Search NASASearch

SEARCH · Search NASA

Results for “building simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Myna: Connecting powder bed fusion build data to simulation tools for digital twin applications

Additive manufacturing (AM), as a digital process, can generate a detailed digital thread linking a part’s design and manufacturing to its operational performance. As AM systems advance, an increasing amount of process data is stored in manufacturing databases. In principle, this data can be utilized by simulation-based digital twin approaches, such as real-time process control and asynchronous post-processing guidance. However, few tools currently exist for systematically integrating digital thread data with computational tools. Here, in this study, we propose a software package, called Myna, for connecting data from powder bed fusion processes to simulation tools. The utility of such a platform is demonstrated using build data from the Oak Ridge National Laboratory Manufacturing Demonstration Facility “Peregrine v2023-10” public dataset to automatically configure and run 54 semi-analytical 3DThesis melt pool simulations, 78 numerical Additive FOAM melt pool simulations, and 3 ExaCA microstructure simulations. The simulated, spatially registered microstructures are then compared directly with electron backscatter diffraction characterization of the corresponding as-built part locations. The resulting simulated microstructure showed variation as a function of process parameters, particularly stripe width; however, the experimental data had little variation between the microstructure texture and grain size resulting from different processing conditions. Analysis of the discrepancies suggest that it is possible a two-phase ferritic-austenitic solidification model is needed to accurately predict grain size and texture for certain stainless steel 316L feedstock compositions under powder bed fusion conditions, providing direction for future research. As illustrated here, due to the number and complexity of the simulations involved in AM process-structure–property predictions, automated methods to connect process data and simulations will remain necessary tools for testing hypotheses and implementing digital twin applications.

Knapp, Gerald L. [Oak Ridge National Laboratory (O

Virtual Build: Low-Tech Simulations Can Be High on IPPD Content

After two years of design, component testing, and parts fabrication, the project team was within months of starting assembly on the first major elements of a new product assembly. Schedules were extremely tight and there was no room for error in the first unit build-up for test. The first draft of the assembly drawing was nearing completion and needed to be approved by key members of the Integrated Product Team (IPT) before release. Only then could the manufacturing planning be finalized and released for assembly to begin. What could we do to improve the quality of our first build effort? How could we minimize all the changes inherent in the first-time build of a complex mechanical system? Why not a dress rehearsal of the build process with all the participating players, hardware, and build documentation? A "virtual build simulation". In an organization employing integrated product teams there is no substitute for clear communication between the various cross-functional members. Despite team collocation, integrated solid modeling, and frequent coordination meetings. elements of the product-process design can still slip through the cracks and show up on the assembly floor. The virtual build exercise was designed to provide one intensive hands-on experience for all members of the design and assembly team in time to make corrections without schedule impact.

Hilscher, Rick

A Comparison of Two Balance Calibration Model Building Methods

Simulated strain-gage balance calibration data is used to compare the accuracy of two balance calibration model building methods for different noise environments and calibration experiment designs. The first building method obtains a math model for the analysis of balance calibration data after applying a candidate math model search algorithm to the calibration data set. The second building method uses stepwise regression analysis in order to construct a model for the analysis. Four balance calibration data sets were simulated in order to compare the accuracy of the two math model building methods. The simulated data sets were prepared using the traditional One Factor At a Time (OFAT) technique and the Modern Design of Experiments (MDOE) approach. Random and systematic errors were introduced in the simulated calibration data sets in order to study their influence on the math model building methods. Residuals of the fitted calibration responses and other statistical metrics were compared in order to evaluate the calibration models developed with different combinations of noise environment, experiment design, and model building method. Overall, predicted math models and residuals of both math model building methods show very good agreement. Significant differences in model quality were attributable to noise environment, experiment design, and their interaction. Generally, the addition of systematic error significantly degraded the quality of calibration models developed from OFAT data by either method, but MDOE experiment designs were more robust with respect to the introduction of a systematic component of the unexplained variance.

DeLoach, Richard

Design and Build of Reactor Simulator for Fission Surface Power Technology Demonstrator Unit

The Nuclear Systems Team at NASA Marshall Space Flight Center (MSFC) focuses on technology development for state of the art capability in non-nuclear testing of nuclear system and Space Nuclear Power for fission reactor systems for lunar and Mars surface power generation as well as radioisotope power systems for both spacecraft and surface applications. Currently being designed and developed is a reactor simulator (RxSim) for incorporation into the Technology Demonstrator Unit (TDU) for the Fission Surface Power System (FSPS) Program, which is supported by multiple national laboratories and NASA centers. The ultimate purpose of the RxSim is to provide heated NaK to a pair of Stirling engines in the TDU. The RxSim includes many different systems, components, and instrumentation that have been developed at MSFC while working with pumped NaK systems and in partnership with the national laboratories and NASA centers. The main components of the RxSim are a core, a pump, a heat exchanger (to mimic the thermal load of the Stirling engines), and a flow meter for tests at MSFC. When tested at NASA Glenn Research Center (GRC) the heat exchanger will be replaced with a Stirling power conversion engine. Additional components include storage reservoirs, expansion volumes, overflow catch tanks, safety and support hardware, instrumentation (temperature, pressure, flow) for data collection, and power supplies. This paper will discuss the design and current build status of the RxSim for delivery to GRC in early 2012.

Godfroy, Thomas

Demography, dynamics and data: building confidence for simulating changes in the world's forests

Vegetation demographic models (VDMs) are advanced tools for simulating forest responses to climate and land-use changes, and are essential for projecting carbon cycling and large-scale forest management strategies. Despite their increasing incorporation into Earth System Models, VDMs differ in their demographic assumptions, with no prior quantitative comparison of their performance. We benchmarked nine VDMs against observational data from boreal, temperate and tropical sites, assessing their accuracy in predicting tree growth, carbon turnover, biomass stocks and size distributions. Models were simulated under consistent climate conditions with postdisturbance recovery monitored for at least 420 yr. Postdisturbance carbon recovery trajectories showed significant variability while remaining within observational ranges. Initial regrowth rates varied substantially (0.03-0.60, 0.18-0.70 and 0.35-1.10 kgCm-2 yr-1 for boreal, temperate and tropical sites, respectively), influenced by each model's initial forest state. Models captured mature forest carbon content but showed compensating effects between overestimated growth and underestimated mortality rates. This first multi-model benchmarking identifies growth and mortality rates as critical calibration targets and highlights the need to refine postdisturbance establishment conditions for model development. We outline specific benchmarking variables needed to improve predictions of forest responses to environmental change.

demographic vegetation model benchmarking

Parallel runway requirement analysis study. Volume 1: The analysis

The correlation of increased flight delays with the level of aviation activity is well recognized. A main contributor to these flight delays has been the capacity of airports. Though new airport and runway construction would significantly increase airport capacity, few programs of this type are currently underway, let alone planned, because of the high cost associated with such endeavors. Therefore, it is necessary to achieve the most efficient and cost effective use of existing fixed airport resources through better planning and control of traffic flows. In fact, during the past few years the FAA has initiated such an airport capacity program designed to provide additional capacity at existing airports. Some of the improvements that that program has generated thus far have been based on new Air Traffic Control procedures, terminal automation, additional Instrument Landing Systems, improved controller display aids, and improved utilization of multiple runways/Instrument Meteorological Conditions (IMC) approach procedures. A useful element to understanding potential operational capacity enhancements at high demand airports has been the development and use of an analysis tool called The PLAND_BLUNDER (PLB) Simulation Model. The objective for building this simulation was to develop a parametric model that could be used for analysis in determining the minimum safety level of parallel runway operations for various parameters representing the airplane, navigation, surveillance, and ATC system performance. This simulation is useful as: a quick and economical evaluation of existing environments that are experiencing IMC delays, an efficient way to study and validate proposed procedure modifications, an aid in evaluating requirements for new airports or new runways in old airports, a simple, parametric investigation of a wide range of issues and approaches, an ability to tradeoff air and ground technology and procedures contributions, and a way of considering probable blunder mechanisms and range of blunder scenarios. This study describes the steps of building the simulation and considers the input parameters, assumptions and limitations, and available outputs. Validation results and sensitivity analysis are addressed as well as outlining some IMC and Visual Meteorological Conditions (VMC) approaches to parallel runways. Also, present and future applicable technologies (e.g., Digital Autoland Systems, Traffic Collision and Avoidance System II, Enhanced Situational Awareness System, Global Positioning Systems for Landing, etc.) are assessed and recommendations made.

Ebrahimi, Yaghoob S.

Flexible Integration of Diverse HVAC Technologies in EnergyPlus via Python-Enabled Workflows

Analysis of advanced controls and novel system types is often not directly feasible in building energy simulation tools. Various techniques extend building energy simulation tool capabilities to allow the use of user-defined scripts and programs, but these approaches have limitations. The EnergyPlus Python plugin offers users new flexibility to use EnergyPlus to call an external Python module at specific points in the simulation, as well as to use Python to call EnergyPlus functionality through an application programming interface (API). This paper presents four case studies leveraging the EnergyPlus Python plugin to facilitate analysis of advanced controls and system types. The use of the Python plugin offers greater modularity and flexibility relative to previous approaches, is less error prone, and is simpler for users to adopt. The Python plugin allows EnergyPlus to be used in a more flexible manner and to accommodate the expanding realm of energy modeling applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

The updated algorithm of the Energy Consumption Program (ECP): A computer model simulating heating and cooling energy loads in buildings

The energy Comsumption Computer Program was developed to simulate building heating and cooling loads and compute thermal and electric energy consumption and cost. This article reports on the new additional algorithms and modifications made in an effort to widen the areas of application. The program structure was rewritten accordingly to refine and advance the building model and to further reduce the processing time and cost. The program is noted for its very low cost and ease of use compared to other available codes. The accuracy of computations is not sacrificed however, since the results are expected to lie within + or - 10% of actual energy meter readings.

Lansing, F. L.

BUILD: A community development simulation game, appendix A

The computer based urban decision-making game BUILD is described. BUILD is aimed at: (1) allowing maximum expression of value positions by participants through resolution of intense, task-oriented conflicts: (2) heuristically gathering information on both the technical and social functioning of the city through feedback from participants: (3) providing community participants with access to technical expertise in urban decision making, and to expose professionals to the value positions of the community: and (4) laying the groundwork for eventual development of an actual policy making tool. A brief description of the roles, sample input/output formats, an initial scenario, and information on accessing the game through a time-sharing system are included.

Orlando, J. A.

The relative importance of building design parameters in reducing energy use and sensible heat release from buildings in light of forecasted future weather data and building coverage ratio

Buildings typically have a 60-to-75-year lifespan before they require significant maintenance or modifications. However, most builders evaluate the performance of their new buildings using whole-building energy simulation tools based on the current typical meteorological year (TMY) file or actual meteorological year. The energy use consumption and sensible heat release pattern observed from buildings could potentially change based on shifting global climates. Therefore, the recommended energy-efficiency design parameters might also change during these periods. In this study, we evaluate the role of different building design parameters, such as material reflectivity, HVAC COP, and insulation values, on building energy usage and sensible heat release from buildings with different building coverage ratios (BCR), based on the current and future weather file TMY (fTMY) for the middle of the century (2040–2060). The role of sensible heat release from buildings is not accounted for accurately while estimating building energy usage in most whole-building energy simulations. The study conducts a series of whole-building energy simulation analyses using EnergyPlus to evaluate the role of different design parameters based on TMY and fTMY weather conditions. The analysis is conducted for two hot desert climatic cities: Phoenix (USA) and Abu Dhabi (UAE). The results show that, for the base case in a future climate, the sensible heat release is reduced by an average of 30% due to the reduced delta T between the surface and ambient air. Further, the results show an increase in total energy consumption by 5% annually. The results also show that, for buildings with traditional coatings, shorter buildings release more heat than taller buildings. On the other hand, for buildings with reflective paints, shorter buildings release less heat than taller buildings. The findings from this study can be used by policymakers, utility companies, and builders to better understand the relative role of different building design parameters while constructing new and retrofitting existing buildings.

Alhazmi, Mansour [King Fahd University of Petroleu

Building Airport Surface HITL Simulation Capability

FutureFlight Central is a high fidelity, real-time simulator designed to study surface operations and automation. As an air traffic control tower simulator, FFC allows stakeholders such as the FAA, controllers, pilots, airports, and airlines to develop and test advanced surface and terminal area concepts and automation including NextGen and beyond automation concepts and tools. These technologies will improve the safety, capacity and environmental issues facing the National Airspace system. FFC also has extensive video streaming capabilities, which combined with the 3-D database capability makes the facility ideal for any research needing an immersive virtual and or video environment. FutureFlight Central allows human in the loop testing which accommodates human interactions and errors giving a more complete picture than fast time simulations. This presentation describes FFCs capabilities and the components necessary to build an airport surface human in the loop simulation capability.

facility capabilities

End-Use Savings Shapes Upgrade Package Documentation: Wall and Roof Insulation and New Windows

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on an upgrade package of three end-use savings shapes upgrades - Window Replacement, Exterior Wall Insulation, and Roof Insulation, which we will refer to collectively as the "High Efficiency Envelope" package. More details on the individual upgrades can be found on the ComStock Measures Documentation page. An upgrade package applies two or more EUSS upgrades to a single building model simulation. Since ComStock is a bottom-up physics-based model, an upgrade package will go beyond aggregating or summing the individual upgrade results and produce novel results by simulating interactions between the upgrades. For example, pairing an envelope upgrade with an electrification upgrade would likely result in higher savings results than the sum of these upgrades individually, and the size of the heating, ventilating, and air conditioning (HVAC) equipment may be reduced if the envelope upgrade reduces the loads significantly.

29 ENERGY PLANNING, POLICY, AND ECONOMY

End-Use Savings Shapes Upgrade Package Documentation: LED Lighting, HP-RTU and ASHP-Boiler

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on an upgrade package of three end-use savings shapes upgrades - Light Emitting Diode (LED) Lighting, Heat Pump Rooftop Unit (RTU) (HP-RTU), and Air-Source Heat Pump (ASHP) Boiler, which we will refer to collectively as the "Interior Lighting and Heat Pump" package. More details on the individual upgrades can be found on the ComStock Measures Documentation page. An upgrade package applies two or more EUSS upgrades to a single building model simulation. Since ComStock is a bottom-up physics-based model, an upgrade package will go beyond aggregating or summing the individual upgrade results and produce novel results by simulating interactions between the upgrades. For example, pairing an envelope upgrade with an electrification upgrade would likely result in higher savings results than the sum of these upgrades individually, and the size of the heating, ventilating, and air conditioning (HVAC) equipment may be reduced if the envelope upgrade reduces the loads significantly.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Helicopter simulator qualification

CAE has extensive experience in building helicopter simulators and has participated in group working sessions for fixed-wing advisory circulars. Against this background, issues that should be addressed in establishing helicopter approval criteria were highlighted. Some of these issues are not immediately obvious and may, indeed, be more important than the criteria a themselves.

Hampson, Brian

Computerized energy analysis for the Mars operations support building

A detailed computerized building load simulation of the Operations Support Building at the Mars Deep Space Station, Goldstone, California is described. Five energy conservation suggestions were investigated prior to implementation. The results showed that cost savings of about 16 percent of present energy costs are possible.

Yung, C. S.

IFSAR Simulation Using the Shooting and Bouncing Ray Technique

Interferometric Synthetic Aperture Radar (IFSAR) is a technique that allows an automated way to carry out terrain mapping. IFSAR is carried out by first generating a SAR image pair from two antennas that are spatially separated. The phase difference between the SAR image pair is proportional to the topography. After registering the SAR images, the difference in phase in each pixel is extracted to generate an interferogram. Since the phase can only be measured within 2pi radians, phase unwrapping is carried out to extract the absolute phase for each pixel that will be proportional to the local height. While IFSAR algorithm is typically applied to measurement data, it is useful to develop an IFSAR simulator to develop a better understanding of the IFSAR technique. The IFSAR simulator can be used in choosing system parameters, experimenting with processing procedures and mission planning. In this paper we will present an IFSAR simulation methodology to simulate the interferogram based on the shooting and bouncing ray (SBR) technique. SBR is a standard ray-tracing technique used to simulate scattering from large, complex targets. SBR is carried out by shooting rays at the target or scene. At the exit point of each ray, a ray-tube integration is done to find its contribution to the total field. A fast algorithm has been developed for the SBR for simulating SAR images of complex targets. In the IFSAR simulation, we build upon the fast SAR simulation technique. Given the antenna pair configuration, radar system parameters and the geometrical description of the scene, we first simulate two SAR images from each antenna. After post processing the two SAR images, we generate an interferogram. Phase unwrapping is then performed on the interferogram to arrive at the desired terrain map. We will present results from the SBR-based IFSAR simulator. The results will include terrain map reconstruction of urban environments. The reconstruction will be compared to the ground truth to examine the fidelity of the simulation. We will also investigate the effect of multi-bounce scattering in urban environments on phase unwrapping and reconstruction.

Houshmand, Bijan

Jake Garn Mission Simulator and Training Facility, Building 5, Historical Documentation

In response to President George W. Bush's announcement in January 2004 that the Space Shuttle Program (SSP) would end in 2010, the National Aeronautics and Space Administration (NASA) completed a nation-wide historical survey and evaluation of NASA-owned facilities and properties (real property assets) at all its Centers and component facilities. The buildings and structures which supported the SSP were inventoried and assessed as per the criteria of eligibility for listing in the National Register of Historic Places (NRHP) in the context of this program. This study was performed in compliance with Section 110 of the National Historic Preservation Act (NHPA) of 1966 (Public Law 89-665), as amended; the National Environmental Policy Act (NEPA) of 1969 (Public Law 91-190); Executive Order (EO) 11593: Protection and Enhancement of the Cultural Environment; EO 13287, Preserve America, and other relevant legislation. As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities at was conducted by NASA's Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, "Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas," prepared in November 2007 by NASA JSC's contractor, Archaeological Consultants, Inc. As a result of this survey, the Jake Gam Mission Simulator and Training Facility (Building 5) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 5 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 5 was still used to support the SSP as an astronaut training facility. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 5 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 5 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work product on CD, are also provided.

Slovinac, Trish