Search NASA⌕ Search

SEARCH · Search NASA

Results for “airport infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

62 records · Page 4

Hydrogen Applications for Energy Transition in Port and Airport Operations at the Port Authority of New York and New Jersey

The Port Authority of New York and New Jersey (PANYNJ) is focused on achieving meaningful reductions in emissions as part of its environmental sustainability efforts. To reach its 2030 target for reducing Scope 1 and Scope 2 carbon dioxide equivalent (CO2e) emissions and its goal of net-zero emissions by 2050, PANYNJ is exploring a range of energy solutions, including hydrogen technologies. This report evaluates the potential role of hydrogen in reducing emissions across key operational areas: vehicles, equipment, stationary power, aviation propulsion, and marine propulsion. It examines hydrogen's technical feasibility, infrastructure needs, and economic implications within PANYNJ's operational context. The findings aim to inform decisions as PANYNJ transitions to cleaner energy sources and reduces environmental impacts. Based on the existing literature and stakeholders' feedback, the report outlines both opportunities and challenges associated with hydrogen integration, providing insights to guide PANYNJ's future sustainability initiatives.

33 ADVANCED PROPULSION SYSTEMS↗

Federal Aviation Administration Vertiport Electrical Infrastructure Study

In this detailed analysis, the authors assess the charging infrastructure needed for the deployment of advanced air mobility involving electrified vertical take-off and landing technologies. The report covers four research areas: (1) Identifying charging infrastructure requirements for existing facilities based on flight operational parameters, potential use cases, charging strategy, and other constraints. (2) Assessing sites on power availability to meet charging demand, the impact on grid infrastructure, potential hazards, and cybersecurity needs, and using technoeconomic analysis to identify opportunities for onsite distributed energy resources, primarily solar photovoltaics and battery energy storage systems. (3) Calculating greenhouse gas emission based on total energy consumption attributable to each site. (4) Analyzing the job and economic development impact for sites adopting new infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Maximizing Solar and Transportation Synergies

This report considers the technological and market pathways that will enable better use of photovoltaic (PV) electricity as fuel for future transportation demand. Most of the pathways identified will require collaborative research and development (R&D) efforts to improve the capabilities of multiple technologies, including PV, energy storage, vehicles, electrolyzers, electrofuels, and infrastructure. For plug-in electric vehicles (PEVs), technologies that enable wide-scale managed and coordinated charging are among the highest priorities for continued research, development, and deployment in the near term. Furthermore, managed and coordinated charging capabilities are foundational for future vehicle-to-grid (V2G) functionality in the long term. For hydrogen fuel cell electric vehicles (FCEVs), the use of PV electricity for electrolysis provides an opportunity to increase PV deployment. For rail, air, and maritime transportation, the feasibility of increased PV use varies in the near term; opportunities for synergies with solar include the electrification of rail, increased reliability from airport microgrids, and switching from heavy fuel oil to clean maritime electrofuels made from PV-based hydrogen. Over the longer term, battery swap stations for electric airplanes and the co-location of solar with hydrogen fueling stations at shipping ports may enable greater synergies between PV and transportation.

14 SOLAR ENERGY↗

Sustainable Aviation Fuel Blending and Logistics

Worldwide, aviation accounts for 2% of all manmade carbon dioxide emissions and 12% of all transportation CO2 emissions. In 2023, the U.S. accounted for 27% of the world jet fuel consumption. The aviation industry has set sustainability goals, and mandates. Sustainable aviation fuel (SAF), made from nonpetroleum feedstocks, significantly reduces aviation emissions. SAF must be blended with petroleum-based jet fuel prior to its use in aircraft. Jet fuel quality standards and certification documents are essential to fuel performance, operability, and safety and are the primary driver in determining locations for blending. Several locations were evaluated including terminals, airports, refineries, and greenfield/brownfield sites. While all the locations evaluated are technically capable of blending fuel, there are practical considerations that make terminals the optimal location for blending. The report includes background on jet fuel and SAF use, fuel quality standards, modes of transport for both conventional jet fuel and SAF, and terminal information.

09 BIOMASS FUELS↗

Report series: finding of effect and mitigation documentation for the mercury solar photovoltaic array and battery energy storage system, area 23, nevada national security site, nye county, nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) proposes to install solar photovoltaic (PV) power generation arrays and an associated battery energy storage system (BESS) for the town of Mercury at the Nevada National Security Site (NNSS) in Nye County, Nevada (Figure 1). The purposes of the development of this facility are to support long-term efforts to modernize Mercury and to provide energy-resilient infrastructure and address climate adaptation needs. Because it is within the boundary of the Mercury Historic District (MHD), it is subject to the terms of the Programmatic Agreement Between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (hereafter referred to as the Mercury PA). An identification and evaluation report prepared for this undertaking determined that a contributing element to the MHD, the Mercury airstrip (26NY15777), is within the APE (Haynes 2024). The Mercury airstrip was developed following the closure of Camp Desert Rock in 1957 and used until late 1963 or 1964 when the Camp Desert Rock Airport was renovated, and the Mercury Bypass road constructed. The town of Mercury and the immediate surrounding area have been determined eligible for listing in the National Register of Historic Places (NRHP) as the MHD (SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992 (Reed 2019). Originally recorded in 2016, 26NY15777 was determined individually not eligible for listing in the NRHP because it lacked sufficient integrity to convey its significance (Palmer 2016). It was subsequently determined in 2018 to be a contributing element of the MHD in an architectural survey of the district (Palmer 2018) and identified in Appendix C of the Mercury PA as a Category I contributing element. However, as per Stipulation IV.B.2, because the airstrip had already been formally evaluated and determined not to be individually eligible for the NRHP in consultation with the SHPO, this categorization was an error. NNSA/NFO reported this to the SHPO in Haynes 2024 and the SHPO concurred on June 11, 2024 (Reed). Accordingly, the airstrip is a Category II Property for the purposes of complying with the Mercury PA. The Mercury airstrip is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and subject to the stipulations of the Mercury PA.

25 ENERGY STORAGE↗

Mobility Data and Models Informing Smart Cities

This presentation explores the interactions of Emerging Technology, Changing Urban Environments, and Urban Travel Behavior on Mobility and Energy Impacts. Key findings include quantifying impacts of emerging mobility, access and infrastructure associated with new mobility choices and services in urban areas. The results demonstrate new data collection methods and capabilities to understand and identify key levers to improve energy productivity of future mobility systems and of quickly evolving MaaS and COVID-19 contexts to monitor rapidly shifting urban mobility patterns. Under development are mode choice models for new modes versus traditional modes. Initial estimates are developed on the potential of workforce mobility strategies in shaping future energy-efficient mobility system impacts. For mode replacement and workforce mobility, this presentation offers observability into the changes in number of transactions per mode, after ride-hailing/TNC/MaaS introduction and in origins of workforce to enable user need-driven reimagining of efficient mobility systems: Seattle (SEA-TAC) airport: for every 100 new TNC transactions for ground transportation, ~27% replaced transit, 35% replaced parking, 17% replaced car rentals, and 21% replaced taxis. Similarly, at Denver International (DEN), ride-hailing transactions replaced transit, parking, car rental and taxis at a rate of 34.7%, 39.0%, 16.6%, and 9.7%, respectively. A workforce mobility tool, analysis/visualization techniques, and capabilities to understand and identify key job commute needs, new choices in access to job opportunities, and affordability aspects as levers to improve energy productivity of future integrated urban mobility systems.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

A resilient network recovery framework against cascading failures with deep graph learning

Because of the increasing importance and dependencies of infrastructure networks and the potential for massive cascading failures in real-world network systems, maintenance optimization to effectively reduce system performance loss caused by diverse disruptions is of significant interest among researchers and practitioners. In this work, a new recovery framework was developed to rapidly identify important system components for maintenance to improve network resilience against cascading failures. Here this work provides distinct advantages to determine an optimal maintenance priority by combining real-time network structure importance with other maintenance prioritization based on customer preference. This approach adopts structural graph embedding and deep reinforcement learning to extract real-time network topology information (such as minimum vertex cover) to update the maintenance priority during the recovery process. Based on the case studies on synthetic networks and a US airport network, the proposed recovery framework with real-time network topology awareness shows better performance than other maintenance prioritization strategies regarding resilience enhancement. This work improves the understanding of how the changing network structure influences maintenance effects. It also provides insights of the practical usefulness of advanced deep learning on helping optimal maintenance prioritization to effectively reduce the intensity and extent of cascading failures.

42 ENGINEERING↗

Hydrogen Transportation and Distributed Energy Systems Risk and Feasibility Assessment for Airport Facilities - CRADA 555 (Abstract)

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support PDX in performing a risk assessment for several hydrogen deployment scenarios. It is intended that the deployment of hydrogen at PDX could serve several roles, including decarbonizing its bus fleet and building out a distributed energy system which could also be used to facilitate emergency operations. PDX’s initial plans concern replacing their current fleet of 28 busses with FCEBs. To do so, PDX will need to deploy the hydrogen systems needed to support the buses. This includes hydrogen storage, production, delivery, filling, compression, and maintenance. PDX also has long range plans to build a distributed energy system to support normal and resilient operations. This study will investigate the risks of each plan individually, and a combined plan which serves both. Additionally, PDX is in an area with the potential for high seismic activity, as such this work will also include a seismic risk assessment. A detailed risk assessment using PDX as a test case is necessary to ensure the deployment of large-scale hydrogen is successful and to understand the benefits or drawbacks in contrast to electric only technologies. Many technologies have been proposed that claim to utilize hydrogen for both transportation and distributed energy systems; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for PDX will be analyzed, a risk assessment will be performed on the hydrogen infrastructure and distributed energy system. These assessments will be useful for understanding how each of these technologies would perform as applied to a large public facility and public safety. The results of this CRADA, and an impact of the DOE funding, will evaluate hydrogen as a key fuel for PDX and will accelerate by several years availability of hydrogen, fuel cells, and other low-carbon technologies.

08 HYDROGEN↗