Search NASA⌕ Search

SEARCH · Search NASA

Results for “VOL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Clean Cities Now: Vol. 17, No. 1, Spring 2013 (Brochure)

Biannual newsletter for the U.S. Department of Energy's Clean Cities initiative. The newsletter includes feature stories on advanced vehicle deployment, idle reduction, and articles on Clean Cities coalition successes across the country.

09 BIOMASS FUELS↗

Clean Cities Now: Vol. 18, No. 1, Spring 2014 (Newsletter)

Spring 2014 edition of the biannual newsletter of the U.S. Department of Energy's Clean Cities program. Each issue contains program news, success stories, and information about tools and resources to assist in the deployment of alternative fuels, advanced vehicles, idle reduction, fuel efficiency improvements, and other measures to cut petroleum use in transportation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2012 Update to the Site Discharge Pollution Prevention Plan, Rev. 1: Sandia/Mortandad Watershed Receiving Waters: Sandia Canyon, Cañada del Buey, Mortandad Canyon, and Ten-Site Canyon (Vol. 2)

Two historical industrial activity areas are associated with S001, S-SMA-0.25: Sites 03-013(a) and 03-052(f). Solid Waste Management Unit (SWMU) 03-013(a) is a 1500-ft-long corrugated metal pipe (CMP) storm drain that served building 03-0038. The storm drain ran underground around building 03-0038, east along the south side of the Otowi Building (building 03-0261) and connected to four other storm drains before daylighting 100 ft east of the Otowi Building where it became an open concrete- and rock-lined ditch. The open drain continued past transportable office buildings (buildings 03-1616 and 03-1617) and passed beneath streets and sidewalks to a point northeast of the Oppenheimer Study Center (building 03-0207) where it discharged to the SWMU 03-052(f) outfall before draining into Sandia Canyon. Most of the CMP associated with SWMU 03-013(a) was removed in 2004 to accommodate the construction of the National Security Science Building (03-1400) and a new parking structure (03-1402) east of the Otowi Building. The CMP was managed as nonhazardous/nonradioactive industrial waste. Inspection of the drainline trench showed no evidence of a release from the drainpipe. A new storm drainline was installed west of SWMU 03-052(f) to manage storm water runoff from the new parking structure. The new storm drain discharges to SWMU 03-052(f). Potential contaminants associated with industrial materials historically managed at this Site are metals and petroleum products. SWMU 03-052(f) is a formerly permitted outfall (U.S. Environmental Protection Agency [EPA] 03A023) that received wastewater from floor drains [Area of Concern (AOC) 03-013(b)], sinks, water fountains, and a storm drain [SWMU 03-013(a)], which served building 03-0038 until 1987 when the drains in building 03-0038 were rerouted to the Technical Area 03 (TA-03) sanitary sewer system. Stoddard solvents, dry acid, and caustic materials from the maintenance shop were discarded through sinks and floor drains to this outfall. Spent paint solvents and cutting oils contaminated with machined beryllium particles may also have been released to the floor drains during the 1960s and 1970s. In addition, cooling water for welding torches was discharged directly to the drains. The first spill was approximately 200 gal. of a water-waste oil mixture that was discharged when an automatic compressor blowdown mechanism failed. A second spill from a ruptured air-compressor oil line resulted in the release of approximately 1 qt of compressor oil to the drain. This spill produced an oily sheen on the surface of the water at the SWMU 03-052(f) outfall. A third spill occurred when approximately 15 gal. of diesel fuel was released from a ruptured truck fuel line into the utilities construction trench between buildings 03-1793 and 03-1794. On the same day, a clay sewer pipe in the utility trench broke, releasing approximately 2000 gal. of wastewater into the excavation. A sump was used to remove the wastewater from the excavation, and the wastewater was discharged to SWMU 03-052(f). The diesel-contaminated asphalt and soil were removed and disposed of. Runoff from parking lots and the surrounding areas also discharges to the outfall. Outfall 03A023 was removed from the National Pollutant Discharge Elimination System (NPDES) permit on July 11, 1997. Potential contaminants associated with industrial materials historically managed at this Site are volatile organic solvents, petroleum products, and metals included in discharges from the maintenance contractor’s shop in building 03-38 and three reported petroleum hydrocarbon spills.

54 ENVIRONMENTAL SCIENCES↗

2012 Update to the Site Discharge Pollution Prevention Plan (Rev. 1): Los Alamos/Pueblo Watershed (Vol. 1)

One historical industrial activity area is associated with R001, R-SMA-0.5: Site C-00-020. Area of Concern (AOC) C-00-020 is a suspected mortar impact area located along the north valley wall of Rendija Canyon on General Services Administration (GSA) and U.S. Forest Service (USFS) land. The 30-acre site also includes a tributary of Rendija Canyon. Most of the site lies within the Santa Fe National Forest, except for a small area on the southeastern edge that is private property. AOC C-00-020 was suspected to be a former mortar-impact area because of a “U.S. Property—No Trespassing” sign and a nearly illegible bilingual sign posted in the area. The signs no longer remain. Extensive archival searches have revealed no documentation regarding the use of this site as a munitions impact area. In addition, no field evidence of operations (e.g., munitions debris [MD], munitions and explosives of concern [MEC], unexploded ordnance [UXO], or impact scars) has ever been found at AOC C-00-020. Resource Conservation and Recovery Act (RCRA) facility investigation (RFI) activities conducted in 1993 included conducting an ordnance sweep followed by a geophysical sweep. No ordnance, MD, MEC, or UXO was located. In addition, no ordnance was found during the 2007 investigation or during the 2009 ordnance survey. The site is located within an area burned by the 2000 Cerro Grande fire. The stream channel that runs through the center of the site has been widened by flooding. Currently, there are burned and live trees on the steep slopes next to the stream. Ordnance surveys at the site resulted in no findings except for scrap metal such as bailing wire. The complete absence of ordnance and explosives waste (OEW) confirmed that the site was never used as an ordnance-impact area. In accordance with the approved investigation work plan, no further investigation was conducted at AOC C-00-020. The New Mexico Environment Department (NMED) concurred with the conclusion that no additional ordnance surveys need to be conducted at this site and issued a corrective action complete without controls for AOC C-00-020 on May 16, 2012. No industrial materials were historically managed at this Site; therefore, no potential contaminants are associated with the Site.

54 ENVIRONMENTAL SCIENCES↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. 1 -- National Study, Executive Summary

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. I. National Study. Executive Summary

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established an installed capacity target of 175 gigawatts (GW) RE by 2022 that includes 60 GW of wind and 100 GW of solar, up from current capacities of 29 GW wind and 9 GW solar. India’s contribution to global efforts on climate mitigation extends this ambition to 40% non-fossil-based generation capacity by 2030. Global experience demonstrates that power systems can integrate wind and solar at this scale; however, evidence-based planning is important to achieve wind and solar integration at least cost. The purpose of this analysis is to evaluate the operation of India’s power grid with 175 GW of RE in order to identify potential cost and operational concerns and actions needed to efficiently integrate this level of wind and solar generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CASC Newsletter Vol. 4 (Jan 2018)

The Sidney Fernbach Postdoctoral Fellowship in the Computing Sciences was established in 2012 to attract top new researchers into the Computation Directorate. Similar to LLNL’s Lawrence Fellowship, it offers outstanding new scientists the opportunity to establish their own research directions with a great deal of autonomy. The Lawrence Fellowship is open to all technical disciplines at the Laboratory and is awarded to several candidates each year. The Fernbach, on the other hand, focuses specifically on disciplines in the computing sciences: applied mathematics, computer science, computational science, and data science. It usually supports one fellow at a time for a two-year term.

97 MATHEMATICS AND COMPUTING↗

APS Science 2018 Vol. 1

Research and engineering highlights are reported from the advanced photon source at Argonne National Laboratory.

43 PARTICLE ACCELERATORS↗

RIKEN/RBRC Scientific Review Committee Meeting (Vol. 132)

The RIKEN BNL Research Center (RBRC) was established in April 1997 at Brookhaven National Laboratory*. It is funded by RIKEN, "Rikagaku Kenkyusho", of Japan and the U. S. Department of Energy’s Office of Science. The Memorandum of Understanding between RIKEN and BNL, initiated in 1997, has been renewed in 2002, 2007, 2012 and 2018. The Center is dedicated to the study of strong interactions, including spin physics, lattice QCD, and RHIC physics through the nurturing of a new generation of young physicists. The RBRC has an active workshop program on strong interaction physics with each workshop focused on a specific physics problem. For most of these workshops, the talks are made available on the RBRC website. To date there are over 116 proceedings volumes available. In 2017 RBRC celebrated its 20th anniversary since its inauguration in 1997. This was also the year of the 100th anniversary of RIKEN. The RBRC is well matured and moves into the new generation with dismantling of the PHENIX detector and construction of the new sPHENIX detector at RHIC. We are on track with growth plans in place. On April 1st 2017, Hideto En’yo, Director of RIKEN Nishina Center for Accelerator-Based Science, was named Acting Director of the RBRC, preceded by Samuel Aronson, Nicholas Samios and Tsung-Dao Lee.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Environmental Investigations at Former CCC/USDA Facilities: Master Work Plan (Vols 1 and 2)

The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides the CCC/USDA with technical assistance for site characterization investigations and remediation efforts at its former grain storage facilities in Kansas, Nebraska, and Missouri (and possible other states), where carbon tetrachloride is the contaminant of primary concern. Argonne’s environmental investigations at these facilities are based on an expedited approach to site characterization that Argonne developed, which became the basis for Standard D6235-98 (now Standard D62351-18; revised in 2004 and 2018) of the American Society for Testing and Materials (ASTM 2018).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Isotopic and Fuel Lattice Parameter Trends in Extended Enrichment and Higher Burnup LWR Fuel Vol I: PWR fuel

Commercial light water reactor (LWR) operators and fuel vendors in the United States are pursuing changes to nuclear fuel that include extended enrichment (EE) and accident-tolerant fuel (ATF) designs. The term EE (8% > 235 U > 5%) is used in this report to refer to a subset of high assay low-enriched uranium (HALEU) that is considered usable in commercial US LWRs in the near term. ATF features are designed to improve fuel system performance under accident conditions. One goal of EE is to improve fuel cycle economy by enabling fuel to be depleted to higher burnup than the typical current maximum pin burnup limits (62 gigawatt-days per metric ton of uranium [GWd/MTU]). Adoption of EE, ATF, and high burnup (HBU) fuels in the US commercial fleet requires a clear understanding of the effects on core physics parameters and used fuel isotopic content, as well as confidence in the accuracy of computer code predictions over an expanded range of materials, enrichment, and burnup. A thorough understanding of the applicability and adequacy of benchmark data (e.g., criticality, decay heat, isotopic content) for computer code validation is necessary to ensure that appropriate safety margins are maintained. To prepare for and support these potential changes, the effects of EE, ATF, and HBU are being assessed for selected representative LWR fuel designs. The project is divided into phases: this report summarizes the findings of Phase 1, which focuses on the lattice physics parameter and used fuel isotopic changes for a conventional Westinghouse 17×17 pressurized water reactor (PWR) design. The primary investigation tool is the SCALE Polaris code using the SCALE 56-group Evaluated Nuclear Data File (ENDF)/B-VII.1 cross sections. The goal of the current work is to (1) identify and explain important effects of EE and HBU (reactivity, lattice physics, and isotopic effects) assuming that PWR fuel design and usage remain similar to those for current enrichment fuel, (2) provide limited code-to-code comparisons with higher order cross section libraries and/or codes, and (3) identify any apparent anomalous trends in the results for further investigation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

APS Science 2020 (Vol. 2)

The U.S. Department of Energy's Advanced Photn Source (APS) is one of the world’s most productive x-ray light source facilities. Each year, the APS provides high-brightness x-ray beams to a diverse community of more than 5,000 researchers in materials science, chemistry, condensed matter physics, the life and environmental sciences, and applied research. Researchers using the APS produce over 2,000 publications each year detailing impactful discoveries, and solve more vital biological protein structures than users of any other x-ray light source research facility. APS x-rays are ideally suited for explorations of materials and biological structures; elemental distribution; chemical, magnetic, electronic states; and a wide range of technologically important engineering systems from batteries to fuel injector sprays, all of which are the foundations of our nation’s economic, technological, and physical well-being. The APS occupies an 80-acre site on the Argonne campus, about 25 miles from downtown Chicago, Illinois. It shares a site with the Center for Nanoscale Materials and the Advanced Protein Characterization Facility.

01 COAL, LIGNITE, AND PEAT↗

APS Science 2020 (Vol. 1)

The U.S. Department of Energy's Advanced Photon Source (APS) is one of the world’s most productive x-ray light source facilities. Each year, the APS provides high-brightness x-ray beams to a diverse community of more than 5,000 researchers in materials science, chemistry, condensed matter physics, the life and environmental sciences, and applied research. Researchers using the APS produce over 2,000 publications each year detailing impactful discoveries, and solve more vital biological protein structures than users of any other x-ray light source research facility. APS x-rays are ideally suited for explorations of materials and biological structures; elemental distribution; chemical, magnetic, electronic states; and a wide range of technologically important engineering systems from batteries to fuel injector sprays, all of which are the foundations of our nation’s economic, technological, and physical well-being. The APS occupies an 80-acre site on the Argonne campus, about 25 miles from downtown Chicago, Illinois. It shares a site with the Center for Nanoscale Materials and the Advanced Protein Characterization Facility.

25 ENERGY STORAGE↗

Follow-on Report of Analysis of Approaches to Supplemental Treatment of Low-Activity Waste at the Hanford Nuclear Reservation (Vol. I)

The Hanford Site, in southeast Washington State, is preparing to disposition approximately 56,000,000 gallons (56 Mgal) of radioactive and chemically hazardous wastes currently stored in underground tanks at the site. Tank wastes will be divided into a high-activity fraction and a low-activity fraction for subsequent treatment and disposition. A waste processing and treatment facility, the Waste Treatment and Immobilization Plant (WTP), will include the high-level waste (HLW) vitrification facility (WTP HLW Vitrification Facility) for immobilizing the high-activity fraction and a low-activity waste (LAW) vitrification facility (WTP LAW Vitrification Facility) for immobilizing the low-activity fraction. Both facilities will use vitrification technology to immobilize the Hanford tank wastes in a glass waste form. The volume of LAW to be treated and disposed of following waste retrieval and WTP operations will exceed the planned processing capacity of the WTP LAW Vitrification Facility. ORP-11242,-River Protection Project System Plan, estimates a shortfall in LAW treatment capacity of approximately 56 Mgal, approximately 50% of the projected LAW volume. To maintain the planned tank waste processing mission schedule, the U.S. Department of Energy (DOE) will require additional LAW treatment capacity (termed “supplemental LAW”) external to the WTP process. LAW must be solidified by a treatment technology before the waste can be permanently disposed of in an approved DOE on-site disposal facility or a commercial (state or U.S. Nuclear Regulatory Commission [NRC-licensed]) off-site mixed low-level waste disposal facility. A decision on the approach to supplemental LAW treatment, processing, and disposal has not yet been made

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Core Physics Characteristics of Extended Enrichment and Higher Burnup LWR Fuels using the Polaris/PARCS Two-Step Approach. Vol. I: PWR Fuel

Nuclear fuel with extended enrichment (235U enrichment within 5-8 wt%) is one of the evolutionary changes that have been pursued in recent years by commercial light water reactor operators and fuel vendors to improve the fuel cycle economy and operation performance of a nuclear plant. This work assesses the performance of the Polaris/PARCS two-step approach in core physics modeling of the pressurized water reactor cores with extended enrichment fuel, referred to as “LEU+” in this report. A representative LEU+ core with a 24-month fuel cycle developed by Southern Nuclear Company (SNC) was modeled using this two-step approach. A representative LEU core with an 18-month fuel cycle was also modeled to provide a reference for the LEU+ core. As expected, significantly more burnable poison absorbers were used in the LEU+ core to accomodate its higher fuel enrichment. Nine different fuel assembly types were modeled using Polaris for each core to generate the assembly cross sections, which were then processed by GenPMAX to prepare the cross-section data for PARCS. The average specific powers of each fuel batch in each core were derived from VERA results and higher specific powers in fresh assemblies were found in the LEU core due to its less total uranium loading included in the VERA LEU model, given that the total core power was assumed to be the same for both cores. PARCS models were developed to simulate the steady-state operations of both cores. PARCS results on the LEU+ core were first compared with the VERA results for verification purpose; good agreements were seen in soluble boron and burnup distribution results, indicating that the Polaris/PARCS modeling and simulation were correctly implemented. Core physics parameters calculated by PARCS, at zero power physics tests, beginning of cycle (BOC), and end of cycle conditions (EOC), were compared between the LEU+ core and the LEU core, including soluble boron concentration, burnup distributions, assembly and pin power peaking factors, fuel temperature reactivity coefficients, moderator temperature and density reactivity coefficients, control rod worth, and shut down margin. The main differences in PARCS results between the LEU+ and the LEU cores are summarized below: 1)The critical boron concentrations were found to be much higher in the LEU+ core than in the LEU core (1582 vs. 1335 ppm for peak values). 2)Higher assembly radial power peaking factors (1.4 vs. 1.3 for peak values), 2D pin peaking factors (1.53 vs. 1.42 for peak values), and 3D pin peaking factors (1.89 vs. 1.81 for peak values) were found in the LEU+ core than in the LEU core. 3)Significantly higher reactivity coefficients of moderator temperature (and density) were found in LEU+ than in LEU.4)Significantly lower control rod worth at EOC were found in LEU+ than LEU for all but one control banks.5)Significantly lower shut down margins were found in the LEU+ core than in the LEU core. The Polaris/GenPMAX/PARCS code suite was found to be capable of modeling the LEU+ PWR core for steady-state operations and no unexpected results in core physics parameters were observed, in spite of that a) several bugs in PARCS were identified and workarounds were used; b) several features were found lacking in the current version of PARCS that would be useful for core modeling. A list of requests for bug fixes and feature upgrades for PARCS originated from this work were transmitted to the code developers. The assessments on the performance of the Polaris/PARCS two-step approach in core modeling for boiling water reactor with LEU+ fuel is ongoing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗