Search NASA⌕ Search

SEARCH · Search NASA

Results for “activity report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

STS-100 Crew Activity Report: Flight Day 8 Highlights

On this eighth day of the STS-100 Endeavour mission, Mission Specialists Chris Hadfield and Scott Parazynski are seen preparing for and performing their spacewalks as they check the connections between the Destiny Laboratory Module and the Canadian Robotic Arm, remove an early communications antenna from the Unity Module, and confirm power connections for the Canadian Robotic Arm. Commander Kent Rominger is seen during a workout on Endeavour's ergometer.

Source record↗

STS-100 Crew Activity Report: Flight Day 5 Highlights

On this fifth day of the STS-100 mission, the crews of Endeavour (Commander Kent Rominger, Pilot Jeffrey Ashby, and Mission Specialists Chris Hadfield, Scott Parazynski, John Phillips, Umberto Guidoni, and Yuri Valentinovich Lonchakov) and the Expedition 2 crew (Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms) are seen greeting each other after opening the connecting hatches between Endeavour and the International Space Station (ISS). Parazynski uses the newly installed Canadian Robotic Arm to lift the Rafaello Module out of the payload bay of Endeavour and install it onto the Destiny Laboratory Module on the ISS. Ashby, Hadfield, and Parazynski answer questions about the mission during an on-orbit press conference. Ashby and Parazynski give a guided video tour of the interior of the ISS/Endeavour complex.

Source record↗

STS-100 Crew Activity Report: Flight Day 2 Highlights

On this second day of the STS-100 mission, the crewmembers of Endeavour (Commander Kent Rominger, Pilot Jeffrey Ashby, and Mission Specialists Chris Hadfield, Scott Parazynski, John Phillips, Umberto Guidoni, and Yuri Valentinovich Lonchakov) are seen during various preparations for the upcoming docking procedure with the International Space Station (ISS). Footage shows Hadfield and Parazynski checking their spacesuits and the tools they will use on the first spacewalk. The Shuttle's robotic arm is used to survey the payload bay of Endeavour and to check on the Canadian Robotic Arm. Expedition 2 crewmembers Susan Helms and Jim Voss are seen in the Destiny Laboratory Module. The Canadian Robotic Arm is shown against a backdrop of Earth after it unfolds from the payload bay.

Source record↗

STS-100 Crew Activity Report: Flight Day 7 Highlights

On this seventh day of the STS-100 mission, the crewmembers of Endeavour, Commander Kent Rominger, Pilot Jeffrey Ashby, and Mission Specialists Chris Hadfield, Scott Parazynski, John Phillips, Umberto Guidoni, and Yuri Valentinovich Lonchakov, are seen as they unload equipment from the Rafaello Logistics Module. Guidoni and Rominger answer questions from the Italian and European Space Agencies in an on-orbit press conference. The computer glitch that delayed tests on the Canadian Robotic Arm and another boost to the International Space Station (ISS) is described.

Source record↗

STS-100 Crew Activity Report: Flight Day 4 Highlights

On this fourth day of the STS-100 mission, Mission Specialists Chris Hadfield and Scott Parazynski are seen performing their spacewalks, where they work on the electrical connections between the Destiny Laboratory and the Canadian Robotic Arm, remove the ultrahigh frequency antenna from the pallet and install it onto Destiny, and raise the Robotic Arm to prepare it for deployment. The fully deployed Robotic Arm is seen against a backdrop of Earth.

Source record↗

MSFC Skylab extravehicular activity development report

The development activities are presented in a chronological order and cover the EVA hardware design from initial concept to final flight configuration. Major concepts which were considered, and the criteria for design are identified. The reasons for the acceptance or rejection of these concepts are discussed. The report concludes that developmental protocol of interleaving analyses and simulations on an iterative basis provided a conservative, flexible and simple EVA system, which was effective not only for the nominal Skylab mission but for many contingency activities as well.

Heckman, R. T.↗

Paris Observatory Analysis Center (OPAR): Report on Activities, January - December 2012

We report on activities of the Paris Observatory VLBI Analysis Center (OPAR) for calendar year 2012 concerning the development of operational tasks, the development of our Web site, and various other activities: monitoring of the Earth's free core nutation, measuring of the post-seismic displacements of some stations, and the analysis of the recent IVS R&D sessions, including observations of quasars close to the Sun.

Lambert, Sebastien↗

FY21 Report on Activities for EBS International

This report summarizes the FY21 Activities for EBS International Collaborations Work Package. The international collaborations work packages aim to leverage knowledge, expertise, and tools from the international nuclear waste community, as deemed relevant according to SFWST “roadmap” priorities. This report describes research and development (R&D) activities conducted during fiscal year 2021(FY21) specifically related to the Engineered Barrier System (EBS) R&D Work Package in the Spent Fuel and Waste Science and Technology (SFWST) Campaign supported by the United States (U.S.) Department of Energy (DOE). It fulfills the SFWST Campaign deliverable M4SF- 21SN010308062. The R&D activities described in this report focus on understanding EBS component evolution and interactions within the EBS, as well as interactions between the host media and the EBS. A primary goal is to advance the development of process models that can be implemented directly within the Generic Disposal System Analysis (GDSA) platform or that can contribute to the safety case in some manner such as building confidence, providing further insight into the processes being modeled, establishing better constraints on barrier performance, etc. Sandia National Laboratories is participating in THM modeling in the international projects EBS Task Force and DECOVALEX 2023. EBS Task Force, Task 11 is on modeling of laboratory-scale High Temperature Column Test conducted at Lawrence Berkeley National Laboratory. DECOVALEX 2023, Task C is on THM modeling of the full-scale emplacement experiment (FE experiment) at the Mont Terri Underground Rock Laboratory, Switzerland. This report summarizes Sandia’s progress in the modeling studies of DECOVALEX 2023, Task C. Modeling studies related to the High Temperature Column Test will be documented in future reports.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

COSMIC monthly progress report

Activities of the Computer Software Management and Information Center (COSMIC) are summarized for the month of January 1994. Tables showing the current inventory of programs available from COSMIC are presented and program processing and evaluation activities are discussed. Marketing and customer service activities in this period are presented as is the progress report of NASTRAN maintenance and support. Tables of disseminations and budget summary conclude the report.

Source record↗

American Nuclear Society ANS-8 Standards Forum [Slides]

The agenda for this forum includes an agenda discussion, membership discussion, a review of recent SC-8 & NCSCC ballots, ISO TC85/SC5/WG8 standards activity report (D. Bowen), NCSCC activity report (L. Wetzel), reports from working group chairs, and old/new business.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

COSMIC monthly progress report

Activities of the Computer Software Management and Information Center (COSMIC) are summarized for the month of April 1994. Tables showing the current inventory of programs available from COSMIC are presented and program processing and evaluation activities are summarized. Five articles were prepared for publication in the NASA Tech Brief Journal. These articles (included in this report) describe the following software items: GAP 1.0 - Groove Analysis Program, Version 1.0; SUBTRANS - Subband/Transform MATLAB Functions for Image Processing; CSDM - COLD-SAT Dynamic Model; CASRE - Computer Aided Software Reliability Estimation; and XOPPS - OEL Project Planner/Scheduler Tool. Activities in the areas of marketing, customer service, benefits identification, maintenance and support, and disseminations are also described along with a budget summary.

Source record↗

COSMIC monthly progress report

Activities of the Computer Software Management and Information Center (COSMIC) are summarized for the month of May 1994. Tables showing the current inventory of programs available from COSMIC are presented and program processing and evaluation activities are summarized. Nine articles were prepared for publication in the NASA Tech Brief Journal. These articles (included in this report) describe the following software items: (1) WFI - Windowing System for Test and Simulation; (2) HZETRN - A Free Space Radiation Transport and Shielding Program; (3) COMGEN-BEM - Composite Model Generation-Boundary Element Method; (4) IDDS - Interactive Data Display System; (5) CET93/PC - Chemical Equilibrium with Transport Properties, 1993; (6) SDVIC - Sub-pixel Digital Video Image Correlation; (7) TRASYS - Thermal Radiation Analyzer System (HP9000 Series 700/800 Version without NASADIG); (8) NASADIG - NASA Device Independent Graphics Library, Version 6.0 (VAX VMS Version); and (9) NASADIG - NASA Device Independent Graphics Library, Version 6.0 (UNIX Version). Activities in the areas of marketing, customer service, benefits identification, maintenance and support, and dissemination are also described along with a budget summary.

Source record↗