At least 73 records · Page 4

A comparison of methods for assessing power output in non-uniform onshore wind farms

Wind resource assessments are used to estimate a wind farm's power production during the planning process. It is important that these estimates are accurate, as they can impact financing agreements, transmission planning, and environmental targets. Here, we analyze the challenges in wind power estimation for onshore farms. Turbine wake effects are a strong determinant of farm power production. With given input wind conditions, wake losses typically cause downstream turbines to produce significantly less power than upstream turbines. These losses have been modeled extensively and are well understood under certain conditions. Most notably, validation of different model types has favored offshore farms. Models that capture the dynamics of offshore wind conditions do not necessarily perform equally as well for onshore wind farms. We analyze the capabilities of several different methods for estimating wind farm power production in 2 onshore farms with non-uniform layouts. We compare the Jensen model to a number of statistical models, to meteorological downscaling techniques, and to using no model at all. In conclusion, we show that the complexities of some onshore farms result in wind conditions that are not accurately modeled by the Jensen wake decay techniques and that statistical methods have some strong advantages in practice.

17 WIND ENERGY↗

A New Framework for Quantifying Lidar Uncertainty

As wind turbine sizes increase and wind energy expands to more complex and remote sites, remote sensing devices such as lidars are expected to play a key role in wind resource assessment and power performance testing. The switch to remote sensing devices represents a paradigm shift in the way the wind industry typically obtains and interprets measurement data for wind energy. For example, the measurement techniques and sources of uncertainty for a remote sensing device are vastly different from those associated with a cup anemometer on a meteorological tower. Current IEC standards discuss uncertainty due to mounting, calibration, and classification of the remote sensing device, among other parameters. Values of the uncertainty are typically given as a function of the mean wind speed measured by a reference device. However, real-world experience has shown that lidar performance is highly dependent on atmospheric conditions, such as wind shear, turbulence, and aerosol content. At present, these conditions are not directly incorporated into the estimated uncertainty of a lidar device. In this presentation, we propose the development of a new lidar uncertainty framework that adapts to current flow conditions and more accurately represents the actual uncertainty inherent in lidar measurements under different conditions. In this new framework, sources of uncertainty are identified for estimation of the line-of-sight wind speed and reconstruction of the three-dimensional wind field. These sources are then related to physical processes caused by the atmosphere and lidar operating conditions. The framework is applied to lidar data from an operational wind farm to assess the ability of the framework to predict errors in lidar-measured wind speed.

17 WIND ENERGY↗

An Overview of Wind Energy Production Prediction Bias, Losses, and Uncertainties

The financing of a wind farm directly relates to the preconstruction energy yield assessments which estimate the annual energy production for the farm. The accuracy and the precision of the preconstruction energy estimates can dictate the profitability of the wind project. Historically, the wind industry tended to overpredict the annual energy production of wind farms. Experts have been dedicated to eliminating such prediction errors in the past decade, and recently the industry is recording near-zero average energy prediction bias. Herein, we present an overview of the energy yield assessment errors across the global wind energy industry. We identify a long-term trend of reduction in the overprediction bias, whereas the uncertainty associated with the prediction error is prominent. We also summarize the recent advancements of the wind resource assessment process that justify the bias reduction, including the improvements in modeling and measurement techniques. Additionally, because the energy losses and uncertainties substantially influence the prediction error, we document and examine the estimated and observed loss and uncertainty values from the literature, according to the proposed framework in the International Electrotechnical Commission 61400-15 wind resource assessment standard. From our findings, we highlight the opportunities for the industry to move forward, such as the validation and reduction of prediction uncertainty, and the prevention of energy losses caused by wake effect and environmental events. Overall, this study provides a summary on how the wind energy industry has been quantifying and reducing prediction errors, energy losses, and production uncertainties. Finally, for this work to be as reproducible as possible, we include all of the data used in the analysis in appendices to the manuscript.

literature review↗

Effects of Changing Atmospheric Conditions on Wind Turbine Performance (Poster)

Multi-megawatt, utility-scale wind turbines operate in turbulent and dynamic winds that impact turbine performance in ways that are gradually becoming better understood. This poster presents a study made using a turbulent flow field simulator (TurbSim) and a Turbine aeroelastic simulator (FAST) of the response of a generic 1.5 MW wind turbine to changing inflow. The turbine power output is found to be most sensitive to wind speed and turbulence intensity, but the relationship depends on the wind speed with respect to the turbine's rated wind speed. Shear is found to be poorly correlated to power. A machine learning method called 'regression trees' is used to create a simple model of turbine performance that could be used as part of the wind resource assessment process. This study has used simple flow fields and should be extended to more complex flows, and validated with field observations.

17 WIND ENERGY↗

Using Machine Learning to Create Turbine Performance Models (Presentation)

Wind turbine power output is known to be a strong function of wind speed, but is also affected by turbulence and shear. In this work, new aerostructural simulations of a generic 1.5 MW turbine are used to explore atmospheric influences on power output. Most significant is the hub height wind speed, followed by hub height turbulence intensity and then wind speed shear across the rotor disk. These simulation data are used to train regression trees that predict the turbine response for any combination of wind speed, turbulence intensity, and wind shear that might be expected at a turbine site. For a randomly selected atmospheric condition, the accuracy of the regression tree power predictions is three times higher than that of the traditional power curve methodology. The regression tree method can also be applied to turbine test data and used to predict turbine performance at a new site. No new data is required in comparison to the data that are usually collected for a wind resource assessment. Implementing the method requires turbine manufacturers to create a turbine regression tree model from test site data. Such an approach could significantly reduce bias in power predictions that arise because of different turbulence and shear at the new site, compared to the test site.

17 WIND ENERGY↗

A Twenty-Year Analysis of Winds in California for Offshore Wind Energy Production Using WRF v4.1.2

Offshore wind resource characterization in the United States relies heavily on simulated winds from numerical weather prediction (NWP) models, given the lack of hub-height observations offshore. One such NWP data set used extensively by U.S. stakeholders is the Wind Integration National Dataset (WIND) Toolkit, a 7-year time-series data set produced in 2013 by the National Renewable Energy Laboratory. In this study, we present an update to that data set for offshore California that leverages recent advancements in NWP modeling capabilities and extends the period of record to a full 20 years. The data set predicts a significantly larger wind resource (0.25–1.75 m s-1 stronger), including in three Call Areas that the Bureau of Ocean Energy Management is considering for commercial activity. We conduct a set of yearlong simulations to study factors that contribute to this increase in the modeled wind resource. The largest impact arises from a change in the planetary boundary layer parameterization from the Yonsei University scheme to the Mellor-Yamada-Nakanishi-Niino scheme and their diverging wind profiles under stable stratification. Additionally, we conduct a refined wind resource assessment at the three Call Areas, characterizing distributions of wind speed, shear, veer, stability, frequency of wind droughts, and power production. We find that, depending on the attribute, the new data set can show substantial disagreement with the WIND Toolkit, thereby driving important changes in predicted power.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

Offshore Wind Technology: Above the Water

WINDExchange will produce an Offshore Wind Technology: Above the Water Webinar. The webinar will explore the technology involved in offshore wind above the water including wind farm technology, turbine technology, and wind resource assessments and modeling to provide foundational technical information to communities and interested stakeholders.

above the water↗

Wind Plant Performance Prediction Benchmark Phase 1 (Technical Report)

Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was created out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results.

17 WIND ENERGY↗

Lake Michigan Offshore Wind Feasibility Assessment

The purpose of this project was to conduct the first comprehensive offshore wind assessment over Lake Michigan and to advance the body of knowledge needed to support future commercial wind energy development on the Great Lakes. The project involved evaluation and selection of emerging wind measurement technology and the permitting, installation and operation of the first mid-lake wind assessment meteorological (MET) facilities in Michigan’s Great Lakes. In addition, the project provided the first opportunity to deploy and field test floating LIDAR and Laser Wind Sensor (LWS) technology, and important research related equipment key to the sitting and permitting of future offshore wind energy development in accordance with public participation guidelines established by the Michigan Great Lakes Wind Council (GLOW). The project created opportunities for public dialogue and community education about offshore wind resource management and continued the dialogue to foster Great Lake wind resource utilization consistent with the focus of the GLOW Council. The technology proved to be effective, affordable, mobile, and the methods of data measurement accurate. The public benefited from a substantial increase in knowledge of the wind resources over Lake Michigan and gained insights about the potential environmental impacts of offshore wind turbine placements in the future. The unique first ever hub height wind resource assessment using LWS technology over water and development of related research data along with the permitting, sitting, and deployment of the WindSentinel MET buoy has captured public attention and has helped to increase awareness of the potential of future offshore wind energy development on the Great Lakes. Specifically, this project supported the acquisition and operation of a WindSentinel (WS) MET wind assessment buoy, and associated research for 549 days over multiple years at three locations on Lake Michigan. Four research objectives were defined for the project including to: 1) test and validate floating LIDAR technology; 2) collect and access offshore wind data; 3) detect and measure bird and bat activity over Lake Michigan; 4) conduct an over water sound propagation study; 5) prepare and offer a college course on offshore energy, and; 6) collect other environmental, bathometric, and atmospheric data. Desk-top research was performed to select anchorage sites and to secure permits to deploy the buoy. The project also collected and analyzed data essential to wind industry investment decision-making including: deploying highly mobile floating equipment to gather offshore wind data; correlating offshore wind data with conventional on-shore MET tower data; and performing studies that can contribute to the advancement and deployment of offshore wind technologies. Related activities included: • Siting, permitting, and deploying an offshore floating MET facility; • Validating the accuracy of floating LWS using near shoreline cup anemometer MET instruments; • Assessment of laser pulse technology (LIDAR) capability to establish hub height measurement of wind conditions at multiple locations on Lake Michigan; • Utilizing an extended-season (9-10 month) strategy to collect hub height wind data and weather conditions on Lake Michigan; • Investigation of technology best suited for wireless data transmission from distant offshore structures; • Conducting field-validated sound propagation study for a hypothetical offshore wind farm from shoreline locations; • Identifying the presence or absence of bird and bat species near wind assessment facilities; • Identifying the presence or absence of benthic and pelagic species near wind assessment facilities; All proposed project activities were completed with the following major findings: • Floating Laser Wind Sensors are capable of high quality measurement and recordings of wind resources. The WindSentinel presented no significant operational or statistical limitations in recording wind data technology at a at a high confidence level as compared to traditional anemometer cup technology. • During storms, mean Turbulent Kinetic Energy (TKE) increases with height above water; • Sufficient wind resources exist over Lake Michigan to generate 7,684 kWh of power using a 850 kW rated turbine at elevations between 90 - 125 meters, a height lower than originally anticipated for optimum power generation; • Based on initial assessments, wind characteristics are not significantly different at distant (thirty-two mile) offshore locations as compared to near-shore (six mile) locations; • Significant cost savings can be achieved in generation wind energy at lower turbine heights and locating closer to shore. • Siting must be sufficiently distant from shore to minimize visual impact and to address public sentiment about offshore wind development; • Project results show that birds and bats do frequent the middle of Lake Michigan, bats more so than birds; • Based on the wind resource assessment and depths of Lake Michigan encountered during the project, future turbine placement will most likely need to incorporate floating or anchored technology; • The most appropriate siting of offshore wind energy locations will enable direct routing of transmission cables to existing generating and transmission facilities located along the Michigan shoreline; • Wind turbine noise propagation from a wind energy generating facility at a five mile offshore location will not be audible at the shoreline over normal background sound levels.

17 WIND ENERGY↗

Federal Wind Energy Assistance through NREL (Fact Sheet)

NREL assists with wind resource assessment and development activities initiated by federal agencies to facilitate distributed renewable energy projects at federal agency sites. This brief outlines the process for requesting NREL assistance with federal wind energy projects.

17 WIND ENERGY↗

Developing a 20-year high-resolution wind data set for Puerto Rico

The purpose of this study is to develop a high-resolution wind resource data set for Puerto Rico as part of the wind resource assessment in the Puerto Rico Grid Resilience and Transition to 100 % Renewable Energy Study (PR100) project. The Weather and Research and Forecasting (WRF) is used to model 20-years (2001-2020) of wind resource data on a 3-km grid for the Puerto Rico region. Because accurately representing the planetary boundary layer (PBL)-physics in the WRF is key to accurately model low-level wind speed, 11 different PBL schemes are examined and evaluated to find a WRF configuration that can provide the most accurate wind data. The modeled wind speeds are validated with buoy observations, and the Shin-Hong PBL scheme is selected to generate the final wind data set. Here, the overall results demonstrate that the high-resolution data correctly represents the climate of Puerto Rico (e.g., a dominant easterly trade wind). At 160 m above ground, the southern regions of Puerto Rico show strong offshore wind speed (>8 m/s on average) throughout the daytime and nighttime. For land-based wind, average wind speed ranges from 5 m/s-7 m/s during daytime, whereas notable high wind speeds (>9 m/s) appear in the mountain regions during nighttime.

17 WIND ENERGY↗

Development of a Metocean Reference Site near the Massachusetts and Rhode Island Wind Energy Areas

This project developed the first long-term U.S.-based offshore MetOcean Reference Site (MORS-1) by capitalizing on a unique combination of one of the few existing publicly available offshore wind energy metocean observational campaigns in the United States and the only existing research-grade offshore fixed tower. Data collected at MORS-1 has facilitated improved wind resource assessments, improved short-term power production estimates, and reduced costs for sensor validation and calibration efforts, which translate into reduced overall wind energy project risk and cost for developers. Now operational, MORS-1 serves the needs of both industry and researchers using a nonprofit, joint industry-academic partnership model. Led by the Woods Hole Oceanographic Institution, the MORS-1 development effort focused on creating both a recognized organizational structure that will ensure support of the MORS-1 by the wider wind energy industry and research community, and a highly validated data collection and sensor validation facility that will serve as the premier location for cost- and uncertainty-reducing resource characterization and research efforts.

17 WIND ENERGY↗

Simulated wind farm wake sensitivity to configuration choices in the Weather Research and Forecasting model version 3.8.1

Wakes from wind farms can extend over 50 km downwind in stably stratified conditions. These wakes can undermine power production at downwind turbines, adversely impacting revenue. As such, wind farm wake impacts must be considered in wind resource assessments, especially in regions of dense wind farm development. The open-source Weather Research and Forecasting (WRF) numerical weather prediction model includes a wind farm parameterization to estimate wind farm wake effects, but model configuration choices can influence the resulting predictions of wind farm wakes. These choices include vertical resolution, horizontal resolution, and whether or not to include the addition of turbulent kinetic energy generated by the rotating wind turbines. Despite the sensitivity to model configuration, no clear guidance currently exists for these options. Here we compare simulated wind farm wakes produced by varying model configurations with meteorological observations near a land-based wind farm in flat terrain over several diurnal cycles. A WRF configuration comprised of horizontal resolutions of 3 km or 1 km paired with a vertical resolution of 10 m provides the most accurate representation of wind farm wake effects, such as the correct surface warming and elevated wind speed deficit. The inclusion of turbine-generated turbulence is also critical to produce accurate surface warming and should not be omitted.

17 WIND ENERGY↗

Wind Powering America Initiative (Fact Sheet)

The U.S. Department of Energy's Wind Powering America initiative engages in technology market acceptance, barrier reduction, and technology deployment support activities. This fact sheet outlines ways in which the Wind Powering America team works to reduce barriers to appropriate wind energy deployment, primarily by focusing on six program areas: workforce development, communications andoutreach, stakeholder analysis and resource assessment, wind technology technical support, wind power for Native Americans, and federal sector support and collaboration.

17 WIND ENERGY↗

How Wrong Can the Operational AEP Uncertainty Estimate Be When We Ignore the Correlations Between the Uncertainty Components?

Calculations of wind farm annual energy production (AEP) on operational data are essential for a variety of financial transactions during the life of wind plants. The AEP estimate is associated with an uncertainty value, which is calculated by combining contributions connected to on-site measurements, long-term reference measurements, losses, regression, windiness adjustment, and wind resource interannual variability. Although very limited documentation on the topic exists, the conventional approach currently used by the wind energy community to assess the uncertainty connected to the operational AEP estimate assume that the different uncertainty components are uncorrelated and therefore calculates the overall uncertainty with a sum of squares approach. In this analysis, we contrast the traditional technique to estimate the overall AEP uncertainty by ignoring the correlation between its different components with a novel Monte Carlo based approach, which can instead take into account the correlation between different uncertainty categories. We consider monthly operational data from 472 wind farms from the Energy Information Administration (EIA) 923 database to assess the difference between the two approaches. Long-term wind speed data needed for the AEP assessment are taken from three reanalysis products: the Modern-Era Retrospective analysis for Research and Applications v2 (MERRA-2), the European Reanalysis Interim (ERA-interim), and the National Centers for Environmental Prediction v2 (NCEP-2). The results of the Monte Carlo approach show that three pairs of AEP uncertainty components do show a statistically significant correlation: the uncertainty connected with wind resource inter-annual variability is positively correlated with the one related to the windiness correction and negatively correlated with the one due to the regression, and the wind measurement uncertainty is positively correlated with the regression uncertainty. All these correlations, which are found between uncertainty components which are not only part of an operational analysis, but also of a wind resource assessment, are currently ignored in the conventional techniques used as industry standard. We further investigate the causes of these correlations, in terms of common dependencies of different uncertainty components on wind resource variability, number of data points, and quality of the regression between wind speed and energy production data. Next, we quantify the error in the current industry standard technique, in terms of the percentage difference in total uncertainty calculated with the two considered approaches, for all the analyzed wind farms. We find a mean absolute percentage difference of about 6%, with the largest differences being greater than 20%. The data clearly confirm that ignoring the actual correlation between the uncertainty components can lead to large errors in the assessment of the operational AEP uncertainty, and the proposed Monte Carlo approach should be preferred.

Monte Carlo↗

Feasibility of Wind to Serve Upper Skagit’s Bow Hill Tribal Lands and Feasibility Update for Residential Renewable Energy

A two year wind resource assessment was conducted to determine the feasibility of developing a community scale wind generation system for the Upper Skagit Indian Tribe's Bow Hill land base, and the project researched residential wind resource technologies to determine the feasibility of contributing renewable wind resource to the mix of energy options for our single and multi-family residential units.

17 WIND ENERGY↗

Characterization of winds through the rotor plane using a phased array SODAR and recommendations for future work.

Portable remote sensing devices are increasingly needed to cost effectively characterize the meteorology at a potential wind energy site as the size of modern wind turbines increase. A short term project co-locating a Sound Detection and Ranging System (SODAR) with a 200 meter instrumented meteorological tower at the Texas Tech Wind Technology Field Site was performed to collect and summarize wind information through an atmospheric layer typical of utility scale rotor plane depths. Data collected identified large speed shears and directional shears that may lead to unbalanced loads on the rotors. This report identifies suggestions for incorporation of additional data in wind resource assessments and a few thoughts on the potential for using a SODAR or SODAR data to quantify or investigate other parameters that may be significant to the wind industry.

17 WIND ENERGY↗