Search NASA⌕ Search

SEARCH · Search NASA

Results for “buyer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The Vehicle Integrated Performance Analysis Experience: Reconnecting With Technical Integration

Very early in the Space Launch Initiative program, a small team of engineers at MSFC proposed a process for performing system-level assessments of a launch vehicle. Aimed primarily at providing insight and making NASA a smart buyer, the Vehicle Integrated Performance Analysis (VIPA) team was created. The difference between the VIPA effort and previous integration attempts is that VIPA a process using experienced people from various disciplines, which focuses them on a technically integrated assessment. The foundations of VIPA s process are described. The VIPA team also recognized the need to target early detailed analysis toward identifying significant systems issues. This process is driven by the T-model for technical integration. VIPA s approach to performing system-level technical integration is discussed in detail. The VIPA process significantly enhances the development and monitoring of realizable project requirements. VIPA s assessment validates the concept s stated performance, identifies significant issues either with the concept or the requirements, and then reintegrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program s insight and review process. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful

McGhee, D. S.↗

Preliminary Structural Sizing and Alternative Material Trade Study of CEV Crew Module

This paper presents the results of a preliminary structural sizing and alternate material trade study for NASA s Crew Exploration Vehicle (CEV) Crew Module (CM). This critical CEV component will house the astronauts during ascent, docking with the International Space Station, reentry, and landing. The alternate material design study considers three materials beyond the standard metallic (aluminum alloy) design that resulted from an earlier NASA Smart Buyer Team analysis. These materials are graphite/epoxy composite laminates, discontinuously reinforced SiC/Al (DRA) composites, and a novel integrated panel material/concept known as WebCore. Using the HyperSizer (Collier Research and Development Corporation) structural sizing software and NASTRAN finite element analysis code, a comparison is made among these materials for the three composite CM concepts considered by the 2006 NASA Engineering and Safety Center Composite Crew Module project.

Bednarcyk, Brett A.↗

The NASA Engineering and Safety Center (NESC) GN and C Technical Discipline Team (TDT): Its Purpose, Practices and Experiences

This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA projects. This paper will then describe key issues and findings from several of the recent GN&C-related independent assessments and consultations performed and/or supported by the NESC GN&C TDT. Among the examples of the GN&C TDT s work that will be addressed in this paper are the following: the Space Shuttle Orbiter Repair Maneuver (ORM) assessment, the ISS CMG failure root cause assessment, the Demonstration of Autonomous Rendezvous Technologies (DART) spacecraft mishap consultation, the Phoenix Mars lander thruster-based controllability consultation, the NASA in-house Crew Exploration Vehicle (CEV) Smart Buyer assessment and the assessment of key engineering considerations for the Design, Development, Test & Evaluation (DDT&E) of robust and reliable GN&C systems for human-rated spacecraft.

Dennehy, Cornelius J.↗

Ares Launch Vehicles Lean Practices Case Study

The Ares launch vehicles team, managed by the Ares Projects Office (APO) at NASA Marshall Space Flight Center, has completed the Ares I Crew Launch Vehicle System Requirements Review and System Definition Review and early design work for the Ares V Cargo Launch Vehicle. This paper provides examples of how Lean Manufacturing, Kaizen events, and Six Sigma practices are helping APO deliver a new space transportation capability on time and within budget, while still meeting stringent technical requirements. For example, Lean philosophies have been applied to numerous process definition efforts and existing process improvement activities, including the Ares I-X test flight Certificate of Flight Readiness (CoFR) process, risk management process, and review board organization and processes. Ares executives learned Lean practices firsthand, making the team "smart buyers" during proposal reviews and instilling the team with a sense of what is meant by "value-added" activities. Since the goal of the APO is to field launch vehicles at a reasonable cost and on an ambitious schedule, adopting Lean philosophies and practices will be crucial to the Ares Project's long-term SUCCESS.

Doreswamy, Rajiv↗

Debris Disks and Hidden Planets

When a planet orbits inside a debris disk like the disk around Vega or Beta Pictoris, the planet may be invisible, but the patterns it creates in the disk may give it away. Observing and decoding these patterns may be the only way we can detect exo-Neptunes orbiting more than 20 AU from their stars, and the only way we can spot planets in systems undergoing the late stages of planet formation. Fortunately, every few months, a new image of a debris disk appears with curious structures begging for explanation. I'll describe some new ideas in the theory of these planet-disk interactions and provide a buyers guide to the latest models (and the planets they predict).

Kuchner, Marc↗

Improving Software Engineering on NASA Projects

Software Engineering Initiative: Reduces risk of software failure -Increases mission safety. More predictable software cost estimates and delivery schedules. Smarter buyer of contracted out software. More defects found and removed earlier. Reduces duplication of efforts between projects. Increases ability to meet the challenges of evolving software technology.

Crumbley, Tim↗

Lessons Learned in Building the Ares Projects

Since being established in 2005, the Ares Projects at Marshall Space Flight Center have been making steady progress designing, building, testing, and flying the next generation of exploration launch vehicles. Ares is committed to rebuilding crucial capabilities from the Apollo era that made the first human flights to the Moon possible, as well as incorporating the latest in computer technology and changes in management philosophy. One example of an Apollo-era practice has been giving NASA overall authority over vehicle integration activities, giving civil service engineers hands-on experience in developing rocket hardware. This knowledge and experience help make the agency a "smart buyer" of products and services. More modern practices have been added to the management tool belt to improve efficiency, cost effectiveness, and institutional knowledge, including knowledge management/capture to gain better insight into design and decision making; earned value management, where Ares won a NASA award for its practice and implementation; designing for operability; and Lean Six Sigma applications to identify and eliminate wasted time and effort. While it is important to learn technical lessons like how to fly and control unique rockets like the Ares I-X flight test vehicle, the Ares management team also has been learning important lessons about how to manage large, long-term projects.

Sumrall, John Phil↗

NASA-DoD Lead-Free Electronics Project. DRAFT Joint Test Report

The use of conventional tin-lead (SnPb) in circuit board manufacturing is under ever-increasing political scrutiny due to increasing regulations concerning lead. The "Restriction of Hazardous Substances" (RoHS) directive enacted by the European Union (EU) and a pact between the United States National Electronics Manufacturing Initiative (NEMI), Europe's Soldertec at Tin Technology Ltd. and the Japan Electronics and Information Technology Industries Association (JEITA) are just two examples where worldwide legislative actions and partnerships/agreements are affecting the electronics industry. As a result, many global commercial-grade electronic component suppliers are initiating efforts to transition to lead-free (Pb-free) in order to retain their worldwide market. Pb-free components are likely to find their way into the inventory of aerospace or military assembly processes under current government acquisition reform initiatives. Inventories "contaminated" by Pb-free will result in increased risks associated with the manufacturing, product reliability, and subsequent repair of aerospace and military electronic systems. Although electronics for military and aerospace applications are not included in the RoHS legislation, engineers are beginning to find that the commercial industry's move towards RoHS compliance has affected their supply chain and changed their parts. Most parts suppliers plan to phase out their non-compliant, leaded production and many have already done so. As a result, the ability to find leaded components is getting harder and harder. Some buyers are now attempting to acquire the remaining SnPb inventory, if it's not already obsolete. Original Equipment Manufacturers (OEMs), depots, and support contractors have to be prepared to deal with an electronics supply chain that increasingly provides more and more parts with Pb-free finishes-some labeled no differently than their Pb counterparts-while at the same time providing the traditional Pb parts. The longer the transition period, the greater the likelihood of Pb-free parts inadvertently being mixed with Pb parts and ending up on what are supposed to be Pb systems. As a result, OEMs, depots, and support contractors need to take action now to either abate the influx of Pb-free parts, or accept it and deal with the likely interim consequences of reduced reliability due to a wide variety of matters, such as Pb contamination, high temperature incompatibility, and tin whiskering. Allowance of Pb-free components produces one of the greatest risks to the reliability of a weapon system. This is due to new and poorly understood failure mechanisms, as well as unknown long-term reliability. If the decision is made to consciously allow Pb-free solder and component finishes into SnPb electronics, additional effort (and cost) will be required to make the significant number of changes to drawings and task order procedures. This project is a follow-on effort to the Joint Council on Aging Aircraft/Joint Group on Pollution Prevention (JCAA/JG-PP) Pb-free Solder Project which was the first group to test the reliability of Pb-free solder joints against the requirements of the aerospace and military community.

Kessel, Kurt↗

Active Matrix OLED Test Report

This report focuses on the limited environmental testing of the AMOLED display performed as an engineering evaluation by The NASA Johnson Space Center (JSC)-specifically. EMI. Thermal Vac, and radiation tests. The AMOLED display is an active-matrix Organic Light Emitting Diode (OLED) technology. The testing provided an initial understanding of the technology and its suitability for space applications. Relative to light emitting diode (LED) displays or liquid crystal displays (LCDs), AMOLED displays provide a superior viewing experience even though they are much lighter and smaller, produce higher contrast ratio and richer colors, and require less power to operate than LCDs. However, AMOLED technology has not been demonstrated in a space environment. Therefore, some risks with the technology must be addressed before they can be seriously considered for human spaceflight. The environmental tests provided preliminary performance data on the ability of the display technology to handle some of the simulated induced space/spacecraft environments that an AMOLED display will see during a spacecraft certification test program. This engineering evaluation is part of a Space Act Agreement (SM) between The NASA/JSC and Honeywell International (HI) as a collaborative effort to evaluate the potential use of AMOLED technology for future human spaceflight missions- both government-led and commercial. Under this SM, HI is responsible for doing optical performance evaluation, as well as temperature and touch screen studies. The NASA/JSC is responsible for performing environmental testing comprised of EMI, Thermal Vac, and radiation tests. Additionally, as part of the testing, limited optical data was acquired to assess performance as the display was subjected to the induced environments. The NASA will benefit from this engineering evaluation by understanding AMOLED suitability for future use in space as well as becoming a smarter buyer (or developer) of the technology. HI benefits from the environmental testing results by understanding its performance limitations/shortcomings to improve subsequent generations of AMOLED technology. Note that the AMOLED used in this test was not deSigned for the space environment but rather for commercial/industrial terrestrial applications.

Salazar, George↗

Active Matrix Organic Light Emitting Diode (AMOLED) Environmental Test Report

This report focuses on the limited environmental testing of the AMOLED display performed as an engineering evaluation by The NASA Johnson Space Center (JSC)-specifically. EMI. Thermal Vac, and radiation tests. The AMOLED display is an active-matrix Organic Light Emitting Diode (OLED) technology. The testing provided an initial understanding of the technology and its suitability for space applications. Relative to light emitting diode (LED) displays or liquid crystal displays (LCDs), AMOLED displays provide a superior viewing experience even though they are much lighter and smaller, produce higher contrast ratio and richer colors, and require less power to operate than LCDs. However, AMOLED technology has not been demonstrated in a space environment. Therefore, some risks with the technology must be addressed before they can be seriously considered for human spaceflight. The environmental tests provided preliminary performance data on the ability of the display technology to handle some of the simulated induced space/spacecraft environments that an AMOLED display will see during a spacecraft certification test program. This engineering evaluation is part of a Space Act Agreement (SM) between The NASA/JSC and Honeywell International (HI) as a collaborative effort to evaluate the potential use of AMOLED technology for future human spaceflight missions- both government-led and commercial. Under this SM, HI is responsible for doing optical performance evaluation, as well as temperature and touch screen studies. The NASA/JSC is responsible for performing environmental testing comprised of EMI, Thermal Vac, and radiation tests. Additionally, as part of the testing, limited optical data was acquired to assess performance as the display was subjected to the induced environments. The NASA will benefit from this engineering evaluation by understanding AMOLED suitability for future use in space as well as becoming a smarter buyer (or developer) of the technology. HI benefits from the environmental testing results by understanding its performance limitations/shortcomings to improve subsequent generations of AMOLED technology. Note that the AMOLED used in this test was not deSigned for the space environment but rather for commercial/industrial terrestrial applications.

Salazar, George A.↗

Advanced Extravehicular Activity Pressure Garment Requirements Development

The NASA Johnson Space Center advanced pressure garment technology development team is addressing requirements development for exploration missions. Lessons learned from the Z‐2 high fidelity prototype development have reiterated that clear low‐level requirements and verification methods reduce risk to the government, improve efficiency in pressure garment design efforts, and enable the government to be a smart buyer. The expectation is to provide requirements at the specification level that are validated so that their impact on pressure garment design is understood. Additionally, the team will provide defined verification protocols for the requirements. However, in reviewing exploration space suit high level requirements there are several gaps in the team's ability to define and verify related lower level requirements. This paper addresses the efforts in requirement areas such as mobility/fit/comfort and environmental protection (dust, radiation, plasma, secondary impacts) to determine the by what method the requirements can be defined and use of those methods for verification. Gaps exist at various stages. In some cases component level work is underway, but no system level effort has begun, in other cases no effort has been initiated to close the gap. Status of ongoing efforts and potential approaches to open gaps are discussed.

Ross, Amy↗

Advanced Extra-Vehicular Activity Pressure Garment Requirements Development

The NASA Johnson Space Center advanced pressure garment technology development team is addressing requirements development for exploration missions. Lessons learned from the Z-2 high fidelity prototype development have reiterated that clear low-level requirements and verification methods reduce risk to the government, improve efficiency in pressure garment design efforts, and enable the government to be a smart buyer. The expectation is to provide requirements at the specification level that are validated so that their impact on pressure garment design is understood. Additionally, the team will provide defined verification protocols for the requirements. However, in reviewing exploration space suit high level requirements there are several gaps in the team's ability to define and verify related lower level requirements. This paper addresses the efforts in requirement areas such as mobility/fit/comfort and environmental protection (dust, radiation, plasma, secondary impacts) to determine the method by which the requirements can be defined and use of those methods for verification. Gaps exist at various stages. In some cases component level work is underway, but no system level effort has begun; in other cases no effort has been initiated to close the gap. Status of on-going efforts and potential approaches to open gaps are discussed.

Ross, Amy↗

National Unmanned Aerial System Standardized Performance Testing and Rating (NUSTAR)

The overall objective of the NUSTAR Capability is to offer standardized tests and scenario conditions to assess performance of the UAS. The following are goals of the NU-STAR: 1. Create a prototype standardized tests and scenarios that vehicles can be tested against. 2. Identify key performance parameters of all UAS and their standardized measurement strategy. 3. Develop standardized performance reporting method (e.g., consumer report style) to assist prospective buyers. 4. Identify key performance metrics that could be used by judged towards overall safety of the UAS and operations. 5. If vehicle certification standard is made by a regulatory agency, the performance of individual UAS could be compared against the minimum requirement (e.g., sense and avoid detection time, stopping distance, kinetic energy, etc.).

Testing↗

Using MCC Facility Metrics to Size, Inform, and Troubleshoot

The Mission Control Center (MCC) underwent a major architecture update that has been used for Mission Operations since 2016. The MCC Performance team has collected system performance and usage metrics to improve the configuration, troubleshoot incidents, and help size the system to accommodate future programs. The data is collected through MCC custom software and custom scripts to extract data from our Commercial Off The Shelf (COTS) tools. This data has enabled MCC to support more activities concurrently, help our operations and development teams to respond to issues more quickly, and make our directorate informed buyers to meet new requirements when developing project plans for the upcoming Fiscal Year.

Data Science↗

Pushing Green: Leveraging Home Energy Score to Promote Deep-Energy Retrofits in Portland, Oregon

In the United States, 39% of total energy is consumed by the building sector, 20% of which is attributed to residential buildings. Older homes, built before 1992 when the U.S. Department of Energy’s (DOE) Building Energy Codes Program was established, represent approximately 68% of residential building stock in the country and often have significant air leakage, inadequate insulation and inefficient heating & cooling systems. These older homes have long been the elephant in the room: how can programs effectively increase efficiency in all of the homes in need? Developed by DOE, the Home Energy Score was established to provide homeowners, buyers, and renters a comparable score measuring a home's energy use. Much like the MPG rating of automobiles, the Home Energy Score provides an overview of a residential building’s energy efficiency. In 2016, the City of Portland passed an ordinance requiring all residential properties to receive a Home Energy Score before being listed for sale, a mandate that was implemented January 1, 2018. Since 2018, more than 22,000 homes throughout the Portland Metro area have received Home Energy Scores (amounting to over 10% of Portland's single-family homes). This paper explores the sample of Home Energy Scores throughout Portland, including at the neighborhood level, identifies trends in efficiency measures, describes how the data has been used to date and proposes ways program administrators can use the Home Energy Score to increase the impact of energy efficiency programs on a city-scale.

Antonopoulos, Chrissi A.↗

A National Secure-by-Design Strategy

The US National Cybersecurity Strategy published March 2, 2023 uses plain language to communicate that the US is calling for a major change in how we prioritize the security of software systems used in critical infrastructure. It acknowledges that our current approach, which is essentially, “let the buyer beware,” leaves entities who are least able to assess or defend vulnerable software responsible for the impacts of designed-in weaknesses while the makers of the technology bear no liability. The strategy recommends a security-by-design approach, recommending that software vendors be held liable to uphold a “duty of care” to consumers and for systems to be designed to “fail safely and recover quickly” . For energy infrastructure, the strategy calls out the need to implement the National Cyber-Informed Engineering Strategy to achieve higher confidence security for energy infrastructures. The Idaho National Laboratory, a pioneer in cyber-informed engineering concepts, is at the forefront of organizations educating others in industry, academia, and government on how to apply these concepts to real-world challenges. In this brief, we'll outline some of the basic principles of security-by-design and offer examples of how, in a water sector context, they're being put into successful practice.

42 ENGINEERING↗

Becoming a 10: A Closer Look at the U.S. Department of Energy Home Energy Score's Updates, Improvements, and Expansion

The U.S. Department of Energy (DOE)'s Home Energy Score provides homeowners, buyers, and renters directly comparable and credible information about a home's estimated energy use and costs. Certified Qualified Assessors conduct low-cost assessments to provide each home a 1-10 score alongside a set of cost-effective upgrades to improve the score. As of February 2022, hundreds of assessors have delivered over 175,000 scores to homes across the country. Originally released in 2012 using DOE2.1e as the modeling backend, after years of effort, a new version of Home Energy Score was released in 2021 utilizing DOE's flagship energy modeling software, EnergyPlus. The updated architecture leverages modeling advancements and enables new building technologies to be added to the Scoring Tool. The new release represents a leap forward in harmonizing modeling assumptions across DOE and industry programs. In this paper we discuss the rigorous approach to model comparison with DOE2 undertaken prior to the update, utilizing test homes and real homes from the Home Energy Score database to strike a balance between consistency and more accurate energy predictions. We also discuss additional new capabilities, including improvements made to the upgrade recommendations methodology, the inclusion of an energy cost estimate metric based on ResStock analysis for use in home appraisals, and improved data analysis for quality assurance. Finally, we look at the impact Home Energy Score has had over the last decade and its future potential as its uptake in state energy plans, local ordinances, utility programs, and real estate data continues to grow.

building energy modeling↗