Search NASA⌕ Search

SEARCH · Search NASA

Results for “Update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

IBPSA Project 2 BOPTEST: An update on the test cases available in the framework for testing advanced control strategies in buildings

Project 2 develops software infrastructure, test cases, and extensions for the Building Optimization Testing Framework (BOPTEST) to address the expanding needs of building and urban energy system controls through open international collaboration. This paper provides an overview of the new test cases available as of BOPTEST version 0.7.1. Each test case is developed using open-source Modelica libraries and Spawn of EnergyPlus, enabling the creation of high-fidelity building models that incorporate envelope dynamics, Heating Ventilation and Air Conditioning (HVAC) systems, and explicit control representations. Currently, eight test cases are available, with five additional cases under development. These test cases cover a wide range of climates, building types, and HVAC systems. This paper compiles and summarizes test case descriptions, cites original manuscripts that developed them for a more detailed description, and reports baseline control performance metrics. Furthermore, two example applications are presented: one illustrating different levels of control, from supervisory to low-level, and another demonstrating how Model Predictive Control (MPC) solutions must be adapted from continuous to integer to control some building actuators.

Zanetti, Ettore↗

US EPA Superfund Radiation Risk Assessment Update: Superfund Update: Revisions to Risk and Dose Assessment Tools - 18232

The U.S. Environmental Protection Agency (EPA) Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet based calculators for risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical regional screening level calculator. A comprehensive set of revisions to the PRG calculator was finished in November 2014. Additional revisions to the other 5 calculators were made in 2015. A set of further revisions are expected to be finalized prior to December 2016 and will be discussed in this abstract. There are several additional revisions that may be finished prior to WM 2017 and will be presented if finished or discussed in more general terms if still underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US EPA Superfund Radiation Risk Assessment Update: Superfund Update: Revisions to Risk and Dose Assessment Tools - 19057

The U.S. Environmental Protection Agency (EPA) Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet-based calculators for radiation risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical Regional Screening Level calculator. A comprehensive set of revisions to the PRG calculator was finished in November 2014. Additional revisions to the other 5 calculators were made in 2015. A set of further revisions are expected to be finalized prior to December 2018 and will be discussed in this abstract. A new Radon Vapor Intrusion Screening Level (RVISL) calculator is expected to be finished in 2019, similar to the Vapor Intrusion Screening Level (VISL) for chemical calculator that was finished in 2018. There are several additional revisions that may be finished prior to WM 2019 and will be presented if finished or discussed in more general terms if still underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Off-Highway Gasoline Consuption Estimation Models Used in the Federal Highway Administration Attribution Process: 2008 Updates

This report is designed to document the analysis process and estimation models currently used by the Federal Highway Administration (FHWA) to estimate the off-highway gasoline consumption and public sector fuel consumption. An overview of the entire FHWA attribution process is provided along with specifics related to the latest update (2008) on the Off-Highway Gasoline Use Model and the Public Use of Gasoline Model. The Off-Highway Gasoline Use Model is made up of five individual modules, one for each of the off-highway categories: agricultural, industrial and commercial, construction, aviation, and marine. This 2008 update of the off-highway models was the second major update (the first model update was conducted during 2002-2003) after they were originally developed in mid-1990. The agricultural model methodology, specifically, underwent a significant revision because of changes in data availability since 2003. Some revision to the model was necessary due to removal of certain data elements used in the original estimation method. The revised agricultural model also made use of some newly available information, published by the data source agency in recent years. The other model methodologies were not drastically changed, though many data elements were updated to improve the accuracy of these models. Note that components in the Public Use of Gasoline Model were not updated in 2008. A major challenge in updating estimation methods applied by the public-use model is that they would have to rely on significant new data collection efforts. In addition, due to resource limitation, several components of the models (both off-highway and public-us models) that utilized regression modeling approaches were not recalibrated under the 2008 study. An investigation of the Environmental Protection Agency's NONROAD2005 model was also carried out under the 2008 model update. Results generated from the NONROAD2005 model were analyzed, examined, and compared, to the extent that is possible on the overall totals, to the current FHWA estimates. Because NONROAD2005 model was designed for emission estimation purposes (i.e., not for measuring fuel consumption), it covers different equipment populations from those the FHWA models were based on. Thus, a direct comparison generally was not possible in most sectors. As a result, NONROAD2005 data were not used in the 2008 update of the FHWA off-highway models. The quality of fuel use estimates directly affect the data quality in many tables published in the Highway Statistics. Although updates have been made to the Off-Highway Gasoline Use Model and the Public Use Gasoline Model, some challenges remain due to aging model equations and discontinuation of data sources.

02 PETROLEUM↗

Bayesian model updating with finite element vs surrogate models: Application to a miter gate structural system

Bayesian finite element (FE) model updating using direct model evaluations of large-scale high-fidelity FE models is extremely computationally expensive. Surrogate models can be used as fast emulators of FE models to accelerate the model calibration process. The physics/mechanics-based FE models are still the underpinning behind the surrogate models. Here, this paper evaluates the loss in accuracy and the gain in computational time while performing Bayesian model updating by using surrogate model evaluations compared to using direct FE model evaluations. This evaluation is crucial before entirely relying on surrogate models in model updating for structural health monitoring (SHM) and damage prognosis (DP) purposes. This paper also demonstrates Bayesian updating and surrogate model construction of large-scale high-fidelity FE models of infrastructure systems. In this regard, the miter gate structural system is considered as the testbed structure. Three predominant damage modes (loss of contact between gate and wall, loss of thickness due to corrosion, and loss of tension in the diagonal rods) are considered for model updating purposes. Bayesian model updating is performed using direct FE evaluations by leveraging parallel computing. Two types of surrogates, namely polynomial chaos expansion (PCE) and Gaussian process regression (GPR), are developed for the miter gate. Model updating is performed again using the trained surrogate models, and the updating results are compared with their counterparts obtained using the direct FE evaluation results. The posterior distribution of the FE model parameters obtained using the trained surrogates are sufficiently accurate with respect to the posterior obtained utilizing the direct FE evaluations. In addition, an approximate 4-fold decrease in the computational time was observed when using surrogate model evaluations instead of direct FE evaluations for model updating.

42 ENGINEERING↗

Secure LoRa Firmware Update with Adaptive Data Rate Techniques

Internet of Things (IoT) devices rely upon remote firmware updates to fix bugs, update embedded algorithms, and make security enhancements. Remote firmware updates are a significant burden to wireless IoT devices that operate using low-power wide-area network (LPWAN) technologies due to slow data rates. One LPWAN technology, Long Range (LoRa), has the ability to increase the data rate at the expense of range and noise immunity. The optimization of communications for maximum speed is known as adaptive data rate (ADR) techniques, which can be applied to accelerate the firmware update process for any LoRa-enabled IoT device. In this paper, we investigate ADR techniques in an application that provides remote monitoring of cattle using small, battery-powered devices that transmit data on cattle location and health using LoRa. In addition to issues related to firmware update speed, there are significant concerns regarding reliability and security when updating firmware on mobile, energy-constrained devices. A malicious actor could attempt to steal the firmware to gain access to embedded algorithms or enable faulty behavior by injecting their own code into the device. A firmware update could be subverted due to cattle moving out of the LPWAN range or the device battery not being sufficiently charged to complete the update process. To address these concerns, we propose a secure and reliable firmware update process using ADR techniques that is applicable to any mobile or energy-constrained LoRa device. The proposed system is simulated and then implemented to evaluate its performance and security properties.

97 MATHEMATICS AND COMPUTING↗

Development of an update to ISA S67.04 and RP 67.04: 'Setpoints for Nuclear Safety-Related Instrumentation for Nuclear Power Plants' - 146

The purpose of this paper is to provide an overview of the update to International Society of Automation (ISA) Standard ISA S67.04 - 2006, 'Setpoints for Nuclear Safety-Related Instrumentation for Nuclear Power Plants', and ISA RP 67.04-2000, 'Methodologies for Determination of Setpoints for Nuclear Safety-Related Instrumentation'. Significant advances have occurred on the utility, Nuclear Steam Supply System (NSSS) vendor, and regulatory side, related to improved techniques for analysis and monitoring. These and other changes, including those related to Technical Specifications and surveillance interval extensions, are being included in the latest update to this primary standard for setpoint control in nuclear plants in the U.S. and around the world. In 2016, the ISA S67.04 Committee agreed to proceed with a revision to this Standard and Recommended Practice, with major updates in the following areas: 1. Definitions - Updates for improved definitions based on TSTF-493, Rev 4, RIS-2006-17 and NRC updated Regulatory Guide (RG) 1.105 2. 95/95 - Updates based on improved guidance on the development of component input data and analysis techniques for 95% probability/95% confidence calculations 3. TSTF-493, RIS 2006-17 updates for Technical Specification input and to support changes 4. NRC input from updates in the Regulatory Guide 1.105 and Branch Technical Position BTP-7-12 revision process. 5. Improved guidance from the Electric Power Research Institute (EPRI) in References 7, 8 and 9. These standards are being updated with a new version anticipated to be issued as a draft in 2017 and submitted for ISA approval in 2019. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Publication and Impact of Preprints Included in the First 100 Editions of the CDC COVID-19 Science Update: Content Analysis

Preprints are publicly available manuscripts posted to various servers that have not been peer reviewed. Although preprints have existed since 1961, they have gained increased popularity during the COVID-19 pandemic due to the need for immediate, relevant information. The aim of this study is to evaluate the publication rate and impact of preprints included in the Centers for Disease Control and Prevention (CDC) COVID-19 Science Update and assess the performance of the COVID-19 Science Update team in selecting impactful preprints. All preprints in the first 100 editions (April 1, 2020, to July 30, 2021) of the Science Update were included in the study. Preprints that were not published were categorized as “unpublished preprints.” Preprints that were subsequently published exist in 2 versions (in a peer-reviewed journal and on the original preprint server), which were analyzed separately and referred to as “peer-reviewed preprint” and “original preprint,” respectively. Time to publish was the time interval between the date on which a preprint was first posted and the date on which it was first available as a peer-reviewed article. Impact was quantified by Altmetric Attention Score and citation count for all available manuscripts on August 6, 2021. Preprints were analyzed by publication status, publication rate, preprint server, and time to publication. Of the 275 preprints included in the CDC COVID-19 Science Update during the study period, most came from three servers: medRxiv (n=201, 73.1%), bioRxiv (n=41, 14.9%), and SSRN (n=25, 9.1%), with 8 (2.9%) coming from other sources. Additionally, 152 (55.3%) were eventually published. The median time to publish was 2.3 (IQR 1.4-3.7). When preprints posted in the last 2.3 months were excluded (to account for the time to publish), the publication rate was 67.8%. Moreover, 76 journals published at least one preprint from the CDC COVID-19 Science Update, and 18 journals published at least three. The median Altmetric Attention Score for unpublished preprints (n=123, 44.7%) was 146 (IQR 22-552) with a median citation count of 2 (IQR 0-8); for original preprints (n=152, 55.2%), these values were 212 (IQR 22-1164) and 14 (IQR 2-40), respectively; for peer-review preprints, these values were 265 (IQR 29-1896) and 19 (IQR 3-101), respectively. Prior studies of COVID-19 preprints found publication rates between 5.4% and 21.1%. Preprints included in the CDC COVID-19 Science Update were published at a higher rate than overall COVID-19 preprints, and those that were ultimately published were published within months and received higher attention scores than unpublished preprints. These findings indicate that the Science Update process for selecting preprints had a high fidelity in terms of their likelihood to be published and their impact. The incorporation of high-quality preprints into the CDC COVID-19 Science Update improves this activity’s capacity to inform meaningful public health decision-making.

59 BASIC BIOLOGICAL SCIENCES↗

Automated Model Updating Effect on the Linear and Nonlinear Dynamic Responses of Historical Masonry Structures

Finite element models supply the simulation of the problems to obtain the structural behaviors under different loading conditions. The updating processes based on changing the uncertain parameters such as material properties, boundary conditions, meshing size etc. are made to create actual finite element models in order to represent the real conditions of the problems. This procedure can be made using two methods, namely manual model updating and global/local automatic model updating. The global/local automatic model updating procedures are very popular owing to the applicability to all kind of engineering structures, minimizing the differences nearly to zero, availability of damage localization and structural health monitoring. In this paper a historical masonry armory building selected as an application and its finite element analyses, experimental measurements and automated model updating processes are carried out. The finite element model of the structures was developed with ANSYS software and first three natural frequencies are attained. The experimental dynamic characteristics such as natural frequencies, damping ratios and mode shapes are obtained using ambient vibration method. The differences between experimental and numerical frequencies are minimized up to the range of 0–1%, by using local updating procedure. The linear and nonlinear seismic analyses of the building are conducted on initial and updated models. At the end of the analyses, maximum displacements, principal stresses and strains are given with detail. In addition, crack distributions diagrams are attained to validate the stresses accumulation points. It can be seen that there is an increasing trend in the displacement, stress and strain values after finite element model updating both linear and nonlinear analysis. In addition, linear and nonlinear analysis results are compared with each other to evaluate the nonlinear analysis effect. It is concluded that the displacement and strain values are increased after nonlinear analysis. But, there is not any agreement in stress values.

42 ENGINEERING↗

Lazy Updating of hubs can enable more realistic models by speeding up stochastic simulations

To respect the nature of discrete parts in a system, stochastic simulation algorithms (SSAs) must update for each action (i) all part counts and (ii) each action's probability of occurring next and its timing. This makes it expensive to simulate biological networks with well-connected “hubs” such as ATP that affect many actions. Temperature and volume also affect many actions and may be changed significantly in small steps by the network itself during fever and cell growth, respectively. Such trends matter for evolutionary questions, as cell volume determines doubling times and fever may affect survival, both key traits for biological evolution. Yet simulations often ignore such trends and assume constant environments to avoid many costly probability updates. Such computational convenience precludes analyses of important aspects of evolution. Here we present “Lazy Updating,” an add-on for SSAs designed to reduce the cost of simulating hubs. When a hub changes, Lazy Updating postpones all probability updates for reactions depending on this hub, until a threshold is crossed. Speedup is substantial if most computing time is spent on such updates. We implemented Lazy Updating for the Sorting Direct Method and it is easily integrated into other SSAs such as Gillespie's Direct Method or the Next Reaction Method. Testing on several toy models and a cellular metabolism model showed >10× faster simulations for its use-cases—with a small loss of accuracy. Thus we see Lazy Updating as a valuable tool for some special but important simulation problems that are difficult to address efficiently otherwise.

97 MATHEMATICS AND COMPUTING↗

CCF Parameter Estimations, 2020 Update

This report documents the quantitative results of the common-cause failure (CCF) data collection effort (which included data through 2020) and summarizes the results of the parameter estimation quantification process performed on CCF data in the U.S. Nuclear Regulatory Commission (NRC) CCF database. This is the 2020 update to NUREG/CR-5497, updating data and parameter estimations for CCFs. This release, CCF Parameter Estimation 2020, reflects the CCF data contained within the CCF database, https://rads.inl.gov/Pages/CCF.aspx, by executing (in August 2021) the CCF query rules in the folder SPAR Rules 2020. The data covers the period from 1/1/2006 to 12/31/2020, the most recent 15-year period in which data are available. The use of the most recent rolling 15-year data in parameter estimation differs from previous updates, in which 1/1/1997 was used as the starting date (e.g., 1/1/1997 to 12/31/2015 for the 2015 update, 1/1/1997 to 12/31/2012 for the 2012 update). The new date range (i.e., the most recent 15-year period), was selected for this CCF update so as to be consistent with the date range chosen for the component reliability parameter estimation, and with the effort to include sufficient data for analysis while simultaneously reflecting the most recent industry performance. These results are appropriate for use in probabilistic risk assessment (PRA) studies, including the Standardized Plant Analysis Risk (SPAR) models of commercial nuclear power plants (NPPs) in the U.S. This update may be referred as: U.S. Nuclear Regulatory Commission, "CCF Parameter Estimations, 2020 Update," https://nrcoe.inl.gov/publicdocs/CCF/ccfparamest2020.pdf, November 2021.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Core Model Proposal #399: Updating the SSP Database (v3.0) (Population, GDP, and Labor Force) and Labor Productivity (KLEM)

This Core Model Proposal (CMP) updates the Shared Socioeconomic Pathway (SSP) database to a recent version (v3.0.1; released in 2024) within GCAM. Currently, GCAM relies on socioeconomic drivers, including population, GDP, and labor force projections, from the original SSP database version released in 2013. These projections, provided by independent socioeconomic dynamic models (e.g., multi-dimensional demographic models and macroeconomic models of convergence growth), may need regular updates when (1) near-term observations become available and (2) there are updates and advancements in the socioeconomic modeling. Timely updates of socioeconomic drivers in global economic equilibrium and multisector dynamic modeling will ensure (1) alignment of historical years and near-term projections with observations, enhancing base year calibrations, including calibration parameters and labor productivity, and (2) improvement of long-term projections with updated socioeconomic drivers, which set the scale of the economy. This CMP updates the SSP data (from v2013 to v2024) and also fixes/reconciles historical GDP data sources in GCAM. We investigate the impact of these updates on GCAM projections.

97 MATHEMATICS AND COMPUTING↗

An Updated Performance Assessment For A New Low-Level Radioactive Waste Disposal Facility In West Texas - 12192

This Performance Assessment (PA) submittal is an update to the original PA that was developed to support the licensing of the Waste Control Specialists LLC Low-Level Radioactive Waste (LLRW) disposal facility. This update includes both the Compact Waste Facility (CWF) and the Federal Waste Facility (FWF), in accordance with Radioactive Material License (RML) No. R04100, License Condition (LC) 87. While many of the baseline assumptions supporting the initial license application PA were incorporated in this update, a new transport code, GoldSim, and new deterministic groundwater flow codes, including HYDRUS and MODFLOWSURFACT{sup TM}, were employed to demonstrate compliance with the performance objectives codified in the regulations and RML No. R04100, LC 87. A revised source term, provided by the Texas Commission on Environmental Quality staff, was used to match the initial 15 year license term. This updated PA clearly confirms and demonstrates the robustness of the characteristics of the site's geology and the advanced engineering design of the disposal units. Based on the simulations from fate and transport models, the radiation doses to members of the general public and site workers predicted in the initial and updated PA were a small fraction of the criterion doses of 0.25 mSv and 50 mSv, respectively. In a comparison between the results of the updated PA against the one developed in support of the initial license, both clearly demonstrated the robustness of the characteristics of the site's geology and engineering design of the disposal units. Based on the simulations from fate and transport models, the radiation doses to members of the general public predicted in the initial and updated PA were a fraction of the allowable 25 mrem/yr (0.25 m sievert/yr) dose standard for tens-of-thousands of years into the future. Draft Texas guidance on performance assessment (TCEQ, 2004) recommends a period of analysis equal to 1,000 years or until peak doses from the more mobile radionuclides occur. The EPA National Emissions Standards for Hazardous Air Pollutants limits radionuclide doses through the air pathway to 10 mrem/yr. Gaseous radionuclide doses from the CWF and the FWF, due to decomposition gases, are a small fraction of the dose limit. The radon flux from the CWF and FWF were compared to the flux limit of 20 pCi/m{sup 2}-s from 40 CFR 192. Because of the thick cover system, the calculated radon flux was a very small fraction of the limit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updated respiration routines alter spatio-temporal patterns of carbon cycling in a global land surface model

Abstract We updated the routines used to estimate leaf maintenance respiration (MR) in the Energy Land Model (ELM) using a comprehensive global respiration data base. The updated algorithm includes a temperature acclimating base rate, an updated instantaneous temperature response, and new plant functional type specific parameters. The updated MR algorithm resulted in a very large increase in global MR of 16.1 Pg (38%), but the signal was not geographically uniform. The increase was concentrated in the tropics and humid warm-temperate forests. The increase in MR led to large but proportionally smaller decreases in global net primary production (19%) and in average global leaf area index (15%). The effect on global gross primary production (GPP) was a more modest 5.7 Pg (4%). A detailed site level analysis also demonstrated a wide range of effects the updated algorithm can have on the seasonal cycle of GPP. Output from the updated and old models did not differ markedly in how closely they matched a suite of benchmarks. Given the substantial impact on the land surface carbon cycle, a neutral influence on model benchmarks, and better alignment with empirical evidence, an MR algorithm similar to the one presented here should be adopted into ELM.

54 ENVIRONMENTAL SCIENCES↗

Updates and Verifications of the PROTEUS Suite in FY19

In FY19 efforts were made on updating and verifying the PROTEUS suite in terms of depletion and fuel cycle capabilities, updated MSR capabilities, improving code usability, and supporting simulation of micro reactors. The fuel reloading and shuffling schemes as well as the built-in depletion solver were implemented to add the fuel cycle capability to PROTEUS-NODAL. PERSENT can run with PROTEUS-NODAL which now produce the CCCC interface files. The MSR simulation capability was further updated by making PROTEUS-NODAL coupled with SAM via the MOOSE wrapper. The high fidelity solvers of PROTEUS were updated to support the multiphysics simulation of SFRs and micro reactors. The coupled system of PROTEUS / FLUENT / ANLHTP was developed using Python-based external drivers, demonstrating the coupled simulation for small 3D test problems with heat pipe failure transients. In addition, the gamma transport capability was implemented to compute the detailed gamma distributions that determines the primary heat sources for the fuel assembly structure and non-fueled assemblies. Verification tests using fuel assembly and 2D core problems indicated very good agreement in heating distributions between PROTEUS and VARIANT / GAMSOR solutions. For user support, the NEAMS Workbench was updated to include PROTEUS-NODAL and further extended to handle PROTEUS-MOC for which the support of Workbench is limited, instead requiring the off-line generation of mesh files and corresponding cross section sets. The utility tools of PROTEUS were also updated to support users to model and simulate complicated and non-conventional geometry cores.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Selection of 3013 Containers for Field Surveillance (FY 2021 Update)

This Update is the ninth in a series of reports that document the binning and sample selection of 3013 containers for the Field Surveillance program as part of the Integrated Surveillance Program. The last Update was in 2016. This Update documents changes to the binning and changes to the random and engineering judgment samples since 2016. This Update also documents field surveillance activities since 2016 and describes plans to complete random sampling in 2025. In addition, this Update describes a new effort to collect surveillance data as part of down blending operations and updates assumptions about Advanced Recovery and Integrated Extraction System (ARIES) 3013 containers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants: 2020 Update

This report documents the quantitative results of the current industry-average performance for components and initiating events (IEs) at U.S. commercial nuclear power plants (NPPs). It represents the third update of the original analysis in NUREG/CR-6928 with data through 2020. Continuous characterization and updating of current industry-average performance with the latest industry data available are important steps in maintaining up-to-date risk models. Typically, data from 1998–2002 were used in NUREG/CR-6928, data from 1998–2010 in the first update, data from 1998–2015 in the second update, and data from 2006–2020 in this update, although many IEs required longer periods for adequate characterization of frequencies in all these analyses. As with NUREG/CR-6928 and previous updates, four types of events are covered in this report: component unreliability (e.g., a pump that fails to start or fails to run), component or train unavailability resulting from test or maintenance outages, special event probabilities covering operational issues (e.g., pump restarts and injection valve re-openings during unplanned demands), and IE frequencies. Results (in the form of beta distributions for failure probabilities upon demand and gamma distributions for rates) are used as inputs to the U.S. Nuclear Regulatory Commission standardized plant analysis risk models covering U.S. commercial NPPs.

99 GENERAL AND MISCELLANEOUS↗