Search NASA⌕ Search

SEARCH · Search NASA

Results for “and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

SRS Defense Waste Processing Facility - the Nation's Only Operating Vitrification Facility - Completes 20 Years of Radioactive Operations - 17407

Savannah River Remediation (SRR) is the current Liquid Waste contractor at the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina, and operates the Defense Waste Processing Facility (DWPF), along with the other SRS liquid waste facilities. The DWPF, the nation's only operating vitrification facility, completed 20 years of radioactive operations in 2016. During this period, DWPF has safely treated the high-level liquid waste at this DOE facility since radioactive operations began with the first transfer of sludge waste feed to DWPF on March 12, 1996. A little over a month later, on April 29, 1996, the first radioactive canister was poured. DWPF poured its 4,000. canister of vitrified waste on December 31, 2015. As of September 30, 2016, DWPF has removed approximately 59.9 million curies from the liquid waste system at SRS and placed them in 4,106 canisters. SRS has operationally closed 8 high-level waste tanks. The DWPF melter has poured nearly 7.14 million kg of molten glass, and the facility has used only two melters in its lifetime. Melter 1 poured 1,339 canisters (1996-2002), while melter 2 to date (September 30, 2016) has poured 2,767 canisters (2003-present). Melter 2 continues to safely and efficiently operate. In order to achieve these accomplishments, the facility has chronicled a history of continued operational improvements such as the installation of bubblers in the melter to increase production, incorporation of glass compositions to achieve higher waste loadings, and improvements to melter design to extend melter life. As SRR moves forward to the next 20 years, continued improvements as well as maintaining the aging infrastructure through a proactive system health program are key priorities. This paper chronicles 20 years of challenges, improvements and accomplishments, and discusses future operations and infrastructure upgrades including implementation of a key flowsheet change to significantly reduce hydrogen generation in the Chemical Process Cell. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Organic thin-film transistors with a bottom bilayer gate dielectric having a low operating voltage and high operational stability

This study reports on p-channel bottom-gate organic thin-film transistors (OTFT) that achieve low-voltage operation with a thin bilayer gate dielectric of CYTOP/HfO 2 that also leads to high operational stability. A bottom-gate geometry allows the thickness of the gate dielectric to be reduced to 17 nm, thereby increasing the gate dielectric capacitance density to a value of up to 258 nF/cm 2 . All OTFTs yielded threshold voltages (V TH ) lower than -1 V, thereby providing minimum operating voltage (gate to source voltage ~ V TH ) of -1 V with field-effect mobility values in the range from 0.3 to 0.8 cm 2 /Vs and subthreshold swing values below 100 mV/dec. Operational stability during DC bias stress was found similar to that measured in devices with a top-gate geometry, with about 1% of drain current change after 6 h. Here, using a double-stretched exponential function, the operational stability characteristics were modeled. It was found that by increasing the metal oxide layer thickness, the threshold voltage can shift toward positive values under DC stress tests. For CYTOP layer thicknesses above 15 nm, a thicker CYTOP layer was found to shift the threshold voltage in the opposite direction toward negative values. Furthermore, these p-channel bottom-gate organic transistor with a bilayer gate dielectric of CYTOP/HfO 2 combine high mobility, high operational stability, and lower voltage operation of -1 V compared to top-gate OTFTs.

36 MATERIALS SCIENCE↗

Advancements in Remote Ground Control Station Operator Pilot in Command Training Program for Beyond Visual Line of Sight Flight Operations

The training program for a Remote Ground Control Station Operator Pilot in Command (R-GCSO PIC) at NASA Langley Research Center marks a pivotal evolution in preparing operators for Beyond Visual Line of Sight (BVLOS) operations. This program, developed within the Advanced Air Mobility (AAM) project High Density Vertiplex (HDV) subproject, was crafted to bridge the gap between traditional Ground Control Station Operators (GCSO) and R-GCSO PICs, focusing on uncrewed aircraft systems (UAS). It encompassed extensive theoretical and practical training, including hands-on experience with advanced simulators and live flight operations, while ensuring a deep understanding of BVLOS complexities. The training leveraged NASA technologies like the MPATH (Measuring Performance for Autonomy Teaming with Humans) ground control station software and incorporated human factors principles to enhance operational readiness. This paper details the program's development, execution, and the critical insights gained, emphasizing the necessity of continuous adaptation in training methodologies to meet the evolving demands of UAS operations in the National Airspace System.

Ground control station operator↗

Investigating the impact of a multi-module operation environment on the task performance time of human operators – An explanatory study

The worldwide demand for Small Modular Reactors (SMRs) has surged in recent years due to their enhanced safety and versatility in supporting diverse industrial sectors. A unique feature of SMR operation is that a single human operator is responsible for managing multiple modules. Therefore, securing a sufficient amount of human performance data pertaining to this new environment is essential for the safe operation of SMRs. In this explanatory study, a series of experiments were conducted using the NuScale simulator, a representative SMR design, with student operators. A total of 12 student operators were assigned two types of off-normal events and asked to cope with them using paper-based procedures. Subsequently, their task performance times were compared with those of student operators responsible for a single unit based on the Task Complexity (TACOM) measure. Results indicate that the performance of student operators under the experimental conditions of this study degraded by a factor of 2 to 3, depending on the characteristics of the off-normal events.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Lessons Learned During the Transition of SORCE Science Operations to Daylight Only Operations

In July 2013, NASA's Solar Radiation and Climate Experiment experienced a battery anomaly which placed it into safemode halting all science observations. Initial attempts to recover the spacecraft to an operational configuration failed due to the reduced capacity of the battery. As the keystone mission for measuring total solar irradiance, and the cornerstone mission for measuring the solar spectral irradiance there was a strong motivation for developing a new operations concept that would allow SORCE to resume daily measurements of the Sun. The operations team faced many challenges over the next several months. For a five-day period in late 2013 the operations team was able resume science observations to cross-calibrate SORCE data with a new instrument launched in November 2013. After the cross-calibration campaign was completed a new operations concept was deployed which allowed SORCE to perform daylight only operations. In this mode of operations all non-essential components are powered off at each eclipse entry and then turned back on at sunrise. In March 2014 SORCE resumed making daily measurements of the Sun. This paper will review the events and lessons learned from the six-month recovery effort.

Spacecraft Anomaly↗

Electronic Performance Support for Operational Systems: A Case Study of the Link Monitor and Control Operator Assistant

For complex operational systems, help needs to come from the inside out. It is often not realistic to call a help desk for problems that need immediate attention, especially for tasks that put a heavy cognitive load on the system operator. This session addresses the issues associated with providing electronic performance support for operational systems, including situations where the system is already fielded and can only change through evolution rather than revolution. We present a case study based on our experiences in developing the Link Monitor and Control Operator Assistant for NASA's Deep Space Network (DSN). The goals of the Operator Assistant are to improve the operability of the system and increase the efficiency of mission operations.

Hill, Randall W., Jr.↗

Application of System Operational Effectiveness Methodology to Space Launch Vehicle Development and Operations

The Department of Defense (DoD) defined System Operational Effectiveness (SOE) model provides an exceptional framework for an affordable approach to the development and operation of space launch vehicles and their supporting infrastructure. The SOE model provides a focal point from which to direct and measure technical effectiveness and process efficiencies of space launch vehicles. The application of the SOE model to a space launch vehicle's development and operation effort leads to very specific approaches and measures that require consideration during the design phase. This paper provides a mapping of the SOE model to the development of space launch vehicles for human exploration by addressing the SOE model key points of measurement including System Performance, System Availability, Technical Effectiveness, Process Efficiency, System Effectiveness, Life Cycle Cost, and Affordable Operational Effectiveness. In addition, the application of the SOE model to the launch vehicle development process is defined providing the unique aspects of space launch vehicle production and operations in lieu of the traditional broader SOE context that examines large quantities of fielded systems. The tailoring and application of the SOE model to space launch vehicles provides some key insights into the operational design drivers, capability phasing, and operational support systems.

Watson, Michael D.↗

Matrix multiplication operations using pair-wise load and splat operations

Mechanisms for performing a matrix multiplication operation are provided. A vector load operation is performed to load a first vector operand of the matrix multiplication operation to a first target vector register. A pair-wise load and splat operation is performed to load a pair of scalar values of a second vector operand and replicate the pair of scalar values within a second target vector register. An operation is performed on elements of the first target vector register and elements of the second target vector register to generate a partial product of the matrix multiplication operation. The partial product is accumulated with other partial products and a resulting accumulated partial product is stored. This operation may be repeated for a second pair of scalar values of the second vector operand.

97 MATHEMATICS AND COMPUTING↗

Practical Operations of Energy Storage Providing Ancillary Services: From Day-Ahead to Real-Time

As renewable resources are increasingly penetrating power systems, energy storage systems (ESSs) become essential in providing both energy arbitrage and ancillary services. Because of its high flexibility, ESSs have been taken into account in the daily operation of the bulk power system in many places. This paper proposes a general framework in the current electricity market environment to help system operators model the participation of multi-type ESSs and evaluate the performance of both energy arbitrage and reserve provision. We discuss different levels of ESSs' flexibility in providing ancillary services and also consider a deliberate and practical implementation of the modeling. This framework can be seamlessly integrated into the daily market operation without sacrificing computational efficiency. Numerical experiments validate the efficacy of the proposed framework and show that ESSs possess excellent potential in providing ancillary services for the bulk power system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

(abstract) Mission Operations and Control Assurance: Flight Operations Quality Improvements

Mission Operations and Command Assurance (MO&CA), a recent addition to flight operations teams at JPL. provides a system level function to instill quality in mission operations. MO&CA's primary goal at JPL is to help improve the operational reliability for projects during flight. MO&CA tasks include early detection and correction of process design and procedural deficiencies within projects. Early detection and correction are essential during development of operational procedures and training of operational teams. MO&CA's effort focuses directly on reducing the probability of radiating incorrect commands to a spacecraft. Over the last seven years at JPL, MO&CA has become a valuable asset to JPL flight projects. JPL flight projects have benefited significantly from MO&CA's efforts to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit directly from previous and ongoing experience. Since MO&CA, like Total Quality Management (TQM), focuses on continuous improvement of processes and elimination of rework, we recommend that this effort be continued on NASA flight projects.

mission operation flight operations error detectio↗

Streamlining Tactical Operator Handoffs During Multi-Vehicle Operations

Increased automation has shifted the operator control paradigm from a single operator controlling a single vehicle, to multiple operators collaborating to control multiple vehicles; this paradigm is known as m:N. Many questions remain unanswered in this new operational paradigm about the division of assets as workload for individual operators varies over time. This paper explores the management of workload by enabling operators to temporarily handoff vehicles among each other. A study was conducted to explore both a manual and assisted method for performing handoffs during manipulated contingency scenarios. The assisted handoff method allowed subjects to easily choose and group nominal and/or contingency vehicles. The number of contingencies was also manipulated to determine the effect workload had on how pilots utilized the ability to handoff vehicles. Results show subjects performed handoffs more often when there were more contingencies and when the assisted handoff tool was available. In addition, the assisted tool made subjects feel more comfortable, enabling them to feel like they could take longer to resolve contingency situations. Lastly, even during contingencies, subjects were able to successfully complete secondary tasks.

m:N operations↗

Integrated operation scenarios: Chapter 6 of the special issue: on the path to tokamak burning plasma operation

Here we report the progress of the development and optimization of operational scenarios for ITER and beyond, focusing upon baseline, hybrid, and steady-state scenarios since 2007. This includes advancements made by the integrated operation scenarios (IOS) topical group of the international tokamak physical activity as well as contributions from the broader tokamak community. The key area of research involves developing IOSs that encompass tokamak physics, operation, and technology by utilizing integrated modeling and control strategies. This requires leveraging available actuators to simultaneously control plasma position and shape, MHD activities that could lead to disruptions, transport, plasma-wall interaction and power exhaust, fuel cycle, fusion burn, and tritium breeding. The control extends from the plasma initiation phase, through the current ramp-up, flattop, start and end of the fusion burn, and current ramp-down, to the plasma termination phase. A review of the currently developed scenarios and modeling is provided in terms of (i) optimizing plasma initiation in ITER, (ii) preparing for the low activation phase to fully commission all tokamak systems and establish and validate physics and scenario conditions in preparation for deuterim-tritium (DT) operation, (iii) developing and preparing baseline and hybrid scenarios to demonstrate the feasibility of achieving these regimes within device constraints, (iv) exploring steady-state scenarios to meet ITER’s steady-state goals, (v) evaluating and preparing actuators for ITER, (vi) developing integrated control solutions using shared actuators. The most notable achievements include; (i) the development of ITER demonstration discharges by matching various dimensionless parameters, (ii) the development of scenarios in an ITER-like tungsten environment and DT operation, and (iii) the development of scenarios in superconducting tokamaks, enabling long-pulse operations with similar coil constraints to ITER. Along with these significant achievements, outstanding issues and recommendations for further research and development are provided. Importantly, this study goes beyond simply updating the ITER Physics Basis; it carries profound implications for the broader field of burning plasma research, offering valuable insights and guidance for the next generation of fusion experiments and devices.

ITER↗

Mission Operations and Command Assurance: Automating an Operations TQM Task

Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality into mission operations. The mission operations environment is inherently risky because each decision made is potentially mission critical. The flight operations environment generally requires operators to make rapid critical decisions and solve problems based on limited information, while closely following standard procedures. MO&CA's primary goal is to help improve the operational reliability and reduce risk of projects during flight. To achieve this goal, automation of the MO&CA task is required. MO&CA specifically embodies the TQM principle of continuous process improvement (CPI) in which processes are continually examined and analyzed for opportunities for improvement. The second way in which MO&CA implements CPI on JPL projects is on new projects or upgrades to existing projects.

mission↗

Axion Dark Matter Experiment: Detailed design and operations

Axion dark matter experiment ultra-low noise haloscope technology has enabled the successful completion of two science runs (1A and 1B) that looked for dark matter axions in the 2.66–3.1 μeV mass range with Dine–Fischler–Srednicki–Zhitnisky sensitivity. Therefore, it is the most sensitive axion search experiment to date in this mass range. Here, we discuss the technological advances made in the last several years to achieve this sensitivity, which includes the implementation of components, such as the state-of-the-art quantum-noise-limited amplifiers and a dilution refrigerator. Furthermore, we demonstrate the use of a frequency tunable microstrip superconducting quantum interference device amplifier in run 1A, and a Josephson parametric amplifier in run 1B, along with novel analysis tools that characterize the system noise temperature.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Human Behavior and Performance Support for ISS Operations and Astronaut Selections: NASA Operational Psychology for Six-Crew Operations

The Behavioral Health and Performance group at NASA Johnson Space Center provides psychological support services and behavioral health monitoring for ISS astronauts and their families. The ISS began as an austere outpost with minimal comforts of home and minimal communication capabilities with family, friends, and colleagues outside of the Mission Control Center. Since 1998, the work of international partners involved in the Space Flight Human Behavior and Performance Working Group has prepared high-level requirements for behavioral monitoring and support. The "buffet" of services from which crewmembers can choose has increased substantially. Through the process of development, implementation, reviewing effectiveness and modifying as needed, the NASA and Wyle team have proven successful in managing the psychological health and well being of the crews and families with which they work. Increasing the crew size from three to six brought additional challenges. For the first time, all partners had to collaborate at the planning and implementation level, and the U.S. served as mentor to extrapolate their experiences to the others. Parity in available resources, upmass, and stowage had to be worked out. Steady progress was made in improving off-hours living and making provisions for new technologies within a system that has difficulty moving quickly on certifications. In some respect, the BHP support team fell victim to its previous successes. With increasing numbers of crewmembers in training, requests to engage our services spiraled upward. With finite people and funds, a cap had to placed on many services to ensure that parity could be maintained. The evolution of NASA BHP services as the ISS progressed from three- to six-crew composition will be reviewed, and future challenges that may be encountered as the ISS matures in its assembly-complete state will be discussed.

VanderArk, Steve↗