paper are a valuable tool to illustrate whether the engine-efficiency “sweet spot” matches the most frequent operating conditions. In this study, NREL developed engine heat maps to quantify the important operating points for various vocations using our Fleet DNA database of commercial fleet vehicle operations data. These heat maps clearly show that high-frequency operating points vary significantly according to vehicle vocation, while only a few of them match the sweet spot. Beyond the illustration, engine in-use heat maps can also be leveraged to build up reduced-order engine-efficiency models, needed by many rapid powertrain simulations. As case studies, nine reduced-order models – including line-haul truck, transfer truck, transit bus, transit bus with compressed natural gas (CNG) engine, drayage, refuse pickup, local delivery, utility truck, and school bus with CNG engine – using a trust-region reflective algorithm to fit the on-road data extracted based on the engine in-use heat maps.

33 ADVANCED PROPULSION SYSTEMS↗

Scale and Regionality of Nonelectric Markets for U.S. Nuclear Light Water Reactors

This study assesses existing and potential industries that could conceivably be directly coupled to existing nuclear reactors. The goal is to identify the scale, location, and accessibility of the candidate industrial-product markets, as well as process feedstocks that are available near the plants to establish new industries. For example, CO 2 as a feedstock can be combined with H 2 to produce formic acid (FA), transportation fuels, and lubricants. These new plants can be entirely supported with the heat and electricity provided by a nearby NPP. The potential demand for nonelectric industrial products was assessed by documenting current and possible growth of nonelectricity product markets considered. This assessment used DOE- and industry-supported tools, data, and projections to capture regional industrial market opportunities. Electricity-capacity markets that reward large and reliable generators, such as NPPs, were considered because the electricity market will likely continue to be an important revenue source to NPPs. The key is to balance the needs of energy customers so as to optimize revenue for the affiliated energy customers or partners. In most cases, flexible plant energy delivery and power generation for the grid will require either energy storage or a stock of intermediate products to sustain the industrial customers when the NPP dispatches electricity to the grid. A diverse mix of temperate regions with operating NPPs around the U.S.—representing a variety of operating markets, local generation mix, and seasonal climates—were chosen for this market study. Both current and future market opportunities for candidate industrial-product markets surrounding these NPPs were studied. Figure 2 illustrates the regions chosen for this study. The success of developing nonelectric industrial-product markets as alternative revenue-generating sources for LWRs depends, not only on demand from growing existing markets, such as petroleum refining and NH 3 production, but also on the development of new markets such as light-duty (LD) and heavy-duty (HD) hydrogen FCEVs, synfuels, chemical production, biofuels, metal refining, injection of hydrogen into NG pipelines for gas power-generating units, FA, polymers, and close-coupled industrial heat applications, all of which can significantly increase demand relative to current levels while decarbonizing energy sectors. This study also presents a sample analysis of the economics of hydrogen production in an area of Minnesota, considering the capital and operating costs of a hydrogen plant as well as the local market demand for hydrogen. It includes some assumptions on electricity-grid pricing, showing how hydrogen could be integrated with an NPP and be competitive with the incumbent hydrogen-production process, steam methane reforming (SMR). The objectives of this study include: Provide U.S. NPP operators a robust sampling of the market demand location, scale, and accessibility (including storage and transportation) of the wide variety of industrial-product choices that can be produced using nuclear thermal energy and electricity proximate to a subset of U.S. NPPs to inform the industry of the potential opportunity; show examples and trade-off analyses of how U.S. LWR operators can access these markets, including storage and transportation of industrial products to their intended markets; and present a general analysis example for one industrial product (hydrogen) in one region (Minnesota area), including production, storage, and transportation, to show how nuclear-hybrid integrated energy systems (IESs) could access local markets and improve the profitability of an NPP.

03 NATURAL GAS↗

Reference Piping and Instrumentation Diagrams for Heat Transport Systems for Methanol Plants

This report aims to bridge the gap between advanced nuclear reactor vendors and methanol producers seeking decarbonization. It equips both parties with tools and preliminary information for integrating clean heat from advanced reactors into novel methanol production processes. The proposed investigation in this report involves a three-step approach: 1. Design of Current and Decarbonized Process Models for Methanol Production. This report initiates process modeling of two novel methanol production pathways, with their overall energy requirements comparative to classical methanol production (see Figure ES1). The two process models provide the foundation for analyzing integration of hermos-electric generation from advanced nuclear reactors. 2. Identification of Coupling Points to Integrate Advanced Reactors. This report investigates the integration with two advanced reactor technologies: light-water reactors (LWRs) and high-temperature gas reactors (HTGRs). The key coupling points between advanced nuclear reactors and the production facilities associated with the two decarbonized methanol process pathways are identified. 3. Preliminary Heat and Electricity Transfer Design from Reactors to Methanol Production Sites. The preliminary designs for piping and instrumentation to transfer heat from the boundary of advanced reactor technology location to the boundary of methanol production site are evaluated within the context of decarbonized pathways. The pipe analysis for heat transfer adheres to relevant codes and specifications from American Society of Mechanical Engineering. A simplified design for transmission of electricity to the industrial site has been provided.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Ultra High-Temperature Magnetic Bearing System for s-CO 2 Turbines/Expanders. Phase II Final Report

The goal of this project is to design and construct of a prototype of ultra-high temperature permanent magnet (UHT–PM), which provides the force to pull the spinning shaft towards the target position in the magnetic bearing (MB) clearance circle. This project will develop a PM biased MB system, that is actively cooled to the 550°C maximum operating temperature limit of PMs. The MB test environment will include 700°C, 40krpm and 4,000 psi requirements to advance the supercritical carbon dioxide (sCO 2 ) and other types of Brayton power cycle systems. The proposed novel MBs combine PMs for supplying the bias field and electromagnets for supplying the control field, both in UHT conditions. The choice of material is the UHT Sm-Co PMs (US patent 6,451,132) due to their significantly better thermal stability. The 6-pole homopolar design permits uninterrupted force delivery via a redundant control capability (US patent 7,429,811) even if 3 poles were to fail. The Phase I efforts was to focus on development and demonstration of component technologies and detailed design of full scale components and a demonstrator test rig for use in Phase II. UHT–PMs were produced and used in the MB actuator. The operating environment of the EEC-T550 Sm-Co magnet material could be extended by implementing active cooling. Electromagnetic coils imbedded in the MB provide forces to stabilize the shaft position at the target via sensing and control stages. Shaft position sensors enable to identify the present position of the spinning shaft relative to its desired target position in the MB clearance circle (air gap). Auxiliary bearings will be installed to provide a backup support system in the event that power to the MB fails or there is a fault in a device providing current to the MB coils. For control, reliability and safety reasons the sensors and auxiliary bearings are typically located as close as possible to the MBs, which exposes them to the same environmental conditions. Development of only the actuator for the UHT environment is an inadequate approach to complete integration of the MB system in the turbine/expander. Therefore the UHT sensor and auxiliary bearing were designed and developed along with the actively cooled, UHT-PM actuator development. Although shaft position sensors are commercially available (Kaman) they may cost up to $10k per channel, and a full 5 axis magnetic suspension is best implemented with up to 20 sensors. Once successfully completed, this project will significantly extend the operating environment capability for turbomachinery applications such as nuclear power, concentrated solar thermal, fossil fuel, geothermal, and shipboard propulsion. The further advancement of UHT-PM-MB will also strengthen the US position in PM technology, which is presently heavily dominated by China. The UHT Sm-Co magnet material that will be utilized in the proposed work has been developed exclusively by the project proposer. Many actuators, motors, generators and other MB applications will greatly benefit from the proposed work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗