Search NASA⌕ Search

SEARCH · Search NASA

Results for “configuration management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

Cioletti, Louis↗

Configuration Management at NASA

NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

Doreswamy, Rajiv↗

Graphical User Interface Development and Design to Support Airport Runway Configuration Management

The objective of this effort was to develop a graphical user interface (GUI) for the National Aeronautics and Space Administration's (NASA) System Oriented Runway Management (SORM) decision support tool to support runway management. This tool is expected to be used by traffic flow managers and supervisors in the Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facilities.

Jones, Debra G.↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 12: PEP data item descriptions

Contractor information requirements necessary to support the power extension package project of the space shuttle program are specified for the following categories of data: project management; configuration management; systems engineering and test; manufacturing; reliability, quality assurance and safety; logistics; training; and operations.

Source record↗

Knowledge-based network operations

An expert system for enhancing the operability of the ground communication element of the Jet Propulsion Laboratory's Deep Space Network is described. The system performs network fault management, configuration management, and performance management in real time. Extracted management information serves as input to the expert system and is used to update a management information data base. The monitor and control activities involve dividing software for each processor into layers which are each modeled as a finite state machine.

Wu, Chuan-Lin↗

A Recipe for Streamlining Mission Management

This paper describes a project's design and implementation for streamlining mission management with knowledge capture processes across multiple organizations of a NASA directorate. Thc project's focus is on standardizing processes and reports; enabling secure information access and case of maintenance; automating and tracking appropriate workflow rules through process mapping; and infusing new technologies. This paper will describe a small team's experiences using XML technologies through an enhanced vendor suite of applications integrated on Windows-based platforms called the Wallops Integrated Scheduling and Document Management System (WISDMS). This paper describes our results using this system in a variety of endeavors, including providing range project scheduling and resource management for a Range and Mission Management Office; implementing an automated Customer Feedback system for a directorate; streamlining mission status reporting across a directorate; and initiating a document management, configuration management and portal access system for a Range Safety Office's programs. The end result is a reduction of the knowledge gap through better integration and distribution of information, improved process performance, automated metric gathering, and quicker identification of problem areas and issues. However, the real proof of the pudding comes through overcoming the user's reluctance to replace familiar, seasoned processes with new technology ingredients blended with automated procedures in an untested recipe. This paper shares some of the team's observations that led to better implementation techniques, as well as an IS0 9001 Best Practices citation. This project has provided a unique opportunity to advance NASA's competency in new technologies, as well as to strategically implement them within an organizational structure, while wetting the appetite for continued improvements in mission management.

Mitchell, Andrew E.↗

Integrated Modeling Environment

The Integrated Modeling Environment (IME) is a software system that establishes a centralized Web-based interface for integrating people (who may be geographically dispersed), processes, and data involved in a common engineering project. The IME includes software tools for life-cycle management, configuration management, visualization, and collaboration.

Mosier, Gary↗

SOFIA Program SE and I Lessons Learned

Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.

Ray, Ronald J.↗

Configuration Analysis Tool

Configuration Analysis Tool (CAT), is information storage and report generation system for aid of configuration management activities. Configuration management is discipline composed of many techniques selected to track and direct evolution of complex systems. CAT is interactive program that accepts, organizes and stores information pertinent to specific phases of project.

Merwarth, P. D.↗

Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix D: EOS configuration design data. Part 2: Data management system configuration

The Earth Observatory Satellite (EOS) data management system (DMS) is discussed. The DMS is composed of several subsystems or system elements which have basic purposes and are connected together so that the DMS can support the EOS program by providing the following: (1) payload data acquisition and recording, (2) data processing and product generation, (3) spacecraft and processing management and control, and (4) data user services. The configuration and purposes of the primary or high-data rate system and the secondary or local user system are explained. Diagrams of the systems are provided to support the systems analysis.

Source record↗

Advanced Software Techniques for Data Management Systems. Volume 2: Space Shuttle Flight Executive System: Functional Design

A functional design of software executive system for the space shuttle avionics computer is presented. Three primary functions of the executive are emphasized in the design: task management, I/O management, and configuration management. The executive system organization is based on the applications software and configuration requirements established during the Phase B definition of the Space Shuttle program. Although the primary features of the executive system architecture were derived from Phase B requirements, it was specified for implementation with the IBM 4 Pi EP aerospace computer and is expected to be incorporated into a breadboard data management computer system at NASA Manned Spacecraft Center's Information system division. The executive system was structured for internal operation on the IBM 4 Pi EP system with its external configuration and applications software assumed to the characteristic of the centralized quad-redundant avionics systems defined in Phase B.

Pepe, J. T.↗

Functional Analysis for an Integrated Capability of Arrival/Departure/Surface Management with Tactical Runway Management

The runway is a critical resource of any air transport system. It is used for arrivals, departures, and for taxiing aircraft and is universally acknowledged as a constraining factor to capacity for both surface and airspace operations. It follows that investigation of the effective use of runways, both in terms of selection and assignment as well as the timing and sequencing of the traffic is paramount to the efficient traffic flows. Both the German Aerospace Center (DLR) and NASA have developed concepts and tools to improve atomic aspects of coordinated arrival/departure/surface management operations and runway configuration management. In December 2012, NASA entered into a Collaborative Agreement with DLR. Four collaborative work areas were identified, one of which is called "Runway Management." As part of collaborative research in the "Runway Management" area, which is conducted with the DLR Institute of Flight Guidance, located in Braunschweig, the goal is to develop an integrated system comprised of the three DLR tools - arrival, departure, and surface management (collectively referred to as A/D/S-MAN) - and NASA's tactical runway configuration management (TRCM) tool. To achieve this goal, it is critical to prepare a concept of operations (ConOps) detailing how the NASA runway management and DLR arrival, departure, and surface management tools will function together to the benefit of each. To assist with the preparation of the ConOps, the integrated NASA and DLR tools are assessed through a functional analysis method described in this report. The report first provides the highlevel operational environments for air traffic management (ATM) in Germany and in the U.S., and the descriptions of the DLR's A/D/S-MAN and NASA's TRCM tools at the level of details necessary to compliment the purpose of the study. Functional analyses of each tool and a completed functional analysis of an integrated system design are presented next in the report. Future efforts to fully develop the ConOps will include: developing scenarios to fully test environmental, procedural, and data availability assumptions; executing the analysis by a walk-through of the integrated system using these scenarios; defining the appropriate role of operators in terms of their monitoring requirements and decision authority; executing the analysis by a walk-through of the integrated system with operator involvement; characterizing the environmental, system data requirements, and operator role assumptions for the ConOps.

Phojanamongkolkij, Nipa↗

The ERSDT Software Quality Assurance Plan Practices and Development Environment Setup for RASCAL 5

This document includes the information pertaining to the practices of the Emergency Response Software Development Team (ERSDT) for the RASCAL software project. The content includes information regarding: 1) Software Quality Assurance. 2) Project Management. 3) Configuration Management. 4) Development Standards. 5) Third-Party Software. 6) Verification and Validation. The information contained in this report is considered living documentation. The information contained in this report was assembled from multiple documents and content management systems.

97 MATHEMATICS AND COMPUTING↗

The Second European Service Module (ESM-2) Evolutions, Production and Challenges

This paper presents an overview of the Second European Service Module (ESM-2), the second in a series of European Service Modules produced as part of the Barter agreement between NASA and ESA for the Orion Program. The European Industrial consortium is led by the ESA prime contractor Airbus Defence and Space in Bremen. ESA and Airbus signed the ESM-2 contract on 16 February 2017, for this key element of the Orion Exploration Mission 2 (EM-2). EM-2 is the first crewed mission for Orion and will take astronauts farther into the solar system than humanity has ever travelled. EM-2 will also be a historic mission for Europe, as the ESM-2 will be the first European spacecraft to be part of a human transportation system carrying humans beyond low Earth orbit. ESM-2 is mainly a recurring production following ESM-1. Nevertheless, there are a number of important changes being implemented, for example, to incorporate upgrades to further enhance safety and reliability. The challenging delivery schedule for ESM-2 has driven the need to commence manufacturing prior to completion of the qualification on ESM-1. In addition, some requirement deviations and non-compliances approved for ESM-1 have resulted in modifications for ESM-2. In order to manage the competing constraints effectively, the ESM-2 Team has put in place a number of novel approaches to manage schedule, risk, and technical changes. Airbus has set up multi-functional teams according to an approach known as "Major Spacecraft Deliveries" consisting of quality assurance, engineering and procurement. The risk of starting manufacturing prior to qualification is managed through a special risk share agreement. This agreement necessitates rigorous risk reviews across the board for all manufacturing, assembly, integration and test milestones. The ESM-2 changes are managed by Configuration Management, but Airbus has also introduced the Technical Baseline Matrix to provide a transparent top-level overview of the changes from ESM-1 to ESM-2. The tool provides the basis for ESM-2 design and development needs, decisions, as well as the input for the Orion EM-2 Critical Design Review (CDR). The main technical evolutions, status of the production and the novel management approaches for ESM-2 are presented and discussed in the paper.

Orion European Service Module Programme↗

Data base management system configuration specification

The functional requirements and the configuration of the data base management system are described. Techniques and technology which will enable more efficient and timely transfer of useful data from the sensor to the user, extraction of information by the user, and exchange of information among the users are demonstrated.

Neiers, J. W.↗

Survey of piloting factors in V/STOL aircraft with implications for flight control system design

Flight control system design factors involved for pilot workload relief are identified. Major contributors to pilot workload include configuration management and control and aircraft stability and response qualities. A digital fly by wire stability augmentation, configuration management, and configuration control system is suggested for reduction of pilot workload during takeoff, hovering, and approach.

Ringland, R. F.↗