Search NASA⌕ Search

SEARCH · Search NASA

Results for “communication options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Design of a pressurized lunar rover

A pressurized lunar rover is necessary for future long-term habitation of the moon. The rover must be able to safely perform many tasks, ranging from transportation and reconnaissance to exploration and rescue missions. Numerous designs were considered in an effort to maintain a low overall mass and good mobility characteristics. The configuration adopted consists of two cylindrical pressure hulls passively connected by a pressurized flexible passageway. The vehicle has an overall length of 11 meters and a total mass of seven metric tons. The rover is driven by eight independently powered two meter diameter wheels. The dual-cylinder concept allows a combination of articulated frame and double Ackermann steering for executing turns. In an emergency, the individual drive motors allow the option of skid steering as well. Two wheels are connected to either side of each cylinder through a pinned bar which allows constant ground contact. Together, these systems allow the rover to easily meet its mobility requirements. A dynamic isotope power system (DIPS), in conjunction with a closed Brayton cycle, supplied the rover with a continuous supply of 8.5 kW. The occupants are all protected from the DIPS system's radiation by a shield of tantalum. The large amount of heat produced by the DIPS and other rover systems is rejected by thermal radiators. The thermal radiators and solar collectors are located on the top of the rear cylinder. The solar collectors are used to recharge batteries for peak power periods. The rover's shell is made of graphite-epoxy coated with multi-layer insulation (MLI). The graphite-epoxy provides strength while the thermally resistant MLI gives protection from the lunar environment. An elastomer separates the two materials to compensate for the thermal mismatch. The communications system allows for communication with the lunar base with an option for direct communication with earth via a lunar satellite link. The various links are combined into one signal broadcast in the S-band at 2.3 GHz. The rover is fitted with a parabolic reflector disk for S-band transmission, and an omnidirectional antenna for local extravehicular activity (EVA) communication. The rover's guidance, navigation, and control subsystem consists of an inertial guidance system, an orbiting lunar satellite, and an obstacle avoidance system. In addition, the rover is equipped with a number of external fixtures including two telerobotic arms, lights, cameras, EVA storage, manlocks, a docking fixture, solar panels, thermal radiators, and a scientific airlock. In conclusion, this rover meets all of the design requirements and clearly surpasses them in the areas of mobility and maneuverability.

Bhardwaj, Manoj↗

Airspace Technology Demonstration 3 (ATD-3): Multi-Flight Common Route (MFCR) Technology Transfer Document Summary Version 1.0

This summary document and accompanying technology artifacts satisfy the second of three Research Transition Products (RTPs) defined in the ATD-3 Applied Traffic Flow Management (ATFM) Research Transition Team (RTT) Plan. This transfer consists of NASA's Multi-Flight Common Route (MFCR) research for efficient route corrections for en-route weather avoidance. The MFCR concept builds on the experience of the legacy Dynamic Weather Routes (DWR) and focuses on a better balance of potential savings with ATC acceptability, common route corrections options for multiple flights on similar routings, and better use of existing and/or modern automation for communication and coordination of route change options. All of these capabilities are expected to improve system performance significantly in terms of actual delay-reducing clearances issued to flights compared to that of the DWR tool and operating concept.

tech transfer↗

Airspace Technology Demonstration 3 (ATD-3) Multi-Flight Common Route (MFCR) Technology Transfer Document Summary Version 2.0

Airspace Technology Demonstration - 3 (ATD-3) is part of NASA's Airspace Operations and Safety Program (AOSP) - specifically, its Airspace Technology Demonstrations (ATD) Project. ATD-3 is a multi-year research and development effort which proposes to develop and demonstrate automation technologies and operating concepts that enable air navigation service providers and airspace users to continuously assess weather, winds, traffic, and other information to identify, evaluate, and implement workable opportunities for flight plan route corrections that can result in significant flight time and fuel savings in en-route airspace. In order to ensure that the products of this tech-transfer are relevant and useful, NASA has created strong partnerships with the FAA and key industry stakeholders. This summary document and accompanying technology artifacts satisfy the second of three Research Transition Products (RTPs) defined in the Applied Traffic Flow Management (ATFM) Research Transition Team (RTT) Plan. The original transfer, completed in December 2017, consisted of NASA's Multi-Flight Common Route (MFCR) research for efficient route corrections for en-route weather avoidance. This transfer updates the Concept of Operations document to a publicly-available NASA Technical Memorandum. The MFCR concept builds on the experience of the legacy Dynamic Weather Routes (DWR) and focuses on a better balance of potential savings with ATC acceptability, common route corrections options for multiple flights on similar routings, and better use of existing and/or modern automation for communication and coordination of route change options. All of these capabilities are expected to improve system performance significantly in terms of actual delay-reducing clearances issued to flights compared to that of the DWR tool and operating concept.

Tech transfer↗

Space station needs, attributes and architectural options. Volume 1: Executive summary NASA

The uses alignment plan was implemented. The existing data bank was used to define a large number of station requirements. Ten to 20 valid mission scenarios were developed. Architectural options as they are influenced by communications operations, subsystem evolvability, and required technology growth are defined. Costing of evolutionary concepts, alternative approaches, and options, was based on minimum design details.

Source record↗

Stability-Augmentation Devices for Miniature Aircraft

Non-aerodynamic mechanical devices are under consideration as means to augment the stability of miniature autonomous and remotely controlled aircraft. Such aircraft can be used for diverse purposes, including military reconnaissance, radio communications, and safety-related monitoring of wide areas. The need for stability-augmentation devices arises because adverse meteorological conditions generally affect smaller aircraft more strongly than they affect larger aircraft: Miniature aircraft often become uncontrollable under conditions that would not be considered severe enough to warrant grounding of larger aircraft. The need for the stability-augmentation devices to be non-aerodynamic arises because there is no known way to create controlled aerodynamic forces sufficient to counteract the uncontrollable meteorological forces on miniature aircraft. A stability-augmentation device of the type under consideration includes a mass pod (a counterweight) at the outer end of a telescoping shaft, plus associated equipment to support the operation of the aircraft. The telescoping shaft and mass pod are stowed in the rear of the aircraft. When deployed, they extend below the aircraft. Optionally, an antenna for radio communication can be integrated into the shaft. At the time of writing this article, the deployment of the telescoping shaft and mass pod was characterized as passive and automatic, but information about the deployment mechanism(s) was not available. The feasibility of this stability-augmentation concept was demonstrated in flights of hand-launched prototype aircraft.

Wood, RIchard M.↗

Development of Two High-Energy Bus ‘Cores’ for Rapid Support of Low-TRL and Educational Payloads: A Software-Configured EPS Combined with Flexible C&DH

For several years the TechEdSat flight series (TES-n), developed by the Nano Orbital Workshop (NOW) group at NASA Ames, has relied upon an in-house developed unit to serve both EPS (Electrical Power System) and C&DH (Command and Data Handling) roles along with low data-rate telemetry functions, i.e., serving as the ‘core’ of the spacecraft bus. This ‘core’ has a considerable task given the rapid cadence of the TES program and the typically low-TRL of payloads; configurability and compatibility are key to prevent mission-specific hardware. However, at only 15 watts the current core has become insufficient to support the program’s growing missions and increasingly demanding payloads. To this end, the NOW program is developing new cores to support two TES mission classes: a single-PCB ‘MiniCore’ designed to support 80-watt missions 6U or smaller in LEO, and a three-PCB, radiation-tolerant ‘StackCore’ designed to support 6U and larger missions over 500 watts in LEO and beyond. The ‘MiniCore’ design consists of three main segments: a processor-agnostic C&DH, a software-configured EPS, and a backup low data-rate radio. The design philosophy was to enable rapid-manufacture in a turbulent supply chain, hence the design consists of COTS parts with a focus on those able to be drop-in replaced with radiation-tolerant versions when demanded by the mission. As a single PC-104 sized circuit board, power density and ease of integration also dominated design, demanding the use of modern features such as single-point USB-C for easy charging and monitoring of the spacecraft on the ground. The ‘MiniCore’ can support 80 watts of load, 140 watt-hours of storage, and over 20 watts of optimized solar generation with extensive power monitoring throughout. The ‘MiniCore’ supports one battery pack, six solar-panels, six loads, five actuators, Iridium SBD, and an internal 802.15.4 network. Additionally, the processor-agnostic design can accept any PJRC Teensy 3.x or Adafruit Feather microcontroller unit to enable processor scaling with mission requirements or environment. It is expected a development unit of this design will be completed before conference. The ‘StackCore’ design consists of three stacked PC-104 sized circuit boards: one dedicated to power generation and storage, one dedicated to power distribution, and one dedicated to C&DH tasks. This delineation is necessary to support the transition from highly integrated ICs to discrete analog circuitry, enabling a primarily analog control power system able to operate without software in a radiation environment with finer monitoring compared to the ‘MiniCore’ design. The planned base architecture supports over 500 watts of load, 250 watt-hours of storage, and over 80 watts of optimized solar generation. The power distribution board allows for the use of daughter cards hosting custom converters or interfaces for payloads, in addition to the software-configured supplies used on the ‘MiniCore’. This core stack will be managed by a Vorago ARM M4 microcontroller and support the same wireless communications as the ‘MiniCore’, with optional integration of a NOW S-band radio and attitude determination sensors for ‘black box’ functionality. It is expected the prototype will still be in development during conference.

Spacecraft↗

Development of Two High-Energy Bus ‘Cores’ for Rapid Support of Low-TRL and Educational Payloads: A Software-Configured EPS Combined with Flexible C&DH

For several years the TechEdSat flight series (TES-n), developed by the Nano Orbital Workshop (NOW) group at NASA Ames, has relied upon an in-house developed unit to serve both EPS (Electrical Power System) and C&DH (Command and Data Handling) roles along with low data-rate telemetry functions, i.e., serving as the ‘core’ of the spacecraft bus. This ‘core’ has a considerable task given the rapid cadence of the TES program and the typically low-TRL of payloads; configurability and compatibility are key to prevent mission-specific hardware. However, at only 15 watts the current core has become insufficient to support the program’s growing missions and increasingly demanding payloads. To this end, the NOW program is developing new cores to support two TES mission classes: a single-PCB ‘MiniCore’ designed to support 80-watt missions 6U or smaller in LEO, and a three-PCB, radiation-tolerant ‘StackCore’ designed to support 6U and larger missions over 500 watts in LEO and beyond. The ‘MiniCore’ design consists of three main segments: a processor-agnostic C&DH, a software-configured EPS, and a backup low data-rate radio. The design philosophy was to enable rapid-manufacture in a turbulent supply chain, hence the design consists of COTS parts with a focus on those able to be drop-in replaced with radiation-tolerant versions when demanded by the mission. As a single PC-104 sized circuit board, power density and ease of integration also dominated design, demanding the use of modern features such as single-point USB-C for easy charging and monitoring of the spacecraft on the ground. The ‘MiniCore’ can support 80 watts of load, 140 watt-hours of storage, and over 20 watts of optimized solar generation with extensive power monitoring throughout. The ‘MiniCore’ supports one battery pack, six solar-panels, six loads, five actuators, Iridium SBD, and an internal 802.15.4 network. Additionally, the processor-agnostic design can accept any PJRC Teensy 3.x or Adafruit Feather microcontroller unit to enable processor scaling with mission requirements or environment. It is expected a development unit of this design will be completed before conference. The ‘StackCore’ design consists of three stacked PC-104 sized circuit boards: one dedicated to power generation and storage, one dedicated to power distribution, and one dedicated to C&DH tasks. This delineation is necessary to support the transition from highly integrated ICs to discrete analog circuitry, enabling a primarily analog control power system able to operate without software in a radiation environment with finer monitoring compared to the ‘MiniCore’ design. The planned base architecture supports over 500 watts of load, 250 watt-hours of storage, and over 80 watts of optimized solar generation. The power distribution board allows for the use of daughter cards hosting custom converters or interfaces for payloads, in addition to the software-configured supplies used on the ‘MiniCore’. This core stack will be managed by a Vorago ARM M4 microcontroller and support the same wireless communications as the ‘MiniCore’, with optional integration of a NOW S-band radio and attitude determination sensors for ‘black box’ functionality. It is expected the prototype will still be in development during conference.

Spacecraft↗

Development of Two High-Energy Bus ‘Cores’

For several years the TechEdSat flight series (TES-n), developed by the Nano Orbital Workshop (NOW) group at NASA Ames, has relied upon an in-house developed unit to serve both EPS (Electrical Power System) and C&DH (Command and Data Handling) roles along with low data-rate telemetry functions, i.e., serving as the ‘core’ of the spacecraft bus. This ‘core’ has a considerable task given the rapid cadence of the TES program and the typically low-TRL of payloads; configurability and compatibility are key to prevent mission-specific hardware. However, at only 15 watts the current core has become insufficient to support the program’s growing missions and increasingly demanding payloads. To this end, the NOW program is developing new cores to support two TES mission classes: a single-PCB ‘MiniCore’ designed to support 80-watt missions 6U or smaller in LEO, and a three-PCB, radiation-tolerant ‘StackCore’ designed to support 6U and larger missions over 500 watts in LEO and beyond. The ‘MiniCore’ design consists of three main segments: a processor-agnostic C&DH, a software-configured EPS, and a backup low data-rate radio. The design philosophy was to enable rapid-manufacture in a turbulent supply chain, hence the design consists of COTS parts with a focus on those able to be drop-in replaced with radiation-tolerant versions when demanded by the mission. As a single PC-104 sized circuit board, power density and ease of integration also dominated design, demanding the use of modern features such as single-point USB-C for easy charging and monitoring of the spacecraft on the ground. The ‘MiniCore’ can support 80 watts of load, 140 watt-hours of storage, and over 20 watts of optimized solar generation with extensive power monitoring throughout. The ‘MiniCore’ supports one battery pack, six solar-panels, six loads, five actuators, Iridium SBD, and an internal 802.15.4 network. Additionally, the processor-agnostic design can accept any PJRC Teensy 3.x or Adafruit Feather microcontroller unit to enable processor scaling with mission requirements or environment. It is expected a development unit of this design will be completed before conference. The ‘StackCore’ design consists of three stacked PC-104 sized circuit boards: one dedicated to power generation and storage, one dedicated to power distribution, and one dedicated to C&DH tasks. This delineation is necessary to support the transition from highly integrated ICs to discrete analog circuitry, enabling a primarily analog control power system able to operate without software in a radiation environment with finer monitoring compared to the ‘MiniCore’ design. The planned base architecture supports over 500 watts of load, 250 watt-hours of storage, and over 80 watts of optimized solar generation. The power distribution board allows for the use of daughter cards hosting custom converters or interfaces for payloads, in addition to the software-configured supplies used on the ‘MiniCore’. This core stack will be managed by a Vorago ARM M4 microcontroller and support the same wireless communications as the ‘MiniCore’, with optional integration of a NOW S-band radio and attitude determination sensors for ‘black box’ functionality. It is expected the prototype will still be in development during conference.

Avery Brock↗

The critical satellite technical issues of future pervasive broadband low-cost communication networks

The critical technical issues of signal waveform design, projected spacecraft technology, satellite launch options, and satellite cost are discussed for future pervasive broadband communication networks. With DPCM video signal encoding, 32 Mb/s user-to-user data rate per channel, 10% overhead, two orthogonal polarizations, and crosstalk loss limited to 1 dB, TFM permits about 75 channels/GHz of frequency allocation. The BOM (beginning of mission) weight and power of a baseline 400-channel multibeam satellite is about 1800 kg and 5000 W. Each 35 Mb/s channel can support 1 to 10 video channels. The weight and power estimates assume hardened digital logic, composite materials for a multibeam antenna structure, high-efficiency solar cells, batteries, and amplifiers. Based on a cost model for large communication satellites, the total space segment cost of two active satellites and one spare would be about $485 M.

Harvey, R. L.↗

Coarse-Grain Bandwidth Estimation Scheme for Large-Scale Network

A large-scale network that supports a large number of users can have an aggregate data rate of hundreds of Mbps at any time. High-fidelity simulation of a large-scale network might be too complicated and memory-intensive for typical commercial-off-the-shelf (COTS) tools. Unlike a large commercial wide-area-network (WAN) that shares diverse network resources among diverse users and has a complex topology that requires routing mechanism and flow control, the ground communication links of a space network operate under the assumption of a guaranteed dedicated bandwidth allocation between specific sparse endpoints in a star-like topology. This work solved the network design problem of estimating the bandwidths of a ground network architecture option that offer different service classes to meet the latency requirements of different user data types. In this work, a top-down analysis and simulation approach was created to size the bandwidths of a store-and-forward network for a given network topology, a mission traffic scenario, and a set of data types with different latency requirements. These techniques were used to estimate the WAN bandwidths of the ground links for different architecture options of the proposed Integrated Space Communication and Navigation (SCaN) Network. A new analytical approach, called the "leveling scheme," was developed to model the store-and-forward mechanism of the network data flow. The term "leveling" refers to the spreading of data across a longer time horizon without violating the corresponding latency requirement of the data type. Two versions of the leveling scheme were developed: 1. A straightforward version that simply spreads the data of each data type across the time horizon and doesn't take into account the interactions among data types within a pass, or between data types across overlapping passes at a network node, and is inherently sub-optimal. 2. Two-state Markov leveling scheme that takes into account the second order behavior of the store-and-forward mechanism, and the interactions among data types within a pass. The novelty of this approach lies in the modeling of the store-and-forward mechanism of each network node. The term store-and-forward refers to the data traffic regulation technique in which data is sent to an intermediate network node where they are temporarily stored and sent at a later time to the destination node or to another intermediate node. Store-and-forward can be applied to both space-based networks that have intermittent connectivity, and ground-based networks with deterministic connectivity. For groundbased networks, the store-and-forward mechanism is used to regulate the network data flow and link resource utilization such that the user data types can be delivered to their destination nodes without violating their respective latency requirements.

Cheung, Kar-Ming↗

National law enforcement telecommunications network

Alternative approaches are analyzed to a National Law Enforcement Telecommunications Network (NALECOM) designed to service all state-to-state and state-to-national criminal justice communications traffic needs in the United States. Network topology options were analyzed, and equipment and personnel requirements for each option were defined in accordance with NALECOM functional specifications and design guidelines. Evaluation criteria were developed and applied to each of the options leading to specific conclusions. Detailed treatments of methods for determining traffic requirements, communication line costs, switcher configurations and costs, microwave costs, satellite system configurations and costs, facilities, operations and engineering costs, network delay analysis and network availability analysis are presented. It is concluded that a single regional switcher configuration is the optimum choice based on cost and technical factors. A two-region configuration is competitive. Multiple-region configurations are less competitive due to increasing costs without attending benefits.

Reilly, N. B.↗

Criteria for Evaluating Alternative Network and Link Layer Protocols for the NASA Constellation Program Communication Architecture

Selecting a communications and network architecture for future manned space flight requires an evaluation of the varying goals and objectives of the program, development of communications and network architecture evaluation criteria, and assessment of critical architecture trades. This paper uses Cx Program proposed exploration activities as a guideline; lunar sortie, outpost, Mars, and flexible path options are described. A set of proposed communications network architecture criteria are proposed and described. They include: interoperability, security, reliability, and ease of automating topology changes. Finally a key set of architecture options are traded including (1) multiplexing data at a common network layer vs. at the data link layer, (2) implementing multiple network layers vs. a single network layer, and (3) the use of a particular network layer protocol, primarily IPv6 vs. Delay Tolerant Networking (DTN). In summary, the protocol options are evaluated against the proposed exploration activities and their relative performance with respect to the criteria are assessed. An architectural approach which includes (a) the capability of multiplexing at both the network layer and the data link layer and (b) a single network layer for operations at each program phase, as these solutions are best suited to respond to the widest array of program needs and meet each of the evaluation criteria.

Benbenek, Daniel↗

The Impact of Delayed Communication on NASA’s Human-Systems Operations: Preliminary Results of a Systematic Review

Throughout the history of human spaceflight, NASA has relied on a team of ground-based experts on Earth to manage its missions, vehicles, and crews to ensure crew safety and mission success. However, as missions progress beyond low-Earth orbit (LEO), this paradigm of dependence on ground must evolve. Beyond LEO, in missions to the moon and Mars, crews will confront new challenges: limited evacuation options, reduced resupply capabilities, and significant communication delays that impede real-time support from experts on the ground. This reduction in ground support amplifies the likelihood that crews will be unable to adequately respond to unanticipated, safety-critical events. Understanding the scope of these risks and identifying effective countermeasures hinges on understanding the impact of communication delays on complex operations, especially in urgent, unforeseen events. Real-time communication currently provides the crew with continuous access to a large, extensively resourced ground team skilled in anomaly resolution. However, as communication delays grow, the need to transfer some responsibilities from ground experts to onboard crew becomes evident. NASA has been exploring this shift in operational responsibilities and its effectiveness in managing complex operations for decades. Nevertheless, a comprehensive understanding of the specific challenges posed by communication delays and the necessary countermeasures to mitigate them remains a gap. In this paper, we present an update on our systematic review of the literature on communication delays, the first in-depth review since 2013 (Rader et al.). We introduce a coding taxonomy to capture key constructs from papers of interest and discuss preliminary findings. These preliminary results suggest two significant research gaps: limited studies have been conducted 1) with lunar-like latencies and 2) on problem-solving strategies for the maximum latencies expected in Mars missions. We outline plans and propose recommendations to address these gaps through ongoing and future research.

human-systems integration↗

The Impact of Delayed Communications on NASA's Human-Systems Operations: Preliminary Results of a Systematic Review

Throughout the history of human spaceflight, NASA has relied on a team of ground-based experts on Earth to manage its missions, vehicles, and crews to ensure crew safety and mission success. However, as missions progress beyond low-Earth orbit (LEO), this paradigm of dependence on ground must evolve. Beyond LEO, in missions to the moon and Mars, crews will confront new challenges: limited evacuation options, reduced resupply capabilities, and significant communication delays that impede real-time support from experts on the ground. This reduction in ground support amplifies the likelihood that crews will be unable to adequately respond to unanticipated, safety-critical events. Understanding the scope of these risks and identifying effective countermeasures hinges on understanding the impact of communication delays on complex operations, especially in urgent, unforeseen events. Real-time communication currently provides the crew with continuous access to a large, extensively resourced ground team skilled in anomaly resolution. However, as communication delays grow, the need to transfer some responsibilities from ground experts to onboard crew becomes evident. NASA has been exploring this shift in operational responsibilities and its effectiveness in managing complex operations for decades. Nevertheless, a comprehensive understanding of the specific challenges posed by communication delays and the necessary countermeasures to mitigate them remains a gap. In this paper, we present an update on our systematic review of the literature on communication delays, the first in-depth review since 2013 (Rader et al.). We introduce a coding taxonomy to capture key constructs from papers of interest and discuss preliminary findings. These preliminary results suggest two significant research gaps: limited studies have been conducted 1) with lunar-like latencies and 2) on problem-solving strategies for the maximum latencies expected in Mars missions. We outline plans and propose recommendations to address these gaps through ongoing and future research.

earth-independence↗

Communications satellite business ventures - Measuring the impact of technology programmes and related policies

An economic evaluation and planning procedure which assesses the effects of various policies on fixed satellite business ventures is described. The procedure is based on a stochastic financial simulation model, the Domsat II, which evaluates spacecraft reliability, market performance, and cost uncertainties. The application of the Domsat II model to the assessment of NASA's ion thrusters for on-orbit propulsion and GaAs solar cell technology is discussed. The effects of insurance rates and the self-insurance option on the financial performance of communication satellite business ventures are investigated. The selection of a transportation system for placing the satellites into GEO is analyzed.

Greenberg, J. S.↗

An Evaluation of optional timing/synchronization features to support selection of an optimum design for the DCS digital communication network

The task was to evaluate the ability of a set of timing/synchronization subsystem features to provide a set of desirable characteristics for the evolving Defense Communications System digital communications network. The set of features related to the approaches by which timing/synchronization information could be disseminated throughout the network and the manner in which this information could be utilized to provide a synchronized network. These features, which could be utilized in a large number of different combinations, included mutual control, directed control, double ended reference links, independence of clock error measurement and correction, phase reference combining, and self organizing.

Bradley, D. B.↗

The Gandalf Staff: A Mobile Tool for Lunar Exploration (2nd year of development)

The Gandalf Staff is a mobile tool designed to be a flexible device supporting crewed and uncrewed operations on the lunar surface. The core of the device is a 24v battery with communications and data storage systems. Initial optional components supporting crewed Extra-Vehicular Activity (EVA) include a LiDAR and 360˚ camera. These provide 3D mapping of the traverse for documentation, and to aid future planning. The mapping also creates outreach opportunities for the public to “stand beside” the astronaut in Virtual Reality (VR). The staff provides external lighting for field site illumination in the south polar region low sun angle environment. Navigation instruments for crew position determination with Lunar Search and Rescue (LunaSAR) are also included. The staff itself can be used as a walking aid or as a splint for Incapacitated Crew Rescue (ICR). As a stand-alone device, the staff operates as a long duration untended science platform collecting environmental data and sending it to a lunar base station. The stand-alone mode requires connection to an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could become an electrical recharging station. To make rapid progress in the 1st year, and also to demonstrate innovative project management techniques, NASA guided a private industry partner, T STAR, in leading Capstone Engineering student teams at Texas A&M University (TAMU) for proof-of-concept development and testing. These teams developed the power system and demonstrated successful integration of LiDAR, WiFi communications, and external lighting subsystems. Another industry team at Jacobs Technology prototyped a tripod to hold the staff upright. For the 2nd year (FY’22), NASA will again collaborate with partners to prototype enhanced power and lighting concepts. Year 2 will also add new capability for LunaSAR and geophysical science instrumentation using a heat probe. The heat probe is based upon Apollo heritage but modified to measure subsurface volatile ice regimes at the Artemis landing site. Components of the Gandalf Staff can be developed, tested, and deployed independently, or on the integrated staff, rovers, or utility trailers. The project supports crew safety, lunar sample curation, mission science, and public outreach goals of NASA. PLAIN TEST SUMMARY: Gandalf Staff is a 24v battery powered mobile tool for the lunar surface supporting crewed geologic field site exploration, or as a stand-alone science platform. As a tool assisting astronauts conducting field geology, the Gandalf Staff provides external lighting to illuminate shadowed regions on the surface. It also documents the process of collecting rocks and dust samples using a LiDAR (laser range instrument) and cameras. The staff provides a beacon for emergency location of astronauts and augments communications when the astronauts are blocked by large boulders. As a standalone science platform, the Gandalf Staff provides a power system for instruments and sensors to measure the lunar environment over long periods of time. The staff gathers data and sends the results to a lunar base station for analysis.

External Lighting↗