Analysis of Respirator Cartridge Performance Testing on the 702-AZ Primary Exhauster for the Hanford AY/AZ Tank Farms during a Waste-Disturbing Event

Washington River Protection Solutions (WRPS) conducted tests using two types of chemical cartridges for use in air-purifying respirators (APR) to determine the period of time that the cartridges would provide adequate performance1 for APRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPC) from vapors exiting the 702-AZ Primary Exhauster for the Hanford AY-AZ tank farms. Unlike prior cartridge testing on the 702-AZ Primary Exhauster, the recent tests were performed during a waste-disturbing event. The Occupational Safety and Health Administration (OSHA) identifies cartridge testing as a valid approach for establishing a cartridge change schedules. Testing is commonly applied in situations where mixtures of COPCs exist, and where other approaches, such as manufacturer recommendations and modeling, are less reliable. The tests were designed and conducted to assure measurement and/or control of the key variables OSHA identified as important to estimate the cartridge service life, including temperature, humidity, COPC concentration, breathing rate, and cartridge adsorption capacity. Testing was conducted from February 10–11, 2017, on a slipstream from the 702-AZ exhauster fed to a respirator cartridge test stand developed by WRPS in collaboration with HiLine Engineering (Richland, Washington). Multipurpose respirator cartridges, SCOTT 7422-SD1 and SCOTT 7422-SC1 (SCOTT Safety, Monroe, North Carolina), were assessed on separate days. Sample media (sorbent tubes) and canisters (e.g., Summa) sampling were used to collect samples of the vapor stream entering and exiting the respirator cartridge and were subsequently analyzed for COPC concentrations. Pacific Northwest National Laboratory was tasked with conducting an independent analysis of the analytical results and making recommendations based on the results for respiratory cartridge performance and service life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification of Hanford Tank Wastes for Condensate Recycle and Feed Composition Changeover Testing (Rev. 1)

During the vitrification of Hanford Site nuclear waste at the Waste Treatment and Immobilization Plant (WTP), which is a part of the safe and efficient retrieval, treatment, and disposal mission of the U.S. Department of Energy Office of River Protection, the offgas condensate generated from the waste-to-glass conversion is currently planned to be concentrated by evaporation in the Effluent Management Facility (EMF). This concentrated condensate can then be recycled back to the incoming waste and vitrified. To test the recycle process, an apparatus was designed and built to mimic the EMF evaporator and was then used to concentrate a volume of condensate produced during the vitrification of a sample of Hanford tank 241-AP-107 (referred to herein as AP-107) waste in a continuous laboratory-scale melter (CLSM). The concentrated condensate was added to an additional sample of AP-107 waste, to mimic one round of the recycle process, and the combined solution was vitrified, producing a second round of recycle condensate. In the current study, the EMF test apparatus was used to concentrate the second-round recycle condensate under evaporation conditions (at 45 °C and 1.4 psia) designed to emulate EMF operation. The condensate was successfully concentrated by a factor of ~10 while retaining over 95 % of the technetium-99 (99Tc), Cs, and I inventories in the concentrate. Another portion of AP-107 waste was retrieved by Washington River Protection Solutions, LLC (WRPS) and transferred to Pacific Northwest National Laboratory (PNNL), where it was pretreated and then combined with the second-round recycle AP-107 condensate concentrate and glass-forming chemicals (GFCs) to form the two-time recycle AP-107 melter feed, approximating a second round to the recycling action to be performed at the WTP. A portion of AP-105 waste was also retrieved by WRPS and provided to PNNL for pretreatment and combining with GFCs to form AP-105 melter feed. The two-time recycle AP-107 and AP-105 melter feeds were processed consecutively in the CLSM. The CLSM run proceeded for 13.63 hours, producing 9.70 kg of glass for an average glass production rate of 1464 kg m 2 d -1 during the two-time recycle AP-107 feed charging and 1568 kg m 2 d -1 during the AP-105 feed charging. The rate during AP-107 charging was essentially equivalent to the rate when processing no-recycle AP-107 feed and lower than that achieved when processing one-time recycle AP-107 feed. However, all rates were within the potential range of variability when processing melter feeds with similar composition in the CLSM. Likewise, the rate during AP-105 charging was higher than the previous rate processing AP-105, but within the potential CLSM range. The cold-cap characteristics changed from the typically thin AP-107 cold cap to a foamy-edged cold cap as previously seen with AP-105 shortly after transitioning to the AP-105 melter feed. The glass produced during the CLSM run was within 10 % of its target composition for the primary glass components. The CaO and Li 2 O targets varied by more than 1 wt% between the two-time recycle AP-107 and AP-105 glass targets and it took about 2 turnovers of the CLSM glass inventory to reach a relative chemical steady state in the glass for CaO and Li 2 O after the melter feed inputs were switched.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Respirator Cartridge Performance Testing on a Hanford AW Tank Farm Exhauster Slipstream

Washington River Protection Solutions (WRPS) conducted tests on two types of chemical cartridges for use in air-purifying respirators (APR) to determine the period of time that the cartridges would provide adequate performance for APRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPCs) from vapors exiting the exhauster for the Hanford AW tank farm. The Occupational Safety and Health Administration (OSHA) identifies cartridge testing as a valid approach for establishing a cartridge change schedules. Testing is commonly applied in situations where mixtures of COPCs exist, and where other approaches, such as manufacturer recommendations and modeling, are less reliable. The tests were designed and conducted to assure measurement and/or control of the key variables OSHA identified as important to estimate cartridge service-life, including temperature, humidity, COPC concentration, breathing rate, and cartridge adsorption capacity. Testing was conducted from September 23-25, 2016, on a slipstream from the AW exhauster, under static conditions fed to a respirator cartridge test stand developed by WRPS in collaboration with HiLine Engineering (Richland, Washington). Multipurpose respirator cartridges, SCOTT 7422-SD1 and SCOTT 7422-SC1 (SCOTT Safety, Monroe, North Carolina), were assessed on separate days. Sample media (sorbent tubes) were used to collect samples of the vapor stream entering and exiting the respirator cartridge, and were subsequently analyzed for COPC concentrations. Pacific Northwest National Laboratory was tasked with conducting an independent analysis of the analytical results and making recommendations based on the results for respiratory cartridge performance and service life.

54 ENVIRONMENTAL SCIENCES↗

Project Report for Cold Spray Phase 2 (Tasks 9-20)

In support of the ongoing environmental protection mission at the Hanford Site, led by Washington River Protection Solutions (WRPS), the cold spray team has continued development of the tank refurbishment technology. Orano Federal Services, along with subcontractors VRC Metal Systems (VRC) and Robotic Technologies of Tennessee (RTT), have worked with WRPS experts to refine the tools demonstrated in Phase 1 of this project, with the potential to refurbish double shell tanks (DST)s on the Hanford Site, extending the service lives of these vital waste storage facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Report for Cold Spray: Phase 2

In support of the ongoing environmental protection mission at the Hanford Site, led by Washington River Protection Services (WRPS), the cold spray team has continued development of the tank refurbishment technology. Orano Federal Services, along with subcontractors VRC Metal Systems (VRC) and Robotic Technologies of Tennessee (RTT), have worked with WRPS experts to refine the tools demonstrated in Phase 1 of this project, with the potential to refurbish double shell tanks (DST)s on the Hanford Site, extending the service lives of these vital waste storage facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unraveling the mystery of natural rubber biosynthesis. Part II. Composition and growth of in vitro natural rubber using high-resolution size exclusion chromatography

The superior properties of natural rubber (cis-1,4-polyisoprene [NR]) are a function of its structure and composition, properties that still remain a mystery and that are irreplaceable by any synthetic rubber. NR from guayule (Parthenium argentatum) has been gaining special interest for its hypoallergenic properties while maintaining superior mechanical properties that are commonly associated with the Brazilian rubber tree (Hevea brasiliensis), the most common source of NR. Techniques exist to isolate washed rubber particles (WRPs) that contain enzymatically active rubber transferase, to study NR biosynthesis, and previous work on the in vitroNRgrowth in Hevea has demonstrated the presence of around 50wt%of a low molecular weight ([MW], Mn <10 000 g/mol) fraction. Structural and compositional analyses of this low MW fraction in Hevea are challenging due to the high protein content. Here, we discuss the analysis and composition of guayule latex and WRPs using high-resolution Size Exclusion Chromatography. We also discuss the composition of the soluble fraction of inactive guayule latex using matrix-assisted laser desorption ionization/time of flight mass spectrometry.

36 MATERIALS SCIENCE↗

STATISTICAL EVALUATION OF SMALL SCALE MIXING DEMONSTRATION SAMPLING AND BATCH TRANSFER PERFORMANCE - 12093

The ability to effectively mix, sample, certify, and deliver consistent batches of High Level Waste (HLW) feed from the Hanford Double Shell Tanks (DST) to the Waste Treatment and Immobilization Plant (WTP) presents a significant mission risk with potential to impact mission length and the quantity of HLW glass produced. DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS) has previously presented the results of mixing performance in two different sizes of small scale DSTs to support scale up estimates of full scale DST mixing performance. Currently, sufficient sampling of DSTs is one of the largest programmatic risks that could prevent timely delivery of high level waste to the WTP. WRPS has performed small scale mixing and sampling demonstrations to study the ability to sufficiently sample the tanks. The statistical evaluation of the demonstration results which lead to the conclusion that the two scales of small DST are behaving similarly and that full scale performance is predictable will be presented. This work is essential to reduce the risk of requiring a new dedicated feed sampling facility and will guide future optimization work to ensure the waste feed delivery mission will be accomplished successfully. This paper will focus on the analytical data collected from mixing, sampling, and batch transfer testing from the small scale mixing demonstration tanks and how those data are being interpreted to begin to understand the relationship between samples taken prior to transfer and samples from the subsequent batches transferred. An overview of the types of data collected and examples of typical raw data will be provided. The paper will then discuss the processing and manipulation of the data which is necessary to begin evaluating sampling and batch transfer performance. This discussion will also include the evaluation of the analytical measurement capability with regard to the simulant material used in the demonstration tests. The paper will conclude with a discussion of the analysis results illustrating the relationship between the pre-transfer samples and the batch transfers, which support the recommendation regarding the need for a dedicated feed sampling facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Discovery of the First Leaking Double-Shell Tank - Hanford Tank 241-AY-102

Full text - Long Abstract. A routine video inspection of the annulus region of double-shell tank 241-A Y-102 in August of 2012 indicated the presence material in the annulus space between the primary and secondary liners. A comparison was made to previous inspections performed in 2006 and 2007. which indicated that a change had occurred. The material was observed at two locations on the floor of the annulus and one location at the top of the annulus region where the primary and secondary top knuckles meet (RPP-ASMT-53793). Subsequent inspections were performed. leading to additional material observed on the floor of the annulus space in a region that had not previously been inspected (WRPS-PER-2012-1363). The annulus Continuous Air Monitor (CAM) was still operational and was not indicating elevated radiation levels in the annulus region. When the camera from the inspections was recovered. it also did not indicate increased radiation above minimum contamination levels (WRPS-PER-2012-1363). A formal leak assessment team was established August 10, 2012 to review tank 241-AY-102 construction and operating histories and to determine whether the material observed in the annulus had resulted from a leak in the primary tank. The team consisted of individuals from Engineering. Base Operations and Environmental Protection. As this was a first-of-its-kind task. a method for obtaining a sample of the material in the annulus was needed. The consistency of the material was unknown.and the location of a majority of the material was not conducive to using the sampling devices that were currently available at Hanford. A subcontractor was tasked with the development fabrication.and testing of a sampling device that would be able to obtain multiple samples from the material on the annulus floor. as well as the material originating from a refractory air-slot near the floor of the annulus space. This sampler would need to be able to collect and dispense the material it collected into a sample jar retrieval device for transportation of the material to the 222-S laboratory on the Hanford site for analysis. The subcontractor agency fabricated a remote underground sampler by modifying off-the-shelf robotics and parts. Limited testing of the sampler was conducted using a mock-up of the tank annulus and one simulated material type -a salt block. The mock-up testing indicated that the sampler would be able to maneuver within the confined space and that the device worked with full functionality. A total of six weeks had passed from initiation to implementation of the new sampler in the 241-AY-102 tank annulus. Initial sample material was obtained from the annulus floor using the Off-Riser Sampler System that has been used at Hanford tor years to obtain material from the primary tanks. This could be used at the location near Riser 83 since the material was collected directly from the annulus floor and not from a location on the wall or behind a pipe, as was needed from the two locations near Riser 90. After obtaining a small sample of the material on the annulus floor.this sampler sustained terminal damage due to conduit pipes it had to transverse in order to collect and recover material from this location. Several issues were also encountered during deployment of the new sampler into the annulus near Riser 90. These included: Difficulty fitting the sampler down the 12-inch riser into the annulus due to a small tolerance in the size of the sampler; Failure of sampler components and functions during deployment including the camera. pneumatics.and bearing seals; Delays in the field due to supporting equipment issues including cables. cameras. and scaffolding; and, Low recovery of sample material obtained for analysis. The complications that occurred during deployment and use of the new sampler during the sampling event ultimately resulted in lower recovery of material from these locations in the annulus than was obtained using the Off-Riser Sampler System and limited the analyses that could be performed for determining the origin of the material. Following completion of the sample analyses and the assessment of its construction history and use. there was a consensus among the leak assessment team members that two of the three materials sampled from the annulus floor region were the result of waste leaking from a breach in the primary tank. The probable leak cause was identified as corrosion at high temperatures in a tank whose containment margins had been reduced due to construction difficulties (RPP-ASMT-53793). A formal Lessons Learned was created concerning designing equipment tor unique purposes under time constraints. This document was published in OPEXShare on May 20. 2013. It highlighted some of the issues that arose with the subcontractor sampler development and provided recommendations to prevent a recurrence should this task need to be performed again in the future. The document can be found at http://msa.hanford.gov/opex/lesson.cfm/2013/5/20/3481/AY-102-Annulus-Sampler-Designing-Equipment-for-Unique-Purposes-under-Time-Constraints/.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaboration, Automation, and Information Management at Hanford High Level Radioactive Waste (HLW) Tank Farms

Washington River Protection Solutions (WRPS), operator of High Level Radioactive Waste (HLW) Tank Farms at the Hanford Site, is taking an over 20-year leap in technology, replacing systems that were monitored with clipboards and obsolete computer systems, as well as solving major operations and maintenance hurdles in the area of process automation and information management. While WRPS is fully compliant with procedures and regulations, the current systems are not integrated and do not share data efficiently, hampering how information is obtained and managed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Vision for Tank Waste Cleanup (One System Integration) - 12506

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The Cleanup of Hanford's 56 million gallons of radioactive and chemical waste stored in 177 large underground tanks represents the Department's largest and most complex environmental remediation project. Sixty percent by volume of the nation's high-level radioactive waste is stored in the underground tanks grouped into 18 'tank farms' on Hanford's central plateau. Hanford's mission to safely remove, treat and dispose of this waste includes the construction of a first-of-its-kind Waste Treatment Plant (WTP), ongoing retrieval of waste from single-shell tanks, and building or upgrading the waste feed delivery infrastructure that will deliver the waste to and support operations of the WTP beginning in 2019. Our discussion of the 2020 Vision for Hanford tank waste cleanup will address the significant progress made to date and ongoing activities to manage the operations of the tank farms and WTP as a single system capable of retrieving, delivering, treating and disposing Hanford's tank waste. The initiation of hot operations and subsequent full operations of the WTP are not only dependent upon the successful design and construction of the WTP, but also on appropriately preparing the tank farms and waste feed delivery infrastructure to reliably and consistently deliver waste feed to the WTP for many decades. The key components of the 2020 vision are: all WTP facilities are commissioned, turned-over and operational, achieving the earliest possible hot operations of completed WTP facilities, and supplying low-activity waste (LAW) feed directly to the LAW Facility using in-tank/near tank supplemental treatment technologies. A One System Integrated Project Team (IPT) was recently formed to focus on developing and executing the programs that will be critical to successful waste feed delivery and WTP startup. The team is comprised of members from Bechtel National, Inc. (BNI), Washington River Protection Solutions LLC (WRPS), and DOE-ORP and DOE-WTP. The IPT will combine WTP and WRPS capabilities in a mission-focused model that is clearly defined, empowered and cost efficient. The genesis for this new team and much of the 2020 vision is based on the work of an earlier team that was tasked with identifying the optimum approach to startup, commissioning, and turnover of WTP facilities for operations. This team worked backwards from 2020 - a date when the project will be completed and steady-state operations will be underway - and identified success criteria to achieving safe and efficient operations of the WTP. The team was not constrained by any existing contract work scope, labor, or funding parameters. Several essential strategies were identified to effectively realize the one-system model of integrated feed stream delivery, WTP operations, and product delivery, and to accomplish the team's vision of hot operations beginning in 2016: - Use a phased startup and turnover approach that will allow WTP facilities to be transitioned to an operational state on as short a timeline as credible. - Align Tank Farm (TF) and WTP objectives such that feed can be supplied to the WTP when it is required for hot operations. - Ensure immobilized waste and waste recycle streams can be received by the TF when required to support 2016 production of immobilized low-activity waste (ILAW). - Ensure the required baseline and additional funding is provided beginning in fiscal year 2011. - Modify TF and WTP contracts to adequately address this vision. The 2020 Vision provides a summary of strategies and key actions that optimize the approach to startup, commissioning, and turnover of WTP facilities. This vision focuses on the legally enforceable requirement to achieve the Consent Decree milestones of starting radioactive operations in 2019, and achieving initial WTP operations in 2022. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Form Development for Solidification of Liquid Secondary Wastes to Support Hanford Direct Feed Low Activity Waste Vitrification - 17484

The US Department of Energy/Office of River Protection DOE/ORP has funded a program led by Washington River Protection Solutions (WRPS) to develop and test cementitious waste forms for immobilization of liquid secondary waste (LSW) at the Hanford site in Southeastern Washington State. The LSW comprises a concentrated brine from processing liquid effluents at Hanford's Effluent Treatment Facility. The liquid effluents include condensates from the 242-A tank waste evaporator and future offgas condensates from the Low Activity Waste (LAW) Vitrification Facility. To facilitate waste form formulation development and testing, WRPS developed LSW simulants and engaged subject matter experts at the Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL). This paper describes results of recent work done to develop and test a grout formulation tailored to address the elevated sulfate levels in Hanford LSW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford double-shell tank ultrasonic test examinations - 15287

Washington River Protection Solutions, LLC (WRPS) under contact from the US DOE is responsible for assessing the condition of the double-shell tanks (DSTs) of the Hanford Nuclear Site. WRPS contracted AVERA Federal Services, LLC to perform the ultrasonic testing inspections of the primary tank wall in 28 DSTs to access the condition of the tanks, judge the effects of past corrosion control practices, and satisfy a regulatory requirement to periodically (eight to ten year frequency) assess the integrity of the tanks per Brookhaven National Laboratory (BNL) guidelines for structural integrity programs for tank systems. The major requirements for the Ultrasonic Testing (UT) of each tank are to detect, characterize (identify, size and locate), and record measurements made of any wall thinning, pitting or cracks that might be present in the wall of the primary tank. The UT program examines representative areas of the primary tank and secondary liner by deploying equipment in the annulus of the tank through two 24-inch diameter risers approximately 180 deg. apart. From 1996 to 2006 the first-round of ultrasonic test inspections for all DSTs were completed utilizing a Pulse-Echo (P-Scan) system. The second round of ultrasonic test inspections have continued since 2007 and are complete for 26 of 28 tanks. The two remaining tanks will receive the second inspections during fiscal year 2015. Currently, the ultrasonic testing comparison results between the first and second rounds of inspection have identified no structural integrity concerns at action levels specified in the BNL guidelines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Control room consolidation at Hanford tank farms for improved conduct of operation - 15345

Washington River Protection Solutions (WRPS) manages the underground waste storage tanks at the Hanford site in Washington State on behalf of the DOE Office of River Protection. There are 177 tanks distributed among 18 tank farms spread across an area of desert scrub covering about 20 square miles. A single evaporator facility supports the tanks to provide waste reduction activities. Farms and associated equipment, including exhausters, have been operated locally since installation. Upgrades over time introduced limited automation, but using inconsistent platforms, and providing isolated control locations around the farms. However, as the Tank Farms move from maintenance operations to production operations, with increased numbers of waste transfers and evaporator campaigns, and also prepare for integration with the adjacent Hanford Waste Treatment Plant, then operational improvements were planned and are being implemented. Infrastructure improvement projects included upgrades of control systems to a common platform, and installation of a fiber optic based local area network to the majority of farms, which together provided a distributed control system supporting tank farms. This new infrastructure provided the basis to propose consolidation of control and monitoring operations to a single location. More than a single location, the new Central Control Room was to increase effectiveness of operations by providing full status of all activities being performed across the Tank Farms and the Evaporator. The recent addition of productivity e-tools also would provide capability for management, supervisors and operators to make informed decisions regarding facility operations, through custom online applications designed to provide real time information derived from operational data. For example, tracking turnover activities between shifts, and maintaining compliance with limited conditions for operations. The Central Control Room would also have a single supervisor able to effectively manage the status of all assets and processes. The expected benefits of this arrangement include increased operator utility, increased situational awareness, improved response time for upset conditions, improvement in operator environment, and reductions in operating costs. The projected ROI for the Central Control Room when fully operational was projected to be about two years based on reduced costs from freeing up operations staff to perform other work plus the time and material savings realized by operations being performed with increased situational awareness. So the Central Control Room would become a hub for monitoring and controlling facility operations while responding to real time information affecting productivity and performance, from a centralized location customized to a fresh working environment. Over a 14-month period, WRPS developed the concept and engineering, procured over 500 items, modified and installed in renovated building, and completed transition and testing of this new Central Control Room, turning over the initial phase to Operations for 24/7 use in April 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A summary of the Hanford single-shell tank structural analysis of record - 15526

Washington River Protection Solutions, LLC (WRPS), the US DOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009 to better understand the integrity of the single-shell tanks (SSTs). A panel of experts from industry and academia was created to recommend project activities in four main areas: structural integrity, liner degradation, leak integrity and prevention, and contamination migration. One of the panel's primary recommendations was to perform a detailed structural integrity analysis of the SSTs. WRPS and the U.S. Department of Energy, Office of River Protection commissioned the Pacific Northwest National Laboratory (PNNL) to perform this structural integrity analysis of record for the Hanford single shell tanks. This is one of seventeen panel recommendations that form the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order; also known as the Tri-Party Agreement. Finite element analysis was used to predict the structural response of the SSTs to the historical thermal and operating loads, plus design basis seismic loads. Bounding thermal histories were established from waste temperature records and applied to the model to include the thermal degradation of concrete modulus and strength, plus cracking due to differential thermal expansion while under in situ static loading conditions. PNNL contracted with Becht Engineering to evaluate the dynamic response of the tanks to a design basis earthquake. The degraded stiffness of the reinforced concrete was also incorporated in the seismic analysis. The combined response to static and seismic loads was then evaluated against the design requirements of the American Concrete Institute standard, ACI-349-06, for nuclear safety-related concrete structures. Specific analyses were performed for the four major tank designs.This paper presents an overview of the analysis methods used and it summarizes the major analytical findings that are common to the tanks and others that are specific to the individual tank designs. The analyses of record determined that including the bounding effects of their operating histories, each tank design currently satisfies the ACI-349-06 structural integrity design requirements. Although leak tightness is not directly addressed in the structural integrity analysis, this analysis will be a key input in the formal tank integrity assessment due in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Double-Shell tank Integrity program - 15533

Waste at Hanford is stored in 149 single-shell tanks and 28 double-shell tanks (DSTs). Concerns related to aging radioactive waste storage facilities throughout the US DOE complex led to Brookhaven National Laboratory (BNL) developing guidelines for structural integrity programs for tank systems (BNL-52527, Guidelines for Development of Structural Integrity Programs for DOE High-Level Waste Storage Tanks). The committee of experts who developed these guidelines is commonly known as the Tank Structural Integrity Panel (TSIP). The US DOE has subsequently adopted these guidelines, and requires site operators to have a program consistent with them (DOE M 435.1, Radioactive Waste Management Manual). The Washington River Protection Solutions, LLC (WRPS) manages the tanks for the US DOE Office of River Protection (ORP) under the Tank Operations Contract (TOC). The US DOE-ORP contractual agreement with the TOC (11-NSD-010) includes a requirement to 'maintain the tank structural integrity program as described in RPP-7574, Double-Shell tank Integrity Project Plan'. The DST integrity is maintained with a variety of activities such as ultrasonic and visual inspections, chemistry controls, corrosion monitoring and structural analyses methods. The recent loss of tank 241-AY-102 has led to the formation of the High-Level Waste Integrity Assessment Panel to evaluate the DST integrity project (DSTIP) and to recommend improvements to the DSTIP. This panel continues the DOE practice of seeking expert advice to guide the formulation and continuous assessment of tank integrity activities. The panel has concluded its work and WRPS has developed a series of tasks to implement their recommendations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering scale demonstration of a prospective cast Stone process - 15584

A cementitious waste form is one of the alternatives being evaluated for Supplemental Immobilization of Hanford Low Activity Waste (LAW). Washington River Protection Solutions (WRPS) is collecting data on cementitious or pozzolanic waste forms such as Cast Stone. The goal of this project for WRPS is to obtain data on the performance of the Cast Stone waste form for immobilizing LAW. As part of the data package being assembled, an engineering-scale demonstration with non-radioactive simulants was performed at the Savannah River National Laboratory (SRNL) using the Scaled Continuous Processing Facility (SCPF) to fill a container with simulated Cast Stone grout. Legacy salt solution from previous Hanford salt waste testing was trimmed to resemble the average composition generated from the Hanford Tank Waste Operation Simulator (HTWOS) used in the screening tests. The dry blend materials, ordinary portland cement (OPC), Class F fly ash, and ground granulated blast furnace slag (GGBFS or BFS) were obtained from Lafarge North America in Pasco, WA. Over three days, the SCPF was used to fill a 6,056 liter (1600 gallon) container with simulated Cast Stone grout. The tank was instrumented with x-, y-, and z-axis thermocouples to monitor curing temperature and two formed core sampling vials. The target production rate was 5.7 L/min (1.5 gpm). This required a salt solution flow rate of approximately 3.78 L/min (1 gpm) and a premix feed rate of approximately 263 kh/h (580 lb/h). The final surface slope at a fill height of 100 cm was 2.5-3.8 cm across the 260 cm (8.5 ft) diameter tank. During processing, grout was collected from both the mixer discharge and the discharge into the tank. These samples were stored in a humid environment either in a closed box proximal to the tank or inside the laboratory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inspection Technology Advancements for Hanford Double Shell Tank Integrity Verification - 16150

The Hanford double-shell tanks (DSTs) were constructed in southeastern Washington State between 1968 and 1986 to store nuclear waste. Most of the tank waste came from the Hanford nuclear weapons program, which has been stopped for more than 25 years. The tanks will be needed for many years to come until suitable vitrification and permanent storage solutions are developed. These tanks are nominally 45 ft. deep from the dome peak to the floor. The inner tank is nominally 75 ft. dia. and the outer tank is nominally 80 ft. dia., leaving a 2.5 ft. annulus between the two side tank walls. The waste management program (under direction of Washington River Protection Solutions, WRPS) manages inspections of these DSTs from the annulus to justify their continued safe service and to avoid the high cost of new replacement tanks. Over time, the Hanford Tank Farm contractors, currently WRPS, have increased their ultrasound inspections of these tanks. Pacific Northwest National Laboratory has worked with the Hanford Tank Farm contractors for more than 15 years to advance applicable tank nondestructive inspection technology for improved performance and cost reduction. Past, present, and planned technology advancements are addressed in this paper, including tank wall ultrasonic testing examination, extreme value statistical analysis, phased array for the tank wall, transmit/receive tandem synthetic aperture focusing technique knuckle examination, and electromagnetic acoustic transducer screening of the tank wall including mill-scale compensation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Readiness Activities for the Direct Feed Low Activity Waste (DFLAW) Program - 16221

The WTP is a one-of-a-kind nuclear waste treatment facility being designed and constructed for the DOE by Bechtel National, Inc. (BNI) and principal subcontractor URS-AECOM, to process and vitrify radioactive waste stored in underground tanks at the Hanford Site. The Tank Operations Contractor (TOC), Washington River Protection Solutions (WRPS), has the responsibility to retrieve, stage, pretreat, and deliver the pretreated feed directly to the WTP Low-Activity Waste Vitrification Facility, scope referred to as Direct Feed Low Activity Waste (DFLAW). Extensive planning is in progress under the auspices of One System, an effort with joint participation by WTP and TOC personnel. To support an integrated approach to readiness for the DFLAW Program, an Integrated Operational Readiness Committee (IORC) was established to contribute to a safe and effective operational readiness of the WTP. The IORC, an advisory committee, comprising representatives from BNI, WRPS, and the Hanford interfacing partners for WTP operations, Mission Support Alliance (MSA) and CH2M HILL Plateau Remediation Company (CHPRC). In addition, an Operational Readiness (OR) workshop was conducted with several objectives accomplished to support an integrated approach to readiness with specific focus on the management of interfaces between the various contractors and facilities. This culminated in the development of a readiness strategy document called the Operational Readiness Support Plan (ORSP). This ORSP describes the joint approach to WTP startup operating in the DFLAW configuration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗