Search NASA⌕ Search

SEARCH · Search NASA

Results for “Usability evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Evaluation of Synthetic Diamond Detectors for Fast Neutron and X-ray Detection [Slides]

Element6 has come out of a two year production pause (pre-COVID) with material that lacks their previous QC – some is excellent, but screening is needed. Applied Diamond can now make usable polycrystalline material, for applications not requiring absolute flux calibration. A large area possible (1cm 2 ). Great Lakes Crystal Technology has made great progress in two years, but still needs development to become a trusted supplier of single crystal material. LANL staff (Dongsung Kim) has developed proficient lithography and bonding expertise at CINT to make devices from vendor supplied material. LANL staff has continued and expanded capabilities for device testing at NSLS-II.

42 ENGINEERING↗

TelemeTrak Final Technical Report – Award DE-SC0022722

We developed a browser-based simulation tool to evaluate whether buffering can be advantageous in various climate zones. This tool leverages the Amazon cloud services to process hundreds of simulations in a parametric sweep. This tool, still under development, will ultimately be usable by installers to determine exactly how much storage of what type to include.

25 ENERGY STORAGE↗

Calibration and Uncertainty Estimation Using the Ensemble Kalman Filter with a Large Subsurface Flow and Transport Model - 20321

At routinely monitored groundwater contamination sites, periodically measured environmental conditions such as groundwater levels and contaminant concentrations are used to inform and confirm a conceptual site model (CSM) and guide the development and calibration of a numerical groundwater flow and transport model. The calibration of groundwater flow and transport models after each measurement (sampling) event can illuminate deficiencies in a CSM, identify areas where additional monitoring is warranted, and predict the behavior of the system to guide decision making. However, manual and automated (e.g. PEST) model calibration tools can be time-consuming and computationally expensive to implement after each sampling event. Perhaps as a result, such calibration tools generally utilize all available monitoring data simultaneously rather than sequentially assimilating monitoring data one sampling event at a time as the results from sampling become available. A more real-time data assimilation approach may reduce parameter uncertainty, quantify the value of additional monitoring data, and produce a usable model more quickly and with less effort. To mitigate the potential time-consuming aspects of manual and widely applied automated calibration techniques, a data assimilation algorithm called the ensemble Kalman filter (EnKF) was evaluated as a relatively efficient method of model calibration and uncertainty assessment via the sequential integration of monitoring data into a model. The EnKF was able to successfully and efficiently assimilate monitoring and modeling data to calibrate a complex flow and transport model at a real-world site with significant subsurface heterogeneity, uncertainty, and 12 years of monitoring data (over 4,000 individual measurements of groundwater levels and over 2,500 measurements of contaminant concentrations). Starting with an uncalibrated model data from annual sampling events were sequentially assimilated, and the resultant predication errors and estimated parameter uncertainties were tracked. After all monitoring data were assimilated, both flow and transport residuals at the end of the EnKF process were comparable to those produced via a concurrent PEST calibration effort but required fewer model simulations. Both uncertainty and prediction errors decreased over time. In a real-time application, the adequacy of the model could be assessed after each sampling event. The benefits of such a real-time approach to utilizing monitoring data include reduced costs (in the form of model updates or site characterization efforts), early flagging of possible errors in the CSM, and a reduced risk of overfitting and corresponding increased confidence in model predictions. This tool may be particularly useful compared to other calibration techniques (e.g. manual, PEST) when model runtimes are long, calibration parameters are many, or parameter uncertainty is large. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Human Factors Evaluation of Energy Visualization Dashboards

Energy visualization systems provide information about use in real-time to assist users with energy efficiency. In this study, three energy visualization dashboards for small businesses were developed and tested. Performance measurement, NASA Task Load Index (TLX) workload assessment, and posttest survey were used to conduct the usability testing. Compared with the dashboards that were designed using line charts and tables, a dashboard designed using visuals (e.g., gauges, pie charts, and flashing lights) produced quicker response time, lower mental and temporal demand and effort ratings, and higher ratings of engagement, interest, and trustworthiness.

Nimbarte, Ashish D. (ORCID:0000000210599112)↗

Verification and Validation of High Explosive Reactive Burn Models Implemented in LANL's EAP and LAP Code Base (FY2020 L2 Milestone MRT 7129) [Slides]

Advanced reactive burn models enable phenomena to be modeled that aren’t possible with programmed burn. Programmed burn propagates a burn front at a prescribed speed from a prescribed initiation point. Reactive burn uses the hydro variables (pressure, temperature, etc.) to determine when, how rapidly, and to what extent a zone detonates. This enables a completely new set of problems to be simulated. Our goal in this milestone has been to improve the usability of reactive burn modes. Thus, the closure criteria are: 1. Perform code and solution verification of the reactive burn models using appropriate solutions and simplified HE setups. 2. Perform validation assessments using small-scale experiments. 3. Evaluate sensitivities and quantify uncertainties due to model form variations and mesh dependencies.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Investigating Scientific Data Change with User Research Methods

Scientific datasets are continually expanding and changing due to fluctuations with instruments, quality assessment and quality control processes, and modifications to software pipelines. Datasets include minimal information about these changes or their effects requiring scientists manually assess modifications through a number of labor intensive and ad-hoc steps. The Deduce project is investigating data change to develop metrics, methods, and tools that will help scientists systematically identify and make decisions around data changes. Currently, there is a lack of understanding, and common practices, for identifying and evaluating changes in datasets since systematically measuring and managing data change is under explored in scientific work. We are conducting user research to address this need by exploring scientist's conceptualizations, behaviors, needs, and motivations when dealing with changing datasets. Our user research utilizes multiple methods to produce foundational, generative insights and evaluate research products produced by our team. In this paper, we detail our user research process and outline our findings about data change that emerge from our studies. Our work illustrates how scientific software teams can push beyond just usability testing user interfaces or tools to better probe the underlying ideas they are developing solutions to address.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Strategies for Enhancing Battery Life Under Fast Charging: Insights from NMC-Based Cell Cycling

Fast charging improves the usability of consumer electronics and electric vehicles (EVs) by reducing range anxiety and downtime but accelerates battery degradation and raises safety concerns. Optimizing operational conditions during fast-charging is critical to mitigating aging and ensuring safety. This study evaluated multilayer Gr/NMC811 cells under various conditions, including depths of discharge (DODs of 68%, 84%, and 100%), upper charge cutoff voltages (4.1–4.2 V), and post-charge rest periods (2–30 min), using a 20 min fast charging protocol for up to 500 cycles (up to 150,000 miles of EV use assuming 3.3 mi/kWh vehicle level energy efficiency). Surprisingly, higher DODs under fast charging improved battery life and performance compared to lower DODs. Reducing the upper charge cut-off voltage helped mitigate degradation. A brief 2 min rest period after charging further reduced aging effects. The primary aging modes were loss of lithium inventory and cathode active material. Although minor lithium plating was observed within 500 cycles, it did not affect performance significantly. These findings suggest that, with optimized conditions, cells can sustain hundreds of fast charge cycles—equivalent to over 100,000 miles of EV use—without significant adverse effects on performance or longevity.

25 - ENERGY STORAGE↗

Uranium measurements in the field using high-resolution cadmium zinc telluride detectors

A new generation of cadmium zinc telluride (CZT) detectors has become available and is being evaluated by the International Atomic Energy Agency (IAEA) for safeguards verifications in the field. The new CZT detector, model M400, is a room temperature spectrometer manufactured by H3D, Inc. The M400 demonstrates superior energy resolution, effective isotope identification capabilities, and convenient usability features when tested in a controlled laboratory environment. These characteristics define the M400 as a potential platform for IAEA field detection applications, which could become suitable for nuclear material characterization (e.g., enrichment verification) and nuclear safeguards missions. The capabilities of gamma spectrometry codes including Fixed energy, Response function Analysis with Multiple efficiencies (FRAM) from Los Alamos National Laboratory, CZT for Uranium (CZTU) from Lawrence Livermore National Laboratory, and Gamma Detector Response and Analysis Software (GADRAS) from Sandia National Laboratories were adapted for M400 spectra, and the performance of the codes has been validated. This was reported in a prior work. To further validate the performance of the high-energy resolution CZT detector and the isotopic analysis codes, a field measurement campaign consisting of uranium hexafluoride (UF 6 ) cylinder measurements was conducted at a fuel fabrication facility. A total of 34 Type 30B cylinders containing UF6 were measured using three different M400 CZT detectors. Each detector was outfitted with a custom rectangular collimator and shield made out T-Flex®, a tungsten-impregnated polymer. Measurements were performed at three different locations of the cylinder, ensuring that the measurement geometry satisfied the infinite thickness criterion. The spectra from the M400 CZT were analyzed using the code General Enrichment Meter (GEM). For analyzing the gamma-ray spectra from UF 6 cylinder, the GEM code is the appropriate tool since it relies only on the gamma-ray emissions from 235 U and not from other isotopes. Results from the spectral analysis were compared with the known abundance of 235 U in the cylinders, as well as with the International Target Values 2020 (ITV2020). The suitability of the different underlying techniques used by the various codes for UF 6 analysis is discussed. The challenges of measuring UF 6 contained in cylinders and mitigation strategies are highlighted.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PRO-X Parallelization Study

The proliferation resistance optimization (PRO-X) program is actively supporting the design of nuclear systems by developing a framework to both optimize the fuel cycle infrastructure for nuclear reactor (including both advanced reactors (ARs) and research reactors (RRs)) and minimize the potential for production of weapons-usable nuclear material (Figure 1). One area of interest is in the impact a modular approach to bulk handling fuel cycle facilities could have on meeting safeguards requirements to identify future areas of growth within the proliferation resistance space. This study evaluates how changing the number of streams within a fuel cycle facility could impact a facilities ability to meet both domestic and international safeguards requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

QASMBench: A Low-Level Quantum Benchmark Suite for NISQ Evaluation and Simulation

The rapid development of quantum computing (QC) in the NISQ era urgently demands a low-level benchmark suite and insightful evaluation metrics for characterizing the properties of prototype NISQ devices, the efficiency of QC programming compilers, schedulers and assemblers, and the capability of quantum system simulators in a classical computer. In this work, we fill this gap by proposing a low-level, easy-to-use benchmark suite called QASMBench based on the OpenQASM assembly representation. It consolidates commonly used quantum routines and kernels from a variety of domains including chemistry, simulation, linear algebra, searching, optimization, arithmetic, machine learning, fault tolerance, cryptography, and so on, trading-off between generality and usability. To analyze these kernels in terms of NISQ device execution, in addition to circuit width and depth, we propose four circuit metrics including gate density, retention lifespan, measurement density, and entanglement variance, to extract more insights about the execution efficiency, the susceptibility to NISQ error, and the potential gain from machine-specific optimizations. Applications in QASMBench can be launched and verified on several NISQ platforms, including IBM-Q, Rigetti, IonQ and Quantinuum. For evaluation, we measure the execution fidelity of a subset of QASMBench applications on 12 IBM-Q machines through density matrix state tomography, comprising 25K circuit evaluations. In addition we also compare the fidelity of executions among the IBM-Q machines, the IonQ QPU and the Rigetti Aspen M-1 system.

97 MATHEMATICS AND COMPUTING↗

An open source knowledge graph ecosystem for the life sciences

Translational research requires data at multiple scales of biological organization. Advancements in sequencing and multi-omics technologies have increased the availability of these data, but researchers face significant integration challenges. Knowledge graphs (KGs) are used to model complex phenomena, and methods exist to construct them automatically. However, tackling complex biomedical integration problems requires flexibility in the way knowledge is modeled. Moreover, existing KG construction methods provide robust tooling at the cost of fixed or limited choices among knowledge representation models. PheKnowLator (Phenotype Knowledge Translator) is a semantic ecosystem for automating the FAIR (Findable, Accessible, Interoperable, and Reusable) construction of ontologically grounded KGs with fully customizable knowledge representation. The ecosystem includes KG construction resources (e.g., data preparation APIs), analysis tools (e.g., SPARQL endpoint resources and abstraction algorithms), and benchmarks (e.g., prebuilt KGs). We evaluated the ecosystem by systematically comparing it to existing open-source KG construction methods and by analyzing its computational performance when used to construct 12 different large-scale KGs. With flexible knowledge representation, PheKnowLator enables fully customizable KGs without compromising performance or usability.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

A Real-Time Data Dashboard for Monitoring Travel Behavior

When running a smartphone app-based travel behavior study, it is important to keep participants engaged in contributing data. Long study durations and/or large samples make it difficult to engage participants in reporting their travel behavior. We developed a dashboard web application called 'emdash' to facilitate and ease the data collection maintenance task. It allows deployers to view trip trajectories, track which participants are uploading data, and generate report ready plots. Emdash can also be useful for deployers to identify ways to best encourage a particular transportation mode shift and to provide feedback and reporting to participants. Using the dashboard, a single admin was able to support a classic travel study with 80 participants. The dashboard is currently deployed in a two-year electric bike (e-bike) pilot study called CanBikeCO, conducted in six locations across Colorado, USA. CanBikeCO targets carbon emissions reduction and equity improvement by evaluating changes to participants' travel behavior when they are offered free e-bikes. Each CanBikeCO location has access to their own version of emdash to help them monitor and support participants. After testing and gathering feedback, we made improvements to the dashboard's usability and scalability, and proposed a method to make detecting data issues easier. Improvements include configurable options and limiting the volume of data sent to the dashboard as study size and duration increase.

ADVANCED PROPULSION SYSTEMS,MATHEMATICS AND COMPUT↗

Urban building energy modeling (UBEM) tools: A state-of-the-art review of bottom-up physics-based approaches

Regulations corroborate the importance of retrofitting existing building stocks or constructing new energy-efficient districts. There is, thus, a need for modeling tools to evaluate energy scenarios to better manage and design cities, and numerous methodologies and tools have been developed. Among them, Urban Building Energy Modelling (UBEM) tools allow the energy simulation of buildings at large scales. Choosing an appropriate UBEM tool, balancing the level of complexity, accuracy, usability, and computing needs, remains a challenge for users. The review focuses on the main bottom-up physics-based UBEM tools, comparing them from a user-oriented perspective. Five categories are used: (i) the required inputs, (ii) the reported outputs, (iii) the exploited workflow, (iv) the applicability of each tool, and (v) the potential users. Moreover, a critical discussion is proposed, focusing on interests and trends in research and development. The results highlighted major differences between UBEM tools that must be considered to choose the proper one for an application. Finally, barriers of adoption of UBEM tools include the needs of a standardized ontology, a common three-dimensional city model, a standard procedure to collect data, and a standard set of test cases. This feeds into future development of UBEM tools to support cities’ sustainability goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Trigger-based Incremental Data Processing with Unified Sync and Async Model

In recent years, more and more applications in the cloud have needs to process large-scale on-line datasets, which evolve over time as new entries are added and existing entries are modified. Several programming frameworks, such as Percolator and Oolong, are proposed for such incremental data processing and can achieve efficient processing with an event-driven abstraction. However, these frameworks are inherently asynchronous, leaving the heavy burden of managing synchronization to applications' developers, which further significantly restricts their usabilities. In this study, we propose a trigger-based incremental computing framework in the cloud, called Domino, with both synchronous and asynchronous mechanisms to coordinate parallel triggers. With this new framework, both synchronous and asynchronous applications can be seamlessly developed. Use cases and extensive evaluation results confirm that it can deliver sufficient performance, and also is easy to use for incremental applications in large-scale distributed computing.

97 MATHEMATICS AND COMPUTING↗

PDV Methods and Analysis for Surveillance of Explosive Components

The Weapons Evaluation Test Laboratory (WETL) at Sandia is collaborating with Lawrence Livermore National Laboratory (LLNL) to enhance explosive surveillance testing by integrating Photon Doppler Velocimetry (PDV) data. This project has streamlined the testing environment, reducing hardware costs and training needs while improving data collection efficiency and usability for lab technicians.

Kress, Matthew Kip [Sandia National Laboratories (↗

Development of Remote Cutting Tools for use at ATR - 20438

As a result of years of operations of the Advanced Test Reactor (ATR) at the Idaho National Lab (INL), the ATR canal has become congested due to the storage of materials including waste consisting of highly irradiated remote handled (RH) metals. In order to support its continuing nuclear mission the ATR requires canal space to support fuel storage and future core internal change out (CIC) components. INL staff determined that the canal must be cleaned out and waste removed to efficiently utilize the valuable canal floor space. It was determined that a methodology for processing, packaging, characterizing, and removing current and future irradiated hardware from the ATR canal is needed. Orano Federal Services (OFS) and its subcontractor Babcock Services Inc. (BSI) were selected to provide remote tooling in order to safely and efficiently size reduce the material currently stored in the ATR canal. INL developed detailed requirements that established the design and performance requirements for the tooling. Orano TN and BSI had recently successfully completed similar tasks in clearing highly activated materials from spent fuel pools and canals at commercial nuclear plants. That experience directly translated into a proven approach that could be used at the ATR thereby saving time and money and lowering risks. Based on BSI's demonstrated proficiency in the design and deployment of remote size reduction specialty tooling at comparable commercial facilities, Orano Federal Services was confident that a solution to INL's requirements could be delivered. The tooling had to be designed to be compatible with the operational requirements of the ATR canal as well as the functionality needed by the facility operators that will use the equipment. Some of the major design requirements and functions of the equipment included remote operations, capability to shear highly irradiated sections of aluminum and steel tubing, pipe, and components ranging in size from 0.6 cm to 16.5 cm diameter into 1.5 m -1.8 m lengths, utilizing buoyancy compensation to assist with underwater operations, and use commercially available existing technology and components as much as practical. The design team evaluated and selected commercially available equipment that could be modified to meet the design and performance specifications. In addition, a waste sizing table (WST) was designed and fabricated to further ensure the size reduction equipment would perform as expected and give the facility operators a stable and usable remote, underwater work platform. After successful development of the tooling, a mock up test and operator training was conducted to ensure the tooling performed as expected and met the requirements of INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Virtual Test Bed Capabilities: Virtual DOME Model and New Updates to Repository

The Department of Energy (DOE) Office of Nuclear Energy National Reactor Innovation Center accelerates the deployment of novel reactor concepts by establishing both physical and virtual spaces for building and testing various components, systems, and complete pilot plants. The Virtual Test Bed represents the virtual arm of the National Reactor Innovation Center and is a joint effort with the DOE Nuclear Energy Advanced Modeling and Simulation Program. The Virtual Test Bed mission is to accelerate the deployment of advanced reactors by facilitating the adoption of cutting-edge DOE advanced modeling and simulation tools to design, evaluate, and license reactors. This is primarily achieved by storing example challenge problems in an externally available repository and by developing models to fill the M&S gaps needed for potential demonstrators. Activities conducted this fiscal year focused on developing of a Demonstration of Microreactor Experiments shield model to help accelerate the confirmatory analysis required for the reactor demonstration. This model and workflow will allow developers to leverage advanced modeling and simulation tools to ensure their reactor demonstration concept will meet dose requirements and that the surrounding shield will stay within concrete temperature limits during steady-state and transient operation conditions. An initial model has been developed to evaluate the temperature distribution in the concrete shield during steady-state operation, including neutron and gamma heating effects. Various modeling strategies have been examined to understand their applicability and limitations with different reactor designs to make the workflow as reactor-agnostic as possible and computationally effective to maximize its usability. In addition to describing the Demonstration of Microreactor Experiments shield model and associated results, this report summarizes other accomplishments regarding repository maintenance and improvement and new external models hosted on the repository.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗