Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous improvement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The Eighth Annual NASA/Contractors Conference and 1991 National Symposium on Quality and Productivity: Extending the boundaries of total quality management

The Eighth Annual NASA/Contractors Conference and 1991 National Symposium on Quality and Productivity provided a forum to exchange knowledge and experiences in these areas of continuous improvement. The more than 1,100 attendees from government, industry, academia, community groups, and the international arena had a chance to learn about methods, tools, and strategies for excellence and to discuss continuous improvement strategies, successes, and failures. This event, linked via satellite to concurrent conferences hosted by the NASA Goddard Space Flight Center in Greenbelt, Maryland, and Martin Marietta Astronautics Group in Denver, Colorado, also explored extending the boundaries of Total Quality Management to include partnerships for quality within communities and encouraged examination, evaluation, and change to incorporate the principles of continuous improvement.

Templeton, Geoffrey B.↗

SU-F-J-116: Clinical Experience-Based Verification and Improvement of a 4DCT Program

Purpose: To demonstrate the role of continuous improvement fulfilled by the Medical Physicist in clinical 4DCT and CBCT scanning. Methods: Lung (SABR and Standard) patients’ 4D respiratory motion and image data were reviewed over a 3, 6 and 12 month period following commissioning testing. By identifying trends of clinically relevant parameters and respiratory motions, variables were tested with a programmable motion phantom and assessed. Patient traces were imported to a motion phantom and 4DCT and CBCT imaging were performed. Cos6 surrogate and sup-inf motion was also programmed into the phantom to simulate the long exhale of patients for image contrast tests. Results: Patient surrogate motion amplitudes were 9.9+5.2mm (3–35) at 18+6bpm (6–30). Expiration/Inspiration time ratios of 1.4+0.5second (0.6–2.9) showed image contrast effects evident in the AveCT and 3DCBCT images. Small differences were found for patients with multiple 4DCT data sets. Patient motion assessments were simulated and verified with the phantom within 2mm. Initial image reviews to check for reconstructed artefacts and data loss identified a small number of patients with irregularities in the automatic placement of inspiration and expiration points. Conclusion: The Physicist’s involvement in the continuous improvements of a clinically commissioned technique, processes and workflows continues beyond the commissioning stage of a project. Our experience with our clinical 4DCT program shows that Physics presence is required at the clinical 4DCT scan to assist with technical aspects of the scan and also for clinical image quality assessment prior to voluming. The results of this work enabled the sharing of information from the Medical Physics group with the Radiation Oncologists and Radiation Therapists. This results in an improved awareness of clinical patient respiration variables and how they may affect 4D simulation images and also may also affect the treatment verification images.

60 APPLIED LIFE SCIENCES↗

Evaluating Process Effectiveness to Reduce Risk

It is well documented that government agencies do not have the same incentive as the private sector to focus on process effectiveness and continual improvement of those processes. It is also well documented whenever government agencies fail to deliver efficient, effective, consistent, and fair services to the citizens. In spite of the various "reinventing government" and "effectiveness initiatives" of the past decades, and in spite of the efforts on the part of many agencies to improve, government in general still lags behind industry in creating a culture of effective processes and systems. While the tragic events that unfolded recently in Flint, Michigan, teach us that running government "like a business" does not always take the needs of the citizenry into account, there are many lessons and techniques from the private sector that government agencies can use to improve. The incentive to improve, while mandated by various administrations1, needs to come from within the workforce, in order to effectively take root. The best, most effective incentive is to reduce, control or eliminate risk. Government agencies face some of the same risks as the private sector, while some are unique. While ISO 310002 has been around since 2009, risk has taken on increased visibility within the private sector with the advent of the emphasis on risk-based thinking in ISO 9001:20153. The relationship between risk-based thinking and effective processes is simple and direct. Those processes that are well thought out and standardized (i.e. Plan-Do-Check-Act), will have taken into account the applicable policy, statutory, regulatory, safety, quality and technical parameters, which may not occur to someone performing the process with minimal experience or training; and thus protect the employees, the public and the agency from statutory and regulatory violations; delay in providing services; non-delivery of services; harm to public or employee safety and health; cost overruns; breaches in security; loss of confidence in government; failure of publicly funded projects; damage to the environment; ethics violations, and the list goes on; with local, national and even international consequences. The Plan-Do-Check-Act process, also known as the "process approach" can be used at any time to establish and standardize a process, and it can also be used to check periodically for "process creep" (i.e., informal, unauthorized changes that have occurred over time), any necessary updates and improvements. While ISO 9001 compliance is not mandated for all government agencies, if interpreted correctly, it can be useful in establishing a framework and implementing effective management systems and processes.4 Another method that can be used to evaluate effectiveness is the scorecard definitions in Mallory's Process Management Standard5 as a basis for evaluating work on the process level on effective, and continuously improved and improving processes. With processes on the lower end of the scale, agencies are vulnerable to a great many risks, with employees and managers making up many of the rules as they go, leading to the above listed negative results. Without clear guidance for nominal operations, off-nominal situations can, and do, increase the likelihood of chaos. In an increasingly technical environment, with inter-agency communication and collaboration becoming the norm, agencies need to come to grips with the fact that processes can become rapidly outdated, and that the technical community should take on an increased role in the maturation of the agency's processes. Industry has long known that effective processes are also efficient, and process improvement methods such as Kaizen, Lean, Six Sigma, 5S, and mistake proofing lead to increased productivity, improved quality, and decreased cost. Again, government agencies have different concerns, but inefficiencies and mistakes can have dire and wide reaching consequences for the public that they serve. While no one goes to work planning to cause harm, it is up to agencies to establish upper level systems, which make establishment and compliance with processes possible. Again, Mallory provides us with a Systems Management Standard6, similar to the Process Management Standard, with a scale of 0-5 for systems effectiveness and maturity. Deming determined that "eighty-five percent of the reasons for failure are deficiencies in the systems and process rather than the employee. The role of management is to change the process rather than badgering individual employees to do better." 7 It is not just the working level employees who need effective processes, but the mid-and upper level managers as well. A disciplined management culture sets the tone for the employees, aids both routine and off-nominal decision-making, and incorporates risk -based thinking into the systems and processes as a matter of normal activity. Figure 1, illustrates the relationship between ineffective and effective processes and risk, through the use of the "stoplight" colors that are commonly used to show serious situations (red), situations which may be improving or deteriorating depending on trends (yellow), and situations that are under control and continuously improved (green).

Shepherd, Christena C.↗

Advanced Permanent Magnet Generator Topologies Using Multimaterial Shape Optimization and 3D Printing: Preprint

A vast majority of utility-scale wind turbine generators in the United States are dependent on foreign- sourced rare-earth permanent magnets that are vulnerable to supply chain uncertainties. Many small wind original equipment manufacturers are motivated to pursue continuous improvements to the generator design to lower the material and production costs and improve performance by lowering cogging torque and increasing the efficiency. Traditional design and manufacturing offer limited opportunities. In this work, we demonstrate advanced design approaches for a 15-kW baseline wind turbine generator by making use of recent progress in three-dimensional (3D) printing of polymer- bonded magnets and, electrical and structural steel. We explore three methods of magnet parametrization using Bezier curves resulting in symmetric, asymmetric and multimaterial magnet designs. We employ a multiphysics approach combining parametric computer-aided design modeling, finite- element analysis and targeted sampling to identify novel designs with more opportunities for reducing rare-earth material, improving efficiency and minimizing cogging torque. The results show that asymmetric-pole design and multimaterial-pole designs offer a greater opportunity to minimize rare-earth magnet materials by up to 35% with similar performance as the baseline generator, suggesting newer opportunities with design freedom beyond traditional limits of symmetry and as allowed by 3D printing.

Bezier curves↗

Monte Carlo Simulations of High-speed, Time-gated MCP-based X-ray Detectors: Saturation Effects in DC and Pulsed Modes and Detector Dynamic Range

We present here results of continued efforts to understand the performance of microchannel plate (MCP)–based, high-speed, gated, x-ray detectors. This work involves the continued improvement of a Monte Carlo simulation code to describe MCP performance coupled with experimental efforts to better characterize such detectors. Our goal is a quantitative description of MCP saturation behavior in both static and pulsed modes. We have developed a new model of charge buildup on the walls of the MCP channels and measured its effect on MCP gain. The results are compared to experimental data obtained with a short-pulse, high-intensity ultraviolet laser; these results clearly demonstrate MCP saturation behavior in both DC and pulsed modes. The simulations compare favorably to the experimental results. The dynamic range of the detectors in pulsed operation is of particular interest when fielding an MCP–based camera. By adjusting the laser flux we study the linear range of the camera. These results, too, are compared to our simulations.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Total quality management: It works for aerospace information services

Today we are in the midst of information and 'total quality' revolutions. At the NASA STI Program's Center for AeroSpace Information (CASI), we are focused on using continuous improvements techniques to enrich today's services and products and to ensure that tomorrow's technology supports the TQM-based improvement of future STI program products and services. The Continuous Improvements Program at CASI is the foundation for Total Quality Management in products and services. The focus is customer-driven; its goal, to identify processes and procedures that can be improved and new technologies that can be integrated with the processes to gain efficiencies, provide effectiveness, and promote customer satisfaction. This Program seeks to establish quality through an iterative defect prevention approach that is based on the incorporation of standards and measurements into the processing cycle. Four projects are described that utilize cross-functional, problem-solving teams for identifying requirements and defining tasks and task standards, management participation, attention to critical processes, and measurable long-term goals. The implementation of these projects provides the customer with measurably improved access to information that is provided through several channels: the NASA STI Database, document requests for microfiche and hardcopy, and the Centralized Help Desk.

Erwin, James↗

Total quality management - It works for aerospace information services

Today we are in the midst of information and 'total quality' revolutions. At the NASA STI Program's Center for AeroSpace Information (CASI), we are focused on using continuous improvements techniques to enrich today's services and products and to ensure that tomorrow's technology supports the TQM-based improvement of future STI program products and services. The Continuous Improvements Program at CASI is the foundation for Total Quality Management in products and services. The focus is customer-driven; its goal, to identify processes and procedures that can be improved and new technologies that can be integrated with the processes to gain efficiencies, provide effectiveness, and promote customer satisfaction. This Program seeks to establish quality through an iterative defect prevention approach that is based on the incorporation of standards and measurements into the processing cycle.

Erwin, James↗

Engaging stakeholders to assess landscape sustainability

There is widespread consensus about the need for landscape sustainability but little agreement about how to define or measure it. Objectives: The aim of the paper is to present a systematic approach for measuring progress toward landscape sustainability goals. Methods: The approach was developed based on existing literature and our experiences in applying the approach to support more sustainable agricultural landscapes. Examples applying this approach are summarized for case studies in the United States (U.S.) and Mexico. Results: The approach has six steps: the scope and objectives of the assessment are determined based on the particular context; indicators that alert pending concerns are selected and prioritized based on utility and relevance; baselines and targets are established for each indicator, and scenarios for consideration are determined; the indicator values are obtained and evaluated; trends in and tradeoffs among indicator values are analyzed; and good practices are developed, applied, and assessed. Conclusions: Insights gained from applying this approach suggest that designing sustainable landscapes depends on stakeholder engagement, effective communication, transparency and trust, timely monitoring, and continual improvement. Iterative application of the assessment approach builds capacity and promotes continual improvements in management practices, thus enabling timely responses to changing conditions while still progressing toward a set of locally defined goals.

54 ENVIRONMENTAL SCIENCES↗

Structural Loads Test Measurement Acquisition System (SLTMAS)

This presentation package, a PowerPoint presentation, will be presented at NASA's Sixteenth Annual Continual Improvement and Reinvention Conference as part of an Agency level competition highlighting continual improvements within NASA. The presentation provides a brief overview of the process used to improve the Structural and Dynamics Testing Group's data acquisition capabilities. Results measuring the success of the improvement cycle for the PC based SLTMAS will be presented.

Patterson, Alan↗

Handbook of Industrial Engineering Equations, Formulas, and Calculations

The first handbook to focus exclusively on industrial engineering calculations with a correlation to applications, Handbook of Industrial Engineering Equations, Formulas, and Calculations contains a general collection of the mathematical equations often used in the practice of industrial engineering. Many books cover individual areas of engineering and some cover all areas, but none covers industrial engineering specifically, nor do they highlight topics such as project management, materials, and systems engineering from an integrated viewpoint. Written by acclaimed researchers and authors, this concise reference marries theory and practice, making it a versatile and flexible resource. Succinctly formatted for functionality, the book presents: Basic Math Calculations; Engineering Math Calculations; Production Engineering Calculations; Engineering Economics Calculations; Ergonomics Calculations; Facility Layout Calculations; Production Sequencing and Scheduling Calculations; Systems Engineering Calculations; Data Engineering Calculations; Project Engineering Calculations; and Simulation and Statistical Equations. It has been said that engineers make things while industrial engineers make things better. To make something better requires an understanding of its basic characteristics and the underlying equations and calculations that facilitate that understanding. To do this, however, you do not have to be computational experts; you just have to know where to get the computational resources that are needed. This book elucidates the underlying equations that facilitate the understanding required to improve design processes, continuously improving the answer to the age-old question: What is the best way to do a job?

42 ENGINEERING↗

Continuous Calibration Improvement in Solar Reflective Bands: Landsat 5 Through Landsat 8

Launched in February 2013, the Operational Land Imager (OLI) on-board Landsat 8 continues to perform exceedingly well and provides high science quality data globally. Several design enhancements have been made in the OLI instrument relative to prior Landsat instruments: pushbroom imaging which provides substantially improved Signal-to-Noise Ratio (SNR), spectral bandpasses refinement to avoid atmospheric absorption features, 12 bit data resolution to provide a larger dynamic range that limits the saturation level, a set of well-designed onboard calibrators to monitor the stability of the sensor. Some of these changes such as refinements in spectral bandpasses compared to earlier Landsats and well-designed on-board calibrator have a direct impact on the improved radiometric calibration performance of the instrument from both the stability of the response and the ability to track the changes. The on-board calibrator lamps and diffusers indicate that the instrument drift is generally less than 0.1% per year across the bands. The refined bandpasses of the OLI indicate that temporal uncertainty of better than 0.5% is possible when the instrument is trended over vicarious targets such as Pseudo Invariant Calibration Sites (PICS), a level of precision that was never achieved with the earlier Landsat instruments. The stability measurements indicated by on-board calibrators and PICS agree much better compared to the earlier Landsats, which is very encouraging and bodes well for the future Landsat missions too.

Nischal Mishra↗

A review of 50 years of aerodynamic research with NACA/NASA

Continuous improvements in flight systems have occurred over the past 50 years due, in part, to continuous improvements in aerodynamic research techniques and capabilities. This paper traces that research from the first-hand perspective of the author who, beginning in 1944, has taken part in the NACA/NASA aerodynamic research effort through studies in low-speed wind tunnels, high-speed subsonic tunnels, transonic tunnels, supersonic tunnels, and hypersonic tunnels. New problems were found as systems advanced from low-speed propeller-driven designs to more sophisticated high-speed jet- and rocket-propelled designs. The paper reviews some of these problems and reflects on some of the solutions that have been developed in the course of various aerodynamic research programs in the past. Some of the factors, both technical and nontechnical, that have influenced the aerodynamic design, research, and development of various flight systems will be mentioned.

Spearman, M. Leroy↗

Savannah River Remediation Liquid Waste Operations Lifecycle Savings through a Lean Business System at the Savannah River Site - 17245

Savannah River Remediation (SRR) was contracted by the U.S. Department of Energy (DOE) to manage its liquid waste project at the Savannah River Site. The liquid waste project is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51 one million-gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for lower radioactive decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 tanks have been closed to date. The Lean philosophy took root decades ago in the manufacturing sector and started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. At SRR, a Lean business management system was adopted to address site inefficiencies, aging infrastructure concerns and budget constraints. With yearly escalation and flat budgets, continuous improvement is taking on a larger role - improving the work accomplished for each dollar. This paper focuses on the program results achieved to date, including the lifecycle savings identified through the Rapid Improvement Event (RIE) process. The RIE process is a Lean tool which creates a cross-functional team to analyze, develop and implement improvements for a given process. DOE-EM has recently emphasized the value of contractor's continuous improvement programs through their implementation of Plan of Action and Milestone (POAM): Goal 2 (Increase Efficiency/Improve Performance) Reduce EM Operations Cost in FY16. POAM Goal 2 was a FY 16 effort to achieve 5% cost savings across most programs. This past year's cost savings initiatives will likely become a trend as DOE and its contractors look to do more with less. In support of our own business objectives, as well as, DOE's motivation to improve efficiencies, SRR has held over one hundred formal Lean events and dozens of 5S events that have driven improvement across the Project, including tank closure and production facilities. These improvements have significantly reduced the time required to process material and achieve the overall goal of hazard reduction and tank closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ninth Annual NASA/Contractors Conference on Quality and Productivity. World Class Excellence: The Journey Continues. Keynote presentations

This coference provided an excellent forum for the members of the NASA community to share their experience and expertise in an effort to continuously improve the quality of the US space program. The topics covered include the following: NASA's approach to continual improvement; commitment to total quality; total quality at AlliedSignal Aerospace; organizational TQM; recognition of the 1992 Low Trophy Finalists; announcement of the 1992 Low Trophy Recipients; and the changing face of aerospace contracting.

Templeton, Geoffrey B.↗

Implementation of quality improvement techniques for management and technical processes in the ACRV project

Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

Raiman, Laura B.↗

Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in the past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.

99 GENERAL AND MISCELLANEOUS↗

A proven approach for more effective software development and maintenance

Modern space flight mission operations and associated ground data systems are increasingly dependent upon reliable, quality software. Critical functions such as command load preparation, health and status monitoring, communications link scheduling and conflict resolution, and transparent gateway protocol conversion are routinely performed by software. Given budget constraints and the ever increasing capabilities of processor technology, the next generation of control centers and data systems will be even more dependent upon software across all aspects of performance. A key challenge now is to implement improved engineering, management, and assurance processes for the development and maintenance of that software; processes that cost less, yield higher quality products, and that self-correct for continual improvement evolution. The NASA Goddard Space Flight Center has a unique experience base that can be readily tapped to help solve the software challenge. Over the past eighteen years, the Software Engineering Laboratory within the code 500 Flight Dynamics Division has evolved a software development and maintenance methodology that accommodates the unique characteristics of an organization while optimizing and continually improving the organization's software capabilities. This methodology relies upon measurement, analysis, and feedback much analogous to that of control loop systems. It is an approach with a time-tested track record proven through repeated applications across a broad range of operational software development and maintenance projects. This paper describes the software improvement methodology employed by the Software Engineering Laboratory, and how it has been exploited within the Flight Dynamics Division with GSFC Code 500. Examples of specific improvement in the software itself and its processes are presented to illustrate the effectiveness of the methodology. Finally, the initial findings are given when this methodology was applied across the mission operations and ground data systems software domains throughout Code 500.

Pajerski, Rose↗

Creating and sustaining a safety conscious work environment - 15240

Organizational Culture, Safety Culture, and a Safety Conscious Work Environment (SCWE) are psychological constructs that describe behaviors of organizations, especially with respect to behaviors needed to ensure safe, highly reliable work. These attributes of culture are often singled out in surveys, root cause analyses and management expectations as the basis for being safe or as the cause of an incident. Organizations that wish to improve culture often do not have a framework to measure and act upon tasks or projects that will promote a positive safety culture (and thus a positive SCWE). Combining the work of organizational behavior pioneers with the 'blue collar' approaches to continuous improvement offers framework organizations may use to improve safety culture while devoting efforts to improving conditions that are meaningful and tangible to floor level employees. The framework consists of the use of Safety Culture and SCWE surveys and focus groups to complement each other and offer topical areas that need improvement or study in the organization. A Safety Culture Improvement Panel will then direct specific improvement projects based on these topic areas and relate these projects to causal variables that effect incremental changes in culture. By applying principles of process improvement to the improvement of culture, the framework is formed to have employees work 'day-today' issues while effectively addressing the often vague or abstract notion of improving culture. A case study of the use of these principles is given by following the SCWE Assessment conducted by the Transuranic Waste Processing Center (TWPC) and subsequent improvements derived from data found in the assessment. The attributes of a SCWE and an effective safety culture accomplish much more than just having a safe place to work. These characteristics result in a high performance, continuously improving organization. The experience of commercial nuclear power, the aviation industry, and other high performing endeavors bear this out. Achieving an effective SCWE is not easy, and sustaining it is even more difficult, but the results are surely worth the effort. The techniques discussed in this presentation are effective, available, and cost-effective; they are easily adaptable for use in other organizations to create, sustain and improve a SCWE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗