Search NASA⌕ Search

SEARCH · Search NASA

Results for “chilled water system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Challenges and Opportunities for HVAC + Phase Change Material Thermal Energy Storage in Buildings

Phase-change material (PCM) thermal-energy storage (TES) integrated with HVAC and domestic hot water (DHW) can shift a large share of building thermal loads. By flattening and shifting loads, PCM TES reduces peak electricity use, eases stress on local and grid infrastructure, and lowers costs. It can also defer costly upgrades to service panels, distribution, and transmission. Higher energy density relative to chilled or hot water storage makes PCM TES practical for small, space limited, and retrofit projects, while packaged HVAC-integrated systems expand cost-effective load shifting to commercial buildings that previously lacked options. Despite this promise, deployment faces barriers. This paper presents challenges, opportunities, and lessons learned from lab and field integrations of PCM TES with packaged HVAC systems. Key challenges include misalignment between default heat pump controls tuned for direct-to-load operation and TES charge/discharge objectives, PCM properties that diverge from manufacturer claims and evolve with cycling, and high integration and deployment costs with off-the-shelf products. These studies underscore the need for factory built, integrated systems that arrive as prepackaged modules with proven controls, reducing design and installation effort and delivering predictable performance across projects. The paper outlines steps to enable viable and scalable PCM TES HVAC and DHW systems, including 1) validated methods that can be used to characterize PCM properties and TES system performance, 2) supervisory controls that optimize charge/discharge scheduling, and 3) factory integrated packaging that eliminates bespoke field engineering.

Dutton, Spencer↗

Cascaded Control for Building HVAC Systems in Practice

Actuator hunting is a widespread and often neglected problem in the HVAC field. Hunting is typically characterized by sustained or intermittent oscillations, and can result in decreased efficiency, increased actuator wear, and poor setpoint tracking. Cascaded control loops have been shown to effectively linearize system dynamics and reduce the prevalence of hunting. This paper details the implementation of cascaded control architectures for Air Handling Unit chilled water valves at three university campus buildings. A framework for implementation the control in existing Building Automation software is developed that requires only a single line of additional code. Results gathered for more than a year show that cascaded control not only eliminates hunting in control loops with documented hunting issues, but provides better tracking and more consistent performance during all seasons. A discussion of efficiency losses due to hunting behavior is presented and illustrated with comparative data. Furthermore, an analysis of cost savings from implementing cascaded chilled water valve control is presented. Field tests show 2.2–4.4% energy savings, with additional potential savings from reduced operational costs (i.e., maintenance and controller retuning).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar heating and cooling system installed at Leavenworth, Kansas

A solar heating and cooling is described which is designed to furnish 90 percent of the overall heating load, 70 percent of the cooling load and 100 percent of the domestic hot water load. The building has two floors with a total of 12,000 square feet gross area. The system has 120 flat-plate liquid solar panels with a net area of 2,200 square feet. Five 3 ton Arkla solar assisted absorption units provide the cooling, in conjunction with a 3,000 gallon chilled water storage tank. Two 3,000 gallon storage tanks are provided with one designated for summer use, whereas both tanks are utilized during winter.

Source record↗

The mechanisms of formation and prevention of channel segregation during alloy solidification

Using a base chilled configuration, conditions for the formation and prevention of segregation channels are studied in the ammonium chloride-water and lead-tin systems. Such channels develop when the rejected solute is less dense than the solvent and are therefore a result of density inversion, but slow (less than 5 rpm) rates of mold rotation, about axes inclined to the vertical by 20 to 30 deg, throughout the time of solidification, effectively prevent the formation or propagation of these channels. In experiments with artificially created or blocked channels, a simultaneous solute plume in the bulk liquid must be present in order for a channel to develop. The results indicate that channels originate not within the dendritic array, but immediately ahead of the growth front as a result of perturbation from the less dense boundary layer into the bulk liquid. The effect of mold movement is to translate laterally the bulk liquid relative to the growth front so that perturbations are sheared off. The nature of the liquid movement is considered and shown to be a function of the mold dimensions.

Hellawell, A.↗

Raman Lidar Measurements During the International H2O Project: Instrument Comparisons and Case Studies - 2

The NASA/GSFC Scanning Raman Lidar (SRL) participated in the International H2O Project (IHOP) that occurred in May and June, 2002 in the midwestern part of the U. S. The SRL system configuration and methods of data analysis were described in part I of this paper. In this second part, comparisons of SRL water vapor measurements and those of chilled mirror radiosonde and LASE airborne water vapor lidar are performed. Two case studies are presented; one for daytime and one for nighttime. The daytime case study is of a convectively driven boundary layer event and is used to characterize the SRL water vapor random error characteristics. The nighttime case study is of a thunderstorm-generated cirrus cloud case that is studied in it s meteorological context. Upper tropospheric humidification due to precipitation from the cirrus cloud is quantified as is the cirrus cloud ice water content and particle depolarization ratio. These detailed cirrus cloud measurements are being used in a cirrus cloud modeling study.

Whiteman, D. N.↗

Solar heating and cooling system for an office building at Reedy Creek Utilities

The solar energy system installed in a two story office building at a utilities company, which provides utility service to Walt Disney World, is described. The solar energy system application is 100 percent heating, 80 percent cooling, and 100 percent hot water. The storage medium is water with a capacity of 10,000 gallons hot and 10,000 gallons chilled water. Performance to date has equaled or exceeded design criteria.

Source record↗

Solar heating, cooling, and hot water systems installed at Richland, Washington

The project described is part of the U. S. Department of Energy's solar demonstration program, and became operational in April 1978. The solar system uses 6,000 square feet of flat-plate liquid collectors in a closed loop to deliver solar energy through a liquid-liquid heat exchanger to the building heat-pump duct work or 9,000-gallon thermal energy storage tank. A 25-ton Arkla solar-driven absorption chiller provides the cooling, in conjunction with a 2,000 gallon chilled water storage tank and reflective ponds on three sides of the building surplus heat. A near-by building is essentially identical except for having conventional heat-pump heating and cooling, and can serve as an experimental control. An on-going public relations program was provided from the beginning of the program, and resulted in numerous visitors and tour groups.

Source record↗

Axisymmetric Two-Dimensional Modeling of No Vent Filling of a Cryogenic Tank using Generalized Fluid System Simulation Program

Filling a tank with cryogenic fluid is more challenging than filling a tank with water or any other fluid that is in liquid state at atmospheric condition. Filling a tank with cryogenic fluid is a two-step process. First the tank and the transfer line mustbe chilled. Liquid cryogens start flowing into the tank only after the tank and transfer lines are chilled to the fluid saturation temperature. In normal gravity, cryogenic tanks are usually filled from the bottom at nearly atmospheric pressure. The vapor, caused by heat transfer from the warm tank walls, is allowed to vent from the top of the tank while the tank is being filled. Filling a cryogenic tank in the absence of gravity is more challenging because in a non-stratified environment liquid propellantmay not settle at the tank bottom as it does on earth. There is a strong possibility that liquid propellant may exit through the vent valve, which is typically located at the top of the tank to vent propellant vapor. There are several methodsof filling atank in space: Charge-Hold-Vent method [1], Vented-Chill / No-Vent-Fill (VCNVF)[2],and No Vent Fill with TVS assisted injector [3].This paper addressesnumerical modelingofthe No Vent Fill (NVF) processwhere a TVS (Thermodynamic Vent System) augmented injector was used with the vent valve closed during the entire filling process. NVF tests were conducted in the CRYOgenic Orbital Testbed (CRYOTE) tankat NASA/Marshall Space Flight Centerin 2018.The Generalized Fluid System Simulation Program (GFSSP), a general-purpose flow network code [4] was used to simulate the chilland fill process.

Cryogenics↗

The EGS Collab project: Outcomes and lessons learned from hydraulic fracture stimulations in crystalline rock at 1.25 and 1.5 km depth

With the goal of better understanding stimulation in crystalline rock for improving enhanced geothermal systems (EGS), the EGS Collab Project performed a series of stimulations and flow tests at 1.25 and 1.5 km depths. The tests were performed in two well-instrumented testbeds in the Sanford Underground Research Facility in Lead, South Dakota, United States. The testbed for Experiment 1 at 1.5 km depth contained two open wells for injection and production and six instrumented monitoring wells surrounding the targeted stimulation zone. Four multi-step stimulation tests targeting hydraulic fracturing and nearly year-long ambient temperature and chilled water flow tests were performed in Experiment 1. The testbed for Experiments 2 and 3 was at 1.25 km depth and contained five open wells in an outwardly fanning five-spot pattern and two fans of well-instrumented monitoring wells surrounding the targeted stimulation zone. Experiment 2 targeted shear stimulation, and Experiment 3 targeted low-flow, high-flow, and oscillating pressure stimulation strategies. Hydraulic fracturing was successful in Experiments 1 and 3 in generating a connected system wherein injected water could be collected. However, the resulting flow was distributed dynamically, and not entirely collected at the anticipated production well. Thermal breakthrough was not observed in the production well, but that could have been masked by the Joule-Thomson effect. Shear stimulation in Experiment 2 did not occur - despite attempting to pressurize the fractures most likely to shear - because of the inability to inject water into a mostly-healed fracture, and the low shear-to-normal stress ratio. The EGS Collab experiments are described to provide a background for lessons learned on topics including induced seismicity, the correlation between seismicity and permeability, distributed and dynamic flow systems, thermoelastic and pressure effects, shear stimulation, local geology, thermal breakthrough, monitoring stimulation, grouting boreholes, modeling, and system management.

15 - GEOTHERMAL ENERGY↗

Case Study: NREL Campus Chilled Water Storage Potential: Benchmark Datasets Development and Applications, Task 4 - Use Case Demonstration

The Benchmark Datasets Development and Applications project is a three-year collaboration between the National Renewable Energy Laboratory (NREL), Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and Lawrence Berkeley National Laboratory. The project seeks to collect and curate high-resolution, well-calibrated time series of building operational and indoor/outdoor environmental data, which are crucial to understanding and optimizing building energy efficiency performance and demand flexibility capabilities as well as benchmarking energy algorithms. Project outcomes include approximately twelve high-fidelity building datasets, enhanced data representation tools, and four case studies to illustrate example applications. The goal of these case studies is to define and execute analyses that demonstrate how one or more datasets collected through this project can address a data gap or challenge historically faced by building stakeholders. This technical paper summarizes the findings of one of these case studies, in which we studied the operational efficiencies of the central cooling system at NREL. We looked at three years of data from the three chillers in the Field Test Laboratory Building (FTLB), from 2019 to 2021, to compare equipment operation and demand throughout the time period. Our analysis indicates that all three chillers are operating at or below the optimal loading conditions for most of the operation time, and thus there was no efficiency drop due to loading of the chillers at full capacity. Our recommendation is that no chiller capacity increase is needed; instead, the central plant could benefit from adopting advanced control logics for optimal sequencing of chillers during part load operations. Analysis of adding chilled water thermal storage to the central plant indicated 34% savings in demand cost and 24.5% savings in total cost (energy consumption and demand charge cost). The payback period is estimated to be 11-22 years with an assumed TES cost of $\$$100-$200 per ton. This case study shows how a selected dataset is used to solve a practical building problem - learning the operational status of its components, analyzing the effectiveness of a proposed new technique, and aiding decision-making for the building operations and maintenance team.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Prevalence of typical operational problems and energy savings opportunities in U.S. commercial buildings

In the United States, as much as 30% of the 19 EJ that commercial buildings consume is considered excess. Much of the excess energy is due to the inability to manage building operations efficiently. Because almost 20% of the total primary energy consumption is associated with commercial buildings, significant energy reductions in this sector are needed to mitigate climate change. Therefore, many cities and states are mandating periodic “tune-ups” of these buildings to eliminate excess energy consumption. Although the benefits of tune-ups and retro-commissioning are clear, focusing these mandates to look for specific opportunities has been a challenge because of the lack of studies that document the prevalence of opportunities. Therefore, we analyzed building automation system data from 151 buildings across the United States to document common operational problems and opportunities to improve building operations. This analysis showed that opportunities to improve building operations exist in almost every building. These opportunities were not strongly correlated with building vintage or size, but were reflective of how the buildings are operated. The prevalence of the top 20 opportunities ranged between 74% and 23%, with 40% of these associated with air-handling units. The rest of the opportunities are associated with schedules, chilled and hot-water distribution, and zone controls. Of the 151 buildings, 69 of them implemented corrective actions of some or all opportunities that were identified. Implementation varied across the Re-tuning categories, with 60% for schedule opportunities, 50% for zone opportunities, over 40% for the air-handling unit and hot-water opportunities, and 35% of the chilled-water opportunities. There was wide variation in whole building energy savings, ranging from 0 to 50% and 0 to 18 $/m2 with median percent annual whole building savings of 12% and median normalized annual cost savings of $1.75/m2. In addition to documenting these key findings, the paper provides a list of opportunities that can be automatically and continuously identified and corrected and offers a list of those opportunities that should be the focus of the mandates.

Katipamula, Srinivas↗

Flexible Reinforcement Learning Framework for Building Control using EnergyPlus-Modelica Energy Models

In recent years, reinforcement learning (RL) methods have been greatly enhanced by leveraging deep learning approaches. RL methods applied to building control have shown potential in many applications due to their ability to complement or replace conventional methods such as model-based or rule-based controls. However, RL-based building control software is likely tailored either to one target building system or to a specific RL method so that significant additional effort would be required to customize the RL-based controller for use in other building systems or with other RL approaches. Also, RL-based building controls usually depend on building energy simulations to train controllers, so emulating building dynamics (i.e., thermal dynamics and control dynamics) and capturing sub-hourly dynamic profiles are crucial to further the development of effective RL-based building control methods. To address these challenges, we present an open source RL-based control software employing a high-fidelity hybrid EnergyPlus-Modelica building energy model which emulates building dynamics at 1-minute resolution. This software consists of decoupled components (environment, building emulator, control agent, and RL algorithm), which allows for quick prototyping and benchmarking of standard RL algorithms in different systems; for example, a single component can be replaced without revising all of the software. To demonstrate this software framework, we conducted a benchmark study using an EnergyPlus-Modelica building energy model for a Chicago office building with an RL-based controller to dynamically control the chilled water temperature setpoint and the air handling unit supply air temperature setpoint on selected floors.

Lee, Joon-Yong↗

Thermal storage for electric utilities

Applications of the thermal energy storage (TES) principle (storage of sensible heat or latent heat, or heat storage in reversible chemical reactions) in power systems are evaluated. Load leveling behind the meter, load following at conventional thermal power plants, solar thermal power generation, and waste heat utilization are the principal TES applications considered. Specific TES examples discussed include: storage heaters for electric-resistance space heating, air conditioning TES in the form of chilled water or eutectic salt baths, hot water TES, and trans-seasonal storage in heated water in confined aquifers.

Swet, C. J.↗

Off-design performance of an organic Rankine-vapor compression cooling cycle using R1234ze(E)

In this study, a 264 kW th organic Rankine-vapor compression cycle (ORVC) was experimentally tested over a range of conditions to quantify the individual impact of off-design external conditions. The ORVC was designed to recover waste heat at 91 °C, reject heat to a liquid condenser stream at 30 °C, and produce chilled water at 7 °C. Here, the condenser heat rejection temperature was varied from 16.6 °C to 32.6 °C, the chilled water delivery temperature was varied between 2.1 °C and 13.1 °C, and the heat input temperature was varied from 91 °C to 120 °C. As the condenser heat rejection temperature decreased, the coefficient of performance (COP) of the ORVC improved from 0.558 at 30 °C to 0.682 at 16.6 °C, despite a reduction in compressor isentropic efficiency. Although the chilled water temperature variation had almost no impact on the organic Rankine cycle performance, the compressor efficiency decreased when the delivery temperature was below 7 °C. At the highest chilled water temperature, 13.1 °C, the COP of the ORVC was 0.643. Compressor stall was noted when the condenser heat rejection temperature was greater than 32.6 °C and the chilled water delivery temperature was below 2.1 °C. Increasing the driving heat source inlet temperature improved the COP of the ORVC and the thermal efficiency of the organic Rankine power cycle, while decreasing the efficiency of the compressor and the COP of vapor compression cycle. In addition, the integrated part load value of the system was determined through experimentation to be 0.682, which provides a realistic estimate of real-world performance.

30 DIRECT ENERGY CONVERSION↗

Spectral Monitoring of Volatiles During Drilling into Frozen Lunar Simulant

NASA's Resource Prospector (RP) project intends to characterize the 3D distribution of volatiles in permanently shadowed regions at the lunar poles. One RP remote sensing instrument is a near-infrared spectrometer with an associated camera and radiometer, called the Near-InfraRed Volatile Spectrometer System (NIRVSS). In May 2016, NIRVSS, a Honeybee Robotics drill, and an Inficon mass spectrometer were placed in a vacuum chamber at Glenn Research Center. Also inside was a tube (1.2 m high x 25 cm diameter) filled with lunar simulant NU-LHT-3M, initially doped with a homogeneous water abundance of ~5%, chilled to cryogenic temperatures and exposed to a vacuum (~10e-6 Torr). During drilling, the NIRVSS instruments observed the cuttings pile as subsurface materials were emplaced on the surface. Spectral features associated with water ice, near 2000 and 3000 nm, were measured by the spectrometer during drilling. The spectral data documents development of a desiccated soil layer in the tube down to ~25-30 cm (confirmed by post-test soil analyses), formed during the initial pump down to vacuum. Drilling occurred in 10 cm segments, with the drill stem extracted and flutes brushed after each 10 cm depth. One exception to this was the 40 cm depth segment where the soil was delivered to a sample capture mechanism, and sealed for post-test analyses. To ~30 cm depth the greatest 2000 and 3000 nm signatures were associated with brushing of the drill flutes above the surface. At depths >40 cm the strongest ice signatures were associated with the drill clearing soil from the existing hole, or beginning to encounter new material. For these greater depths, brushing the flutes after extraction produced much weaker ice signatures than for shallower depths. This suggests that the soil may remain trapped in the exit funnel and is not emplaced on the surface. After each event creating strong ice signatures, these signatures decreased to near background levels in 5 minutes or less, due to surface exposure to vacuum.

lunar poles↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

Optics↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

James Webb Space Telescope↗

Model predictive control for optimal dispatch of chillers and thermal energy storage tank in airports

Cost of energy consumption is one of the biggest operational cost for airports, and it is increasing from time to time as airports expand to support growing number of passengers. Various factors affect the energy consumption including efficiency of airport Heating Ventilation and Air conditioning (HVAC) systems, which in turn depends on the efficiency of individual subsystems. Here, in this paper, we present an optimal scheduling method for the central plant system at Dallas Fort Worth airport, involving chillers, pumps, and a thermal energy storage (TES) system. A model predictive control (MPC) problem is formulated to minimize both energy and demand charge costs while satisfying the cooling needs of the airport. The proposed Mixed-Integer Nonlinear Programming (MINLP) formulation includes performance curve based models for chillers and pumps and a simplified state of charge model for TES. The formulation also includes predictions of cooling load and chilled water return temperature. Simulation results for a month in summer show savings around 10% compared to the baseline. Initial recommendations based on insights from simulation results to the manual operation procedures resulted in significant savings. Field test results show a 7% chiller efficiency improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗