Search NASA⌕ Search

SEARCH · Search NASA

Results for “Utility Scale Solar Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Utility-Scale Solar Power Converter: Agile Direct Grid Connect Medium Voltage 4.7-13.8 kV Power Converter for PV Applications Utilizing Wide Band Gap Devices

Solar ADEPT Project: Satcon is developing a compact, lightweight power conversion device that is capable of taking utility-scale solar power and outputting it directly into the electric utility grid at distribution voltage levels—eliminating the need for large transformers. Transformers “step up” the voltage of the power that is generated by a solar power system so it can be efficiently transported through transmission lines and eventually “stepped down” to usable voltages before it enters homes and businesses. Power companies step up the voltage because less electricity is lost along transmission lines when the voltage is high and current is low. Satcon’s new power conversion devices will eliminate these heavy transformers and connect a utility-scale solar power system directly to the grid. Satcon’s modular devices are designed to ensure reliability—if one device fails it can be bypassed and the system can continue to run.

ARPA-E↗

Intelligent Facades for High Performance Green Buildings

Progress Towards Net-Zero and Net-Positive-Energy Commercial Buildings and Urban Districts Through Intelligent Building Envelope Strategies Previous research and development of intelligent facades systems has been limited in their contribution towards national goals for achieving on-site net zero buildings, because this R&D has failed to couple the many qualitative requirements of building envelopes such as the provision of daylighting, access to exterior views, satisfying aesthetic and cultural characteristics, with the quantitative metrics of energy harvesting, storage and redistribution. To achieve energy self-sufficiency from on-site solar resources, building envelopes can and must address this gamut of concerns simultaneously. With this project, we have undertaken a high-performance building integrated combined-heat and power concentrating photovoltaic system with high temperature thermal capture, storage and transport towards multiple applications (BICPV/T). The critical contribution we are offering with the Integrated Concentrating Solar Façade (ICSF) is conceived to improve daylighting quality for improved health of occupants and mitigate solar heat gain while maximally capturing and transferring onsite solar energy. The ICSF accomplishes this multi-functionality by intercepting only the direct-normal component of solar energy (which is responsible for elevated cooling loads) thereby transforming a previously problematic source of energy into a high quality resource that can be applied to building demands such as heating, cooling, dehumidification, domestic hot water, and possible further augmentation of electrical generation through organic Rankine cycles. With the ICSF technology, our team is addressing the global challenge in transitioning commercial and residential building stock towards on-site clean energy self-sufficiency, by fully integrating innovative environmental control systems strategies within an intelligent and responsively dynamic building envelope. The advantage of being able to use the entire solar spectrum for active and passive benefits, along with the potential savings of avoiding transmission losses through direct current (DC) transfer to all buildings systems directly from the site of solar conversion, gives the system a compounded economic viability within the commercial and institutional building markets. With a team that spans multiple stakeholders across disparate industries, from CPV to A&E partners that are responsible for the design and development of District and Regional Scale Urban Development, this project demonstrates that integrating utility-scale high efficiency CPV installations with urban and suburban environments is both viable and desirable within the marketplace. The historical schism between utility scale CPV and BIPV has been one of differing scale and cultures. There is no technical reason why utility-scale CPV cannot be located within urban embedded district scale sites of energy harvesting. New models for leasing large areas of district scale roofs and facades are emerging, such that the model for utility scale energy harvesting can be reconciled to commercial and public scale building sites and campuses. This consortium is designed to unite utility scale solar harvesting into building applications for smart grid development.

14 SOLAR ENERGY↗

The impact of off-site land use energy intensity on the overall life cycle land use energy intensity for utility-scale solar electricity generation technologies

Estimates of the amount of land used for a defined amount of utility-scale electricity generation in the solar power industry, referred to as solar land use energy intensity (LUEI), are important to decision makers for evaluating the environmental impact of energy technology choices. In general, solar energy tends to have a larger on-site LUEI than that of fossil fuels because the energy generated per square meter of power plant area is much lower. Unfortunately, there are few studies that quantify the off-site LUEI for utility-scale solar energy, and of those that do, they share common methodologies and data sets. As such, in this study, we develop a new method for calculating the off-site LUEI for utility-scale solar energy for three different technologies: silicon photovoltaic (Si-PV), cadmium-telluride (CdTe) PV, and parabolic trough concentrated solar thermal. Our results indicate that the off-site LUEI is most likely 1% or less of the on-site LUEI for each technology. Although our results have some inherent uncertainties, they fall within an order of magnitude of other estimates in the literature.

14 SOLAR ENERGY↗

Impacts of Solar Land Availability on the Evolution of the U.S. Power System

Long-term planning scenarios of the United States electricity system have not identified solar resource availability to be a limiting factor in how much solar capacity might be deployed. However, there are some smaller regions where siting challenges indicate solar deployment could be limited by solar resource availability. In this work, we use geospatial modeling tools to develop a restrictive siting scenario that significantly reduces the amount and location of utility-scale solar resources. We use that restrictive siting regime, along with other previously defined siting scenarios, to examine how solar resource availability impacts the buildout of the electricity system using business-as-usual and decarbonization futures in a national-scale capacity expansion model. The restrictive siting scenario uses observed siting pressures to exclude many types of land on which development is allowed today and results in a greater than 90% reduction in solar resource potential-to approximately 3000 GW. Even with this drastic reduction, utility-scale solar capacity grows by more than 3 times through 2050 in the business-as-usual scenarios and by more than 6 times in the decarbonization scenarios, though less solar is deployed in scenarios with lower available solar resource. We quantify how system costs and generation mixes change as solar resource availability changes.

14 SOLAR ENERGY↗

Transmission and Alternatives Analysis and Strategic Stakeholder Engagement

Over the life of this 3-year agreement NREL has developed data, tools, and analyses for utilities to integrate high levels of solar, and demonstrated reliability results to produce a reduction in cost and lower overall risk for stakeholders. There were five projects that made up the Agreement 25805 portfolio, including: 1. Phase 3 of the Western Wind and Solar Integration Study which studied WECC large-scale stability and frequency response. 2. Transient Solar Model Development which developed a generic solar model for cycle-by-cycle analysis. 3. Utility Scale PV Plant Demo which demonstrated control capability on a demo plant. 4. Targeted Transmission Support which contributed to transmission planning with reinforcements 5. Strategic Stakeholder Engagement which communicated and disseminated latest research with utility and industry stakeholders so that discussions and decision-making can be informed by the most current and reliable information available.

14 SOLAR ENERGY↗

Brownfields to Brightfields: A Sustainability Initiative at DOE'S East Tennessee Technology Park Cleanup - 16120

As DOE works toward completing their cleanup mission at the East Tennessee Technology Park (ETTP), the ultimate goal is to return property no longer needed for government use to the community for beneficial re-use. The vision for ETTP is to transform the former gaseous diffusion facility into a commercial industrial park, leveraging the site's infrastructure to attract businesses to the site. While hundreds of acres at ETTP have been transferred for re-use, areas within the former production footprint of the site have future use restricted due to the presence of residual contamination, underground structures and utilities and/or physical features that limit their reuse potential. Brownfield redevelopment with solar energy generation has proven to be an excellent option for beneficial reuse and sustainability thanks to the flexible nature of solar photovoltaic technology and design that can address the restrictions and limitations of the site. Developing a solar project on a cleanup site can be challenging due to a large number of stakeholders and regulatory compliance issues of the environmental legacy at DOE cleanup sites; however, the challenges can be offset by the available infrastructure and low cost property. The requirement for large amounts of land or surface area is a major constraint to the growth of photovoltaic solar systems. An average solar generating facility requires 2 or more hectares (5 acres) for each megawatt (MW) of power generated. Re-using land that is otherwise un-developable provides a cost effective site for renewable energy generation to innovative solar developers. At ETTP, DOE's Oak Ridge Office of Environmental Management and the community reuse organization (Community Reuse Organization of East Tennessee - CROET) supported a local small business (Restoration Services, Inc. - RSI) familiar with the site and environmental regulations to secure a power purchase agreement with the regional electric provider (Tennessee Valley Authority - TVA) for a 1 MW utility-scale photovoltaic solar facility. The solar facility, Powerhouse Six, was developed through a commercial partnership (RSI and Vis Solis, Inc.) that worked closely with the lead ETTP site cleanup contractor (URS-CH2M Oak Ridge LLC - UCOR) and the local government. The selected site at ETTP had limitations on subsurface disturbance to 10 feet below ground surface because of utility ducts and residual contamination. Near surface relics (facility foundation remnants) were also found to prohibit ground penetration. A photovoltaic solar design using a ballasted ground mount system was developed to conform to the restrictions. The ballasted system could follow existing land contours, eliminating the need for any extensive site preparation and avoiding the risk of ground penetration. The lead cleanup contractor's role in facilitating the completion of this project included making the necessary environmental assessment documentation available to obtain the construction notice to proceed from the regional electric provider. They accelerated the transfer of ETTP power lines and electric demand to the city electric department to accommodate connection to the electric grid and supplied the communication connection required for metering the electric power generation. DOE's support along with their cleanup contractor's re-industrialization program and power integration group provided regular communication with the project stakeholders for more than six months to facilitate the early transfer of the utility infrastructure. Powerhouse Six sustainability benefits: - Generates enough clean energy to power more than 100 homes or prevents pollution equivalent to removing 240 cars from the road annually (1,141 metric tons of carbon dioxide); - Provides Brownfield reuse/redevelopment at ETTP; - Eliminates the generation of wastes through excavation and saves money to cleanup other areas for re-use; - Supports regional electric provider's renewable energy initiative; - Offers community economic development/ jobs and property tax income to the City of Oak Ridge; - Demonstrates benefit of ETTP re-industrialization; - Provides long-term lease payments to the community reuse organization; - Supports DOE renewable energy goals; - Demonstrates collaboration between DOE and a public utility for renewable energy development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar Energy Development and Aquatic Ecosystems in the Southwestern United States: Potential Impacts, Mitigation, and Research Needs

The cumulative impacts of utility-scale solar energy facilities on aquatic ecosystems in the Southwestern United States are of concern, considering the many existing regional anthropogenic stressors. We review the potential impacts of solar energy development on aquatic habitat and biota. The greatest potential for impacts is related to the loss, fragmentation, or prolonged drying of ephemeral water bodies and drainage networks resulting from the loss of desert washes within the construction footprint of the facility. Groundwater-dependent aquatic habitat may also be affected by operational groundwater withdrawal in the case of water-intensive solar technologies. Solar panels have also been found to attract aquatic insects and waterbirds, potentially resulting in mortality. Avoiding construction activity near perennial and intermittent surface waters is the primary means of reducing impacts on aquatic habitats, followed by measures to minimize erosion, sedimentation, and contaminant inputs into waterways. Currently, significant data gaps make solar facility impact assessment and mitigation more difficult. Examples include the need for more regional and site-specific studies of surface–groundwater connectivity, more detailed maps of regional stream networks and riparian vegetation corridors, as well as surveys of the aquatic communities inhabiting ephemeral streams. In addition, because they often lack regulatory protection, there is also a need to develop valuation criteria for ephemeral waters based on their ecological and hydrologic function within the landscape. By addressing these research needs, we can achieve the goal of greater reliance on solar energy, while at the same time minimizing impacts on desert ecosystems.

Grippo, Mark↗

Magnet Technology for Power Converters: Nanocomposite Magnet Technology for High Frequency MW-Scale Power Converters

Solar ADEPT Project: CMU is developing a new nanoscale magnetic material that will reduce the size, weight, and cost of utility-scale PV solar power conversion systems that connect directly to the grid. Power converters are required to turn the energy that solar power systems create into useable energy for the grid. The power conversion systems made with CMU’s nanoscale magnetic material have the potential to be 150 times lighter and significantly smaller than conventional power conversion systems that produce similar amounts of power.

ARPA-E↗

PV Variability at the DeSoto Next Generation Solar Energy Center (Cooperative Research and Development Final Report, CRADA Number CRD-11-425)

In order to support the continued integration of utility-scale solar photovoltaic sites into the Florida transmission system and to further enhance our understanding of the effects of cloud-induced output variability on the site and transmission operations, participant elects to enter a Cooperative Research and Development Agreement (CRADA) with the National Renewable Energy Lab (NREL). Under this agreement, NREL will work with participant to instrument their PV plant in DeSoto county FL and obtain solar radiation and power output data. The Florida Power & Light's (FPL) DeSoto Next Generation Energy Center is the largest installed PV plant in the country (25 MW). Our goal is that this site be instrumented and used for research into PV variability and forecasting.

14 SOLAR ENERGY↗

Solar Energy Grid Integration Systems: Final Report of the Florida Solar Energy Center Team

Initiated in 2008, the Solar Energy Grid Integration Systems (SEGIS) program is a partnership involving the U.S. DOE, Sandia National Laboratories, private sector companies, electric utilities, and universities. Projects supported under the program have focused on the complete-system development of solar technologies, with the dual goal of expanding utility-scale penetration and addressing new challenges of connecting large-scale solar installations in higher penetrations to the electric grid. The Florida Solar Energy Center (FSEC), its partners, and Sandia National Laboratories have successfully collaborated to complete the work under the third and final stage of the SEGIS initiative. The SEGIS program was a three-year, three-stage project that include conceptual design and market analysis in Stage 1, prototype development and testing in Stage 2, and moving toward commercialization in Stage 3. Under this program, the FSEC SEGIS team developed a comprehensive vision that has guided technology development that sets one methodology for merging photovoltaic (PV) and smart-grid technologies. The FSEC team's objective in the SEGIS project is to remove barriers to large-scale general integration of PV and to enhance the value proposition of photovoltaic energy by enabling PV to act as much as possible as if it were at the very least equivalent to a conventional utility power plant. It was immediately apparent that the advanced power electronics of these advanced inverters will go far beyond conventional power plants, making high penetrations of PV not just acceptable, but desirable. This report summarizes a three-year effort to develop, validate and commercialize Grid-Smart Inverters for wider photovoltaic utilization, particularly in the utility sector.

14 SOLAR ENERGY↗

Benchmarking Utility-Scale PV Operational Expenses and Project Lifetimes: Results from a Survey of U.S. Solar Industry Professionals

This paper draws on a survey of solar industry professionals and other sources to clarify trends in the expected useful life and operational expenditure (OpEx) of utility-scale photovoltaic (PV) plants in the United States. Solar project developers, sponsors, long-term owners, and consultants have increased project-life assumptions over time, from an average of ~21.5 years in 2007 to ~32.5 years in 2019. Current assumptions range from 25 years to more than 35 years depending on the organization; 17 out of 19 organizations surveyed or reviewed use 30 years or more. Levelized, lifetime OpEx estimates have declined from an average of ~$\$$35/kW DC -yr for projects built in 2007 to an average of ~$\$$17/kW DC -yr in 2019. Across 13 sources, the range in average lifetime OpEx for projects built in 2019 is broad, from $\$$13 to $\$$25/kW DC -yr. Operations and maintenance (O&M) costs—one component of OpEx—have declined precipitously in recent years, to $\$$5-8/kW DC -yr in many cases. Property taxes and land lease costs are highly variable across sites, but on average are—together—of similar magnitude. Other OpEx line items include security, insurance, and asset management. Given 2007-2009 values for not only project life and OpEx but also other drivers of the levelized cost of energy (LCOE, excluding the investment tax credit), the LCOE for utility-scale PV projects built from 2007 through 2009 averaged $\$$305 /MWh. Using 2019 values for all parameters yields an average LCOE of $\$$51 /MWh. The decline in LCOE from $\$$305 /MWh to $\$$51 /MWh was predominantly caused by reductions in up-front expenditures (and, to a much lesser extent, by changes in capacity factors, financing costs, and tax rates), but 9% ($\$$22 /MWh) of the overall decline is due to improvements in project life and OpEx. Project life extensions and OpEx reductions have had similarly sized impacts on LCOE over this period, at $\$$11 /MWh each. Had project life and OpEx not improved over the last decade, LCOE in 2019 would have instead been $\$$73 /MWh—43% higher. Given the limited quantity and comparability of previously available data on these cost drivers, the data and trends presented here may inform assumptions used by electric system planners, modelers, and analysts. The results may also provide useful benchmarks to the solar industry, helping developers and assets owners compare their expectations for project life and OpEx with those of their peers.

14 SOLAR ENERGY↗

Transient Simulations with a Large Penetration of Converter-Interfaced Generation: Scientific Computing Challenges and Opportunities

Current trends in energy systems point to renewable energy sources (RESs) and battery energy storage systems (BESSs) becoming prevalent in power system operations. As of writing this article, the United States has more than 37 GW of utility-scale solar capacity and an additional 112 GW under development. With the rapidly declining capital costs of many of these technologies, we can expect significant deployments in the coming years.

analytical models↗

Charting a Path for Reliable, Resilient and Affordable Clean Energy: A Roadmap for Three Communities in Utah

The roadmap identifies strategies to align deployment of distributed energy resources with the continued growth of utility-scale solar. The strategies outlined in the roadmap have been developed through collaborative discussions with project partners, but may not represent the opinions of, or positions of, all partner organizations and parties involved in the "Renewable Energy Impacts and Solutions in Utah" project. Rather, the strategies outlined in this Roadmap represent a suite of tools and actions that Salt Lake City, Park City, and the City of Moab can consider as each city works towards their community renewable electricity goals. While this Roadmap was developed to inform three communities as they progress towards their specific community energy goals, much of the analysis presented in the roadmap was conducted for Utah as a whole. Other communities in Utah can use the scenarios and strategies outlined in the roadmap to leverage the full potential of distributed energy resources to provide benefits to the community.

100% renewable↗

Annual simulation of photovoltaic retrofits within existing parabolic trough concentrating solar powerplants

Solar power for electricity production comes from either photovoltaics or concentrating solar power plants. The former has seen rapid growth and expansion due to the rapid fall in global prices, while the latter has seen moderate growth due to ability to cheaply store thermal energy for later use. Hybridization, or combining photovoltaics with concentrating solar power represents a potential way for lowering cost while enabling long term storage. Over 5 GW of capacity exist worldwide using parabolic trough style technology for concentrating solar power which presents a unique option for optimization in the form of a photovoltaic retrofit. While it is possible to analyze the performance with detailed physics models, it is necessary to create a model that can handle simulating the plant level performance to fully understand the potential performance. Here, the first utility scale plant level model of a hybrid photovoltaic-concentrating solar power plant is developed. The model is applied to existing concentrating solar power plants around the world utilizing RP-3 mirrors without thermal energy storage to understand the impact on electricity production. Model results indicate that the photovoltaic retrofit can increase yearly electricity production by up to 30% for plants with solar multiples exceeding 1.5, and that increasing the fraction of solar energy reflected further increases the yield. The increased electrical production declines as the plant solar multiple is decreased. The minimum LCOE observed was $0.07/kWh for plants with larger solar multiple and fraction of solar energy reflected to the PV is 50% of the total aperture.

14 SOLAR ENERGY↗

Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to provide various types of new grid-friendly controls.

14 SOLAR ENERGY↗

A non-intrusive optical approach to characterize heliostats in utility-scale power tower plants: Flight path generation/optimization of unmanned aerial systems

A newly developed in situ non-intrusive optical (NIO) approach has been developed to survey various types of heliostat optical errors for a concentrating solar power (CSP) tower plant. To measure mirror surface slope error, facet canting error, and heliostat tracking error at a sub-milliradian accuracy, NIO requires several reflection images scanned over each individual heliostat. For a utility-scale plant that typically includes more than 10,000 heliostats, an unmanned aerial system (UAS) is crucial for efficient implementation of the NIO method. Here, we develop a flight path generation/optimization algorithm to plan more efficient UAS paths to collect NIO data over a utility-scale heliostat field. The algorithm considers NIO data requirements, all potential constraints, optimization within each subfield, and operational flexibility. Case studies are presented to illustrate the feasibility and robustness of the developed flight path algorithm. The path planning algorithm may also find applications elsewhere, such as drone-driven imaging under extreme conditions.

14 SOLAR ENERGY↗