Search NASA⌕ Search

SEARCH · Search NASA

Results for “automatic load balancing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

DISTRI: Distributed Multi-Facility HPC Simulator (DISTRI) v2.1

DISTRI is an advanced network simulator designed for multi-facility computational infrastructures with agentic behavior. It simulates HPC facilities where computational resources act as autonomous agents, making intelligent decisions about job scheduling, load balancing, and resource allocation. The simulator focuses on developing and testing decentralized algorithms that promote resilience and efficiency in multi-facility environments. Key Features: - Agentic Resource Behavior: Processors and DTNs act as autonomous agents with decision-making capabilities - Pheromone-Based Load Balancing: Decentralized load balancing inspired by ant colony optimization - Dual Topology Support: Mesh (normal operations) and Dumbell (network testing) topologies - Comprehensive TCP Simulation: Realistic TCP implementations with multiple congestion control algorithms - Failure Resilience Testing: Processor failure simulation with automatic job reassignment - Extensive Visualization: Detailed performance analysis and metrics collection - Research-Ready: Designed for algorithm development and benchmarking

Bez, Jean Luca [Lawrence Berkeley National Laborat↗

GreenThrift: Optimizing Carbon and Cost for Flexible Residential Loads

Reducing buildings’ carbon emissions is an important sustainability challenge. While scheduling flexible building loads has been previously used for a variety of grid and energy optimizations, carbon footprint reduction using such flexible loads poses new challenges since such methods need to balance both energy and carbon costs while also reducing user inconvenience from delaying such loads. This paper highlights the potential conflict between electricity prices and carbon emissions and the resulting trade-offs in carbon-aware and cost-aware load scheduling. To address this trade-off, we propose GreenThrift, a home automation system that leverages the scheduling capabilities of smart appliances and knowledge of future carbon intensity and cost to reduce both the carbon emissions and costs of flexible energy loads. At the heart of GreenThrift is an optimization technique that automatically computes schedules based on user configurations and preferences. We evaluate the effectiveness of GreenThrift using real-world carbon intensity data, electricity prices, and load traces from multiple locations and across different scenarios and objectives. Our results show that GreenThrift can replicate the offline optimal and retains 97% of the savings when optimizing the carbon emissions. Moreover, we show how GreenThrift can balance the conflict between carbon and cost and retain 95.3% and 85.5% of the potential carbon and cost savings, respectively.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tri-Level Linear Programming Model for Automatic Load Shedding Using Spectral Clustering

Traditional load shedding schemes can be inadequate in grids with high renewable penetration, leading to unstable events and unnecessary grid islanding. Although for both manual and automatic operating modes load shedding areas have been predefined by grid operators, they have remained fixed, and may be sub-optimal due to dynamic operating conditions. In this work, a distributed tri-level linear programming model for automatic load shedding to avoid system islanding is presented. Preventing islanding is preferred because it reduces the need for additional load shedding besides the disconnection of transmission lines between islands. This is crucial as maintaining the local generation-demand balance is necessary to preserve frequency stability. Furthermore, uneven distribution of generation resources among islands can lead to increased load shedding, causing economic and reliability challenges. This issue is further compounded in modern power systems heavily dependent on non-dispatchable resources like wind and solar. The upper-level model uses complex power flow measurements to determine the system areas to shed load depending on actual operating conditions using a spectral clustering approach. The mid-level model estimates the area system state, while the lower-level model determines the locations and load values to be shed. The solution is practical and promising for real-world applications.

Baquedano-Aguilar, Mario D.↗

Intra-Hour Dispatch and Automatic Generator Control Demonstration with Solar Forecasting - Final Report

In this project we address multiple resource integration challenges associated with increasing levels of solar penetration that arise from the variability and uncertainty in solar irradiance. We will model the SMUD service region as its own balancing region, and develop an integrated, real-time operational tool that takes solar-load forecast uncertainties into consideration and commits optimal energy resources and reserves for intra-hour and intra-day decisions. The primary objectives of this effort are to reduce power system operation cost by committing appropriate amount of energy resources and reserves, as well as to provide operators a prediction of the generation fleet’s behavior in real time for realistic PV penetration scenarios. The proposed methodology includes the following steps: clustering analysis on the expected solar variability per region for the SMUD system, Day-ahead (DA) and real-time (RT) load forecasts for the entire service areas, 1-year of intra-hour CPR forecasts for cluster centers, 1-year of smart re-forecasting CPR forecasts in real-time for determination of irreducible errors, and uncertainty quantification for integrated solar-load for both distributed and central stations (selected locations within service region) PV generation.

14 SOLAR ENERGY↗

Transport aircraft loading and balancing system: Using a CLIPS expert system for military aircraft load planning

The requirement for improving aircraft utilization and responsiveness in airlift operations has been recognized for quite some time by the Canadian Forces. To date, the utilization of scarce airlift resources has been planned mainly through the employment of manpower-intensive manual methods in combination with the expertise of highly qualified personnel. In this paper, we address the problem of facilitating the load planning process for military aircraft cargo planes through the development of a computer-based system. We introduce TALBAS (Transport Aircraft Loading and BAlancing System), a knowledge-based system designed to assist personnel involved in preparing valid load plans for the C130 Hercules aircraft. The main features of this system which are accessible through a convivial graphical user interface, consists of the automatic generation of valid cargo arrangements given a list of items to be transported, the user-definition of load plans and the automatic validation of such load plans.

Richardson, J.↗

Weighing Bucket Rain Gauge Instrument Handbook

The OTT precipitation gauge is used for automatic determination of the intensity and amount of precipitation. In contrast to conventional precipitation gauges, the Pluvio2 works using the balance principle. The gauge reliably recognizes precipitation by determining the weight of the collecting bucket. A high-precision stainless steel load cell, hermetically sealed against environmental influences, is used as the sensor element. An integrated temperature sensor compensates for the temperature changes in the weighing mechanism. These sensors have been found to be stable for years. The orifice of the gauge is heated and when snow/ice precipitation occurs, the weight of its water equivalent is the amount observed.

42 ENGINEERING↗

Automatic force balance calibration system

A system for automatically calibrating force balances is provided. The invention uses a reference balance aligned with the balance being calibrated to provide superior accuracy while minimizing the time required to complete the calibration. The reference balance and the test balance are rigidly attached together with closely aligned moment centers. Loads placed on the system equally effect each balance, and the differences in the readings of the two balances can be used to generate the calibration matrix for the test balance. Since the accuracy of the test calibration is determined by the accuracy of the reference balance and current technology allows for reference balances to be calibrated to within +/-0.05% the entire system has an accuracy of +/-0.2%. The entire apparatus is relatively small and can be mounted on a movable base for easy transport between test locations. The system can also accept a wide variety of reference balances, thus allowing calibration under diverse load and size requirements.

Ferris, Alice T.↗

Automatic force balance calibration system

A system for automatically calibrating force balances is provided. The invention uses a reference balance aligned with the balance being calibrated to provide superior accuracy while minimizing the time required to complete the calibration. The reference balance and the test balance are rigidly attached together with closely aligned moment centers. Loads placed on the system equally effect each balance, and the differences in the readings of the two balances can be used to generate the calibration matrix for the test balance. Since the accuracy of the test calibration is determined by the accuracy of the reference balance and current technology allows for reference balances to be calibrated to within .+-.0.05%, the entire system has an accuracy of a .+-.0.2%. The entire apparatus is relatively small and can be mounted on a movable base for easy transport between test locations. The system can also accept a wide variety of reference balances, thus allowing calibration under diverse load and size requirements.

Ferris, Alice T.↗

An Open-Source Tool for Automated Power Grid Stress Level Prediction at Balancing Authorities

The behavior of modern power systems becomes more stochastic and dynamic, due to the increased penetration of variable generation, demand response, new power market structure, extreme weather conditions, contingencies, and unexpected events. It is critically important to predict potential system operational issues so that grid planners and operators can take preventive actions to mitigate the impact, e.g., lack of operational reserves. In this paper, an innovative software tool is presented to assist power grid operators in a balancing authority (BA) to predict the grid stress level over the next operating day. It periodically collects necessary information from public domain such as weather forecasts, electricity demand, and automatically estimates the stress levels on a daily basis. Advanced Neural Network and regression tree algorithms are developed as the prediction engines to achieve this goal. The tool has been tested on a few key balancing authorities that successfully predicates the growing system peak load and increased stress levels under extreme heat waves in the United States of America.

Berscheid, Alan P.↗

Surgical force detection probe

The development progress of a precision electro-mechanical instrument which allows the detection and documentation of the forces and moment applied to human tissue during surgery (under actual operation room conditions), is reported. The pen-shaped prototype probe which measures 1/2 inch in diameter and 7 inches in length was fabricated using an aerodynamic balance. The aerodynamic balance, a standard wind tunnel force and moment sensing transducer, measures the forces and the moments transmitted through the surgeon's hand to the human tissue during surgery. The prototype probe which was fabricated as a development tool was tested successfully. The final version of the surgical force detection probe will be designed based on additional laboratory tests in order to establish the full scale loads. It is expected that the final product will require a simplified aerodynamic balance with two or three force components and one moment component with lighter full scale loads. A signal conditioner was fabricated to process and display the outputs from the prototype probe. This unit will be interfaced with a PC-based data system to provide automatic data acquisition, data processing, and graphics display. The expected overall accuracy of the probe is better than one percent full scale.

Tcheng, Ping↗

Distributed Data-Flow for In-Situ Visualization and Analysis at Petascale

We conducted a feasibility study to research modifications to data-flow architectures to enable data-flow to be distributed across multiple machines automatically. Distributed data-flow is a crucial technology to ensure that tools like the VisIt visualization application can provide in-situ data analysis and post-processing for simulations on peta-scale machines. We modified a version of VisIt to study load-balancing trade-offs between light-weight kernel compute environments and dedicated post-processing cluster nodes. Our research focused on memory overheads for contouring operations, which involves variable amounts of generated geometry on each node and computation of normal vectors for all generated vertices. Each compute node independently decided whether to send data to dedicated post-processing nodes at each stage of pipeline execution, depending on available memory. We instrumented the code to allow user settable available memory amounts to test extremely low-overhead compute environments. We performed initial testing of this prototype distributed streaming framework, but did not have time to perform scaling studies at and beyond 1000 compute-nodes.

97 MATHEMATICS AND COMPUTING↗

DEPEND - A design environment for prediction and evaluation of system dependability

The development of DEPEND, an integrated simulation environment for the design and dependability analysis of fault-tolerant systems, is described. DEPEND models both hardware and software components at a functional level, and allows automatic failure injection to assess system performance and reliability. It relieves the user of the work needed to inject failures, maintain statistics, and output reports. The automatic failure injection scheme is geared toward evaluating a system under high stress (workload) conditions. The failures that are injected can affect both hardware and software components. To illustrate the capability of the simulator, a distributed system which employs a prediction-based, dynamic load-balancing heuristic is evaluated. Experiments were conducted to determine the impact of failures on system performance and to identify the failures to which the system is especially susceptible.

Goswami, Kumar K.↗

A semi–automatic analytical methodology for characterizing the energy consumption of MRI systems using load duration curves

Background and purpose: Magnetic resonance imaging (MRI) scanners are a major contributor to greenhouse gas emissions from the healthcare sector, and efforts to improve energy efficiency and reduce energy consumption rely on quantification of the characteristics of energy consumption. The purpose of this work was to develop a semi-automatic analytical methodology for the characterization of the energy consumption of MRI systems using only the load duration curve (LDC). LDCs are a fundamental tool used across various fields to analyze and understand the behavior of loads over time. Methods: An electric current transformer sensor and data logger were installed on two 3T MRI scanners from two vendors, termed M1 (outpatient scanner) and M2 (inpatient/emergency scanner). Data was collected for 1 month (7/11/2023 to 8/11/2023). Active power was calculated, assuming a balanced three-phase system, using the average current measured across all three phases, a 480 V reference voltage for both machines, and vendor-provided power factors. An LDC was constructed for each system by sorting the active power values in descending order and computing the cumulative time (in units of percentage) for each data point. The first derivative of the LDC was then computed (LDC’), smoothed by convolution with a window function (sLDC’), and used to detect transitions between different system modes including (in descending power levels): scan, prepared-to-scan, idle, low-power, and off. The final, segmented LDC was used to measure time (% total time), total energy (kWh), and mean power (kW) for each system mode on both scanners. The method was validated by comparing mean power values, computed using the segmented 1-month LDC, for each nonproductive system mode (i.e., prepared-to-scan, idle, lower-power, and off) against power levels measured after a deliberate system shutdown was performed for each scanner (1 day worth of data). Results: The validation revealed differences in mean power values <1.4% for all nonproductive modes and both scanners. In the scan system mode, the mean power values ranged from 29.8 to 37.2 kW and the total energy consumed for 1 month ranged from 11 106 to 14 466 kWh depending on the scanner. Over the course of 1 month, the portion of time the scanners were in nonproductive modes ranged from 76% to 80% across scanners and the nonproductive energy consumption ranged from 8010 to 6722 kWh depending on the scanner. The M1 (outpatient) scanner consumed 99.9 and 183.9 kWh/day in idle mode for weekdays and weekends, respectively, because the scanner spent 23% more time proportionally in idle mode on the weekends. Conclusions: A semi-automatic method for quantifying energy consumption characteristics of MRI scanners was introduced and validated. This method is relatively simple to implement as it requires only power data from the scanners and avoids the technical challenges associated with extracting and processing scanner log files. Finally, the methodology enables quantitative evaluation of the power, time, and energy characteristics of MRI scanners in scan and nonproductive system modes, providing baseline data and the capability of identifying potential opportunities for enhancing the energy efficiency of MRI scanners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Using the GeoFEST Faulted Region Simulation System

GeoFEST (the Geophysical Finite Element Simulation Tool) simulates stress evolution, fault slip and plastic/elastic processes in realistic materials, and so is suitable for earthquake cycle studies in regions such as Southern California. Many new capabilities and means of access for GeoFEST are now supported. New abilities include MPI-based cluster parallel computing using automatic PYRAMID/Parmetis-based mesh partitioning, automatic mesh generation for layered media with rectangular faults, and results visualization that is integrated with remote sensing data. The parallel GeoFEST application has been successfully run on over a half-dozen computers, including Intel Xeon clusters, Itanium II and Altix machines, and the Apple G5 cluster. It is not separately optimized for different machines, but relies on good domain partitioning for load-balance and low communication, and careful writing of the parallel diagonally preconditioned conjugate gradient solver to keep communication overhead low. Demonstrated thousand-step solutions for over a million finite elements on 64 processors require under three hours, and scaling tests show high efficiency when using more than (order of) 4000 elements per processor. The source code and documentation for GeoFEST is available at no cost from Open Channel Foundation. In addition GeoFEST may be used through a browser-based portal environment available to approved users. That environment includes semi-automated geometry creation and mesh generation tools, GeoFEST, and RIVA-based visualization tools that include the ability to generate a flyover animation showing deformations and topography. Work is in progress to support simulation of a region with several faults using 16 million elements, using a strain energy metric to adapt the mesh to faithfully represent the solution in a region of widely varying strain.

Geophyical Finite Element Simulation Tool (GeoFEST↗

Survey of U.S. Ancillary Services Markets

In addition to providing energy to end-consumers, power system operators are also responsible for ensuring system reliability. To this end, power markets maintain an array of ancillary services to ensure that it is always possible to balance the supply and demand for energy in real-time. A subset of these ancillary services are commonly procured through market-based mechanisms: namely, Regulation, Spinning, and Non-spinning Reserves. Regulation Reserves are maintained to respond to supply/demand imbalances over short time frames, typically on the order of several seconds to one minute. Resources that provide Regulation Reserves adjust their generation or load levels in response to automatic generation control (AGC) signals provided by the system operator. Contingency reserves are maintained to provide additional generation capacity in the event that load increases substantially or supply side resources reduce their output or are taken offline. The reserves are typically segmented into two categories, 1) Spinning or Synchronized Reserves that are provided by generation units that are actively generating and have the ability to increase or decrease their output, 2) Non-spinning or Non-synchronized Reserves that are provided by generation resources that are not actively generating, but are able to start up and provide generation within a specified timeframe. Contingency reserves typically have response times on the order of ten to 30 minutes and can also be provided by demand-side resources that are capable of reducing their load. There are seven distinct power markets in the United States, each operated by a Regional Transmission Operator (RTO) or Independent System Operator (ISO) that operates the transmission system in its territory, operates markets for energy and ancillary services, and maintains system reliability. Each power market offers its own set of ancillary services, and precise definitions, requirements, and market mechanisms differ between markets. Despite the differences between markets, both in terms of services offered and system requirements, some broad trends generally apply. Regulation Reserves typically have the highest market prices, followed by Spinning Reserves and Non-spinning Reserves. Prices for Regulation Reserves have been the highest in the PJM market, since it opened in October 2012. This is partially because PJM experienced large price spikes during the period of extreme weather conditions in early 2014. ERCOT has traditionally had the highest prices for Spinning Reserves (called Responsive Reserves in ERCOT), including several periods of sustained high prices between 2010 and 2012. This can be explained in part by the relatively high penetration of variable wind resources and a similarly high requirement relative to peak load. ERCOT has also traditionally had the highest price for Non-spinning Reserves, followed by the NYISO East region. Both have experienced several periods of prolonged high prices since their inception, an occurrence that has not been regularly seen in other markets. In ISO-NE and PJM for example, the market clearing price for Non-spinning Reserves is typically $0/MWh more than 95% of the time. Market volume (in terms of the average amount of capacity of each service that is provided to a system) typically follows the reverse order of prices, as systems maintain the most Non-spinning Reserves capacity followed by Spinning Reserves and Regulation Reserves. PJM generally has the largest market for Regulation Reserves both in terms of capacity. The size of most Regulation Reserves markets in terms of capacity stay relatively constant year-to-year, as this is dictated largely by system requirements. PJM also generally has the largest Spinning Reserves market in terms of capacity. SPP, MISO, ISO-NE and SPP (beginning in 2014) all have Spinning Reserve markets with similar average capacity levels. When combined, the markets for Non-spinning and Operating reserves in ISO-NE have a comparable capacity to the market for Primary Reserves 1 in PJM. SPP, MISO, and CAISO all have smaller markets for their respective Non-spinning Reserves products that are roughly the same size as each other in terms of capacity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automatic partitioning of unstructured meshes for the parallel solution of problems in computational mechanics

Most of the recently proposed computational methods for solving partial differential equations on multiprocessor architectures stem from the 'divide and conquer' paradigm and involve some form of domain decomposition. For those methods which also require grids of points or patches of elements, it is often necessary to explicitly partition the underlying mesh, especially when working with local memory parallel processors. In this paper, a family of cost-effective algorithms for the automatic partitioning of arbitrary two- and three-dimensional finite element and finite difference meshes is presented and discussed in view of a domain decomposed solution procedure and parallel processing. The influence of the algorithmic aspects of a solution method (implicit/explicit computations), and the architectural specifics of a multiprocessor (SIMD/MIMD, startup/transmission time), on the design of a mesh partitioning algorithm are discussed. The impact of the partitioning strategy on load balancing, operation count, operator conditioning, rate of convergence and processor mapping is also addressed. Finally, the proposed mesh decomposition algorithms are demonstrated with realistic examples of finite element, finite volume, and finite difference meshes associated with the parallel solution of solid and fluid mechanics problems on the iPSC/2 and iPSC/860 multiprocessors.

Farhat, Charbel↗

TOPEX electrical power system

The TOPEX mission requirements which impact the power requirements and analyses are presented. A description of the electrical power system (EPS), including energy management and battery charging methods that were conceived and developed to meet the identified satellite requirements, is included. Analysis of the TOPEX EPS confirms that all of its electrical performance and reliability requirements have been met. The TOPEX EPS employs the flight-proven modular power system (MPS) which is part of the Multimission Modular Spacecraft and provides high reliability, abbreviated development effort and schedule, and low cost. An energy balance equation, unique to TOPEX, has been derived to confirm that the batteries will be completely recharged following each eclipse, under worst-case conditions. TOPEX uses three NASA Standard 50AH Ni-Cd batteries, each with 22 cells in series. The MPS contains battery charge control and protection based on measurements of battery currents, voltages, temperatures, and computed depth-of-discharge. In case of impending battery depletion, the MPS automatically implements load shedding.

Chetty, P. R. K.↗

Investigation of a Technique for Measuring Dynamic Ground Effect in a Subsonic Wind Tunnel

To better understand the ground effect encountered by slender wing supersonic transport aircraft, a test was conducted at NASA Langley Research Center's 14 x 22 foot Subsonic Wind Tunnel in October, 1997. Emphasis was placed on improving the accuracy of the ground effect data by using a "dynamic" technique in which the model's vertical motion was varied automatically during wind-on testing. This report describes and evaluates different aspects of the dynamic method utilized for obtaining ground effect data in this test. The method for acquiring and processing time data from a dynamic ground effect wind tunnel test is outlined with details of the overall data acquisition system and software used for the data analysis. The removal of inertial loads due to sting motion and the support dynamics in the balance force and moment data measurements of the aerodynamic forces on the model is described. An evaluation of the results identifies problem areas providing recommendations for future experiments. Test results are validated by comparing test data for an elliptical wing planform with an Elliptical wing planform section with a NACA 0012 airfoil to results found in current literature. Major aerodynamic forces acting on the model in terms of lift curves for determining ground effect are presented. Comparisons of flight and wind tunnel data for the TU-144 are presented.

Graves, Sharon S.↗