Search NASA⌕ Search

SEARCH · Search NASA

Results for “adaptive scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Preliminary Cyber-Informed Dynamic Branch Conditions for Analysis with the Dynamic Simplified Cyber MELCOR Model

Instrumentation and control of nuclear power is transforming from analog to modern digital assets. These control systems perform key safety and security functions. This transformation is occurring in new plant designs as well as in the existing fleet of plants as the operation of those plants is extended to 60 years. This transformation introduces new and unknown exploits involving both digital asset induced safety issues and security exploits. Traditional the open literature of nuclear power risk assessment tools and cyber security assessment methods have not been modified or developed to address the unique nature of cyber failure modes and of cyber security threats. Starting in 2015, Sandia National Laboratories (SNL) embarked on a two year dynamic cyber-risk informed project to facilitate the analysis of unique cyber failure modes and the time sequencing of cyber faults, both malicious and non-malicious, and impose those cyber exploits and cyber faults onto a nuclear power plant accident sequence simulator code to assess how cyber exploits and cyber faults could interact with a plant's digital instrumentation and control (DI and C) system in the absence of digital controls. This will be achieved by coupling SNL's existing dynamic scheduler code (ADAPT), nuclear accident simulator code (MELCOR), and cyber Emulytics code (SCEPTRE) to demonstrate real-time simulation of cyber exploits and their impact on automatic DI and C responses. Studying such potential time-sequenced cyber-attacks and their risks (i.e., the associated impact and the associated degree of difficulty to achieve the attack vector) as they pertain to accident management will provide a risk informed basis for developing effective cyber security controls for nuclear power. This paper will discuss the rationale behind the proposed generic cyber exploits for an abstracted Pressurized Water Reactor that has adopted a unified DI and C System. Other papers related to this project submitted to this conference discuss: - The MELCOR model for this abstracted reactor, called the Dynamic Simplified Cyber (DSC) model, - Modifications to ADAPT to: Extend the framework for multiple simulators, Incorporation of importance measures into dynamic event tree analysis, Sort and reduce the dynamic event tree based upon inputs to or outputs from the tree, and - A feasibility study for using density based clustering methods with dynamic time wrapping to cluster and prune dynamic event trees. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flexible Bandwidth Scheduling for Streaming Data Movement Over Dedicated Networks

A wide range of scientific disciplines are generating large amounts of data at a high speed, which must be transferred to remote sites for real-time processing. Reserving bandwidths over dedicated channels in high-performance networks (HPNs) within a specified time interval has proved to be an effective solution to such high-demanding data transfer. Given a bandwidth reservation request, if the desired bandwidth within the specified time interval cannot be satisfied, most of the existing scheduling algorithms simply reject the request, which would immediately terminate the application. One reasonable approach to mitigate this issue is to provide an alternative bandwidth reservation option to schedule the desired bandwidth within the time interval closest to the specified one. We propose a flexible bandwidth reservation algorithm that considers both the best and alternative bandwidth reservation options for a given request. Extensive simulations are conducted to show the superior performance of the proposed scheduling algorithm compared with a heuristic approach adapted from existing scheduling algorithms.

Zuo, Liudong↗

Automated Scheduling of Science Activities for Titan Encounters by Cassini

In an effort to demonstrate the efficacy of automated planning and scheduling techniques for large missions, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] and CLASP (Compressed Large-scale Activity Scheduling and Planning) [2] to the domain of scheduling high-level science goals into conflict-free operations plans for Titan encounters by the Cassini spacecraft.

Ray, Trina L.↗

Automated Scheduling of Science Activities for Titan Encounters by Cassini

In an effort to demonstrate the efficacy of automated planning and scheduling techniques for large missions, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] and CLASP (Compressed Large-scale Activity Scheduling and Planning) [2] to the domain of scheduling high-level science goals into conflict-free operations plans for Titan encounters by the Cassini spacecraft.

Ray, Trina L.↗

Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

MSL↗

Scheduling Software

Advanced Scheduling Environment is a software product designed and marketed by AVYX, Inc. to provide scheduling solutions for complex manufacturing environments. It can be adapted to specific scheduling and manufacturing processes and has led to substantial cost savings. The system was originally developed for NASA use in scheduling Space Shuttle flights and satellite activities. AVYX, Inc. is an offshoot of a company formed to provide computer-related services to NASA. TREES-plus, the company's initial product became the programming language for the advanced scheduling environment system.

Source record↗

Multi-time scale control of demand flexibility in smart distribution networks

This study presents a multi-timescale control strategy to deploy demand flexibilities of electric vehicles (EV) for providing system balancing and local congestion management by simultaneously ensuring economic benefits to participating actors. First, the EV charging problem from consumer, aggregator, and grid operator’s perspective is investigated. A hierarchical control architecture (HCA) comprising scheduling, coordinative, and adaptive layers is then designed to realize their coordinative goal. This is realized by integrating a multi-time scale control, which works from a day-ahead scheduling up to real-time adaptive control. The performance of the developed method is investigated with high EV penetration in a typical distribution network. The simulation results demonstrates that HCA exploit EV flexibility to solve grid unbalancing and congestions with simultaneous maximization of economic benefits by ensuring EV participation to day-ahead, balancing, and regulation markets. For the given network configuration and pricing structure, HCA ensures the EV owners to get paid up to 5 times the cost they were paying without control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Closing the Certification Gaps in Adaptive Flight Control Software

Over the last five decades, extensive research has been performed to design and develop adaptive control systems for aerospace systems and other applications where the capability to change controller behavior at different operating conditions is highly desirable. Although adaptive flight control has been partially implemented through the use of gain-scheduled control, truly adaptive control systems using learning algorithms and on-line system identification methods have not seen commercial deployment. The reason is that the certification process for adaptive flight control software for use in national air space has not yet been decided. The purpose of this paper is to examine the gaps between the state-of-the-art methodologies used to certify conventional (i.e., non-adaptive) flight control system software and what will likely to be needed to satisfy FAA airworthiness requirements. These gaps include the lack of a certification plan or process guide, the need to develop verification and validation tools and methodologies to analyze adaptive controller stability and convergence, as well as the development of metrics to evaluate adaptive controller performance at off-nominal flight conditions. This paper presents the major certification gap areas, a description of the current state of the verification methodologies, and what further research efforts will likely be needed to close the gaps remaining in current certification practices. It is envisioned that closing the gap will require certain advances in simulation methods, comprehensive methods to determine learning algorithm stability and convergence rates, the development of performance metrics for adaptive controllers, the application of formal software assurance methods, the application of on-line software monitoring tools for adaptive controller health assessment, and the development of a certification case for adaptive system safety of flight.

Jacklin, Stephen A.↗

Utilizing AI in Temporal, Spatial, and Resource Scheduling

Aurora is a software system enabling the rapid, easy solution of complex scheduling problems involving spatial and temporal constraints among operations and scarce resources (such as equipment, workspace, and human experts). Although developed for use in the International Space Station Processing Facility, Aurora is flexible enough that it can be easily customized for application to other scheduling domains and adapted as the requirements change or become more precisely known over time. Aurora s scheduling module utilizes artificial-intelligence (AI) techniques to make scheduling decisions on the basis of domain knowledge, including knowledge of constraints and their relative importance, interdependencies among operations, and possibly frequent changes in governing schedule requirements. Unlike many other scheduling software systems, Aurora focuses on resource requirements and temporal scheduling in combination. For example, Aurora can accommodate a domain requirement to schedule two subsequent operations to locations adjacent to a shared resource. The graphical interface allows the user to quickly visualize the schedule and perform changes reflecting additional knowledge or alterations in the situation. For example, the user might drag the activity corresponding to the start of operations to reflect a late delivery.

Stottler, Richard↗

Distributed decision-making for space operations

A programmatic and technical perspective in the context of future space applications is presented, that includes some of the management challenges that arise as the decision-making process becomes increasingly more decentralized. Three challenges are discussed: (1) the degree to which the planners must communicate with each other and with those who are seeking space operations resources, (2) the collection, management, employment and dissemination of the information needed to make decisions, and (3) the challenges connected with schedule integration. The technical perspective presented leads to recommended adaptations to the normal scheduling algorithms that retain the 'degrees of freedom' in the planning result. It is shown that these adaptations are specific technical responses to the programmatic challenges discussed.

Hornstein, Rhoda Shaller↗

Phase-shifting human circadian rhythms: influence of sleep timing, social contact and light exposure

1. Both the timing of behavioural events (activity, sleep and social interactions) and the environmental light-dark cycle have been reported to contribute to entrainment of human circadian rhythms to the 24 h day. Yet, the relative contribution of those putative behavioural synchronizers to that of light exposure remains unclear. 2. To investigate this, we inverted the schedule of rest, sedentary activity and social contact of thirty-two young men either with or without exposure to bright light. 3. On this inverted schedule, the endogenous component of the core temperature rhythm of subjects who were exposed to bright light showed a significant phase shift, demonstrating that they were adapting to the new schedule. In contrast, the core temperature rhythm of subjects who were not exposed to bright light moved on average 0.2 h later per day and after 10 days had not significantly adapted to the new schedule. 4. The direction of phase shift in the groups exposed to bright light was dependent on the time of bright light exposure, while control subjects drifted to a later hour regardless of the timing of their schedule of sleep timing, social contact and meals. 5. These results support the concept that the light-dark cycle is the most important synchronizer of the human circadian system. They suggest that inversion of the sleep-wake, rest-activity and social contact cycles provides relatively minimal drive for resetting the human circadian pacemaker. 6. These data indicate that interventions designed to phase shift human circadian rhythms for adjustment to time zone changes or altered work schedules should focus on properly timed light exposure.

Non-NASA Center↗

Wetland Flow and Salinity Budgets and Elements of a Decision Support System toward Implementation of Real-Time Seasonal Wetland Salinity Management

The project has provided science-based tools for the long-term management of salinity in drainage discharges from wetlands to the San Joaquin River. The results of the project are being used to develop best management practices (BMP) and a decision support system to assist wetland managers adjust the timing of salt loads delivered to the San Joaquin River during spring drawdown. Adaptive drainage management scheduling has the potential to improve environmental compliance with salinity objectives in the Lower San Joaquin River by reducing the frequency of violation of Vernalis salinity standards, especially in dry and critically dry years. The paired approach to project implementation whereby adaptively managed and traditional practices were monitored in a side-by-side fashion has provided a quantitative measure of the impacts of the project on the timing of salt loading to the San Joaquin River. The most significant accomplishments of the project has been the technology transfer to wetland biologists, ditch tenders and water managers within the Grasslands Ecological Area. This “learning by doing” has build local community capacity within the Grassland Water District and California Department of Fish and Game providing these institutions with new capability to assess and effectively manage salinity within their wetlands while simultaneously providing benefits to salinity management of the San Joaquin River.

54 ENVIRONMENTAL SCIENCES↗

Decentralized Distributed Proximal Policy Optimization (DD-PPO) for High Performance Computing Scheduling on Multi-User Systems

Resource allocation in High Performance Computing (HPC) environments presents a complex and multifaceted challenge for job scheduling algorithms. Beyond the efficient allocation of system resources, schedulers must account for and optimize multiple performance metrics, including job wait time and system throughput. Traditional heuristic-based scheduling algorithms increasingly struggle and lack the efficiency needed to meet the demands and address the complexity and scale of modern HPC systems. Consequently, recent research efforts have focused on leveraging advancements in Artificial Intelligence (AI) and Deep Learning (DL), particularly Reinforcement Learning (RL), to develop more adaptable and intelligent scheduling strategies. Previous RL-based scheduling approaches have explored a range of algorithms, from Deep Q-Networks (DQN) to Proximal Policy Optimization (PPO), and more recently, hybrid methods that integrate Graph Neural Networks (GNNs) with RL techniques. However, a common limitation across these methods is their reliance on relatively small datasets, with few methods being evaluated using large-scale, multi-million-job trace datasets representative of real-world HPC workloads. Moreover, existing RL schedulers face scalability issues due to centralized policy updates, which hinder training efficiency and performance when applied to large datasets. This study introduces a novel RL-based scheduler utilizing Decentralized Distributed Proximal Policy Optimization (DD-PPO) algorithm, which supports large-scale distributed training across multiple workers without requiring parameter synchronization at every step. By eliminating reliance on centralized updates to a shared policy, the DD-PPO scheduler enhances scalability, training efficiency, and sample utilization. Experimental validation using a large real-world dataset containing over 11.5 million job traces collected from petascale HPC systems over six years assesses the influence of dataset scale on training effectiveness and compares DD-PPO performance to traditional and advanced scheduling approaches. The experimental results demonstrate improved scheduling performance in comparison to both heuristic-based schedulers and existing RL-based scheduling algorithms.

AI↗

Shiftwork in space - Bright light as a chronobiologic countermeasure

The potential of timed exposures to bright light as a countermeasure to the changes in the work/rest schedules during space missions was investigated. In the experiments, four human subjects were exposed to two sessions of eleven days of simulated weightlessness (6-deg head-down-tilt bedrest) with 6-hr extensions of the scheduled wake time on days 3 and 4 (a 12-hr phase delay). In a blind crossover design, subjects were exposed to bright light (greater than 3500 lux) for 5 hrs on each of the two shift days and on the following day, at times expected to accelerate adaptation to the phase delay (experimental group), or have no phase shifting effect (control group). Results indicate that bright light may accelerate the rate of adaptation to work/rest schedule delays under simulated weightlessness conditions. However, such effect was found to be largely independent of the timing of the light exposure.

Gander, Philippa H.↗