Search NASA⌕ Search

SEARCH · Search NASA

Results for “Tribe”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Hood River Production Program Monitoring and Evaluation (M&E) - Confederated Tribes of Warm Springs : Annual Report For Fiscal Year, October 2007 – September 2008.

This progress report describes work performed by the Confederated Tribes of Warm Springs (CTWSRO) portion of the Hood River Production Program Monitoring and Evaluation Project (HRPP) during the 2008 fiscal year. A total of 64,736 hatchery winter steelhead, 12,108 hatchery summer steelhead, and 68,426 hatchery spring Chinook salmon smolts were acclimated and released in the Hood River basin during the spring. The HRPP exceeded program goals for a release of and 50,000 winter steelhead but fell short of the steelhead release goals of 30,000 summer steelhead and 75,000 spring Chinook in 2008. Passive Integrated Transponders (PIT) tags were implanted in 6,652 hatchery winter steelhead, and 1,196 hatchery summer steelhead, to compare migratory attributes and survival rates of hatchery fish released into the Hood River. Water temperatures were recorded at six locations within the Hood River subbasin to monitor for compliance with Oregon Department of Environmental Quality water quality standards. A preseason spring Chinook salmon adult run forecast was generated, which predicted an abundant return adequate to meet escapement goal and brood stock needs. As a result the tribal and sport fisheries were opened. A tribal creel was conducted from May 22 to July 18 during which an estimated 172 spring Chinook were harvested. One hundred sixteen Spring Chinook salmon redds were observed and 72 carcasses were inspected on 19.4 miles of spawning grounds throughout the Hood River Basin during 2008. Annual salvage operations were completed in two irrigation canals resulting in the liberation of 1,641 fish back to the Hood River.

13 HYDRO ENERGY↗

Wind Generation Feasibility Study for Sac & Fox Tribe of the Mississippi in Iowa (Meskwaki Nation)

The Meskwaki Nation will obtain an anemometer tower. Install the tower at the site that has been pre-qualified as the site most likely to produce maximum electric power from the wind. It will collect meteorological data from the tower's sensors for a one year period, as required for due diligence to identify the site as appropriate for the installation of a wind turbine to provide electric power for the community. Have the collected data analyzed by a meteorologist and a professionally certified wind engineer to produce the reports of expected power generation at the site, for the specific wind turbine(s) under consideration for installation.

17 WIND ENERGY↗

Pascua Yaqui Tribe Renewable Energy Development and Deployment Solar Feasibility Study

In 2012, PYT was awarded a grant from the Department of Energy Tribal Energy Program to conduct a Renewable Energy Development and Deployment Feasibility Study that would define the technical and economic viability of renewable energy on tribal lands. Red Mountain Energy Partners (RMEP) was hired by PYT to complete the study. Through this study, Red Mountain concluded that there are viable opportunities for solar at Tortuga Ranch, the Casino del Sol and a third site near the Justice Center on Camino de Oeste.

14 SOLAR ENERGY↗

Winnebago Tribe Solar Project

The strategy of the Solar Project was to reduce fuel use within two years by a roof mounted photovoltaic system. The police/fire building is completely powered by electricity. The renewable energy system we have selected has a power capacity of 23kW and the ability to export 44.3 MWh. We anticipate 32.55% kWh energy savings, an excess of the required 30% reduction, in the building’s total fuel use based on the most current 12 months of data (2012). The solar electric system is a grid-tie, ballast mounted on a flat roof over the police/fire station. The solar electric system includes 280 Watt modules for a nominal total of 22.80 kW. Approximately 84 modules are ballast mounted to the flat roof facing south.

14 SOLAR ENERGY↗

Tricyclic GyrB/ParE (TriBE) Inhibitors. A new class of broad-spectrum dual-targeting antibacterial agents

Increasing resistance to every major class of antibiotics and a dearth of novel classes of antibacterial agents in development pipelines has created a dwindling reservoir of treatment options for serious bacterial infections. The bacterial type IIA topoisomerases, DNA gyrase and topoisomerase IV, are validated antibacterial drug targets with multiple prospective drug binding sites, including the catalytic site targeted by the fluoroquinolone antibiotics. Growing resistance to fluoroquinolones, frequently mediated by mutations in the drug-binding site, is increasingly limiting the utility of this antibiotic class, prompting the search for other inhibitor classes that target different sites on the topoisomerase complexes. The highly conserved ATP-binding subunits of DNA gyrase (GyrB) and topoisomerase IV (ParE) have long been recognized as excellent candidates for the development of dual-targeting antibacterial agents with broad-spectrum potential. However, to date, no natural product or small molecule inhibitors targeting these sites have succeeded in the clinic, and no inhibitors of these enzymes have yet been reported with broad-spectrum antibacterial activity encompassing the majority of Gram-negative pathogens. Using structure-based drug design (SBDD), we have created a novel dual-targeting pyrimidoindole inhibitor series with exquisite potency against GyrB and ParE enzymes from a broad range of clinically important pathogens. Inhibitors from this series demonstrate potent, broad-spectrum antibacterial activity against Gram-positive and Gram-negative pathogens of clinical importance, including fluoroquinolone resistant and multidrug resistant strains. Moreover, lead compounds have been discovered with clinical potential; they are well tolerated in animals, and efficacious in Gram-negative infection models.

59 BASIC BIOLOGICAL SCIENCES↗

Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek, Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.

13 HYDRO ENERGY↗

Coeur d'Alene Tribe Fisheries Program : Implementation of Fisheries Enhancement Opportunities on the Coeur d'Alene Reservation : 2006 Annual Report.

This annual report summarizes previously unreported data collected to fulfill the contractual obligations for BPA project No.1990-044-00, 'Coeur d'Alene Subbasin Fisheries Habitat Enhancement', during the 2006 calendar year. Even though the contract performance period for this project crosses fiscal and calendar years, the timing of data collection and analysis, as well as implementation of restoration projects, lends itself to this reporting schedule. The 2006 performance period marked the first year that BPA implemented its Process Improvement Initiative with the Pisces system serving as the vehicle for developing statements of work and tracking project performance. This document attempts to provide some consistency between the project objectives, around which past reports have been structured, and the new work element format adopted for use in Pisces. The report is formatted into three primary sections that respectively provide results and discussion of: (1) monitoring and evaluation of biological and physical habitat indicators; (2) implementation of restoration and enhancement projects; and (3) education and outreach work performed during 2006. The relevant work elements and/or milestones found in the statement of work are listed under these section headings and described in the body of the report.

13 HYDRO ENERGY↗

Deployment of Community Scale Solar Photovoltaic Energy Systems in Forest County Potawatomi Community

FCPC is a federally recognized tribe with a membership of more than 1400. The Tribe has a reservation in Forest County, Wisconsin, and tribal trust lands in Milwaukee County, Wisconsin, with significant governmental and business operations in both areas. Until relatively recently, FCPC was one of the poorest tribes in the Midwest. Due to its successful gaming operations, it now has improved its financial situation and is using its resources to benefit both its members and the general public through environmental and other community efforts, many of which are long-delayed because of the extended period of abject poverty. The Tribe has developed the long-term goal of becoming energy independent using renewable resources. In order to meet this goal, the Tribe has taken several important steps. As an interim step, FCPC is purchasing nearly 55 million kilowatt hours of renewable energy certificates (“RECs”) annually from certified renewable energy facilities in the United States. These RECs offset more than 100% of the present electricity use at all of the Tribe’s facilities. The Tribe is currently ranked number 11 on the Environmental Protection Agency’s (EPA) Top 20 Local Government list of green power purchasers and is a member of the EPA’s Green Power Partnership. The original project suggested small scale installations on tribal homes and certain government buildings. The Tribe suggested that the project would result in 730 kw installed. By revising the project, the Tribe was able to install 938 kw and owns the largest installation in Northern Wisconsin with the 800 kW installation at the Potawatomi Carter Casino Hotel (“PCCH”). The PCCH installation, in summer months, can provide near 90% of the use during daylight hours. Although tracking was not immediately available FCPC has since confirmed significant production with certain quarterly savings nearing $210,000. These installations provide a reduction in facility costs providing more revenue for Tribal services including cultural, health, sustainable food sources, environmental preservation and other Tribal initiatives. Further, the installations have resulted in positive steps towards the Tribe’s goals of energy sovereignty and the use of 100% renewable clean energy. Finally, the PCCH project, specifically, has had the additional benefit of providing a likely area for a microgrid. The size of the installation and offset achieved have pushed the Tribe toward planning for storage and a microgrid system that would both further the Tribe’s energy goals and provide a safe haven for the Community during times of need.

14 SOLAR ENERGY↗

Elk Valley Rancheria Energy Efficiency and Alternatives Analysis

The Elk Valley Rancheria, California ('Tribe') is a federally recognized Indian tribe located in Del Norte County, California, in the northwestern corner of California. The Tribe, its members and Tribal enterprises are challenged by increasing energy costs and undeveloped local energy resources. The Tribe currently lacks an energy program. The Tribal government lacked sufficient information to make informed decisions about potential renewable energy resources, energy alternatives and other energy management issues. To meet this challenge efficiently, the Tribe contracted with Frank Zaino and Associates, Inc. to help become more energy self-sufficient, by reducing their energy costs and promoting energy alternatives that stimulate economic development. Frank Zaino & Associates, Inc. provided a high level economic screening analysis based on anticipated electric and natural gas rates. This was in an effort to determine which alternative energy system will performed at a higher level so the Tribe could reduce their energy model by 30% from alternative fuel sources. The feasibility study will identify suitable energy alternatives and conservation methods that will benefit the Tribe and tribal community through important reductions in cost. The lessons learned from these conservation efforts will yield knowledge that will serve a wider goal of executing energy efficiency measures and practices in Tribal residences and business facilities. Pacific Power is the provider of electrical power to the four properties under review at $ 0.08 per Kilowatt-hour (KWH). This is a very low energy cost compared to alternative energy sources. The Tribe used baseline audits to assess current and historic energy usage at four Rancheria owned facilities. Past electric and gas billing statements were retained for review for the four buildings that will be audited. A comparative assessment of the various energy usages will determine the demand, forecast future need and identify the differences in energy costs, narrowing the focus of the work and defining its scope. The Tribe's peak demand periods will help determine the scope of need for alternative energy sources. The Tribe's Energy Efficiency and Alternatives Analysis report included several system investigations which include fuel cells, wind turbines, solar panels, hydro electric, ground source heat pumps, bio mass, cogeneration & energy conservation and implementation for the existing properties. The energy analysis included site visits to collect and analyze historical energy usage and cost. The analysis also included the study of the building systems for the Elk Valley Casino, Elk Valley Rancheria administration complex, United Indian Health Service/Small Community Center complex and the Tribal Gaming Commission Offices. The analysis involved identifying modifications, performing an engineering economic analysis, preparation of a rank ordered list of modifications and preparation of a report to provide recommendations and actions for the Tribe to implement.

03 NATURAL GAS↗

Tribal Engagement in Transmission Planning

The purpose of this white paper is to provide Tribes with information that (a) helps assess whether transmission access is important for their energy goals, and (b) provides guidance on how to engage in transmission planning, if and when doing so would help the Tribe achieve its energy goals. DOE's Office of Indian Energy notes that "Indian Country contains vast untapped energy resources" (OIE 2023). Individual tribes express a wide array of energy needs and goals, ranging from simple access to basic electricity service and energy efficiency tools, to the development of utility-scale generating plants. Access to transmission is a key part of this multifaceted tribal energy picture. About 2.3 percent of the nation's transmission miles are on tribal lands (OIE 2023). Even within that slice, however, circumstances vary widely. Much of that transmission is for local network delivery (138kV or less). There are some large-capacity 500kV lines, but in many cases the Tribe has limited access to them even when they run across the reservation. Some of the Tribes with the largest land area have little transmission, and some such as Navajo Nation and Hopi Tribe have many homes with no access to electricity. This white paper begins with a high-level summary of transmission issues that can affect a Tribe's energy goals. The discussion includes findings from major transmission-related studies, including the 2023 National Transmission Needs Study (GDO 2023). It then discusses strategies that could help a Tribe safeguard its interests when those interests intersect transmission infrastructure planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗