Search NASA⌕ Search

SEARCH · Search NASA

Results for “Utility and Grid Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Large Scale Field Demonstration Evaluation Plan

This Evaluation Plan defines practical, commissioning-oriented test protocols for in-field assessment of grid-forming (GFM) inverter-based resources (IBRs) deployed under the UNIFI Consortium Field Demonstration. The demonstration’s overarching objective is to validate multi vendor GFM technologies at impactful unit/plant scale, assess interoperability and grid-service performance, and evaluate the applicability of the UNIFI Specifications for Grid-forming Inverter-based Resources in real utility environments, including integration with operational systems and protection schemes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Application of Cyber-Informed Engineering for Protecting BESS

This white paper synthesizes an array of crucial grid services provided by BESS technology, assesses its architecture and communications, and presents a case study for analysis against the principles introduced by Cyber-Informed Engineering (CIE). Furthermore, in walking through the analysis, this paper presents a framework to evaluate risks and solutions when considering BESS components. Asset owners and buyers could perform this analysis to assess their BESS product implementations, alternative inverter-based resources (IBR), and energy management systems (EMS). Battery systems fulfill various roles contingent on the unique market demands and the specific challenges presented by regional grid infrastructures. These roles also vary due to the differing utility models for ownership and operation, which are adapted to meet regional and local capabilities and requirements. Concerns have been raised regarding the potential for adversaries to exploit knowledge of battery operational patterns to orchestrate decisive attacks. However, the security of operational data for these systems may not be the primary vulnerability, as much of this information is already well-understood within the community. Applying a modest degree of subject matter expertise can often yield valuable predictions regarding how a battery will respond under certain conditions, such as grid emergencies, high or low-temperature days, Public Safety Power Shutoff (PSPS) events, and outages. The operational characteristics of batteries are well-documented, and their capabilities, including the risks associated with misoperation and the resulting consequences, are published and understood within the industry. CIE practices represent the next step in gaining functional assurance and providing an acceptable level of risk, regardless of whether a battery vendor can support a trusted and validated supply chain. While this issue has exacerbated supply chain challenges, it is not an isolated condition. This foreign supply route is the primary source of BESS for the U.S. market. Significant efforts are underway through the Bipartisan Infrastructure Law (BIL) to change that. Still, strategic short-term operational mitigations are needed to ensure the security of our operational technology (OT) systems, which are enhanced by instilling trust and are separate from vendors implementing CIE principles.

25 ENERGY STORAGE↗

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory↗

High-Fidelity Analysis of EV Integration on Real Utility Feeders in Colorado

Residential electric vehicle (EV) charging has the potential to alter long-held assumptions on load characteristics impacting distribution grid planning, operations, and design standards. This study identifies analysis and control methods to increase the affordability of residential EV charging both for Xcel Energy and their customers. The project also provides solutions for more reliable grid interconnection that can support a reliable utility business model prepared for increasing EV charging load in the coming years. For this project, we referenced Level 2 alternating current (AC) onboard charging profiles for various vehicle models and high-fidelity charging data collected at the experimental setup established at the EV Research Infrastructure Laboratory at the National Renewable Energy Laboratory (NREL). Next, we developed EV adoption models for 2030 and 2040 for the Boulder and Aurora regions in Colorado. Moreover, we evaluated different smart charging control algorithms and compared their performance. We developed time-of-use (TOU)-based and grid-aware active EV charging control methods and integrated them within the study region to understand field impacts. Diving deeper, we selected 10 feeders in Boulder and Aurora for high-fidelity grid modeling down to the house level. We executed detailed grid analysis comparing the smart charge management (SCM) algorithms we developed. Finally, we created a novel tool, Electric Vehicle Infrastructure--Distribution System Integration Tool (EVI-DiST), to integrate all the approaches in a single software environment to provide easy integration, fast simulation, and detailed evaluation capability for utility engineers and other stakeholders.

33 ADVANCED PROPULSION SYSTEMS↗

Improved method for temporally interpolating radiosonde profiles in the convective boundary layer

A significantly improved technique for temporally interpolating radiosonde (RS) profiles of potential temperature and water vapor mixing ratio in the planetary boundary layer during daytime is introduced. The key innovation of this technique is its operation on a height grid normalized with the planetary boundary layer height. This study utilized a three-month dataset of three-hourly soundings from the Atmospheric Radiation Measurement Facility's Southern Great Plains site. The technique was evaluated for convective boundary layer cases, with the necessary boundary layer height data obtained from a ground-based infrared spectrometer. A total of 79 comparisons were conducted between reference soundings and interpolated profiles that did and did not employ height normalization. The results demonstrated a substantial improvement in the representation of interpolated profiles using the new technique, characterized by enhanced correlation, improved amplitude representation, and reduced bias for potential temperature, as well as improved correlation and reduced bias for water vapor mixing ratio.

convective boundary layer↗

Grid-responsive hydrogen production: Capital utilization and current density vs. efficiency in variable electricity markets

To achieve low-cost hydrogen production from water electrolyzers, grid tied electrolysis may need to operate dynamically to minimize the cost of supplying energy to the electrolyzer stack and produce hydrogen during low-cost hours and turn off/down during high-cost hours. Operating systems in this way can decrease capital utilization (capacity factor) and electricity costs. This strategy would shift the dominant cost drivers away from electricity (and thus efficiency) to the capital costs of the system, due to the underutilized capital when operating at low-capacity factors. Increasing the operational current density of the system could, in effect, reduce the capital cost of the system while producing hydrogen at a lower efficiency on a per unit energy basis. In the variable electricity cost profiles analyzed in this paper, increasing the current density for liquid alkaline from 0.5 A/cm2 to 1.5 Ac/m2 and proton exchange membrane electrolyzers from 2 A/cm2 to 4 A/cm2 resulted in substantial reductions in the levelized cost of hydrogen. Additionally, as capacity factors and electricity costs decrease, the optimal operating current density of the electrolyzer systems analyzed increases. These findings suggest R&D efforts should focus on increasing the operational current densities, reducing the turn down ratios, and understanding the durability implications of those strategies on low-temperature liquid alkaline and proton exchange membrane electrolyzers.

08 HYDROGEN↗

Modeling Grid Data Flows for Transmission and Distribution Operations: Review, Design, Next Steps

Operational scenarios of the power grids grow multifold to accommodate the diverse needs of both the utilities and end consumers, and the various other stakeholders in-between. To comprehensively model and apply analytics to support objectives and business functions of grid sectors, a reliable approach to characterize and design data flows is crucial. The flows bridge business functions with communications protocols, stakeholders such as the grid actors, and data interfaces comprising different data objects. Additionally, constraints applied to the flow such as cybersecurity, trust, privacy, and ownership among others intersect these entities, requiring the delineation of their interactions under different scenarios. This paper aims to not only highlight relevant research in the space of grid data flows, but also proposes, for the transmission-distribution sector, a novel modeling approach that marries the aforementioned entities: objectives, business functions, data interfaces, communication protocols, data stakeholders, and flow constraints. It elaborates on the design philosophy and the significance of each entity within the model and applies it to an example function of fault location, isolation and service restoration (FLISR). Finally, the next steps to extend the application of this data flow model for other practical operational scenarios are discussed.

Sundararajan, Aditya [ORNL] (ORCID:000000033577854↗

A Novel Framework to Quantify Power Grid Resilience

The quantification of an operating power grid’s resilience is highly significant today, given its criticality as an enabler of other infrastructures, complexity, and the threat it faces due to a wide range of detrimental events, from extreme climate to cyber attacks. Currently, there exist no standardized definitions and metrics for measuring the resilience of an operating grid. In this paper, we introduce a novel resilience quantification framework and demonstrate a method to measure the flexibility towards topological/structural changes due to potential failures in the power grid to assess operational resilience. We start with the state estimation data from a large utility and use the graph analysis methods and power flow simulation tools to compute the identified resilience parameters.

Yoginath, Srikanth↗

Resilience Strategies to Ensure Water Supply Continuity During Extended Grid Outages

The towns of Edgartown, Oak Bluffs and Tisbury, on the island of Martha’s Vineyard, MA, are concerned about the effect of prolonged grid outages on continuity of their water supply. Water pumping stations operated by the water utilities that currently serve each of the towns currently have backup power generation that can support water delivery for up to one week during peak water demand periods. Sandia advised on options to extend water supply to two weeks.

Mammoli, Andrea Alberto [Sandia National Laborator↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds Developed lands Areas >0.8 km (0.5 miles) from developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Africa Battery Energy Storage Systems (BESS) Capacity Building Utility-Scale Storage: BESS Valuation, Tariffs, and Remuneration [Slides]

Utility-scale Battery Energy Storage Systems (BESS) are key to enhancing grid reliability, integrating renewable energy, and providing operational flexibility. Designing effective valuation, remuneration, and tariff frameworks is essential to ensure both system benefits and financial viability for developers. This presentation outlines a structured methodology for evaluating BESS projects, covering policy and legal considerations, cost and revenue analysis, benchmarking, financial sensitivity, and risk assessment, while ensuring alignment with public interest. It also explores valuation of multiple storage services - bulk energy, ancillary services, and infrastructure support - and monetization strategies through capacity payments, energy tariffs, tolling, arbitrage, and non-wires alternative payments. Technical factors, including round-trip efficiency, degradation, and storage duration, are integrated into financial and operational modeling to quantify both system-wide and project-level benefits. Through case studies and simulation-based approaches, this framework provides regulators, utilities, and developers with practical guidance for tariff design, payment structures, and investment decisions, maximizing the economic and societal value of BESS deployment.

25 ENERGY STORAGE↗

Controller-Hardware-in-the-Loop Evaluation of a Microgrid Controller for a Microgrid System With Multiple Grid-Forming Inverters

This paper presents the laboratory evaluation of a commercial Microgrid Management System (MGMS) implemented in the real-world Bronzeville Microgrid which features a futuristic scenario with high renewable energy integration and the use of multiple Grid-Forming (GFM) inverters. The primary objective of the performance evaluation for the MGMS is to assess the MGMS's capability to dispatch GFM units, including a GFM PV unit and two GFM battery units, to maintain the system stability and ensure economic operation, thus guaranteeing the microgrid's resilience during prolonged outages and dynamic events. The laboratory controller hardware-in-the-loop provides realistic testing environment through detailed electromagnetic transient modeling of the microgrid system, hardware MGMS, and standard communication protocols (DNP3). This CHIL evaluation shows how the MGMS effectively manages the GFM inverters, highlighting its performance in maintaining stability, reliability, and survivability in a microgrid environment with a high penetration of renewable energy sources.

controller hardware-in-the-loop↗

A Real-Time Implementation and Validation of Federated Learning for Grid Services

Grid-edge devices are becoming increasingly important in the energy transition. Preserving privacy was not previously considered an important aspect for power grid operations, but with the increased proliferation of customer-owned assets, it is now an essential consideration. Several mechanisms have been proposed to provide privacy for non-utility owned assets in the power grid. Federated learning (FL) is one method gaining prominence in this area. Although FL has been used for other applications, such as auto-complete in phones, there has not been much investigation into whether these approaches are feasible for grid applications. In this work, we use a research platform with real-time simulators and hardware-in-the-loop capabilities to investigate how FL can be applied to grid-edge devices, and we present the potential grid services that can be derived for these devices. We discuss the computational challenges with deploying complex FL approaches, and we explore several grid services, including participation in retail electricity markets, voltage control, and resilience-driven reconfiguration.

24 POWER TRANSMISSION AND DISTRIBUTION↗