Supercritical Carbon Dioxide Primary Power Large-Scale Pilot Plant

The United States electrical power generation fleet encompasses a wide range of technologies, ranging from traditional combustion-based power generation, to nuclear power, to renewable energy. While the distribution of these assets continues to shift due to economic and regulatory influences, coal combustion continues to be a key part of the US energy portfolio. Despite the relative maturity of coal combustion technology, improvements in overall fuel-to-power efficiency and generation flexibility are still possible and will improve both the economic and environmental factors of coal combustion. Echogen Power Systems proposes to lead a world-class team including the University of Missouri, Electric Power Research Institute and Louis Perry Associates in the design, construction and operation of a 10MWe coal-fired supercritical carbon dioxide (sCO 2 ) large-scale pilot. This transformational technology uses sCO 2 as a working fluid instead of water to achieve high thermodynamic efficiencies that can significantly exceed advanced steam-Rankine cycles. Further, the compact nature of sCO 2 turbomachinery offers capital cost and footprint advantages, and the low maintenance of a water-free power cycle can significantly reduce operation and maintenance (O&M) costs over conventional steam-Rankine systems. Recent integration studies of sCO 2 with coal combustion power plants highlight the significant improvements in plant efficiency that sCO 2 can offer relative to even advanced steam Rankine cycles. At commercial scales, coal-sCO 2 plant net efficiency is predicted to be 39-44.0% (HHV), or 10-20% higher output than conventional steam-Rankine systems, which will significantly improve the competitiveness of coal-fired generation. This proposal builds upon projects previously funded by the Department of Energy, including DE-FE0025959 (High-Efficiency Thermal Integration of Closed Supercritical CO 2 Brayton Power Cycles with Oxy-Fired Heaters) and DE-NE0008470 (Conceptual Design for sCO 2 Power Cycle Test Facility). An appropriately-scaled and properly designed and operated pilot project is essential to overcome the natural risk-aversion of the power generation industry and project financing community. The 10 MWe coal-fired sCO 2 pilot power plant proposed herein will reduce the technical and economic risk of this transformational technology, enabling commercial deployment at the conclusion of the project. For the second phase of this project, Echogen lead a team that completed and refined the pilot system conceptual system and key component designs resulting in the completion of a front-end-engineering-design (FEED) study, completed the NEPA review process, completed the permitting process for construction and operation, refined the techno-economic analysis of the proposed system at commercial scale and received commitments for Phase III cost share. The end result of the program will be to demonstrate the technical and economic superiority of the sCO 2 power cycle for coal-fired operation. Major risk elements will have been retired with sufficient operation at high power to enable the power generation industry to move forward with the first commercial deployment of this transformational system.

01 COAL, LIGNITE, AND PEAT↗

Real-Time Health Monitoring for Gas Turbine Components Using Online Learning and High-Dimensional Data

Capital-intensive turbomachinery, such as gas turbines and combined cycle plants, are constantly being monitored for performance anomalies, faults, and physical degradation. Although these power-generating assets are equipped with hundreds of sensors, existing monitoring tools can only handle moderate-sized data. As a result, only a handful of aggregate metrics are used to monitor machine health. At the same time, developing advanced tools suitable for large datasets have been restricted by the lack of appropriate data. The objective of this proposal was to demonstrate a Big Data analytics framework for fault detection and diagnosis in gas turbine applications. We develop a predictive analytics framework methodology guided by these experimental data, industrial data from our collaborators, and physics-based models with engineering domain knowledge. Our analytics framework consists of four key components (1) a data curation process that addresses data storage, data quality assessments, and integrity checks, (2) a feature engineering component that utilizes statistical methods and transformation algorithms guided by physics-based models to extract high-fidelity fault features that can be leveraged for fault detection and classifying fault severities, (3) a Machine Learning-based fault detection and diagnostics algorithms for detecting operational and hardware faults in the combustion and the turbines section. We utilize two industry-class gas turbine component test rigs to generate first of its kind data for critical gas turbine faults with varying severity levels. Advanced gas turbine test facilities will be interrogated using state-of-the-art instrumentation techniques to build fault signatures and data trends for key combustor and turbine faults. Data generated from a combustor test rig (Georgia Tech) and a turbine test rig (Penn State) during both normal operation and with seeded faults serve as the basis for the Big Data sets. The test conditions in the two test facilities include common, critical events that occur in the operation. Utilizing the combustor test rig, we examine two common combustor faults: lean blowout and centerbody degradation. For the turbine section we develop analytic models for monitoring cooling faults in the gas turbine

03 NATURAL GAS↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

OPEN2018 (continuation of GENSETS effort)

This project has demonstrated the key components and engineering principles to support a residential scale (1 to 2 kWe) recuperated Brayton cycle generator based upon a screw compressor and screw expander. This technical work is a continuation of the previously awarded ‘GENSETS’ program. The product goal has been to achieve a 40% fuel-to-electric LHV efficiency, an 80% overall CHP efficiency, emissions qualified to the California Air Resources Board standards, and at noise levels of 55 dB or less at 1 meter. Further, the product must operate with 8,000 hour service intervals and achieve a mean-time to overhaul of 90,000 hours. Lastly, and possibly most importantly, the product must meet demanding cost targets, exhibiting a factory cost well below $1,500/kWe. After extensive aerodynamic studies under the ‘GENSETS’ program, Brayton concluded that miniature turbomachinery could not achieve an efficiency consistent with the product’s system performance goal. Given compressor and turbine efficiency targets in the range of 78 to 81%, Brayton turned to the rotary screw machines. While the justification for a screw compressor over a conventional centrifugal compressor is well supported by industry experience, the high temperature expander represented the core technology advancement. To meet the extremely high efficiency goals, an all-ceramic rotary screw expander hot section was developed and has now been tested in the laboratory. This first-of-its-kind ceramic screw expander prototype was able to demonstrate aerodynamic efficiency in line with predictions. The test article was successfully run to full stress conditions so has also validated the mechanical design of such a unit. This has opened new avenues for the commercialization of high efficiency, small scale power generation. Interest in the technology has sparked several requests for alternate uses, an invitation to present at a screw machine conference, and continued interest from parties looking to develop a product in the spirit of the original ‘GENSETS’ goals.

42 ENGINEERING↗

MEITNER Resource Team Modeling and Simulation Support to Holos-Quad Reactor Development (Final CRADA Report)

The main objective of this CRADA is to provide Argonne National Laboratory (ANL)’s modeling and simulation capabilities via ARPA-E's MEITNER (Modeling-Enhanced Innovations Trailblazing Nuclear Energy Reinvigoration) Resource Team (RT) arrangement to support the demonstration of the viability of HolosGen’s Holos-Quad reactor design. The Holos-Quad reactor design is an advanced reactor concept that incorporates many new design features, such as the neutron-coupled Subcritical Power Modules (SPMs) in its core design, elimination of balance of plant (BOP) by direct integration of a helium Brayton cycle power conversion system with each SPM, among many other innovative features. The demonstration of the viability of such an innovative reactor design warrants iterations of modeling and simulation and testing. The purpose of this project is to utilize ANL’s modeling and simulation capabilities in nuclear reactor analysis and power conversion system analysis to inform HolosGen and the Design Team (DT) in the design and optimization of the Holos-Quad concept. The major work scopes of this project include: to investigate conceptual designs and materials for radiation shielding to protect personnel and internal components such as turbomachinery; Assess the the helium Brayton cycle power conversion system performance in both nominal and load following conditions; Investigate power conversion components and overall system performance; Identify control strategies to enable load following; Perform simulations of HolosGen’s subscale simulator and using available test data for code validation/benchmark purpose; Perform core thermal-hydraulics, safety analysis, and structural analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Ultra High-Temperature Magnetic Bearing System for s-CO 2 Turbines/Expanders. Phase II Final Report

The goal of this project is to design and construct of a prototype of ultra-high temperature permanent magnet (UHT–PM), which provides the force to pull the spinning shaft towards the target position in the magnetic bearing (MB) clearance circle. This project will develop a PM biased MB system, that is actively cooled to the 550°C maximum operating temperature limit of PMs. The MB test environment will include 700°C, 40krpm and 4,000 psi requirements to advance the supercritical carbon dioxide (sCO 2 ) and other types of Brayton power cycle systems. The proposed novel MBs combine PMs for supplying the bias field and electromagnets for supplying the control field, both in UHT conditions. The choice of material is the UHT Sm-Co PMs (US patent 6,451,132) due to their significantly better thermal stability. The 6-pole homopolar design permits uninterrupted force delivery via a redundant control capability (US patent 7,429,811) even if 3 poles were to fail. The Phase I efforts was to focus on development and demonstration of component technologies and detailed design of full scale components and a demonstrator test rig for use in Phase II. UHT–PMs were produced and used in the MB actuator. The operating environment of the EEC-T550 Sm-Co magnet material could be extended by implementing active cooling. Electromagnetic coils imbedded in the MB provide forces to stabilize the shaft position at the target via sensing and control stages. Shaft position sensors enable to identify the present position of the spinning shaft relative to its desired target position in the MB clearance circle (air gap). Auxiliary bearings will be installed to provide a backup support system in the event that power to the MB fails or there is a fault in a device providing current to the MB coils. For control, reliability and safety reasons the sensors and auxiliary bearings are typically located as close as possible to the MBs, which exposes them to the same environmental conditions. Development of only the actuator for the UHT environment is an inadequate approach to complete integration of the MB system in the turbine/expander. Therefore the UHT sensor and auxiliary bearing were designed and developed along with the actively cooled, UHT-PM actuator development. Although shaft position sensors are commercially available (Kaman) they may cost up to $10k per channel, and a full 5 axis magnetic suspension is best implemented with up to 20 sensors. Once successfully completed, this project will significantly extend the operating environment capability for turbomachinery applications such as nuclear power, concentrated solar thermal, fossil fuel, geothermal, and shipboard propulsion. The further advancement of UHT-PM-MB will also strengthen the US position in PM technology, which is presently heavily dominated by China. The UHT Sm-Co magnet material that will be utilized in the proposed work has been developed exclusively by the project proposer. Many actuators, motors, generators and other MB applications will greatly benefit from the proposed work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Steam-Electric Power Cycle for Advanced Reactor Concepts

This report presents improvements made to RELAP-7 for modeling Rankine power cycles, which are used on the secondary side of some advanced reactor concepts. For example, for a High-Temperature gas-cooled Reactor Pebble bed Module (HTR-PM), in the primary loop, helium transfers heat from the fuel to a steam generator, and on the secondary side, dry steam from the steam generator applies work to a turbine, which is converted into electrical power by a generator. After passing through the turbine, the steam passes through a condenser and pumped to the steam generator inlet, completing a Rankine cycle on the secondary side. This HTR-PM concept is used as an example to demonstrate a steam-electric power cycle capability in RELAP-7. This power cycle requires a number of different physical components, including a pump, compressor, turbine, steam generator, and condenser. The steam generator is modeled using a heat exchange between primary and secondary loops, and the condenser is modeled using a cooling source term. Recent efforts demonstrated preliminary models for the turbomachinery components (pump/compressor and turbine), but more physical models were required. Furthermore, several improvements were made for the robustness of mixed single-phase/two-phase flow present in a Rankine cycle.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Turboexpander for Direct Cooling in Hydrogen Vehicle Fueling Infrastructure

Hydrogen fuel cell electric vehicles (FCEVs) have been identified as one of a few options for zero carbon emissions transportation. A major advantage of FCEVs is that they can fuel quickly and follow a familiar fueling behavior to hydrocarbon-fueled vehicles. Whether light duty or heavy duty, the goal for a hydrogen dispenser is to fuel a vehicle in the same amount of time as the fossil fuel equivalent. When hydrogen is dispensed into the vehicle storage system, however, the temperature rises due to the Joule-Thomson effect and the heat of compression. Typically, vehicles store the compressed hydrogen in composite overwrapped pressure vessels that have a polymer liner with an operational temperature limit of 85°C. This temperature limit can be exceeded during fast fueling if hydrogen is not precooled. Precooling allows for a dispenser to fuel a vehicle at a faster flow rate by preventing the storage tank on the vehicle from overheating. Fueling protocols and requirements are presented in SAE J2601 Fueling Protocols for Light Duty Gaseous Hydrogen Surface Vehicles [1]. A heavy-duty equivalent is under development with similar requirements for precooling. Currently, conventional precooling for light-duty vehicle refueling uses a heat exchanger and chiller to cool the hydrogen gas to -40°C before entering the vehicle. The precooling system represents a significant part of the station capital and operating costs, so if the cost of the precooling system can be reduced by improving its efficiency, the overall station capital and operating cost can be reduced. In this project, National Renewable Energy Laboratory (NREL) and Sandia National Laboratories (SNL) researchers teamed up to investigate the turboexpander precooling application. A turboexpander is a device that places a turbine in a flow path where a pressure differential can be attained. This expansion device will extract work and lower the temperature of the fluid as the pressure reduces. While initial calculations based on established principles showed potential for a turboexpander to generate cooled gas, much work needs to be done to prove the concept. Turboexpanders typically work best under steady state conditions, while the dispenser is a very dynamic flow system. Dynamic turboexpander systems have been proven, such as a turbocharger on a gasoline vehicle. The inlet pressure at a dispenser is also much higher than any other known turboexpander system but should behave similarly to higher density fluids at lower pressures. Having both performed initial calculations, NREL and SNL researchers teamed up to investigate the turboexpander precooling application further. A project was soon built around the idea with SNL performing system modeling using previously proven capabilities and NREL performing hardware characterization with established station capabilities. Creare LLC was contracted as the turbomachinery expert to design and build the concept device. Part way through the project, however, contracting issues with the funding partner caused the project to terminate early before building and characterizing the concept device. While the project could not continue, many key findings were already learned. This paper is a summary of those findings.

08 HYDROGEN↗

Off-Design Load Analysis of sCO2 Bottoming Cycle for a Natural Gas Combined Cycle Power Plant with Carbon Capture

As an alternative to a steam cycle, a supercritical carbon dioxide (sCO2) power cycle can be considered. Able et. al performed an analysis of an sCO2 cycle in a 2x2-1 configuration; however, this study did not include carbon capture. Previous studies assumed an H-Frame turbine and added a solvent based 95% carbon capture system and performed a levelized cost of electricity (LCOE) optimization for the plant. Their results suggest a LCOE slightly better than when using a steam cycle. In the study, steam is still generated in the heat recovery sections for the solvent regeneration in the carbon capture stripper reboiler. H-Frame gas turbines are also assumed. This work starts with the optimal design from the mentioned work to analyze the off-design performance of the power plant from 100% down to 50% load. The main operational findings and plant-efficiency for off-load conditions while maintaining the target CO2 capture rate are presented. H-Frame gas turbine off-design performance and exhaust conditions to the heat recovery section are obtained from commercial software, Thermoflow®. The CO2 turbomachinery, heat exchangers and other unit operations are sized and implemented in an Aspen Plus® model. Using the gas turbine exhaust conditions as input, the sCO2 cycle is optimized by adjusting stream split ratios, sCO2 circulation flowrate and compressor speed for maximum efficiency. This is done while keeping the target 95% CO2 capture.

Chinen, Anderson Soares↗

High-Temperature Active Magnetic Bearing Development for Supercritical CO 2 Machinery Applications

Hermetic machinery utilizing gas bearings for MW-scale supercritical CO 2 (sCO 2 ) machinery applications can have significantly lower power loss and enable improved cycle efficiency compared to conventional machinery with oil-lubricated bearings. Active magnetic bearings (AMBs) are another option anticipated to have similar power loss and load capacity to gas bearings as well as offering larger mechanical tolerances, the ability to tune properties, and high reliability due to lack of mechanical wear. AMBs also have proven commercial experience at MW-scale, though environments for high-temperature sCO 2 power cycle machinery conditions are novel. Besides the potential impact of AMBs for sCO 2 turbomachinery, the technology also offers promising benefits for steam and gas turbines for power generation, compressors and expanders for industrial heat and power, and in other oil and gas and space applications. The goals of this project were to conceptual design an AMB and perform material testing. Conceptual designs for radial and thrust AMBs were produced based on a hermetically-sealed sCO 2 machinery waste-heat recovery (WHR) application for sizing and loads, and choosing a target design temperature of 540°C useful for high-temperature sCO 2 turbines for concentrating solar power (CSP) applications. Conceptual designs were initially developed for multiple radial and thrust AMBs with spreadsheet-based calculations before selecting one of each to develop further using higher-fidelity design methods for magnetic and structural performance. It was found that the radial AMB at 540°C was feasible, but the thrust AMB needed to be limited to 315°C for high-speed operation. The decision for a reduced-temperature thrust AMB was the result of several significant conclusions: 1) Hiperco 50A, originally chosen for good magnetic performance at high temperature, had insufficient strength for high-speed operation, so it was replaced with 17-4 PH. 2) The reduced magnetic performance from 17-4 PH yielded a larger bearing size, reducing the strength margin. 3) This ultimately led to a creative design implementing a more-compact E-core topology, compared to the original (conventional) C-core, and an integral shaft-disk with Hirth joint connection. These conceptual designs are unique for the size and temperature in CO 2 , relevant for MW-scale CSP applications. Long term, high temperature test data was generated for several materials, filling a void in the current body of literature. Corrosion and magnetic performance measurements were produced for PM materials (Alnico 5-7C, Alnico 9C, and SmCo) with and without nickel-coating for environments of high-temperature CO 2 up to 550°C at atmospheric pressure and 450°C at 103 bar for up to 6,000 hours. Corrosion measurements were also produced for Hiperco 50, a SM material relevant for AMB laminations, with and without C5 coating. Comparisons were also made for 450°C and 550°C, atmospheric pressure air exposures up to 5,000 hours. Results generally show that coatings can be effective at improving oxidation resistance of the bare materials, and Alnicos generally outperformed SmCo after high-temperature exposure. In addition to technical feasibility demonstrated by the design, economic feasibility was demonstrated by updating the TEA from the reference machine, re-evaluating it with CAPEX and OPEX to reflect estimated changes from process-lubricated bearings to AMBs. AMBs were shown to be comparable in performance to process-lubricated bearings, still showing a notable improvement over conventional machinery architecture with oil-lubricated bearings.

42 ENGINEERING↗

Pumped Thermal Energy Storage Using Low-Cost Particles and a Fluid Bed Heat Exchanger for Maximum Power Efficiency

Robust, efficient, cost-effective long-duration electricity storage (LDES) solutions can enhance grid resiliency, support existing transmission and distribution infrastructure, and enable a greater share of low-cost, variable alternative energy sources to penetrate the market. To meet this need, the project team at the National Renewable Energy Laboratory developed a transformative LDES system based on pumped thermal energy storage (TES) using low-cost particles and a fluid bed heat exchanger for maximum power efficiency (PUMP). The PUMP system is composed of high-temperature, low-cost particle TES coupled with an advanced pressurized fluid bed heat exchanger (PFB HX) that supports a high-efficiency pumped thermal energy storage (PTES) system integrated with concentrating solar thermal power (CSP). The PUMP project developed and de-risked a PFB HX and particle CSP system intended to be integrated with reversible turbomachinery and a modeling tool to assess PTES cost and performance.

14 SOLAR ENERGY↗

Prediction of Detonation-Induced Disturbances Propagating Upstream into Inlets of Rotating Detonation Combustors

Disturbances caused by the detonation wave in a rotating detonation combustor (RDC) propagate upstream through the inlet, and can potentially affect and couple to upstream components, such as turbomachinery or isolators. These disturbances can potentially also affect the operation of the RDC itself. By drawing from the analogy of a detonation wave bounded by an inert gas, the pressure disturbances observed upstream of the inlet are explained as the consequence of the passage of an upstream propagating oblique shock. In this study, the pressure rise in the plenum from the oblique shock is measured in an axial air inlet RDC. The speed of the upstream propagating wave is estimated to be moderately above the acoustic speed of the oxidizer in the plenum. The wave propagates into the plenum despite local regions of choking in the inlet. It is estimated that the time it takes a fluid particle to transit from the plenum to the detonation channel through the inlet is much larger than the rotational time of the detonation wave. This implies that a fluid particle experiences multiple shocks prior to entering the detonation channel. The oblique shock propagating upstream through the inlet area change is modeled by leveraging an analogy with a quasi-1D shock wave moving in a variable area duct with mean (incoming) flow. Due to flow expansion along the area change, fluid particles are found to experience stronger shocks in the inlet than in the plenum, thereby creating different thermodynamic states within the fill region as the oxidizer emerges from the inlet.

Feleo, Alexander↗

Processing, Microstructure, and Properties of Bimetallic Steel-Ni Alloy Powder HIP

This work explores technical feasibility in hot isostatic pressing (HIP) manufacturing of an integral bimetallic component using steel and Ni alloy powder for supercritical carbon dioxide (sCO2) turbomachinery. Lab-scale bimetallic HIP specimens using HAYNES® 282® and SS316L or SS415 powder are investigated in powder configuration, heat treatment, microstructure, and tensile properties up to 400 °C. Interdiffusion profiles at dissimilar alloy interfaces caused by HIP cycle is predicted by DICTRA simulations and validated by electron probe microanalysis (EPMA). The interdiffusion distance of most elements is around 100 μm, while C and N have a higher interdiffusion distance. Dense distribution of Ti-rich carbonitrides and alumina particles are found to decorate prior particle boundaries near joining interface on the 282 side, affecting tensile strength across interface as well as tensile failure location. A higher amount of excessive carbonitride formation near interface is observed in SS316L/282 than in SS415/282, which is consistent with the predicted greater degree of interdiffusion effect in SS316L/282. Typical HAYNES® 282® heat treatment condition is applicable to 282/SS316L and 282/SS415 combinations, resulting in a higher strength than cast CF8M and CA6NM. A pilot-scale bimetallic SS415/282 pipe is then demonstrated to show the promise of scaleup.

36 MATERIALS SCIENCE↗

Integrated transient modeling of gas turbine and sCO2 power cycle for exhaust heat recovery application

For distributed generation installations, the transient response of the power generation system is critical to meet power quality (voltage and frequency) requirements. Transient models for gas turbine and supercritical carbon dioxide (sCO2) power cycle were integrated for an exhaust heat recovery bottoming cycle system for a distributed generation application. The transient model for the SGT-750 Siemens gas turbine was a ‘black-box’ functional mockup interface (FMI) model developed by Siemens Industrial Turbomachinery in $Finsp\mathring{a}ng$, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8 °C.

20 FOSSIL-FUELED POWER PLANTS↗

Design and Operability of a Pressurized Oxy Combustion System

Fossil fuel powers more than two-thirds of the world’s electricity, a significant share of which is derived from coal power plants. Despite coal being an abundant and energy-rich fuel, the major halt to its progress is greenhouse gas emissions. Pressurized oxy-combustion cycles can achieve theoretically high thermal efficiencies along with a 90% carbon capture rate. Additionally, the high energy density allows smaller turbomachinery and save capital cost. Thus, the primary objective of this dissertation is to present the design and operability of a pressurized oxy-combustor system. The initial part of the dissertation investigates different thermodynamic cycles and presents a model that can be adapted for existing power plants. The thermodynamic model will be used in the later part to design the proposed combustor. The two cycles analyzed are ENEL and TIPS. This study focuses on qualitative analyses of the cycles using a commercially available software called Aspen Plus®. A detailed benchmark study has been performed to validate the modeling process. ENEL and TIPS cycles are designed in the software, adopting the same principles. Recirculation ratio and pressures are varied to find the efficiency range of the cycles. Power calculations are done to find overall and net efficiency for a fixed recirculation ratio. The efficiencies of the cycles are compared to select an optimum cycle. A recirculation ratio of 50% is selected for implementation. The comparison shows that ENEL is marginally efficient over TIPS, at the cost of a pressure difference of about 70bars. Technology Readiness Level analysis is performed to present the availability of the specialized equipment for the cycles. From the TRL analysis, it is seen that the cost and availability of high viii pressure equipment surmount the edge of TIPS over ENEL. Thus, ENEL is chosen as the better cycle for investigating a scaled experiment considering efficiency and viability. The later part of the dissertation focuses on developing the combustor's design for a pressurized oxy-combustion cycle. The proposed combustor is a powerhead-mounted design aimed to produce 1MW of thermal outputThe different aspects of the design of a down-fired pressurized swirl combustor are presented in this dissertation.

Chowdhury, Mehrin↗

Multi-Objective Cycle Optimization of an Integrally Geared Waste Heat Recovery Unit for a Combined Cycle Power System

This paper has presented the cycle design and optimization details for a sCO2-based WHRS targeting the Solar Turbines Titan 130. The PreheatSR cycle layout was chosen to effectively address the issue of acid dew point corrosion and ensure high system performance is not significantly impacted by use of alternative fuels. The optimization process discussed uses a multi-objective optimization to discover a series of optimal cycle configurations given ambient temperature variability for a chosen site location while considering the initial capital cost of the cycle components. Cycle models built that incorporated off-design methods for the heat exchangers and turbomachinery allowed for the investigation of cycle operation that maximizes power output for individual cycle conditions. The resulting Pareto front serves as a guide for how to configure the WHRS cycle for the highest yearly energy extracted for a given investment.

20 FOSSIL-FUELED POWER PLANTS↗

Accelerate Nuclear Research and Development by Reducing Time and Cost Spend in the Pre-conceptual Design Phase of Advanced Reactor Experiments

The design process of every new concept, such as advanced nuclear reactors or associated experiments, starts with the pre-conceptual design phase. In this phase, the viability of a wide range of design options needs to be assessed quickly, to understand the operating envelope and its feasibility. A variety of physics models (thermal-hydraulics, neutronics, mechanical design, etc.) has to be considered at this very first design stage and optimum component sizes and materials (e.g. heat exchangers, piping, turbomachinery, coolant type, etc.) have to be chosen for a given set of boundary conditions (e.g. heat source, heat sink, flow rate, etc.). Detailed solutions such as provided by high fidelity methods like computational fluid dynamics (CFD), Monte Carlo methods, etc. and even lower fidelity tools such as system or subchannel codes, etc. are usually not used during the pre-conceptual design due to the relatively long time needed to create input models, the computational time to obtain a solution and the lack of flexibility to quickly investigate different combinations of components, individual component sizes and material properties. High fidelity tools are usually only employed in the conceptual design and later phases once a base concept has been identified during the pre-conceptual design stage. The current practice during the pre-conceptual design stage is that analysts collect the needed equations, material properties, closure laws, etc. and create ad-hoc solutions form scratch for every new problem. There clearly is a lack of a flexible scoping tool that can be used during pre-conceptional design before higher fidelity tools (as described above) come into play. To reduce user errors in ad-hoc solutions and increase fidelity and efficiency, this project aims to investigate and develop a user-friendly scoping tool to address the thermal-hydraulic designing needs during preconceptual experiment design, i.e. Thermal-hydraulic Research Universal Scoping Tool (TRUST). The success of TRUST will provide the nuclear engineers with an easy-to-use and affordable calculator for early reactor system design and optimization.

42 ENGINEERING↗

Radial Compressor Design and Off-Design for Trans-critical CO2 Operating Conditions

Presentation for the The 7th International Supercritical CO2 Power Cycles Symposium, February 21 – 24, 2022, San Antonio, Texas. A multi-staged intercooled centrifugal compressor design is performed for an indirect-fired sCO2 cycle and the design point data are used to generate the performance maps using a 2D mean-line analysis code. Fluid and turbomachinery similarity laws are applied to find an appropriate surrogate ideal gas fluid to be used in the design and performance map generation codes. The performance maps are then scaled back for the sCO2 fluid case using the affinity laws.