Search NASA⌕ Search

SEARCH · Search NASA

Results for “capacity development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Non-neutral plasma manipulation techniques in development of a high-capacity positron trap

Preliminary experiments have been performed toward the development of a multi-cell Penning–Malmberg trap for the storage of large numbers of positrons (≥10 10 e + ). We introduce the master-cell test trap and the diagnostic tools for first experiments with electrons. The usage of a phosphor screen to measure the z-integrated plasma distribution and the number of confined particles is demonstrated, as well as the trap alignment to the magnetic field ( B = 3.1 T) using the m = 1 diocotron mode. The plasma parameters and expansion are described along with the autoresonant excitation of the diocotron mode using rotating dipole fields and frequency chirped sinusoidal drive signals. We analyze the reproducibility of the excitation and use these findings to settle on the path for the next generation multi-cell test device.

Singer, M.↗

Staying Current: A Community Readiness Framework for Marine Energy Applied to River Current Energy in Alaska

Marine energy-including wave, tidal, and river current energy-can provide a local energy source for rural and remote communities. Marine energy has the potential to bolster self-sufficiency and create economic opportunities while preserving ecological integrity. Communities may be interested in deploying, testing, and advancing these early-stage technologies to meet their needs. However, limited capacity, workforce constraints, and other barriers can challenge development. To better understand a community's interest in and preparedness for marine energy, we developed a suite of 150 'metrics of readiness.' Organized across seven categories-technical, social, environmental, strategic, governance, economic, financial-and 29 subcategories, the metrics provide a holistic perspective beyond the technical aspects of an energy device. We conducted a desktop application of the metrics of readiness for Igiugig, Alaska. The metrics were applied retrospectively for two points in time: before (2009) and after (2018) in-stream testing of a river current energy device. By documenting changes among categories and subcategories of the metrics, our results show the evolving nature of community readiness for river current energy. They also illustrate how our interdisciplinary framework captures the investment in environmental effects research and commitment to strategic planning that occurred in Igiugig. In future applications, we envision the framework could be used to foster public engagement in marine energy, collaborate with communities in project development, shape capacity building activities, prioritize investments, and inform research needs. While our study focuses on enabling river current energy in Alaska, the metrics of readiness have the potential to inform implementation of other renewable technologies with communities in new geographies.

13 HYDRO ENERGY↗

Development of a high capacity variable conductance heat pipe.

The high-capacity, pressure-primed, tunnel-artery wick concept was used in a gas-controlled variable conductance heat pipe. A variety of techniques were employed to control the size of gas/vapor bubbles trapped within the artery. Successful operation was attained with a nominal 6-foot long, 1-inch diameter cold reservoir VCHP using ammonia working fluid and nitrogen control gas. The pipe contained a heat exchanger to subcool the liquid in the artery. Maximum transport capacity with a 46-inch effective length was 1200 watts level (more than 50,000 watt-inches) and 800 watts at 0.5-inch adverse tilt.

Kosson, R.↗

Calista Energy Management Assistance Initiative

The Calista Energy Management Assistance Initiative (CEMAI) provided technical assistance and capacity building for 56 Tribal communities in the Calista Region of Alaska as an effort to reduce costs, improve operational efficiency, enhance human capacity, and job opportunities. CEMAI catalyzed and guided numerous efforts into a consolidated and effective initiative that brought rural energy best practices, economies of scale, operational efficiencies, human capacity, and economic development to the forefront. Calista Corporation (Calista) is one of thirteen Alaska Native Regional Corporations created under the Alaska Native Claims Settlement Act of 1971 (ANCSA) in the settlement of aboriginal land claims. Calista was incorporated in Alaska on June 12, 1972. The Calista Region covers Alaska’s Bethel and Kusilvak (formerly Wade Hampton) Census areas and includes 56 communities. Calista partnered with Nuvista Light and Electric Cooperative (Nuvista) on the Department of Energy, Office of Indian Energy (DOE-OIE), CEMAI project. Nuvista is a non-profit that seeks to reduce energy costs and provide renewable sources of energy to the people of western Alaska. It is founded and led by a non-profit, Tribe, Native Corporations (including Calista), energy organizations, and Alaska Native stakeholders in the Yukon-Kuskokwim Delta (YK-D) Region; covering the same service boundaries and communities served by Calista. This partnership allowed Calista to direct the project work with local energy experts to respond to community needs. In this arrangement, Calista added credibility and regional accountability while Nuvista added energy-specific expertise and skill set in project management. The delivery of the CEMAI Workplan included short-term or on-demand responses to specific technical assistance requests from communities in addition to longer-term strategically directed activities such as workshops, coordinated training, and capacity development efforts across the region. CEMAI’s Workplan aimed to enhance communities’ readiness for establishing renewable energy projects and implementing energy efficiency initiatives. The CEMAI objectives included: (1) Identifying common operational needs and improvement opportunities for entities with an energy interest or responsibility. (2) Providing access to multi-level expertise to address existing challenges. (3) Developing specialized training programs to build local capacity and community readiness. (4) Nurturing the creation of regional support networks. (5) Increasing access to regional, state, and federal energy initiatives, funding, and expertise. (6) Improving technical skills, provide livable wages, and job opportunities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Summary Paper: An Initial Heliostat Supply Chain Analysis

This paper summarizes the prior analysis, key findings, and recommendations from the published report titled “Initial Heliostat Supply Chain Analysis” [1]. Globally, the growing demand for concentrating solar power (CSP) technologies, primarily for electricity generation plants has been met with supply chains primarily composed of plentiful commodity materials such as steel, aluminum, and glass. Often the commodity materials can be sourced in the domestic market where power plant will be constructed. Although specialty components are required for CSP solar fields —including mirror panels used for heliostat applications—these specialty components constitute about 30-50% of total system installed costs [2]. Only a few companies and countries, including the United States, have developed the capacity to supply such specialty components. The U.S. heliostat supply chain at present is comprised of few companies (e.g., CSP developers), component suppliers, and is its infancy. By 2035, with current and aggressive solar photovoltaic (PV) capacity expansions, there is the potential for 500,000–1,500,000 direct and indirect jobs in the areas of manufacturing, installation and development, and operations and maintenance (O&M) [3]. Utilizing the CSP capacity estimations the recent NREL report [4], the construction of 39 gigawatts (GW) of CSP (assuming mainly power tower) in the U.S. could lead to approximately 195,000 manufacturing, construction, and O&M jobs. This does not include the longer-term jobs and economic impact (e.g., taxes from plant operations staff) from operating the plants once constructed. It is recommended that further CSP component and system supply chain analysis and modelling be undertaken.

Kurup, Parthiv (ORCID:0000000217356703)↗

Annual Update Pantex Plant Site Treatment Plan/Compliance Plan for Development of Mixed Waste Treatment Capacities and Technologies

This updated STP identifies how DOE proposes to obtain commercial treatment or as appropriate, develop technologies for the site's mixed waste in inventory that does not currently have a developed disposition path. This updated STP also provides the methodology to be implemented if mixed waste is generate or identified that requires development of a disposition path.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The development of a high-capacity instrument module heat transport system, appendixes

Data sheets provide temperature requirements for 82 individual instruments that are under development or planned for grouping on a space platform or pallet. The scientific objectives of these instrument packages are related to solar physics, space plasma physics, astronomy, high energy astrophysics, resources observations, environmental observations, materials processing, and life sciences. System specifications are given for a high capacity instrument module heat transport system to be used with future payloads.

Source record↗

Developing a Framework for Effective Network Capacity Planning

As Internet traffic continues to grow exponentially, developing a clearer understanding of, and appropriately measuring, network's performance is becoming ever more critical. An important challenge faced by the Information Resources Directorate (IRD) at the Johnson Space Center in this context remains not only monitoring and maintaining a secure network, but also better understanding the capacity and future growth potential boundaries of its network. This requires capacity planning which involves modeling and simulating different network alternatives, and incorporating changes in design as technologies, components, configurations, and applications change, to determine optimal solutions in light of IRD's goals, objectives and strategies. My primary task this summer was to address this need. I evaluated network-modeling tools from OPNET Technologies Inc. and Compuware Corporation. I generated a baseline model for Building 45 using both tools by importing "real" topology/traffic information using IRD's various network management tools. I compared each tool against the other in terms of the advantages and disadvantages of both tools to accomplish IRD's goals. I also prepared step-by-step "how to design a baseline model" tutorial for both OPNET and Compuware products.

Yaprak, Ece↗

From Structured Solvents to Hybrid Materials (SS2HM) for Chemically Selective Capture and Electromagnetic Release of CO 2 : Mechanisms, Stability and Interfaces (Final Report)

The goal of this research program was to develop high capacity sorbents amenable for alternative regeneration approaches for direct air capture (DAC) of CO 2 . In particular, the research aimed to develop an understanding of CO 2 binding mechanism, thermal and oxidative stability, and regeneration energetics of functionalized ionic liquids (ILs), deep eutectic solvents (DESs), and porous materials. ILs and DESs are high-dielectric solvents with structural tunability that permits the rational-design for energy-efficient regeneration approaches based on electromagnetic (EM) field and moisture-swing. By further incorporating these solvents into polymeric capsules and other structural supports, multi-scale interfaces for targeted CO 2 and energy transfers were achieved. Aspects related to CO 2 capacity, selectivity, stability, dielectric properties, and binding energies were examined through experimental and computational design to identify molecular descriptors to inform future design of structured solvents and hybrid materials for DAC. Enclosed final report details the key findings, science advancements, and workforce development efforts from this project.

36 MATERIALS SCIENCE↗

Cully Community Solar

This report summarizes the outcomes, accomplishments, challenges, and lessons learned from Verde’s Cully Community Solar project, funded by the U.S. Department of Energy’s Solar Energy Technologies Office. The project focused on advancing community solar development through engineering, permitting, interconnection, ecological site design, workforce development, and community engagement. During the project period, Verde and its partners successfully developed and commissioned a 1.25 MW ground-mounted community solar system while also advancing planning for additional community solar capacity and developing approaches that can inform future projects in complex urban environments.

14 SOLAR ENERGY↗

Energy Optimization of Light and Heavy-Duty Vehicle Cohorts of Mixed Connectivity, Automation and Propulsion System Capabilities via Meshed V2V-V2I and Expanded Data Sharing (Final Scientific and Technical Report)

Vehicle connectivity and automated driving technologies individually have the potential to decrease energy consumption and/or increase safety on light, medium or heavy duty vehicles to varying degrees depending on the traffic infrastructure and specific driving scenarios. Due to advances in sensing, perception and computing power, research and development emphasis in the mobility sector has shifted away from connectivity. Prior research has shown that driving automation with the absence of connectivity can in certain circumstances increase energy consumption. The effectiveness of synergizing connectivity and driving automation technologies is the focus of this work, specifically applied to vehicle cohorts of mixed composition, light and heavy duty, and powertrains ranging from all electric to conventional internal combustion engine. The project team is led by Michigan Technological University (MTU) and partnered with AVL Mobility Technologies Inc. (AVL), Borg Warner (BW), Traffic Technology Services (TTS), American Center for Mobility (ACM) and Navistar (NAV). The main thrusts for the team are to develop a micro-traffic simulation environment with specific VD&PT system attributes and CAV capabilities, 2) field a vehicle test fleet of mixed classification, propulsion and CAV capacity, 3) develop artificial intelligence (AI) and machine learning (ML) based multi-agent optimization methods for various traffic infrastructures, 4) integrate the virtual environment and the optimization methods then deploy the system as a CAV hardware in the loop (HiL) for the vehicle test fleet and 5) conduct closed track and public road testing to validate simulation and demonstrated energy and mobility improvements at multiple scales. For a cohort of mixed vehicles, the team will demonstrate a reduction of energy consumption of 10-50% at intersection, arterial roadway and limited access highway scenarios through connectivity and automation in simulation and at a closed test track. The energy reduction objectives of the project are summarized in Table 1, indicating the infrastructure and over what distances are relevant considered. Single scenario energy reductions are not relevant and thus, the research team took the approach to vary parameters associated with the infrastructure, vehicle cohort composition and dynamic behavior to generate energy consumption distributions for both unconnected and connected scenarios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impacts of Renewable Energy and Green Hydrogen Policies on Uttar Pradesh's Power Sector Future

This report is part of a broader program focused on supporting Indian states with long-term power system planning. More information about this program can be found at the National Renewable Energy Laboratory's "Supporting India's States With Renewable Energy Integration" web page at https://www.nrel.gov/international/india-renewable-energy-integration.html. The power sector in Uttar Pradesh, India's most populous state, is poised to transform over the next few decades due to a combination of national and state-level policies impacting both the supply and demand of electricity. The Government of Uttar Pradesh has policies and plans to develop in-state solar PV, pumped storage hydropower, and green hydrogen. Power system policymakers and utilities in Uttar Pradesh are faced with the challenges of planning a system that incorporates increasing amounts of renewable energy and storage resources, meets rising electricity demand due to economic development and green hydrogen production, and satisfies operational and reliability requirements. To support these various objectives, the National Renewable Energy Laboratory (NREL), RMI, and the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) evaluated the least-cost pathways for the state's power sector through 2050. NREL developed a capacity expansion model that identifies investment and operational decisions for every year (2024-2050) for all of India, with detailed representation for the state of Uttar Pradesh, which can provide a framework for recurring planning studies. The main insights from this study can also help inform policy development and investment decisions.

08 HYDROGEN↗

Carbon Capture, Transport, And Storage (CTS) Cost Modeling Of The Onshore Gulf Coast

The onshore Gulf of Mexico region presents significant opportunities for CO2 capture, transport, and storage due to its numerous CO2 sources, such as power plants, refineries, and its substantial CO2 storage potential. However, operators face critical decisions in designing an efficient and cost-effective CO2 pipeline network. This study examines the economic implications of two primary strategies: constructing a trunkline with excess initial capacity versus developing dedicated pipelines incrementally as new CO2 sources come online. Building a trunkline first offers the advantage of future-proofing the network, allowing for the accommodation of increased CO2 volumes from various sources over time. However, this approach incurs higher upfront costs and risks underutilizing the transport capacity in the initial stages, potentially resulting in economic inefficiencies. Conversely, constructing dedicated pipelines for each new CO2 source as it becomes operational may avoid the initial overcapacity issue but fails to capitalize on the economies of scale. This could lead to higher overall costs due to the duplication of infrastructure and increased complexity in network management. This research employs a comprehensive cost-benefit analysis, integrating factors such as capital expenditure, operational costs, projected CO2 volumes, and potential economies of scale. Through this analysis, we aim to provide operators with insights into the most economically viable strategy for CO2 pipeline network design in the region. The findings underscore the importance of strategic planning and highlight the trade-offs between immediate capacity utilization and long-term cost savings, ultimately guiding stakeholders towards informed decision-making in the development of CO2 transport infrastructure. Presented at the 41st USAEE/IAEE North American Conference, 3-6 November 2024, Baton Rouge, LA, United States.

Shih, Chung Yan↗