Search NASA⌕ Search

SEARCH · Search NASA

Results for “complex project costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A Persistent Simulation Environment for Autonomous Systems

The age of Autonomous Unmanned Aircraft Systems (AUAS) is creating new challenges for the accreditation and certification requiring new standards, policies and procedures that sanction whether a UAS is safe to fly. Establishing a basis for certification of autonomous systems via research into trust and trustworthiness is the focus of Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR), a new NASA Convergent Aeronautics Solution (CAS) project. Simulation Environments to test and evaluate AUAS decision making may be a low-cost solution to help certify that various AUAS systems are trustworthy enough to be allowed to fly in current general and commercial aviation airspace. NASA is working to build a peer-to-peer persistent simulation (P3 Sim) environment. The P3 Sim will be a Massively Multiplayer Online (MMO) environment were AUAS avatars can interact with a complex dynamic environment and each other. The focus of the effort is to provide AUAS researchers a low-cost intuitive testing environment that will aid training for and assessment of decisions made by autonomous systems such as AUAS. This presentation focuses on the design approach and challenges faced in development of the P3 Sim Environment is support of investigating trustworthiness of autonomous systems.

Kelley, Benjamin N.↗

NASA Software Cost Estimation Model: An Analogy Based Estimation Model

The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

Hihn, Jairus↗

NASA's Design and Development of a Field Goniometer Instrument Using Solid Works

With NASA suffering severe funding cutbacks, engineers at NASA are required to produce state-of-the-art hardware with limited personnel and financial resources. In light of these constraints, the new NASA mandate is to build better, faster and cheaper. In April of 1998, Stennis Space Center's Commercial Remote Sensing Program contracted to the Systems Engineering Division at NASA Ames Research Center to develop a device known as a Field Goniometer. A Field Goniometer is a device that measures bi-directional reflectance of a target, such as vegetation, relative to the sun and an imaging system in an aircraft or spacecraft. The device is able to provide a spectral fingerprint of the surface it is measuring in wavelengths from 350nm-2500nm using a hyperspectral imager. To accomplish this project, several obstacles had to be overcome. First, the design had to be completed in less than four months. Second, due to the complexity of the design, the use of solid modeling was highly desirable but most of the group's solid modelers were assigned to other jobs. Third, the amount of funding available from the customer was one half to one third the funding typically expended for a job of this nature. Our choices for this project were to design with standard 2-D CAD systems currently used in-house or train additional engineers on our existing solids package or purchase a new solid model package. The use of a 2D CAD system was very undesirable due to the complexity of the design. Using our existing solids modeler would have required a learning curve for our engineers that would be incompatible with our schedule. Prior to this project, a member of our design group researched the solid modeling industry and decided to purchase SolidWorks. After examining the product for ease of use, modeling capability, training time required and cost, we decided our highest probability of success would be to design with Solidworks. During the design phase, our fabrication group was able to provide input at the very early stages, which added significant benefit to the final product. Fabrication cost and schedule savings have been realized by having complex part geometries translated directly from the SolidWorks design models to Surfcam and other computer-aided manufacturing (CAM) software. This direct model translation capability optimized the fabrication processes. The end result was that we were able to successfully complete the project on time and on budget. Other advantages of using SolidWorks, as cited by the design team, include a rapid negotiation of the initial learning curve, the ability to develop solid model hardware prototypes (used to communicate the design intent to both the customer and the fabricator), and the ability to work as a team collaborating on a large, complex model. These types of tools and efforts represent our response to NASA's challenge to produce higher quality products within shorter design and fabrication times.

Turner, Mark↗

Cost and Throughput Analysis for the NASA Ames Arc Jet Modernization Program

NASA Ames Center is currently evaluating alternatives to modernize the Arc Jet Complex, a critical part of testing for NASA’s planetary missions. NASA’s Arc Jet Complex facilities “are used to simulate the aerothermodynamic heating that a spacecraft endures throughout hypersonic atmospheric entry, and to test candidate thermal protection system (TPS) materials and systems. “Because planetary mission schedules often have tight windows due to planetary alignment constraints, a small increase in schedule could result in a two-year delay. Such a delay could increase the cost of a $1billionmissionbyhundreds of millions of dollars due to project personnel pay and clean room storage. To avoid these costs, the authors support NASA Ames in evaluating return on investment (ROI) and effectiveness of alternatives for modernizing the complex. The first input into the ROI is the deconstruction and construction cost estimates, which are developed using independent research on highly specialized subsystems, vendor quotes, and Unified Facilities Criteria (UFC), depending on the facility and work package. One of the measures of effectiveness is throughput analysis of the test bays, as a main goal of the modernization is to increase the number of possible test runs per year. This analysis is conducted via a probabilistic simulation and accounts for a variety of stochastic factors that influence the sequence of test runs, such as the facility availability; test complexity; the need to pause to assess test results; test failure; and the possibility of a system failure. The methodologies for both these analyses are discussed, along with the challenges presented due to the unique nature of the highly specialized test equipment.

Jennifer Scheel↗

A measurement system for large, complex software programs

This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.

Rone, Kyle Y.↗

Scenario-Based Task Design for Airline Pilot Anticipatory Behaviors: Asynchronous Assessment of Complex Cognitive Skills

Airline pilots must anticipate potential threats to passenger safety and efficient flight. Such anticipation needs to occur at both the system and individual levels, yet no formal training for these anticipatory behaviors currently exists. The emerging field of resilience engineering provides a framework to explore this problem. Given the complex nature of this problem, the assessment portion of the project constituted a challenge. Simulator time is expensive as simulators are costly to run, and they are extremely limited in number. Also, by the nature of their work, pilots as a group are hard to connect with in person; thus, asynchronous methods were adopted. Further, to ensure that authentic pilot behaviors were observed, task-based scenarios were used rather than focus group or interview protocols. This session explores the design of asynchronous learning and a measure for assessing pilot anticipatory behaviors outside of a simulator to help design learning opportunities for pilots. The scenario-based and active assessment items will be discussed in detail, and demonstrations of these items will be shared. These items constitute the bulk of the challenge for this work. At the time of this writing, data is being collected to assess the effectiveness of the interactive training module and validate the measures. This data will be analyzed and presented as part of the session. This will include any linkages between the scenario-based and traditional assessment items.

task design↗

Thermal Analysis of the Advanced Modular Power Systems (AMPS) Power Electronic Modules

In an effort to transform future space power system architectures and operations, the Advanced Modular Power Systems (AMPS) project is currently developing an interface standard for power electronic modules to enable modular architectures for space power systems. Each architecture would consist of one or more modular electronic units (MEU) that would comprise of a tailored combination of modules. The standard currently comprises modules enabling switchgear, power conversion, and data interfacing. The objective of the AMPS project is to enable the modularity and interchangeability of different architectures using these standardized modules in hopes of reducing complexity and cost, increasing inherent redundancy and reliability, and minimizing power system redesign for future programs. A key enabler to these future modular architectures will be the thermal management system, which has to contend with acquiring heat from the electronics modules at the card level and then transporting that heat to the radiator of the larger system. The focus of this paper, therefore, will be the thermal design and analysis of multiple AMPS power electronics modules and the development of their thermal-vacuum test.

Modular Power Electronics↗

Experiences in using modal synthesis within project requirements

Modal synthesis methods were developed for use by engineers for cost-effective solutions of large structural dynamics problems. Different methods were proposed by various investigators based upon comparative solutions of relatively simple structures using different forms of displacement functions. The application of modal synthesis methods to a large complex structure in a project environment is described. The considerations include analysis, hardware interfaces, schedules, tests, resources, and other project requirements. Good technical results were obtained through the use of an integrated analysis/test modal synthesis on both substructures and systems.

Garba, J. A.↗

Testing Strategies and Methodologies for the Max Launch Abort System

The National Aeronautics and Space Administration (NASA) Engineering and Safety Center (NESC) was tasked to develop an alternate, tower-less launch abort system (LAS) as risk mitigation for the Orion Project. The successful pad abort flight demonstration test in July 2009 of the "Max" launch abort system (MLAS) provided data critical to the design of future LASs, while demonstrating the Agency s ability to rapidly design, build and fly full-scale hardware at minimal cost in a "virtual" work environment. Limited funding and an aggressive schedule presented a challenge for testing of the complex MLAS system. The successful pad abort flight demonstration test was attributed to the project s systems engineering and integration process, which included: a concise definition of, and an adherence to, flight test objectives; a solid operational concept; well defined performance requirements, and a test program tailored to reducing the highest flight test risks. The testing ranged from wind tunnel validation of computational fluid dynamic simulations to component ground tests of the highest risk subsystems. This paper provides an overview of the testing/risk management approach and methodologies used to understand and reduce the areas of highest risk - resulting in a successful flight demonstration test.

Schaible, Dawn M.↗

Adapting Project Management Practices to Research-Based Projects

From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

Bahr, P.↗

The Impact of Early Design Phase Risk Identification Biases on Space System Project Performance

Risk identification during the early design phases of complex systems is commonly implemented but often fails to result in the identification of events and circumstances that truly challenge project performance. Inefficiencies in cost and schedule estimation are usually held accountable for cost and schedule overruns, but the true root cause is often the realization of programmatic risks. A deeper understanding of frequent risk identification trends and biases pervasive during space system design and development is needed, for it would lead to improved execution of existing identification processes and methods.

Reeves, John D., Jr.↗

Photonic Integrated Circuit (PIC) Device Structures: Background, Fabrication Ecosystem, Relevance to Space Systems Applications, and Discussion of Related Radiation Effects

Electronic integrated circuits are considered one of the most significant technological advances of the 20th century, with demonstrated impact in their ability to incorporate successively higher numbers transistors and construct electronic devices onto a single CMOS chip. Photonic integrated circuits (PICs) exist as the optical analog to integrated circuits; however, in place of transistors, PICs consist of numerous scaled optical components, including such "building-block" structures as waveguides, MMIs, lasers, and optical ring resonators. The ability to construct electronic and photonic components on a single microsystems platform offers transformative potential for the development of technologies in fields including communications, biomedical device development, autonomous navigation, and chemical and atmospheric sensing. Developing on-chip systems that provide new avenues for integration and replacement of bulk optical and electro-optic components also reduces size, weight, power and cost (SWaP-C) limitations, which are important in the selection of instrumentation for specific flight projects. The number of applications currently emerging for complex photonics systems-particularly in data communications-warrants additional investigations when considering reliability for space systems development. This Body of Knowledge document seeks to provide an overview of existing integrated photonics architectures; the current state of design, development, and fabrication ecosystems in the United States and Europe; and potential space applications, with emphasis given to associated radiation effects and reliability.

Body of Knowledge (BOK)↗

Demonstrating the Performance Benefits of the Strutjet RBCC for Space Launch Architectures

The Rocket Based Combined Cycle (RBCC) engine synergistically combines the best elements of airbreathing and rocket propulsion to benefit a wide range of future reusable launch vehicles. Aerojet's Strutjet RBCC offers high I(sub sp) during mid-phase acceleration, and high thrust for boost and final ascent phases. The result is a relatively low gross weight vehicle with lower thrust requirements than comparable all-rocket solutions. Relative to combination propulsion systems, the integrated propulsive elements of the Strutjet reduce engine weight and complexity. In the recent NASA Highly Reusable Space Transportation (HRST) study, vehicles with RBCC-class engines were projected to have lower per flight operations costs than comparable rockets. The more benign operating environment of the RBCC engine primary rockets (2000 psi chamber pressure, lower internal temperatures, gas generator cycle) lead to longer service life, fewer maintenance actions, and increased reliability. Operations costs are typically the most significant contributor to life cycle costs. RBCC-powered vehicles lend themselves naturally to horizontal takeoff, which typically requires less thrust for a given gross vehicle weight when compared to an all-rocket-powered vehicle. The lower thrust requirements reduce engine size and/or quantity, reducing the n of ground personnel and facilities required to maintain the vehicle. The reduced sensitivity to mass fraction also allows the vehicle to be designed with higher margins for improved life and reliability. Because of its multi-mode ascent operation and ability to perform long cruise segments, the strutjet RBCC offers RLV designers a chance to create vehicles with an unprecedented level of mission flexibility. Features such as supersonic cruise, flyback, off-set launch, self-ferry, horizontal takeoff and landing, multi-base operation, and flexible aborts open up a broad range of potential revenue producing missions. The Strutjet can lead to low-cost vehicle designs in traditional areas such as LEO cargo delivery and ISS resupply, and also lead to economically attractive vehicles for small payload missions difficult to achieve with all-rocket solutions. The performance capability of the Strutjet RBCC has been demonstrated in all operating mod underfunding from NASA MSFC and Aerojet as a result of over 1000testsand over 13 years of continuous development-a significant resource investment in the Strutjet engine design.

Johnson, D.↗

International Space Station Configuration Analysis and Integration

Ambitious engineering projects, such as NASA's International Space Station (ISS), require dependable modeling, analysis, visualization, and robotics to ensure that complex mission strategies are carried out cost effectively, sustainably, and safely. Learn how Booz Allen Hamilton's Modeling, Analysis, Visualization, and Robotics Integration Center (MAVRIC) team performs engineering analysis of the ISS Configuration based primarily on the use of 3D CAD models. To support mission planning and execution, the team tracks the configuration of ISS and maintains configuration requirements to ensure operational goals are met. The MAVRIC team performs multi-disciplinary integration and trade studies to ensure future configurations meet stakeholder needs.

Anchondo, Rebekah↗

NICS (NASA Instrument Capabilities Study) Instrument Schedule and Cost Study

This paper summarizes work performed on the Flight Projects Directorate Planetary Science Projects Division (PSPD, Code 430) NICS (NASA Instrument Capabilities study) instrument schedule and cost study. Included are a short summary of the original NICS (NASA, 2008), and the design and approach, data collection, analysis, preliminary findings and recommendations from select areas of the current study. The NICS (2008) was chartered by then NASA Chief Engineer Michael Ryschkewitsch and chaired by Goddard Space Flight Center (GSFC) engineer, John Leon. The focus was to identify problem areas in instrument development and, if possible, to offer solutions. In the area of instrument developments, the NICS (2008) identified a lack of resources and authority to successfully manage to instrument cost and schedule requirements; and a lack of critical skills, expertise, and leadership to successfully implement unique (one-of-a-kind) high technology developments (NASA, 2008, pp. 51, 52). Additionally, the NICS (2008) found problems in requirements formulation, reviews and management; unrealistic caps and overly optimistic estimates; and externally directed changes which increased the likelihood of overrunning cost and schedule (NASA, 2008, pp.53, 54). It is noteworthy that NICS findings are consistent with previous studies at the mission level (Robbins, Schmidt & White, 2020). Five years later in 2013, the Instrument Projects Division (IPD) was established to implement and manage instrument projects greater than $20M. The IPD was known as Code 490. Its structure incorporated several of the NICS (2008) recommendations. To see if these incorporated recommendations made a difference, and to identify other potential challenges in instrument developments, two parallel studies were initiated. Originally led by the IPD, now led by the PSPD, and the Instrument and Payload Systems Engineering Branch (IPSE, Code 592), respectively, the instrument schedule and cost study and the instrument technical complexity study began in 2017. Data collection was initiated in 2020 and is on-going. This paper is limited to the IPD/PSPD study. Among other findings, preliminary data indicate IPD/PSPD project management support positively influenced instrument development as related to providing a dedicated level of support staff, including a deputy Instrument Project Manager (dIPM), reducing IPM leadership changes, and providing other project support. Next steps include continued data collection and analysis, and mapping to technical complexity data.

NICS implementation↗

CVD Rhenium Engines for Solar-Thermal Propulsion Systems

Solar-thermal upper-stage propulsion systems have the potential to provide specific impulse approaching 900 seconds, with 760 seconds already demonstrated in ground testing. Such performance levels offer a 100% increase in payload capability compared to state-of-the-art chemical upper-stage systems, at lower cost. Although alternatives such as electric propulsion offer even greater performance, the 6- to 18- month orbital transfer time is a far greater deviation from the state of the art than the one to two months required for solar propulsion. Rhenium metal is the only material that is capable of withstanding the predicted thermal, mechanical, and chemical environment of a solar-thermal propulsion device. Chemical vapor deposition (CVD) is the most well-established and cost-effective process for the fabrication of complex rhenium structures. CVD rhenium engines have been successfully constructed for the Air Force ISUS program (bimodal thrust/electricity) and the NASA Shooting Star program (thrust only), as well as under an Air Force SBIR project (thrust only). The bimodal engine represents a more long-term and versatile approach to solar-thermal propulsion, while the thrust-only engines provide a potentially lower weight/lower cost and more near-term replacement for current upper-stage propulsion systems.

Williams, Brian E.↗

Systems Engineering Using Heritage Spacecraft Technology: Lessons Learned from Discovery and New Frontiers Deep Space Missions

In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced or heritage systems and the system environment identifies unanticipated issues that result in cost overruns or schedule impacts. The Discovery & New Frontiers (D&NF) Program Office recently studied cost overruns and schedule delays resulting from advanced technology or heritage assumptions for 6 D&NF missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that the cost and schedule growth did not result from technical hurdles requiring significant technology development. Instead, systems engineering processes did not identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement the heritage or advanced technology. This presentation summarizes the study s findings and offers suggestions for improving the project s ability to identify and manage the risks inherent in the technology and heritage design solution.

Barley, Bryan↗

Modified Epoxy Matrix Resins for Reduced Dependence on Redundant Fasteners in Secondary-Bonded Composite Structures

In structural bonds, the interface between adherend and adhesive is nearly two-dimensional making it susceptible to minute quantities of contamination that can lead to weak bonds. No methods currently exist to measure the strength of an adhesive bond nondestructively. For these reasons, regulating organizations such as the Federal Aviation Administration (FAA) often require redundant load paths in secondary-bonded, primary-structures to achieve certification for civil transport aircraft. To meet this requirement, manufacturers commonly install redundant fasteners (~105 fasteners in a twin-aisle airframe with composite fuselage and wings), which add tremendous complexity, time and cost, and significantly reduce performance of the airframe. Under NASA’s Convergent Aeronautics Solutions (CAS) Program, the Adhesive Free Bonding of Composites (AERoBOND) project is investigating reformulated aerospace epoxy matrix resins to enable reflow and diffusion of the resin at the interface during a secondary bonding/cure process. The mixing process eliminates the material discontinuity at the interface, thereby removing the dependence of bond performance on adhesion across a nearly two-dimensional boundary. The AERoBOND interface is similar to the interlaminar region formed during a co-cure process, so joint performance depends on the cohesive properties of the matrix resin, which can be measured, inspected non-destructively, and certified for flight with fewer redundant fasteners. This presentation describes the ongoing development of stoichiometrically-offset epoxy resins to control the degree of cure in composite joints and enable interfacial mixing during secondary bonding/curing. Details on the resin formulation, laminate fabrication, and mechanical testing will also be presented. The precracked mode-II fracture toughness measured from preliminary AERoBOND joints was similar for joints fabricated with conventional epoxy matrix materials.

thermoset, hardener, prepreg, assembly↗